S140010Attachments.pdf
PDF 1 MB Posted
- Attached to
- Northern Region Lands Program Realty Specialist
- Solicitation number
- AG-03R6-S-14-0010
About this file
Solicitation Attachments (Section J of the Solicitation)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S140010CompleteSolicitationPkg.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-03R6-S-14-0010
Lands Program Realty Specialist Attachments, Page 1 of 14
ATTACHMENTS
The following attachments are a part of this solicitation and any resulting contract.
J- 1 Schedule of Items, Page: 1
J- 2 Wage Determination No. 2005-2317, (Rev. 14), Dated 07/25/2014; Page(s): 9
J- 3 Performance Requirements Summary, Page(s): 3
Item Description Unit Quantity Price
Land Adjustment Case -
Simple
Land Adjustment contains 1 ownership parcel with no
Reservations or Outstanding
Rights
Case Various $____________
Land Adjustment Case -
Medium
Land Adjustment contains between 1 and 5 parcels a total of between 1 and 5 Reservations or
Outstanding Rights
Case Various $____________
Land Adjustment Case -
Difficult
Land Adjustment has more than
5 parcels and 5 Reservations and
Outstanding Rights
Ownership
Parcel Various $____________
Reservations Various $_____________
Outstanding
Rights Various $____________
Rights-of-Way 2730 Rights-of-Way Grants
Cases
Road R/W
Case: Cost per
Road
Up to 1,000 $____________
Rights-of-Way 5460 Rights-of-Way
Acquisitions Cases
Road R/W
Case: Cost per
Road
Up to 5,000 $____________
Partial Interest
Enter Partial Interests associated with the Montana Legacy
Donation from The Nature
Conservancy
Outstanding
Rights and
Reservations
250 $____________
Dakota Prairie Grasslands
(DPG) Project
Convert "LOS CONV NAME
NOT KNOWN" entries associated with the Dakota Pairie
Grasslands to Legitimate Case
Name
Per Entry Up to 1,098 $____________
Final Title Opinion (FTO)
Project
Attach FTO Date to Ownership
Parcels Per Entry Up to 1,000 $____________
Outstanding Rights Data
Entry
Enter Outstanding Rights not previously associated with an
Owner Parcel
Per Entry Up to 1,000 $____________
Special Uses Project
Enter Special Use Permits that are long term/permanent in nature
Non linear
Special Use
Permit
Up to 1000 $____________
Linear Special
Use Permits on a Section Basis
Up to 500 $____________
Case File Completion
Enter the following information:
Recording Information Purchase
Price Acquisition Fund Code
Per Case Up to 1,000 $____________
Corrections to LSRS required by National ALP Team
Respond to requests from
National ALP team for further information and/or corrections.
Utilizing data provided by the
ALP team researches issues and makes needed corrections
Per Entry Up to 2,500 $____________
Land Status Contract Schedule of Items
Attachments, Page 3 of 14
Wage Determination No. 2005-2317, (Rev. 14), Dated 07/25/2014
Attachments, Page 4 of 14
Attachments, Page 5 of 14
Attachments, Page 6 of 14
Attachments, Page 7 of 14
Attachments, Page 8 of 14
Attachments, Page 9 of 14
Attachments, Page 10 of 14
Attachments, Page 11 of 14
Attachments, Page 12 of 14
Performance Requirements Summary
Land Status Contract
Desired Outcome
Required Service Performance Standard Acceptable Quality Level
(AQL)
Monitoring Method Incentive/Disincentive
1. Maintenance of R-1’s Lands Status Record System
(LSRS).
Average 15 land adjustment cases per year.
For all new cases, contractor shall update tabular and spatial information on all National Forests.
Categories include but are not limited to:
Land Adjustments Encumbrances Partial Interests Use Restrictions Survey Information
Basic Information (BI) Sheets will be completed and tabular data entered in the electronic LSRS. Spatial component identified and prepared for input by a GIS technician.
95 % Accuracy Random sampling of data.
Periodic inspection.
Customer feedback.
If error rate exceeds 5% contractor reworks BI’s and/or tabular data at his/her expense. Persistent error rate exceeding 5% will be reflected in performance evaluation.
2. Completion of three (3) outstanding land adjustment cases
Contractor will accomplish all duties listed in Desired Outcome No.1 and enter tabular information for Moulton Reservoir, (both Exchange and Purchase) Airport Authority and Fort Missoula Land adjustment cases.
Basic Information (BI) Sheets will be completed and tabular data is entered into the electronic LSRS. Spatial component identified and prepared for input by a GIS technician.
95% Accuracy Random sampling of data.
Periodic inspection.
Customer feedback.
If error rate exceeds 5% contractor reworks BI’s and/or tabular data at his/her expense. Persistent error rate exceeding 5% will be reflected in performance evaluation.
3. Completion of two hundred and fifty (250) partial interests of The Nature Conservancy’s Legacy Donation
Contractor will accomplish all duties listed in Desired Outcome No.1 and enter tabular information and validate all partial interests contained in TNC’s Legacy Project
Basic Information (BI) Sheets will be completed and tabular data is entered into the electronic LSRS. Spatial component identified and prepared for input by a GIS technician.
95 % Accuracy
Using SQL scripts or other methods to query the electronic LSRS, the Land Status Program manager will be able to ascertain if all partial interests have been entered.
Up to a 1% bonus of contractor’s Section B – Item Estimated Total can be awarded if the contractor completes validation on all TNC Legacy project’s partial interests by September 30, 2015.
4. Entry of up to 1,000 Road Rights-of-Way cases (File code 2730 R/W Grants) into
LSRS
Contractor will create case ID, update BI Sheet, enter tabular data and prepare spatial information for entry by a GIS technician for all Rights-of-Way cases on Region One National Forests.
When queried, the electronic LSRS will be able to provide current and accurate Land Status information on Rights-of-Way entries.
95 % Accuracy
Using SQL scripts or other methods to query the electronic LSRS, the Land Status Program Manager will be able to ascertain if all 2730 Rights-of-Way cases identified have been entered.
Up to a 1% bonus of contractor’s Section B – Item Estimated Total can be awarded if the contractor completes entry of all R1 2730 Road Rights-of-Way prior to September 30, 2018.
Attachments, Page 13 of 14
Desired Outcome
Required Service Performance Standard Acceptable Quality Level
(AQL)
Monitoring Method Incentive/Disincentive
5. Entry of up to 5,000 Road Rights-of-Way case (File code 5460 R/W Acquisitions) into LSRS
Contractor will create case ID, update BI Sheet, enter tabular data and prepare spatial information for entry by a GIS technician for all Rights-of-Way cases on Region One National Forests
When queried, the electronic LSRS will be able to provide current and accurate Land Status information on Rights-of-Way entries.
95 % Accuracy
Using SQL scripts or other methods to query the electronic LSRS to ascertain if all Rights-of- Way cases identified have been entered.
Up to a 1% bonus of contractor’s Section B – Item Estimated Total can be awarded if the contractor completes entry of all R1 5460 Road Rights-of-Way prior to September 30, 2019.
6. Corrections to the LSRS requested by the National ALP Team.
Average 25 to 40 per year.
As the National Team creates new reports and requirements for the LSRS, Contractor will provide all information required to keep Region One’s LSRS compliant with National Standards
The TeamForge ticket (or its equivalent) is closed by the National ALP Team
Acceptance by the National ALP Team
Random sampling of data.
Periodic inspection.
Customer feedback.
If error rate exceeds National Team standards, contractor reworks spatial data corrections and/or tabular data at his/her expense
7. Dakota Prairie National Grasslands Project – Correct “LOS
CONV NAME
NOT
KNOWN”
entries.
(Approximately 1098 entries)
Contractor will enter tabular data and link existing spatial information for all Dakota Prairie National Grassland cases that were migrated to the LSRS without case name.
If needed, Basic Information (BI) Sheets will be completed, Local Case ID’s assigned and both tabular and spatial data is corrected in the electronic LSRS.
95% Accuracy
Query the electronic LSRS to ascertain if all
“LOS CONV NAME
NOT KNOWN” cases identified have been converted. Radom sampling of completed cases for accuracy
Up to a 1% bonus of contractor’s Section B – Item Estimated Total can be awarded if the contractor corrects all “LOS CONV NAME NOT KNOWN” entries on all R1 Forests prior to September 30, 2016.
8. Final Title Opinion (FTO) project – Enter FTO date into LSRS for cases that have FTO and have not been entered.
(Approximately 1,000 cases)
Contractor will enter tabular data and link existing spatial information for Land Adjustment cases in which FTO has been obtained but not entered into the LSRS.
If needed, Basic Information (BI) Sheets will be updated, and FTO data will be entered or corrections made to the electronic LSRS
95% Accuracy
Using SQL scripts or other methods to query the automated LSRS to ascertain if all cases identified have been entered.
Up to a 1% bonus of contractor’s Section B – Item Estimated Total can be awarded if the contractor completes entry of all FTO information on cases previously not entered by September 30, 2017.
Attachments, Page 14 of 14
Desired Outcome
Required Service Performance Standard Acceptable Quality Level
(AQL)
Monitoring Method Incentive/Disincentive
9. Entry of non-mineral Outstanding Rights not previously entered into the electronic LSRS. Estimate up to 6,000 entries
Contractor will review closed cases to determine if any outstanding rights remain to be entered into the electronic LSRS. Any such outstanding rights will have their tabular data entered into the electronic LSRS, and link the said right to the appropriate spatial feature.
When queried, the electronic LSRS will be able to provide current and accurate Land Status information on all outstanding rights.
95% Accuracy Random sampling of data.
Periodic inspection.
Customer feedback.
If error rate exceeds 5% contractor reworks BI’s and/or tabular data at his/her expense.
Persistent error rate exceeding 5% will be reflected in performance evaluation.
10. By Forest, identify all long term Special Uses of a permanent nature and enter them into the electronic
LSRS.
(Approximately 4,000 permits)
Contractor will create case ID, update BI Sheet, enter tabular data and prepare spatial information for entry by a GIS technician for all Special Use Permits Region One National Forests. Permits that are required to be entered in the electronic LSRS are described as long term and permanent in nature.
When queried, the electronic LSRS will be able to provide current and accurate Land Status information on all outstanding rights.
95% Accuracy Random sampling of data.
Periodic inspection.
Customer feedback.
If error rate exceeds 5% contractor reworks BI’s and/or tabular data at his/her expense.
Persistent error rate exceeding 5% will be reflected in performance evaluation.
11. Complete entry of Case File information.
Up to 1,000 cases
Contractor shall update tabular and spatial information on all cases in Region 1. Categories include but are not limited to:
Recording Information Purchase Price Acquisition Fund Patent Information on lands that have been disposed and which no interests were retained
When queried, the electronic LSRS will be able to provide current and accurate recording information for all documents that have been recorded as well as historic price information.
95% Accuracy Random sampling of data.
Periodic inspection.
Customer feedback.
If error rate exceeds 5% contractor reworks BI’s and/or tabular data at his/her expense.
Persistent error rate exceeding 5% will be reflected in performance evaluation.
File details come from the government source that posted it. Updated .