Holland_Trail_Bridge_FSSS.pdf

PDF 788 KB Posted

Attached to
Holland Creek Trail Bridge Replacement Federal contract opportunity
Solicitation number
AG-03R6-S-15-0036
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

J- 2 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Holland Creek Trail Bridge Replacement, newest first.
File Type Posted
S150036_Q A.pdf PDF
S150036_Amend01.pdf PDF
MT150080_2015_0109.pdf PDF
ExperienceQuestionnaire_w_BioBased.pdf PDF
S150036_Holland_Cr_RFQ_FBO.pdf PDF
Holland_Creek_Trail_Bridge_Plans.pdf PDF
FoodStorageSpecialOrder.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

For

HOLLAND CREEK TRAIL BRIDGE

Trail No. 35

U.S.D.A Forest Service, Region 1

Flathead National Forest, Swan Lake Ranger District

Missoula County, Montana

FEBRUARY 27, 2015

HOLLAND CREEK TRAIL BRIDGE

Table of Contents

PREFACE

Section 101. — TERMS, FORMAT, AND DEFINITIONS Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT Section 103. — SCOPE OF WORK Section 104. — CONTROL OF WORK Section 105. — CONTROL OF MATERIAL Section 106. — ACCEPTANCE OF WORK Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108. — PROSECUTION AND PROGRESS Section 109. — MEASUREMENT AND PAYMENT

Section 151. — MOBILIZATION

Section 152. — CONSTRUCTION SURVEY AND STAKING Section 153. — CONTRACTOR QUALITY CONTROL Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS

Section 156. — PUBLIC TRAFFIC Section 157. — SOIL EROSION CONTROL Section 201. — CLEARING AND GRUBBING Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Section 209. — STRUCTURE EXCAVATION AND BACKFILL

Section 557. — TIMBER STRUCTURES

Section 601. — MINOR CONCRETE Section 625. — TURF ESTABLISHMENT

Section 912. — TRAIL EXCAVATION AND EMBANKMENT Section 922. — WATERBARS Section 933. — TRAIL STAIRWAYS

Section 961. — TRAIL MATERIALS

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

http://www.nist.gov/

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.02_01_us_08_20_2004

105.02 Material Sources

Add the following before the first paragraph.

Sources have been designated for this project as follows:

Materials Staging Area- Government Furnished – Materials designated as Government

Furnished in the Schedule of Items will be staged in the material staging area indicated on the project Site Plan. Handling and transport of materials from the staging area to the bridge site is to be done by the contractor. Any remaining materials in the staging area after project is complete shall be removed from National Forest land by the Contractor.

All tools and equipment necessary to handle and assemble the Government furnished materials are the responsibility of the Contractor.

Under (b) Contractor-located sources add the following:

Prior to any pit development or use of materials, the pit site shall be approved by the CO that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.01_nat_us_01_17_2013

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the

Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to

106.05 inclusive. The primary method of acceptance is specified in each Section of work.

However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.

Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and

Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 - Mobilization

151.00_01_us_10_11_2006

Delete Section 151 in its entirety and replace with the following.

Description

151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.

Construction Requirements

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the CO.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either

Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

Measurement

151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

Measure mobilization according to Subsection 109.02.

Payment

151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection

109.05.

Progress payments for mobilization lump sum will be paid as follows:

(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5

Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Include all costs associated with the initial cleaning of equipment in the unit bid price for

Mobilization. Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.

152 - Construction Survey and Staking

152.00_01_us_10_11_2006

Delete Section 152 in its entirety and replace with the following.

152.01 This work consists of furnishing qualified personnel and necessary equipment and material to survey, stake, calculate, and record data for the control of work. See FAR Clause

52.236-17 Layout of Work.

Personnel, equipment, and material shall conform to the following:

(a) Personnel. Furnish technically qualified survey crews experienced in highway construction survey and staking. Provide personnel capable of performing in a timely and accurate manner. An acceptable crew supervisor shall be on the project whenever surveying/staking is in progress.

Conduct construction staking under the direct supervision of a professional engineer registered for the state in which work is completed.

(b) Equipment. Furnish survey instruments and supporting equipment capable of achieving the specified tolerances.

(c) Material. Furnish acceptable tools, supplies, and stakes of the type and quality normally used in highway survey work and suitable for the intended use. Furnish stakes and hubs of sufficient length to provide a solid set in the ground with sufficient surface area above ground for necessary legible markings.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints in the field. Provide for the safe storage use and clean-up of paint when on National Forest System Lands. Immediately report all spills to the CO, clean-up and disposal of spills and painting waste shall be in accordance with Federal state and local requirements.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence. At the conclusion of each road segment, the registered engineer shall affix the state authorized seal and sign all field books and drawings and attest in writing to the satisfactory completion of the project.

152.02 General. When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line. Data relating to horizontal and vertical alignment, theoretical slope stake catch points, and other design data will be furnished.

Before beginning construction, notify the CO of any missing initial reference lines, control points, or stakes. Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations

Perform additional calculations for convenient use of Government-furnished data. Provide immediate notification of apparent errors in the initial staking or in the furnished data.

Preserve all initial reference and control points. After beginning construction, replace all destroyed or disturbed initial reference or control points necessary to the work.

Before surveying or staking, discuss and coordinate the following with the CO:

(a) Surveying and staking methods;

(b) Stake marking;

(c) Grade control for courses of material;

(d) Referencing;

(e) Structure control; and

(f) Any other procedures and controls necessary for the work.

Survey and establish controls within the tolerances shown in Table 152-1.

Prepare field notes in an approved format. Furnish all survey notes at least weekly. All field notes and supporting documentation become the property of the Government upon completion of the work.

Start work only after staking for the affected work is accepted.

The construction survey and staking work may be spot-checked for accuracy, and unacceptable portions of work may be rejected. Resurvey rejected work, and correct work that is not within the tolerances specified in Table 152-1. Acceptance of the construction staking does not relieve the Contractor of responsibility for correcting errors discovered during the work and for bearing all additional costs associated with the error.

Remove and dispose of all flagging, lath, stakes, and other staking material after the project is complete.

152.03 Survey and Staking Requirements. Perform all survey, staking, recording of data, and calculations as necessary to construct the project from the initial layout to final completion.

Reset stakes as many times as necessary to construct the work.

(a) Control points. Relocate initial horizontal and vertical control points in conflict with construction to areas that will not be disturbed by construction operations. Furnish the coordinates and elevations for the relocated points before the initial points are disturbed.

(b) Roadway cross-sections. Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater than 200 feet, take cross-sections at a maximum centerline spacing of 80 feet. When the centerline curve radius is greater than 500 feet, take cross-sections at a maximum centerline spacing of 50 feet. Take additional cross-sections at significant breaks in topography and at changes in the typical section. Along each cross-section, measure and record points at breaks in topography, but no further apart than 20 feet. Measure and record points to at least the anticipated slope stake and reference locations. Reduce all cross-section distances to horizontal distances from centerline.

(c) Slope Stakes and References. Locate slope stakes on designated portions of the road.

Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint.

The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other

Government-provided data.

(d) Clearing and grubbing limits. Set clearing and grubbing limits on both sides of centerline at roadway cross-section locations.

Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than

90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line

(e) Centerline reestablishment. Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.

(f) Grade finishing stakes. Set grade finishing stakes, for grade elevations and horizontal alignment, on centerline and on each shoulder at roadway cross-section locations. Set stakes at the top of subgrade and the top of each aggregate course.

Where turnouts are constructed, set stakes on centerline, on each normal shoulder, and on the shoulder of the turnout. In parking areas, set hubs at the center and along the edges of the parking area. Set stakes in all ditches to be paved.

When the centerline curve radius is less than or equal to 200 feet, the maximum centerline spacing for stakes is 25 feet. When the centerline curve radius is greater than 200 feet the maximum centerline spacing for stakes is 80 feet. The maximum transverse spacing between stakes is 20 feet. Use brushes or guard stakes at each stake.

(g) Culverts. Stake culverts to fit field conditions, the final locations may differ from the plans. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:

(1) Diameter, actual field measured length, and type of culvert.

(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.

(3) Station of actual point where culvert intersects centerline.

Stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.

(h) Bridges. Set adequate horizontal and vertical control and reference points for all bridge substructure and superstructure components. Establish and reference the bridge chord or the bridge tangent. Also establish and reference the centerline of each pier, bent, and abutment.

(i) Retaining walls. Survey and record profile measurements along the face of the proposed wall and 5 feet in front of the wall face. Every 25 feet along the length of the wall and at all major breaks in terrain take cross-sections within the limits designated by the CO. For each cross-section, measure and record points every 25 feet and at all major breaks in terrain. Set adequate references and horizontal and vertical control points.

(j) Borrow and waste sites. Perform the work essential for initial layout and measurement of the borrow or waste site. Establish a referenced baseline, site limits, and clearing limits.

Survey and record initial and final cross-sections.

(k) Permanent monuments and markers. Perform all survey and staking necessary to establish permanent monuments and markers. Set permanent monuments according to

Section 621.

(l) Miscellaneous survey and staking. Perform all surveying, staking, and recording of data essential for establishing the layout and control of the following, as applicable:

(1) Approach roads and trails;

(2) Curb and gutter;

(3) Guardrail;

(4) Parking areas;

(5) Paved waterways;

(6) Special ditches;

(7) Turf establishment;

(8) Utilities;

(9) Signs, delineators, and object markers; and

(10) Pavement markings.

(11) Cattleguards

(12) Drain Dips

(13) Erosion Control Measures

(m) Field Discrepancies. Immediately notify the CO if a discrepancy is encountered between the plans and field conditions which affect the final road location. Prepare recommendations, in writing, to the CO for adjustments to the design to better fit field conditions. Affix the state authorized seal and sign the recommendation attesting to the adequacy of the adjustment. Ensure that adjustments to the design follow all applicable regulations and are consistent with design standards and criteria. Adjustments shall minimize construction effort, such as clearing and embankment volumes. Gain written approval of the adjusted design from the CO before incorporating such adjustment in the field. Return to the original design as soon as practical.

Table 152-1 Tolerances for reestablishing centerline, traverse, and elevations.

Precision

Class

Minimum

Position

Closure Angular Accuracy (±)

L-Line Tangent

Control Points a

Vertical Closure b

A

(Bridges) 1/10,000

2 sets, direct/reverse

10 second rejection limit

N/A

0.02 ft or

0.02ft/1000ft c

B 1/5,000

2 sets, direct/reverse

20 second rejection limit

0.1 ft

0.02 ft or

0.02ft/1000ft c

C 1/1,000 1 set, direct/reverse

1 minute rejection limit

0.2 ft 0.5ft/1000ft

D 1/300

Foresight and backsight;

15 minute rejection limit

0.4 ft 1.0ft/1000ft

E 1/100

Foresight and backsight;

30 minute rejection limit

0.8 ft 1.0ft/1000ft

a. Accuracy of offset measurement.

b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.

c. Use greater value.

Table 152-2 Cross section and slope stake tolerances.

Item Tolerances

A B C D E

Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves

(±)2 o (±)3 o (±)3 o (±)5 o (±)5 o

Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed

0.5 ft 1.0 ft 2.0 ft 2.0 ft 3.0 ft

Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line.

0.1 ft or

0.4%

0.15 ft or

0.6%

0.2 ft or

1.0%

0.3 ft or

Horizontal and vertical accuracy for slope stake and slope stake references, in feet or percentage of horizontal distance measured from centerline or reference stake.

0.1 ft or

0.4%

0.15 ft or

0.6%

0.3 ft or

Horizontal and vertical accuracy for clearing limits.

1.0 ft 1.0 ft 1.0 ft 1.5 ft 2.5 ft

a. Use greater value.

152.04 Acceptance. Construction survey and staking will be evaluated under Subsections

106.02 and 106.04.

Measurement

152.05 Measure the Section 152 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

153 - Contractor Quality Control

153.02_nat_us_02_17_2005

153.02 Contractor Quality Control Plan.

Add the following:

Submit written proposals for approval of alternate AASHTO or State approved test methods.

Alternate methods may be allowed based on documented equivalence to the specified method.

153.04_nat_us_10_24_2007

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic

Delete section 156 in its entirety and replace with the following:

156.01 This work consists of controlling and protecting public traffic on roads and trails adjacent to and within the project.

156.02 General. Unless otherwise approved in writing by the Contracting Officer, keep existing roads and trails open to all traffic during trail improvement work, and maintain them in a condition that will adequately accommodate traffic. Post construction signs and traffic control devices in conformance with MUTCD. Post warning signs on all trails as needed to alert the public of activities on the trail. All required signs will be in place and approved prior to beginning work on project.

156.02 Maintaining Roadways And Trails During Work. Maintain roadways and trails in a safe and acceptable condition. Any damage to the roadway or trail resulting from the contractors operations is to be repaired by the contractor. Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.

156.02 Nighttime Operations. Perform construction operations during the hours of daylight (1 hour after sunrise to 1 hour before sunset).

156.03 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.04 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.

157 - Soil Erosion Control

157.00_01_us_10_10_2006

157.02 Materials

Add the following:

Provide bales, wattles, logs and rolls from a certified noxious weed free source.

157.03 General.

Delete the first two paragraphs and replace with the following:

Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.

Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:

(a) The construction activities and sequence of implementation relating to specific erosion control measures.

(b) The location and type of permanent controls to be implemented during construction.

(c) The location and type of temporary controls to be implemented during construction.

(d) For work in stream channels with running water a detailed dewatering plan.

(e) For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

(f) Description of the monitoring plan.

Add the following to the third paragraph:

Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.

157.08 Water Crossings.

Add the following:

At any channel crossing where there is running water, dewater by rerouting water flow around the site before and during excavation and embankment operations.

157.09 Diversions.

Delete the first sentence and replace with the following:

When shown on the plans, construct temporary channels, temporary culverts, or sandbags to divert water around disturbed areas and slopes. Earthen dams are prohibited.

201 - Clearing and Grubbing

Delete section 201 in its entirety and replace with the following:

201.01 This work consists of clearing and grubbing within the clearing limits and other designated areas. Work consists of clearing, grubbing, trimming, removing, and disposing of trees, logs, limbs, branches, brush, plants, and other vegetation within the clearing limits. Work includes the felling and disposing of designated trees outside the clearing limits. Also included are the protection from injury or defacement of trees and other objects not designated for removal and the treatment of damaged trees.

Material

201.02 Conform to the following Subsections:

Backfill material 704.03

Construction Requirements

201.03 General. Construct erosion control measures according to Section 157. Perform work within designated limits. Do not damage vegetation designated to remain. If vegetation designated to remain is damaged or destroyed, repair or replace the vegetation in an acceptable manner.

Where possible, preserve all vegetation adjacent to bodies of water.

201.04 Clearing. Alder brush shall be cleared back to 6 feet from centerline on both sides.

Clearing requires that the entire alder plant be grubbed out. Alders over 6 feet from trail centerline that lean into the trailway shall be cut flush with the base of the plant.

All other trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits shown on the drawings shall be removed and disposed of, except for the following:

(a) Live, sound, and firmly rooted trees of the size SHOWN ON THE DRAWINGS.

(b) Live brush (except alder) and herbaceous plants between the trailway and the clearing limits that are less than 18 inches in height measured from centerline grade and less than ½-inch in diameter at ground line.

Except as provided above, cut all limbs and branches more than ½-inch in diameter that extend into the clearing limits. Cut limbs flush with the tree trunks or stems or cut at the ground surface as

SHOWN ON THE DRAWINGS.

201.04 Damaged Trees. When felling, cutting, or trimming, do not cause bark damage to standing timber. If damage does occur to standing trees, treat the injured trees as directed by the

Contracting Officer. Remove and dispose of trees with major roots exposed by construction that are rendered unstable.

201.05 Grubbing. Grub deep enough to remove stumps, roots, buried logs, moss, turf, or other vegetative debris as follows:

(a) Grub all areas to be excavated.

(b) Grub all embankment areas. All stumps will be removed.

(c) Grub pits, channel changes, and ditches only to the depth necessary for the excavation.

(d) Backfill stump holes and other grubbing holes with backfill material to the level of the surrounding ground according to Subsection 209.10. Compact backfill according to

Subsection 209.11.

201.06 Disposal. Dispose of clearing and grubbing debris by scattering all logs, limbs, brush, grubbed stumps, and roots outside the clearing limits. Do not pile debris in concentrated piles.

Debris may be used to construct trail closures.

Do not place clearing and grubbing debris in water courses, snow ponds, lakes, meadows, or in locations where it could impede the flows to, through, or from drainage structures. Felled trees shall not be left leaning up off the ground against other trees.

201.07 Acceptance. Clearing and grubbing will be evaluated under Subsection 106.02.

Backfilling and compacting of stumps and grubbing holes will be evaluated under Section 209.

201.08 Measure the Section 201 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Do not make deductions from the area computation unless excluded areas are identified in the contract.

Do not measure clearing and grubbing of borrow or material sources.

201.09 The accepted quantities will be paid at the contract price per unit of measurement for the

Section 911 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

203 - Removal of Structures and Obstructions

Description

203.01 Work. Work consists of removal and disposal of existing structures, including puncheons, turnpikes, walkways, bridges, culverts, signs and posts, and other material, above or below ground. Work also includes salvaging DESIGNATED materials and backfilling the resulting trenches, holes, and pits.

Material

203.02 Conform to the following Section and Subsection:

Backfill material 704.03

Concrete 601

Geotextile 714

203.03 Removal. Unless shown on the plans, remove all designated material from the project area and National Forest land. Nails, rebar, and other metal products shall be removed from the wood before disposal.

203.04 Disposal. All removed material may be salvaged by the Contractor unless otherwise shown on the plans. Dispose of all items not designated to be salvaged for the

Government in any legal manner.

Dispose of wood materials by scattering out of sight of the trail. Do not place debris in water courses, snow ponds, lakes, meadows, or where it could impede the flow to, through, or from drainage structures. Dispose of metal products by removing from National Forest lands and placing in approved waste disposal sites.

Treated lumber, concrete, geotextile fabric, plastic culvert pipe, and steel shall be removed from the project area and National Forest land.

203.05 Acceptance. Removal of structures and obstructions will be evaluated under Subsection

106.02.

Backfilling and compacting cavities left by structures will be evaluated under Section 209.

203.07 Measure the Section 203 items listed in the bid schedule according to Subsection 109.02.

203.08 The accepted quantities will be paid at the contract price per unit of measurement for the

Section 203 pay items listed in the bid schedule. Payment will be full compensation for the work

Disposal of construction slash will be compensated under the designated pay item in Section 201.

209 - Structure Excavation and Backfill

Description

209.01 This work consists of excavating, preparing foundations, backfilling, and subsequent removal of safety features for the construction of selected structures with or without a geogrid reinforcing mesh and welded wire facing. This work includes the construction of bridge approach embankments.

Material

209.02 Conform to the following Sections and Subsections:

Backfill material 704.03

Bedding material 704.02

Concrete 601

Foundation fill 704.01

Lean concrete backfill 614

Seal concrete 552

Unclassified borrow 704.06

209.03 Preparation for Structure Excavation. Clear the area of vegetation and obstructions according to Section 201.

209.04 General. Excavate trenches or foundation pits to a width and length that allows room for work. When excavation is complete, request approval as to the character and suitability of the foundation material. The foundation shall provide a firm foundation of uniform density throughout its length and width.

Where necessary to blast rock, blast according to Section 205.

Follow OSHA safety regulations (29 CFR, Part 1926, Subpart P, Excavation) for sloping the sides of excavations, using shoring and bracing, and for using other safety features. When sides of excavations are sloped for safety considerations, provide one copy of the design that demonstrates conformity with OSHA regulations. Where support systems, shield systems, or other protective systems are to be used, design the shoring according to Section 562 and submit working drawings and construction details according to Subsection 104.03.

Remove safety features when no longer necessary. Remove shoring and bracing to at least 2 feet below the surface of the finished ground.

Conserve suitable material for structural backfill from excavated material. Field drain and dry excessively wet material that is otherwise suitable for embankment before placement. Place and shape unsuitable material as directed by the CO. Do not deposit excavated material in or near a waterway. Do not stockpile excavated material or allow equipment closer than 2 feet from the edge of the excavation.

Dispose of unsuitable or excess material according to Subsection 204.14. If approved, suitable material may be used in embankment construction.

Remove all water as necessary to perform work.

209.07 Dewatering. Where necessary to dewater, dewater excavations and allow material to dry before finish grading the bottom of the excavation.

209.08 Foundation Preparation. Excavate all overburden and loose material from the surface of the bedrock. Remove all loose and fractured layers of bedrock until competent rock suitable for the concrete leveling pad is reached. Clean the surface of the competent rock so that it is free of dust and debris prior to placing concrete. The CO shall approve the foundation preparation prior to concrete leveling pad placement.

209.10 Backfill. Backfill as follows:

(a) General. Place backfill in horizontal layers that, when compacted, do not exceed 6 inches in depth. Compact each layer according to Subsection 209.11.

Bring backfill up evenly on all sides of the structure, and extend each layer to the limits of the excavation or to natural ground.

209.11 Compacting. Maximum compacted lift depth is 6 inches. Each layer shall be compacted with mechanical tampers until surface deformation is no longer visible. Adjust the moisture content of the backfill material to a moisture content suitable for compaction.

209.11a Bridge Approach Embankments. Prepare ground for embankment in according to section 201. Place backfill in horizontal layers that, when compacted, do not exceed 6 inches in depth. Compact each layer according to Subsection 209.11. Seed and mulch finished slopes according to Section 625.

209.12 Acceptance.

Material for backfill, bedding, and foundation fill will be evaluated under Subsections 106.02 and

106.04.

Structural excavation and backfill work will be evaluated under Subsections 106.02 and 106.04.

Clearing and removal of obstructions will be evaluated under Sections 201 and 203.

Measurement and Payment

209.13 See Subsection 109.05.

Do not measure structure excavation and backfill for payment.

557 - Timber Structures

557.02_01_us_08_20_2004

557.02 Material.

Furnish, the following compliance certificates to the CO upon delivery of the materials to the jobsite:

(a) Verification of compliance with grading rules and species of timber and lumber.

Provide certification by an agency accepted as competent by the American Lumber

Standards Committee (ALSC).

(b) Lot certification of each charge for preservative, penetration in millimeters, and retention in kilograms per cubic meter (assay method) by a qualified independent inspection and testing agency. In addition, have the producer of the treated products provide written certification that Best Management Practices (BMP's) in accordance with

"Best Management Practices for Treated Wood in Western Aquatic Environments," published by the Western Wood Preservation Institute (WWPI) and Canadian Institute of

Treated wood, were followed, including a description and appropriate documentation of the applicable BMP's used.

(c) Certification from a qualified inspection and testing agency indicating that all glued laminated members are in accordance with the requirements of American National

Standard for Wood Products, "Structural Glued Laminated Timber" (ANSI/AITC

A190.1) modified as SHOWN ON THE DRAWINGS.

(d) Such other certifications as SHOWN ON THE DRAWINGS or called for in the

SPECIAL PROJECT SPECIFICATIONS.

Provide shop drawings for all timber 21 days in advance of fabrication. Show all dimensions and fabrication details for all cut, framed, or bored timbers, and material specifications and treatments.

601 - Minor Concrete

601.00_nat_us_02_27_2007

Delete the entire specification and replace it with the following:

601.01 This work consists of constructing minor concrete structures.

Material

601.02 Conform to the following Subsections:

Air-entraining admixtures 711.02

Chemical admixtures 711.03

Coarse aggregate 703.02

Concrete coloring agents 711.05

Curing material 711.01

Fine aggregate 703.01

Fly ash 725.04

Hydraulic Cement 701.01

Joint fillers 702.01

Precast concrete curbing 725.06

Precast concrete units 725.11

Reinforcing steel 709.01

Structural steel 717.01

Water 725.01

601.03 Concrete Composition. Use the designated concrete composition:

(a) Method A. Submit a mix design showing the proposed masses of aggregate, water, and cement per cubic yard of concrete a minimum of 7 days prior to beginning placement. Proportion the cement, aggregate, and water to obtain concrete with good workability.

Composition of Minor Structure Concrete

Property Specification Test Method

Slump 4 in maximum AASHTO T 119

Air content 5 to 7 percent AASHTO T 152 or T 196

28-day compressive strength 3000 psi AASHTO T 23 and T 22

(b) Method B. Submit the following information a minimum of 7 days prior to beginning placement:

(1) Type, grading, and sources of aggregate.

(2) Type and source of cement, blended cement, or fly ash.

(3) Saturated surface dry weights of the fine and coarse aggregate in pounds per cubic yard of concrete.

(4) Weight of mixing water in pounds per cubic yard of concrete.

(5) Weight of cement in pounds per cubic yard of concrete.

(6) Admixture type, quantity, and certification by manufacturer.

(7) Air content.

(8) Slump.

(9) 28-day compressive strength.

Furnish concrete containing not less than 680 pound of cement per cubic yard. Ensure that slump is 4 inches or less, as determined by AASHTO T 119.

(c) Method C. Make the concrete using a dry,…

This is the start of the file's text. The full file is on GovTribe.