AG-046W-S-17-0042.pdf
PDF 1 MB Posted
- Attached to
- KV Snag Creation 2017 Federal contract opportunity
- Solicitation number
- AG-046W-S-17-0042
About this file
Solicitation AG-046W-S-17-0042
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1-Contract_Map_Package.pdf | ||
| 2-WageRates.pdf | ||
| 3-Questionaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
853741
AG-046W-S-17-0042
Holly Hanson, Contracting Officer 503-668-1601 046W 100
Mt. Hood National Forest 16400 Champion Way, Sandy, OR 97055
Mt. Hood National Forest 16400 Champion Way, Sandy, OR 97055
IPP
Invoice Processing Platform www.ipp.gov
KV Snag Creation 2017
See attached Schedule of Items
115310
05/03/2017
05/22/2017 4pm PST
046W
Mt. Hood National Forest 16400 Champion Way Sandy, OR 97055
KV Snag Creation 2017 AG-046W-S-17-0042 1 of 43
Part I-The Schedule
SECTION B—SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS FOR KV CONTRACT FY 2016
Tree Girdling
ITEM
NO.
SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
Quarry TS 100 Quarry 100/ 10 acres/ 17-24” DBH 6 EA $ $ 102 Quarry 102/ 12 acres/ 18-24” DBH 4 EA $ $ 108 Quarry 108/ 27 acres/ 24-32” DBH 20 EA $ $ 112 Quarry 112/ 8 acres/ 19-24” DBH 8 EA $ $ 114 Quarry 114/ 8 acres/ 26-33” DBH 8 EA $ $ 116 Quarry 116/ 27 acres/ 20-26” DBH 27 EA $ $ 118 Quarry 118/ 27 acres/ 24-30” DBH 10 EA $ $ 120 Quarry 120/ 26 acres/ 24-32” DBH 17 EA $ $
121E Quarry 121E/ 7 acres/ 18-24” DBH 6 EA $ $ 122 Quarry 122/ 22 acres/ 24-30” DBH 22 EA $ $
122A Quarry 122A/ 2 acres/ 24-30” DBH 2 EA $ $ 122B Quarry 122B/ 3 acres/ 24-30” DBH 3 EA $ $ 124 Quarry 124/ 14 acres/ 24-30” DBH 14 EA $ $
124B Quarry 124B/ 2 acres/ 24-30” DBH 2 EA $ $ Rotor TS
101 Rotor 101/ 16 acres/ 18-24” DBH 12 EA $ $ 135 Rotor 135/ 10 acres/ 18-24” DBH 10 EA $ $ 137 Rotor 137/ 47 acres/ 20-25” DBH 45 EA $ $ 143 Rotor 143/ 4 acres/ 20-25” DBH 3 EA $ $
143R Rotor 143R/ 2 acres/ 22-28” DBH 2 EA $ $ 191N Rotor 191N/ 10 acres/ 20-25” DBH 10 EA $ $ 191R Rotor 191R/ 2 acres/ 21-25” DBH 2 EA $ $ 191S Rotor 191S/ 8 acres/ 20-25” DBH 8 EA $ $ 195N Rotor 195N/ 2 acres/ 21-25” DBH 2 EA $ $ 195R Rotor 195R/ 1 acre/ 21-25” DBH 1 EA $ $ 195E Rotor 195E/ 5 acres/ 20-25” DBH 5 EA $ $ 197 Rotor 197/ 6 acres/ 20-25” DBH 6 EA $ $
Rod TS 182 Rod 182/ 19 acres/ 19-25” DBH 10 EA $ $
Total Girdling: $
AG-046W-S-17-0042 2 of 43
Tree Topping
ITEM
NO.
SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
Quarry TS 100 Quarry 100/ 10 acres/ 17-24” DBH 6 EA $ $ 102 Quarry 102/ 12 acres/ 18-24” DBH 6 EA $ $ 112 Quarry 112/ 8 acres/ 19-24” DBH 8 EA $ $ 114 Quarry 114/ 8 acres/ 26-33” DBH 8 EA $ $ 116 Quarry 116/ 27 acres/ 20-26” DBH 27 EA $ $
121E Quarry 121E/ 7 acres/ 18-24” DBH 6 EA $ $ Rotor TS
101 Rotor 101/ 16 acres/ 18-24” DBH 12 EA $ $ 135 Rotor 135/ 10 acres/ 18-24” DBH 10 EA $ $ 137 Rotor 137/ 47 acres/ 20-25” DBH 45 EA $ $ 143 Rotor 143/ 4 acres/ 20-25” DBH 3 EA $ $
143R Rotor 143R/ 2 acres/ 22-28” DBH 2 EA $ $ 191N Rotor 191N/ 10 acres/ 20-25” DBH 10 EA $ $ 191R Rotor 191R/ 2 acres/ 21-25” DBH 2 EA $ $ 195N Rotor 195N/ 2 acres/ 21-25” DBH 2 EA $ $ 195R Rotor 195R/ 1 acre/ 21-25” DBH 1 EA $ $ 195E Rotor 195E/ 5 acres/ 20-25” DBH 5 EA $ $ 197 Rotor 197/ 6 acres/ 20-25” DBH 6 EA $ $
Rod TS 182 Rod 182/ 10 acres/ 19-25” DBH 10 EA $ $
Total Topping: $ _
Tree Top Girdling
ITEM
NO.
SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
Quarry TS 108 Quarry 108/ 27 acres/ 24-32” DBH 20 EA $ $ 118 Quarry 118/ 27 acres/ 24-30” DBH 10 EA $ $ 120 Quarry 120/ 26 acres/ 24-32” DBH 17 EA $ $ 122 Quarry 122/ 22 acres/ 24-30” DBH 22 EA $ $
122A Quarry 122A/ 2 acres/ 24-30” DBH 2 EA $ $ 122B Quarry 122B/ 3 acres/ 24-30” DBH 3 EA $ $ 124 Quarry 124/ 14 acres/ 24-30” DBH 14 EA $ $
124B Quarry 124B/ 2 acres/ 24-30” DBH 2 EA $ $ Total Top Girdling: $
*Due to natural variation in stand sizes, there may be instances where falling would need to occur above or below this range. Trees chosen for DWD creation should be representative of the most common DBH’s of the stand.
**If no Operating Season is shown, there is no restriction on the unit. Operating season restrictions apply to mechanized operations and the use of power tools. If hand tools are used there are no seasonal restrictions.
***Target species- DF (Douglas-fir) WH (western hemlock)
AG-046W-S-17-0042 3 of 43
Specifications for CSP Contract
FY2017
Unit Notes
Quarry 100- Large landing/opening in middle of unit.
Quarry 102- Steep slopes and ridges in unit. Trees are smaller on the ridges and larger in the draws. Some BD. OG unit on S side of unit with large snags and DW.
Quarry 108- The N quarter of unit is like Rotor 109. Snags and DW present. Rest of unit has large trees, few snags, and a little DW. Access down -130 spur past closure and either go thru Rotor 109 or follow -130 down past stream. Take old skid trail near stream into unit.
Quarry 112- Small unit below the 4620 road. Larger trees. The -150 spur has a breached berm and is currently passable but is scheduled for closing this summer.
Quarry 114- There are some old topped trees from Sand unit #4 in the unit. This unit is next to Rotor 115. The average diameter is quite large here. There are some very old, very large pieces of DW in the unit.
Quarry 116- Adjacent to Slip unit 1. -170 and -175 spurs are closed. Stay 150’ off 4620.
Quarry 118- Much of unit is within 150’ of the -180 spur, which is open. The SE part of unit east of -180 road is too narrow along the road for trees to be treated there. Some OG trees in the unit, don’t treat those.
Quarry 120- Take out a lot of unit for 150’ buffer along 4620.
Quarry 121- West side of 4620 has some OG in and around unit. Not that many good trees there and most of this part of the unit is too close to 4620. Don’t treat trees on W side of road.
The finger pointing east is where most of the trees will be treated.
Quarry 122- Plenty of big trees in here. There are a couple ridges running through the E lobe.
There is also about 5 acres of no-cut riparian area (122A and B).
Quarry 122 A and B- (see map pg. 5) Two no-cut drainages within unit 122. Treat trees within the no-cut areas. Do not treat trees within 25’ of any wet areas.
Quarry 124- No road buffers. Put trees in lower lobes.
Quarry 124 A- (see map pg. 5) Mostly hardwoods, don’t top or girdle trees here.
Quarry 124 B- (see map pg. 5) No-cut drainage within unit 124. Treat trees within the no-cut areas. Do not treat trees within 25’ of any wet areas or on any cut banks.
Rod 182- Don’t treat trees south of 4620; too close to road. Some OG snags in stand around this part of the unit. Don’t treat logging damaged trees. Trees are smaller in skyline portion. The
AG-046W-S-17-0042 4 of 43 unit goes over the ridge north of the road. There are some large NF back there. Don’t treat any of those over 25”.
Rotor 143- Back side of Reel 142, waypoint 073. Not much down wood or snags in the unit.
Could be some windthrow in the future.
Rotor 143R- Riparian area between units 143 and 145, about 2 acres. There is a stream running thru a 2nd growth plantation. There are no snags and only some small, old logs across the stream.
There is a need for some structure.
Rotor 191- Unit is in two parts, 191N and 191S. The 2 acres west of the 4620 road are too close to the road to treat trees there. There is cedar in this unit.
191S doesn’t have as many big trees. There are a couple small snags and some BD. Pretty open stand, no need for topped trees here. The -190 spur is closed.
Rotor 195- This unit is in 4 parts. Treat trees in the north portion and the east portion. The west part has too few trees and they are smaller diameter. There is a 1 acre part that wasn’t surveyed.
Rotor 197- Access still blocked by snow. Numbers here may be adjusted after survey.
AG-046W-S-17-0042 5 of 43
Tree Girdling
*Due to natural variation in stand sizes, there may be instances where girdling would need to occur above or below this range. Trees chosen for snag creation should be representative of the most common DBH’s of the stand.
**If no Operating Season is shown, there is no restriction on the unit. Operating season restrictions apply to mechanized operations and the use of power tools. If hand tools are used there are no seasonal restrictions.
***Target species- DF (Douglas-fir) WH (western hemlock)
1. DESCRIPTION OF WORK
This Contract requires services for removing bark and cambium from trees (girdling) at various locations on the Clackamas River Ranger District of the Mt. Hood National Forest in Clackamas County, Oregon.
This girdling is meant to kill the tree and create a wildlife snag in the short term and Down Woody Debris within ten years.
2. PROJECT LOCATION
The locations of the worksites are shown on the Contract Area Maps. Trees to be girdled are in partially harvested plantations, in some small, adjacent riparian areas, or in small un-harvested no-cut areas. This project work will be done within the boundaries of the Quarry, Rotor, and Rod Timber Sales. The work
Unit Acres
Total # Trees to be Girdled in Unit
Target DBH* Range
Operating Season**
Target Species***
Quarry
100 10 6 17-24” 4/1-11/30 DF
102 12 4 18-24’ 4/1-11/30 DF, WH
108 27 20 24-32” 4/1-11/30 DF
112 8 8 19-24” 4/1-11/30 DF
114 8 8 26-33” 4/1-11/30 DF
116 27 27 20-26” 4/1-11/30 DF
118 27 10 24-30” 4/1-11/30 DF, WH
120 26 17 24-32” 4/1-11/30 DF
121E 7 6 18-24” 4/1-11/30 DF
122 22 22 24-30” 4/1-11/30 DF
122A 2 2 24-30” 4/1-11/30 DF
122B 3 3 24-30” 4/1-11/30 DF
124 14 14 24-30” 4/1-11/30
124B 2 2 24-30” 4/1-11/30 DF
Rotor
101 16 12 18-24” 4/1-11/30 DF, WH
135 10 10 18-24” 7/1-11/30 DF
137 47 45 20-25” 7/1-11/30 DF, WH
143 4 3 20-25” 7/1-11/30 DF
143 R 2 2 22-28” 7/1-11/30 DF
191N 10 10 20-25” DF, WH
191R 2 2 21-25” DF
191S 8 8 20-25” DF, NF
195N 2 2 21-25” DF
195R 1 1 21-25” DF
195E 5 5 20-25” DF, WH, NF
197 6 6 20-25” DF
Rod
182 19 10 19-25” DF, NF
Totals 327 265
AG-046W-S-17-0042 6 of 43 area ranges from flat ground to steep areas with logging slash and underbrush. Road access to some of the units may be limited requiring some lengthy walks.
The boundaries of these units were designated with blue timber harvest signs, orange tree tags and orange paint. Some of the tags have faded or been removed from the trees but the boundaries of the units are still readily apparent and the FS has put fresh blue signs with unit numbers on the roads bordering the designated units.
3. CONTRACTOR’S OBLIGATIONS
Contractor shall furnish equipment, materials, labor, supervision, transportation, and all supplies not provided by the Forest Service, which are required to complete the project. The Forest Service shall provide unit maps and blank tree registers. The Contractor will fill out tree registers and map girdled trees on unit maps prior to final inspection. The Contractor shall provide at least the following supplies to complete the contract:
A. Flourescent green waterproof paint B. Three-inch aluminum siding nails C. 4 “ by 4 “ Aluminum signs
The Contractor shall be responsible for insuring that operations will not cause harm or injury to employees (Contractor or Government), or other users of the area. The Contractor shall also be responsible for insuring that operations don’t cause any environmental or resource damage to the work area.
Contractor will be expected to treat trees throughout the units, including the parts of the unit that are the most difficult to access. This may affect production rates. Only by personal inspection can the Contractor determine the conditions to be encountered. Rotor TS units 135, 137, and 143 are behind a locked gate which will be opened on July 1. If the Contractor wants to inspect these units prior to that date, contact the FS to make arrangements.
4. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract after a pre-work meeting agreed upon by the Contractor and Forest Service, (b) prosecute the work diligently, and (c) complete the entire work ready for use. Completion of the work shall include final cleanup of the premises. All work will start on an agreed-upon effective date and be completed by September 30, 2017.
Should windthrown or broken tree tops occur prior to the start of this contract in the project area, the Government reserves the right to make necessary adjustments to the number of snags created.
5. STANDARD GUIDELINES FOR CHOOSING TREES TO GIRDLE AND FOR GIRDLING
TREES
A. All live trees to be girdled will be selected by the Contractor. Contractor shall select only trees with live tops that appear generally healthy. Do not select residual old growth trees, forked trees, trees with dead tops, diseased or dying trees (trees estimated to be dead within five years), or trees currently showing wildlife use (i.e., trees with woodpecker holes).
B. Selected trees should be evenly distributed throughout the units with the following exception. In units with ten or more trees to girdle, three out of every ten girdled trees (30%) will be “clumped”, or girdled in close proximity to each other (10’ to 100’) to create a clump of girdled trees. Don’t girdle a tree within 5 feet of a standing, live tree.
AG-046W-S-17-0042 7 of 43
C. Only select tree species that are noted as target species in the table. Do not girdle minor tree species like cedar or pine, or any other species that is uncommon in the unit.
D. There may be trees scattered through the units that are reserved for wildlife or genetic tree purposes, or trees that have been previously topped or girdled. These trees will already have paint and/or signs to identify them. DO NOT select these trees for girdling.
E. Selected trees shall be at least 150 feet from a Forest Service system road, where possible. In units along system roads girdle trees as far as is feasible from roads. Temporary roads and/or skid roads are not system roads.
F. Trees for girdling should be representative of the largest of the common DBH’s of the stand.
A DBH range for each unit is provided, based on post-harvest surveys. The largest average size class may vary within a unit.
G. The girdling will be done by removing bark and cambium from trees with a power saw, hand saw, and/or chopping tool (axe or pulaski) at approximately breast height. All girdled trees shall expose a minimum of three inches of wood completely around the trunk of the tree (see photo).
Power saws can be used for girdling, however, Contractor must follow all applicable rules and regulations concerning Industrial Fire Precaution Levels. The Contractor shall take all reasonable and practical action to prevent and suppress fires in the project area.
H. Each girdled tree, in all units, shall be marked by the Contractor with flourescent green waterproof spray paint. The mark on each girdled tree shall be a solid green band all around the trunk of the tree at approximately breast height (but not on the exposed wood), visible from all sides.
I. Each girdled tree will be numbered within each unit. The Contractor will fill out Tree Registers and map girdled trees on unit maps prior to final inspection.
J. The contractor will provide the Forest Service with the GPS coordinates of each girdled tree, using a projection of NAD 83. The method of providing this information to the Forest Service will be determined at the pre-work meeting.
K. Each girdled tree will be tagged with an aluminum sign on the side that is most visible to inspectors. This sign will be attached by at least two 3-inch aluminum siding nails nailed into each sign. Each aluminum sign will have written on it:
Project name and unit number Tree number Date of girdling
Example- Quarry 118 Tree #9 8/10/17
L. Do not select/girdle yellow marked trees.
6. INSPECTION
The Forest Service will make periodic inspections to verify that the Contractor is meeting contract specifications. Inspections shall be performed in a manner that will not unduly delay
AG-046W-S-17-0042 8 of 43 work. The minimum standards for acceptable inspection results will be that 90% of the inspected girdled trees meet the standards described above. This includes successful spacing and distribution of the girdled trees throughout the units. Payment less damages will be based on the following methods.
Quality at fully acceptable performance- meets or exceeds 90 percent. Whenever the quality of work meets or exceeds 90 percent, based on the results of the Contractor’s quality control inspection and the Government inspection, the work will be considered acceptable. Full credit will be made based on the bid per unit price for the subitem.
Quality performance level at less than 90 percent. Whenever the quality of work is below 90 percent based on the results of the Contractor’s quality control inspection and the Government inspection, the work is unacceptable and the value of services provided is significantly reduced. Therefore, a deduction will be made for unacceptable performance. For each percentage point that performance quality falls below 90 percent, a 2-percent deduction in unit price will be made.
Example: With a snag creation quality of 85 percent, the deduction would be: 2% x 5 percentage points below 90% = 10%, resulting in the Contractor receiving credit for 90 percent of the bid per unit price.
Quality performance level at less than 70 percent.
No credit will be given where quality of work is below 70 percent.
Sample of Girdled tree
AG-046W-S-17-0042 9 of 43
Tree Topping
*Due to natural variation in stand sizes, there may be instances where topping would need to occur above or below this range. Trees chosen for snag creation should be representative of the most common DBH’s of the stand.
**If no Operating Season is shown, there is no restriction on the unit. Operating season restrictions apply to mechanized operations and the use of power tools. If hand tools are used there are no seasonal restrictions.
***Target species- DF (Douglas-fir) WH (western hemlock)
1. DESCRIPTION OF WORK
This Contract requires services for removing the tops from trees with a power saw at various locations on the Clackamas River Ranger Districts of the Mt. Hood National Forest in Clackamas County, Oregon. This topping is not meant to kill the tree but to create a wildlife snag.
2. PROJECT LOCATION
The locations of the worksites are shown on the Contract Area Maps. Trees to be topped are in partially harvested plantations, in some small, adjacent riparian areas, or in small un-harvested no-cut areas. This project work will be done within the boundaries of the Quarry, Rotor, and Rod Timber Sales. The work area ranges from flat ground to steep areas with logging slash and underbrush. Road access to some of the units may be limited requiring some lengthy walks.
The boundaries of these units were designated with blue timber harvest signs, orange tree tags and orange paint. Some of the tags have faded or been removed from the trees but the boundaries of the units are still readily apparent and the FS has put fresh blue signs with unit numbers on the roads bordering the designated units.
Unit Acres
Total # Trees to be Topped in Unit
Target DBH* Range
Operating Season**
Target Species***
Quarry
100 10 6 17-24” 4/1-11/30 DF
102 12 6 18-24’ 4/1-11/30 DF, WH
112 8 8 19-24” 4/1-11/30 DF
114 8 8 26-33” 4/1-11/30 DF
116 27 27 20-26” 4/1-11/30 DF
121E 7 6 18-24” 4/1-11/30 DF
Rotor
101 16 12 18-24” 4/1-11/30 DF, WH
135 10 10 18-24” 7/1-11/30 DF
137 47 45 20-25” 7/1-11/30 DF, WH
143 4 3 20-25” 7/1-11/30 DF
143 R 2 2 22-28” 7/1-11/30 DF
191N 10 10 20-25” DF, WH
191R 2 2 21-25” DF
191S 8 0
195N 2 2 21-25” DF
195R 1 1 21-25” DF
195E 5 5 20-25” DF, WH, NF
197 6 6 20-25” DF
Rod
182 19 10 19-25” DF, NF
Totals 204 169
AG-046W-S-17-0042 10 of 43
3. CONTRACTOR’S OBLIGATIONS
The Contractor shall:
A. Provide a statement of technical capability and the number of years the Contractor has performed tree climbing work.
B. Document the qualifications or skill level of individual personnel who will execute the provisions of the contract.
C. Specify the techniques and safety practices planned and equipment to be used for the contract to minimize natural resource damage outside the scope of work.
D. Follow all Federal, State, and local safety laws, regulations, and practices applicable to the contract to be performed.
E. Have a qualified ground support person on site on the ground whenever trees are being topped.
The Contractor shall furnish equipment, materials, labor, supervision, transportation, and all supplies not provided by the Forest Service, which are required to complete the project. The Forest Service shall provide unit maps and blank Tree Registers. The Contractor will fill out tree registers and map topped trees on unit maps prior to final inspection. The Contractor shall provide at least the following supplies to complete the contract:
-Flourescent green waterproof paint -Three-inch aluminum siding nails -4” by 4” Aluminum signs
The Contractor shall be responsible for insuring that operations will not cause harm or injury to employees (Contractor or Government), or other users of the area. The Contractor shall also be responsible for insuring that operations don’t cause any environmental or resource damage to the work area.
Contractor will be expected to treat trees throughout the units, including the parts of the unit that are the most difficult to access. This may affect production rates. Only by personal inspection can the Contractor determine the conditions to be encountered. Rotor TS units 135, 137, and 143 are behind a locked gate which will be opened on July 1. If the Contractor wants to inspect these units prior to that date, contact the FS to make arrangements.
4. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract after a pre-work meeting agreed upon by the Contractor and Forest Service, (b) prosecute the work diligently, and (c) complete the entire work ready for use. Completion of the work shall include final cleanup of the premises.
All work will start on an agreed-upon effective date and be completed by September 30, 2017.
Should windthrown or broken tree tops occur prior to the start of this contract in the project area, the Government reserves the right to make necessary adjustments to the number of snags created.
5. STANDARD GUIDELINES FOR CHOOSING TREES TO TOP AND FOR TOPPING TREES
A. All live trees to be topped will be selected by the Contractor. Contractor shall select only trees
AG-046W-S-17-0042 11 of 43 with live tops that appear generally healthy. Do not select residual old growth trees, forked trees, trees with dead tops, diseased or dying trees (trees estimated to be dead within five years), or trees currently showing wildlife use (i.e., trees with woodpecker holes).
B. Selected trees should be evenly distributed throughout the units with the following exception. In units with ten or more trees to top three out of every ten topped trees (30%) will be “clumped”, or topped in close proximity to each other (10’ to 100’) to create a clump of topped trees.
C. Only select tree species that are noted as target species in unit table above. Do not top minor tree species like cedar or pine, or any other species that is uncommon in the unit.
D. Trees for topping should be representative of the largest of the common DBH’s of the stand.
A DBH range for each unit is provided, based on post-harvest surveys. The largest average size class may vary within a unit.
E. There may be trees scattered through the units that are reserved for wildlife or genetic tree purposes, or that have been previously girdled or topped. These trees will already have paint and/or signs to identify them. DO NOT select these trees for topping.
F. Selected trees shall be at least 150’ from a Forest Service open system road, where possible.
In units along system roads top trees as far as is feasible from roads. Temporary roads and/or skid roads are not system roads.
G. Topping must occur above at least the lowest two live branch whorls and should occur below at least the seventh lowest live branch whorl. A whorl is defined as consisting of at least two live, green branches that are in a circular arrangement around the stem of the tree. Do not count small individual branches that are not representative of the typical branch diameter within the stand.
Trees will be topped at a minimum height of 50 feet.
H. Once tree is topped, Contractor shall make several saw cuts across the cut top of the tree, two cuts per inch of diameter. Cuts should be 2-3 inches deep. This is to simulate a broken top.
I. Each topped tree, in all units, shall be marked by the Contractor with green waterproof spray paint. The mark on each topped tree shall be a solid green band all around the trunk of the tree at approximately breast height, visible from all sides. In addition, each topped tree will be tagged with an aluminum sign on the side that is most visible to inspectors. This sign will be attached by at least two 3-inch aluminum siding nails nailed into each sign. Each aluminum sign will have written on it:
Project name and unit number Tree number Date of topping
Example- Quarry 114 Tree #9 9/10/17
J. Each topped tree will be numbered within each unit. The Contractor will fill out Tree Registers and map topped trees on unit maps prior to final inspection.
AG-046W-S-17-0042 12 of 43
A. The contractor will provide the Forest Service with the GPS coordinates of each girdled tree, using a projection of NAD 83. The method of providing this information to the Forest Service will be determined at the pre-work meeting.
K. Do not select/top yellow marked trees.
6. INSPECTION
The Forest Service will make periodic inspections to verify that the Contractor is meeting contract specifications. Inspections shall be performed in a manner that will not unduly delay work. The minimum standards for acceptable inspection results will be that 90% of the inspected cut trees meet the standards described above. This includes successful spacing and distribution of the cut trees throughout the units. Payment less damages will be based on the following methods.
Quality at fully acceptable performance- meets or exceeds 90 percent. Whenever the quality of work meets or exceeds 90 percent, based on the results of the Contractor’s quality control inspection and the Government inspection, the work will be considered acceptable. Full credit will be made based on the bid per unit price for the subitem.
Quality performance level at less than 90 percent. Whenever the quality of work is below 90 percent based on the results of the Contractor’s quality control inspection and the Government inspection, the work is unacceptable and the value of services provided is significantly reduced. Therefore, a deduction will be made for unacceptable performance. For each percentage point that performance quality falls below 90 percent, a 2-percent deduction in unit price will be made.
Example: With a snag creation quality of 85 percent, the deduction would be: 2% x 5 percentage points below 90% = 10%, resulting in the Contractor receiving credit for 90 percent of the bid per unit price.
Quality performance level at less than 70 percent.
No credit will be given where quality of work is below 70 percent.
Sample of topped tree.
AG-046W-S-17-0042 13 of 43
Tree Top Girdling
*Due to natural variation in stand sizes, there may be instances where topping would need to occur above or below this range. Trees chosen for snag creation should be representative of the most common DBH’s of the stand.
**If no Operating Season is shown, there is no restriction on the unit. Operating season restrictions apply to mechanized operations and the use of power tools. If hand tools are used there are no seasonal restrictions.
***Target species- DF (Douglas-fir) WH (western hemlock) NF (noble fir)
1. DESCRIPTION OF WORK
This Contract requires services for girdling the tops of trees at various locations on the Clackamas River Ranger District of the Mt. Hood National Forest in Clackamas County, Oregon. This top girdling is meant to create a wildlife snag.
2. PROJECT LOCATION
The locations of the worksites are shown on the Contract Area Maps. Trees to be top girdled are in partially harvested plantations of the Quarry Timber Sale. This project work will be done within the boundaries of the timber sale units and in some small, adjacent riparian areas.
The work area ranges from flat ground to steep areas with logging slash and underbrush.
Road access to some of the units may be limited requiring some lengthy walks.
The boundaries of these units were designated with blue timber harvest signs, orange tree tags and orange paint. Some of the tags have faded or been removed from the trees but the boundaries of the units are still readily apparent and the FS has put fresh blue signs with unit numbers on the roads bordering the designated units.
Unit Acres
Total # Trees to be Top
Girdled in Unit
Target DBH* Range
Operating Season**
Target Species***
Quarry
108 27 20 24-32” 4/1-11/30 DF
118 27 10 24-30” 4/1-11/30 DF, WH
120 26 17 24-32” 4/1-11/30 DF
122 22 22 24-30” 4/1-11/30 DF
122A 2 2 24-30” 4/1-11/30 DF
122B 3 3 24-30” 4/1-11/30 DF
124 14 14 24-30” 4/1-11/30 DF
124B 2 2 24-30” 4/1-11/30 DF
Totals 123 90
AG-046W-S-17-0042 14 of 43
3. CONTRACTOR’S OBLIGATIONS
The Contractor shall:
A. Provide a statement of technical capability and the number of years the Contractor has performed tree climbing work.
B. Document the qualifications or skill level of individual personnel who will execute the provisions of the contract.
C. Specify the techniques and safety practices planned and equipment to be used for the contract to minimize natural resource damage outside the scope of work.
D. Follow all Federal, State, and local safety laws, regulations, and practices applicable to the contract to be performed.
E. Have a qualified ground support person on site on the ground whenever trees are being top girdled.
The Contractor shall furnish equipment, materials, labor, supervision, transportation, and all supplies not provided by the Forest Service, which are required to complete the project. The Forest Service shall provide unit maps and blank Tree Registers. The Contractor will fill out tree registers and map top girdled trees on unit maps prior to final inspection. The Contractor shall provide at least the following supplies to complete the contract:
A. Fluorescent green waterproof tree marking paint B. Three-inch aluminum siding nails C. 4” by 4” Aluminum signs
The Contractor shall be responsible for insuring that operations will not cause harm or injury to employees (Contractor or Government), or other users of the area. The Contractor shall also be responsible for insuring that operations don’t cause any environmental or resource damage to the work area.
Contractor will be expected to treat trees throughout the units, including the parts of the unit that are the most difficult to access. This may affect production rates. Only by personal inspection can the Contractor determine the conditions to be encountered.
4. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract after a pre-work meeting agreed upon by the Contractor and Forest Service, (b) prosecute the work diligently, and (c) complete the entire work ready for use. Completion of the work shall include final cleanup of the premises. All work will start on an agreed-upon effective date and be completed by September 30, 2017.
Should windthrown or broken tree tops occur prior to the start of this contract in the project area, the Government reserves the right to make necessary adjustments to the number of snags created.
5. STANDARD GUIDELINES FOR CHOOSING TREES TO TOP GIRDLE AND FOR
TOP GIRDLING TREES
A. All live trees to be treated will be selected by the Contractor. Contractor shall select only trees with live tops that appear generally healthy. Do not select residual old growth
AG-046W-S-17-0042 15 of 43 trees or trees currently showing wildlife use (i.e., trees with woodpecker holes). Do not select snags or snag-recruitment trees (e.g., trees that are declining in health such as broken- and cut-off tops, forked tops, spiked tops, trees damaged by logging operations, or trees with disease-infested or very unhealthy-looking crowns). Instead choose healthy-looking trees to treat.
B. When choosing between similar trees, select the tree with the least dominant crown to top.
C. Selected trees should be evenly distributed throughout the units with the following exception. In units with ten or more trees to top girdle, three out of every ten top girdled trees (30%) will be “clumped”, or treated in close proximity to each other (10’ to 100’) to create a clump of top girdled trees. Clumps are limited to a total of 3 trees of any type of treatment (falling, girdling, top girdling, or topping).
D. Don’t top girdle a tree standing within 5 feet of another standing, live tree.
E. Only select tree species that are noted as target species in unit table above. Do not top girdle minor tree species like cedar or pine, or any other species that is uncommon in the unit.
F. Trees for top girdling should be representative of the largest of the common DBH’s of the stand. A DBH range for each unit is provided, based on post-harvest surveys. The largest average size class may vary within a unit.
G. There may be trees scattered through the units that are reserved for wildlife or genetic tree purposes, or that have been previously girdled or topped. These trees will already have paint and/or signs to identify them. DO NOT select these trees for treatment.
H. Selected trees shall be at least 150’ from a Forest Service system road. In units along system roads top girdle trees as far as is feasible from roads. Temporary roads and/or skid roads are not system roads.
I. Girdle the trees at a height of 50-70’ or a top diameter of 10”, whichever occurs first. All live branches below the girdle height can be removed.
J. The girdling will be done by removing the bark and cambium from the trees with a power saw, hand saw, and/or chopping tool (axe or pulaski). All girdled trees shall expose a minimum of four inches of wood completely around the trunk of the tree. Power saws can be used for girdling, however, Contractor must follow all applicable rules and regulations concerning Industrial Fire Precaution Levels. The Contractor shall take all reasonable and practical action to prevent and suppress fires in the project area.
K. Each top girdled tree, in all units, shall be marked by the Contractor with fluorescent green waterproof tree marking spray paint. The mark on each top girdled tree shall be a solid green band all around the trunk of the tree at approximately breast height, visible from all sides. In addition, each top girdled tree will be tagged with an aluminum sign on the side that is most visible to inspectors. This sign will be attached by at least two 3-inch aluminum siding nails nailed into each sign. Each aluminum sign will have written on it:
AG-046W-S-17-0042 16 of 43
Project name and unit number Tree number Date of top girdling
Example- Quarry 116 Tree #9 7/10/17
L. Each top girdled tree will be numbered within each unit. The Contractor will fill out Tree Registers (see attached Tree Register) and map top girdled trees on unit maps prior to final inspection.
M. The contractor will provide the Forest Service with the GPS coordinates of each girdled tree, using a projection of NAD 83. The method of providing this information to the Forest Service will be determined at the pre-work meeting.
N. Do not select/girdle yellow marked trees.
6. INSPECTION
The Forest Service will make periodic inspections to verify that the Contractor is meeting contract specifications. Inspections shall be performed in a manner that will not unduly delay work. The minimum standards for acceptable inspection results will be that 90% of the inspected treated trees meet the standards described above. This includes successful spacing and distribution of the treated trees throughout the units. Payment less damages will be based on the following methods.
Quality at fully acceptable performance- meets or exceeds 90 percent.
Whenever the quality of work meets or exceeds 90 percent, based on the results of the Contractor’s quality control inspection and the Government inspection, the work will be considered acceptable. Full credit will be made based on the bid per unit price for the subitem.
Quality performance level at less than 90 percent. Whenever the quality of work is below 90 percent based on the results of the Contractor’s quality control inspection and the Government inspection, the work is unacceptable and the value of services provided is significantly reduced. Therefore, a deduction will be made for unacceptable performance. For each percentage point that performance quality falls below 90 percent, a 2-percent deduction in unit price will be made.
Example: With a snag creation quality of 85 percent, the deduction would be: 2% x 5 percentage points below 90% = 10%, resulting in the Contractor receiving credit for 90 percent of the bid per unit price.
Quality performance level at less than 70 percent.
No credit will be given where quality of work is below 70 percent.
AG-046W-S-17-0042 17 of 43
CONTRACT CLAUSES
FAR 52.212-4 Contract Terms and Conditions--Commercial Items (Jan 2017) Alternate I (Jan 2017).
FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Jan 2017)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and 108-
78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of
2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct
2016) (Pub. L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul
2013) (41 U.S.C. 2313).
__ (10) [Reserved].
__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C.
657a).
__ (ii) Alternate I (Nov 2011) of 52.219-3.
AG-046W-S-17-0042 18 of 43
__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (ii) Alternate I (JAN 2011) of 52.219-4.
__ (13) [Reserved] X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).
__ (ii) Alternate I (Nov 2011).
__ (iii) Alternate II (Nov 2011).
__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
__ (ii) Alternate I (Oct 1995) of 52.219-7.
__ (iii) Alternate II (Mar 2004) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Nov 2016) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Nov 2016) of 52.219-9.
__ (v) Alternate IV (Nov 2016) of 52.219-9.
X (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
__ (19) 52.219-14, Limitations on Subcontracting (Jan 2017) (15 U.S.C. 637(a)(14)).
__ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C.
637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011)
(15 U.S.C. 657 f).
X (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.
632(a)(2)).
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged
Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business
Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Oct 2016) (E.O.
13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
__ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015)(38 U.S.C. 4212).
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
__ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec
2010) (E.O. 13496).
X (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.
13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
AG-046W-S-17-0042 19 of 43
__ (34) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016). (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017;
applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
Note to paragraph (b)(35): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, GSA, DoD and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
__ (36) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016).
__ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items
(May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
__ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
__ (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Oct 2015) of 52.223-13.
__ (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and
13514).
__ (ii) Alternate I (Jun 2014) of 52.223-14.
__ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
__ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015)
(E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG
2011) (E.O. 13513).
__ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
__ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
X (47) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).
X (48)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41
U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (May 2014) of 52.225-3.
__ (iii) Alternate II (May 2014) of 52.225-3.
AG-046W-S-17-0042 20 of 43
__ (iv) Alternate III (May 2014) of 52.225-3.
__ (49) 52.225-5, Trade Agreements (OCT 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (50) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (51) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct
2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
__ (52) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
__ (53) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42
U.S.C. 5150).
__ (54) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C.
4505, 10 U.S.C. 2307(f)).
__ (55) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C.
2307(f)).
X (56) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul
2013) (31 U.S.C. 3332).
__ (57) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award
Management (Jul 2013) (31 U.S.C. 3332).
__ (58) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (59) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46
U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.] __ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014)(E.O. 13495).
__ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).
X (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41
U.S.C. chapter 67).
*Fringe Benefits: Life, Accident and Health insurance and Sick Leave Program-5.1 percent of basic hourly rate. Paid Holidays- 10 days per year. Vacation- 13 days paid vacation per year up to 3 years of service, 20 days after 3 years of service, and 26 days after 15 years of service. Retirement- 7 percent of basic hourly rate
__ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C.
chapter 67).
AG-046W-S-17-0042 21 of 43
__ (7) 52.222-53, Exemption from…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .