Amendment Two (2)

View the file

Other files

File Type Posted
Amendment3.pdf PDF
AddMoreGravelAmendment.pdf PDF
SolicitationPackage.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment Two (2) 09/3/2015

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA, Forest Service Western Montana Acquisition Zone 24 Fort Missoula Road Missoula, MT 59804

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-03R6-S-15-0076

9B. DATED (SEE ITEM 11)

8/13/15

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return __ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

See Attached.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

Tami L. Mitchell

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1. Replace page 3 of 36 in its entirety with this corrected Schedule of Items.

SERVICES AND PRICES

Schedule of Items

Item # Road Name MM*

Estimated

Quantity Unit Unit Price Total

15101 Mobilization** LSQ 1 LS XXXXXXXX

32001

Stockpiled Aggregate

Type Surfacing, Grading

F-SR or F-SR with

Bentonite AQ 8,700 Ton

Total Amount

*Designated Method of Measurement:

AQ = Actual Quantities

LSQ = Lump Sum Quantities

**To help prevent the spread of weeds, this work will require the Contractor to wash its equipment when specified by the COR. The equipment shall be washed with a pressure washer capable of producing enough water pressure to remove all mineral and organic material from the machine. Before the equipment is moved to the jobsite, it will be inspected and approved in writing by the COR. This work is included under Item 15101 –

Mobilization.

Incidental Payment Items

The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

Basis of Award

One contract will be awarded. Offerors must submit prices for all items. The award will be to the vendor whose quote is most advantageous to the Government, price and other factors considered.

Facsimile Proposals and E-Mail Proposals

(a) Definition. "Facsimile Proposal," as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.

Continuation of Amendment 2.

2. The amendment 1 verbiage is corrected to say:

This amendment adds 700 tons of gravel to the original quantity on the solicitation. Total gravel for

Item No. 32001 is 8,700 tons. (See new schedule of items)

3. The gravel may be quoted with bentonite or without bentonite. The quote must denote which one is being quoted or have separate quotes.

4. Your quote price must be good for 60 days after close of solicitation.

5. If you have already sent in a quote and do not wish to change it, it will be kept with the solicitation until it closes on September 24, 2015 and be considered a valid quote.

6. This amendment extends the quote period from September 3, 2015 to September 17, 2015 at 2:30 p.m. MT for question clarification.