S130094Attachments.pdf

PDF 5 MB Posted

Attached to
Lion Creek Trail Bridge Federal contract opportunity
Solicitation number
AG-03R6-S-13-0094
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

02 - Attachments

View the file

Other files for this federal contract opportunity

Other files attached to Lion Creek Trail Bridge, newest first.
File Type Posted
S130094CompleteSolicitation.pdf PDF
Lion_Cr_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-03R6-S-13-0094

Lion Creek Trail Bridge/Flathead NF Attachments, Page 1 of 138

ATTACHMENTS

Davis-Bacon Act: If this is a contract in excess of $2,000, the Davis Bacon Act requires the Contractor to pay certain minimum wages and benefits to employees working under this contract.

These required minimum wages are stated in the attached Wage Decision.

The following attachments are a part of this solicitation and any resulting contract.

J- 1 Wage Rate Decision No. MT130001, Mod. 0, dated 01/04/2013, 6 pages.

NOTE: THIS PROJECT IS LOCATED IN ZONE 2

J- 2 Forest Service Contract Specifications for Lion Creek Trail Bridge

Section 101 Terms, Format, and Definitions Section 103 Scope of Work Section 104 Control of Work Section 105 Control of Material Section 106 Acceptance of Work Section 107 Legal Relations and Responsibility to the Public Section 109 Measurement and Payment Section 151 Mobilization Section 152 Construction Survey and Staking Section 153 Contractor Quality Control Section 154 Contractor Sampling and Testing Section 156 Public Traffic Section 157 Soil Erosion Control Section 201 Clearing and Grubbing Section 203 Removal of Structures and Obstructions Section 209 Structure Excavation and Backfill Section 251 Riprap Section 253 Gabions and Revet Mattresses Section 308 Minor Crushed Aggregate Section 557 Timber Structures Section 625 Turf Establishment Section 629 – Rolled Erosion Control Products and Cellular Confinement Systems Section 703 Aggregate Section 704 Soil Section 705 Rock Section 713 Roadside Improvement Material Section 714 Geotextile and Geocomposite Drain Material Section 716 Material for Timber Structures Section 720 Structural Wall and Stabilized Embankment Material Section 725 Miscellaneous Material Section 912 Trail Excavation and Embankment Section 913 Turnpike

Attachments, Page 2 of 138

Section 915 Existing Trail Reconstruction Section 922 Waterbars Section 954 Obliteration of Abandoned Trailways Section 961 Trail Materials

J- 3 Food Storage Special Order LC_10_D1_01, 7 pages

J- 4 Invoice Procedures for the Western Montana Acquisition Zone, 4 pages

J- 5 Drawings (See separate document)

Title Sheet Sheet 1 Summary of Quantities and General Notes Sheet 2 Project Alignment Sheets 3-4 Trail Clearing Details Sheet 5 Trail Details Sheet 6 Trail Turnpike Details Sheet 7 Check Dam & Waterbar Details Sheet 8 Bridge General Layout Sheet 9

Bridge Superstructure Details Sheets 10-11 Bridge Sill / Bearing Details Sheet 12 Abutment No. 1 Details Sheet 13 Abutment No. 1 Wing Wall Details Sheet 14 Abutment No. 2 Details Sheet 15 Trail Obliteration Plan Sheet 16

Attachments, Page 3 of 138

Wage Rate Decision No. MT130001, Mod. 0, dated 01/04/2013

Attachments, Page 4 of 138

Attachments, Page 5 of 138

Attachments, Page 6 of 138

Attachments, Page 7 of 138

Attachments, Page 8 of 138

Attachments, Page 9 of 138

Forest Service Contract Specifications for Lion Creek Trail Bridge

FOREST SERVICE CONTRACT SPECIFICATIONS

for

LION CREEK TRAIL BRIDGE

Trail No. 25

USDA - Forest Service, Region 1 Flathead National Forest

Swan Lake Ranger District Lake County, Montana

Attachments, Page 10 of 138

JULY 24, 2013

LION CREEK TRAIL BRIDGE

Table of Contents

Section 101. — TERMS, FORMAT, AND DEFINITIONS Section 103. — SCOPE OF WORK Section 104. — CONTROL OF WORK Section 105. — CONTROL OF MATERIAL Section 106. — ACCEPTANCE OF WORK Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 109. — MEASUREMENT AND PAYMENT Section 151. — MOBILIZATION Section 152. — CONSTRUCTION SURVEY AND STAKING Section 153. — CONTRACTOR QUALITY CONTROL Section 154. — CONTRACTOR SAMPLING AND TESTING Section 156. — PUBLIC TRAFFIC Section 157. — SOIL EROSION CONTROL Section 201. — CLEARING AND GRUBBING Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS Section 209. — STRUCTURE EXCAVATION AND BACKFILL Section 251. — RIPRAP Section 253. — GABIONS AND REVET MATTRESSES Section 308. — MINOR CRUSHED AGGREGATE Section 557. — TIMBER STRUCTURES Section 625. — TURF ESTABLISHMENT Section 629. — ROLLED EROSION CONTROL PRODUCTS AND CELLULAR

CONFINEMENT SYSTEMS

Section 703. — AGGREGATE Section 704. — SOIL Section 705. — ROCK Section 713. — ROADSIDE IMPROVEMENT MATERIAL Section 714. — GEOTEXTILE AND GEOCOMPOSITE DRAIN MATERIAL Section 716. — MATERIAL FOR TIMBER STRUCTURES Section 720. — STRUCTURAL WALL AND STABILIZED EMBANKMENT MATERIAL Section 725. — MISCELLANEOUS MATERIAL Section 912. — TRAIL EXCAVATION AND EMBANKMENT Section 913. — TURNPIKE Section 915. — EXISTING TRAIL RECONSTRUCTION Section 922. — WATERBARS Section 954. — OBLITERATION OF ABANDONED TRAILWAYS Section 961. — TRAIL MATERIALS

Attachments, Page 11 of 138

Section 101. – TERMS, FORMAT, AND DEFINITIONS

101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor," is implied. Also implied in this language are "shall," "shall be," or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

Wherever "directed," "required," "prescribed," or other similar words are used, the "direction," "requirement," or "order" of the Contracting Officer is intended. Similarly, wherever "approved," "acceptable," "suitable," "satisfactory," or similar words are used, the words mean "approved by," "acceptable to," or "satisfactory to" the Contracting Officer.

The word "will" generally pertains to decisions or actions of the Contracting Officer.

101.02 Specifications Format. These specifications are divided into 10 Divisions.

Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 are applicable to all contracts.

Division 150 consists of project contract requirements that are applicable to all contracts. Work under Division 150 is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

Divisions 200 through 600 consist of construction contract requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.

The first three digits of the pay item number in the Bid Schedule identify the Section under which the work is performed.

101.03 Abbreviations. Whenever these abbreviations are used in the specifications, they represent the following:

(a) Acronyms.

AA — Aluminum Association

AAN — American Association of Nurserymen

AAR — Association of American Railroads

AASHTO — American Association of State Highway and Transportation Officials

ACI — American Concrete Institute

ACPA — American Concrete Pavement Association

ADA — Americans with Disabilities Act

AGC — Associated General Contractors of America

AFPA — American Forest and Paper Association

AI — Asphalt Institute

AIA — American Institute of Architects

AISC — American Institute of Steel Construction

Attachments, Page 12 of 138

AISI — American Iron and Steel Institute

AITC — American Institute of Timber Construction

ANSI — American National Standards Institute

APWA — American Public Works Association

ARA — American Railway Association

AREA — American Railway Engineering Association

ARTBA — American Road and Transportation Builders Association

ASCE — American Society of Civil Engineers

ASCII — American Standard Code for Information Interchange

ASLA — American Society of Landscape Architects

ASTM — American Society for Testing and Materials

ATSSA — American Traffic Safety Services Association

AWPA — American Wood Preservers Association

AWS — American Welding Society

AWWA — American Water Works Association

CFR — Code of Federal Regulations

CO — Contracting Officer and All Representatives

CRSI — Concrete Reinforcing Steel Institute

FAR — Federal Acquisition Regulations (48 CFR Chapter 1)

FHWA — Federal Highway Administration

FICA — Federal Insurance Contributions Act

FLH — Federal Lands Highways

FSS — Federal Specifications and Standards

FTMS — Federal Test Method Standard

FUTA — Federal Unemployment Tax Act

GSA — General Services Administration

IEEE — Institute of Electrical and Electronic Engineers

ISO — International Organization for Standardization

ISSA — International Slurry Surfacing Association

ITE — Institute of Transportation Engineers

MIL — Military Specifications

MPI — Master Painters Institute

MSHA — Mine Safety and Health Administration

MUTCD — Manual on Uniform Traffic Control Devices (for Streets and Highways)

NCHRP — National Cooperative Highway Research Program

NEMA — National Electrical Manufacturer's Association

NESC — National Electric Safety Code

Attachments, Page 13 of 138

NFPA — National Forest Products Association

NIST — National Institute of Standards and Technology

OSHA — Occupational Safety and Health Administration

PCA — Portland Cement Association

PCI — Prestressed Concrete Institute

PVC — Polyvinyl Chloride

PTI — Post-Tensioning Institute

SAE — Society of Automotive Engineers

SF — Standard Form

SI — International System of Units

SSPC — Steel Structures Painting Council

TAR — Transportation Acquisition Regulations (48 CFR Chapter 12)

UL — Underwriter's Laboratory

U.S. — United States of America

USC — United States Code

USGS — United States Geological Survey

USPS — United States Postal Service

WCLIB — West Coast Lumber Inspection Bureau

(b) SI symbols.

A — ampere electric current cd — candela luminous intensity

ºC — degree Celsius temperature d — day time g — gram mass h — hour time

H — Henry inductance ha — hectare area

Hz — hertz (s-1) frequency

J — joule (N•m) energy

K — kelvin temperature

L — liter volume lx — lux illuminance m — meter length m2 — square meter area m3 — cubic meter volume min — minute time

Attachments, Page 14 of 138 mp — mile post

N — newton (kg•m/s2) force

Pa — pascal (N/m2) pressure ppm — Part Per Million s — second time t — metric ton mass

V — volt (W/A) electric potential

W — watt (J/s) power

Ω — ohm V/A electric resistance

º — degree plane angle

' — minute plane angle

" — second plane angle

(c) SI prefix symbols.

E — exa 1018

P — peta 1015

T — tera 1012

G — giga 109

M — mega 106 k — kilo 103 c — centi 10-2 m — milli 10-3 µ — micro 10-6 n — nano 10-9 p — pico 10-12 f — femto 10-15 a — atto 10-18

(d) Slope notation (vertical : horizontal). For slopes flatter than 1V:1H, express the slope as the ratio of one unit vertical to a number of units horizontal. For slopes steeper than 1V:1H, express the slope as the ratio of a number of units vertical to one unit horizontal.

101.04 Definitions. The following definitions apply to this contract:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Award — The written acceptance of a bid by the CO.

Backfill — Material used to replace or the act of replacing material removed during construction. Material placed or the act of placing material adjacent to structures.

Base — The layer or layers of material placed on a subbase or subgrade to support a surface course.

Attachments, Page 15 of 138

Bid — A written offer by a bidder to perform work at a quoted price.

Bidder — Any individual or legal entity submitting a bid.

Bid Guarantee — A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and furnish required bonds.

Bid Schedule — The Schedule of Items.

Bridge — No definition.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Clear Zone — The portion of the roadside, including the shoulder, available for the safe use by an errant vehicle in which the driver may regain control of the vehicle. Recommended distances for the clear zone are in the AASHTO Roadside Design Guide.

Commercial Certification — See Subsection 106.03.

Construction Limits — The limits on each side of the project that establish the area disturbed by construction operations and beyond which no disturbance is permitted. Typically the construction limits are the same as the clearing limits, except when additional clearing is required.

Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the performance of and payment for the prescribed work.

Contracting Officer (CO) — An official of the Government with the authority to enter into, administer, and terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.

Contract Modification — Any written change in the terms of the contract. Contract modifications are of the following forms:

(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (e.g., a change in the paying office or the appropriation data).

(b) Change order. A written order, signed by the CO, directing the Contractor to make a change that FAR Clause 52.243-5 Changes and Changed Conditions authorizes the CO to order without the Contractor's consent.

(c) Supplemental agreement. A contract modification that is accomplished by the mutual action of the parties.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the Contractor is the “purchaser”.

Contract Time — The specified time allowed for completion of all contract work.

Crashworthy — A highway feature is crashworthy if it was successfully crash tested under the NCHRP Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features or earlier comparable criteria or if it was accepted through analysis by FHWA, based on similarity to other crashworthy features. A list of crashworthy highway features is available on the FHWA Safety website.

Cross-Section — A vertical section of the ground or structure at right angles to the centerline or baseline of the roadway or other work.

Culvert — No definition.

Attachments, Page 16 of 138

Day — Each and every day shown on the calendar, beginning and ending at midnight.

Density — Mass per unit volume of material. Specific gravity multiplied by the unit mass of water.

Design Quantity — “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these specifications this term is replaced by the term “Contract Quantities”.

Detour — A temporary rerouting of public traffic onto alternate existing roadways in order to avoid the work or part of the work.

Diversion — A temporary rerouting of public traffic onto a temporary alignment within the project limits in order to bypass the work or a portion of the work.

Drawings — Design sheets or fabrication, erection, or construction details submitted to the Government by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Government — The Government of the United States of America.

Highway, Street, or Road — A general term denoting a public way for purposes of vehicular travel, including the entire area within the right-of-way.

Layer — See "lift."

Lift — Defined as follows:

(a) When placing and compacting soils and aggregates, a lift is any single, continuous layer of material that receives the same compactive effort throughout during a single work operation.

(b) When installing culvert pipe less than or equal to 48 inches in diameter, the backfill material placed on both sides of the pipe is considered to be contained in the same lift when the material is placed to the same elevation on both sides of the culvert, the compactive effort applied to one side of the culvert is the same as that applied to the other, and the compactive effort is applied to both sides of the pipe in a continuous operation.

Material — Any substances specified or necessary to satisfactorily complete the contract work.

Maximum Particle Size — The smallest sieve opening through which all particles in the material will pass.

Measurement — The process of identifying the dimensions, quantity, or capacity of an item. See Section 109 for measurement methods, terms, and definitions.

Mineral Soil — Soil or aggregate that is free from organic substances and contains no particles larger than 2 inches at their greatest dimension.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Notice to Proceed — Written notice to the Contractor to begin the contract work.

Pavement Structure — The combination of subbase, base, paving geotextiles, and surface courses placed on a subgrade to support and distribute the traffic load to the roadbed.

Pay Item — A specific item of work for which a unit and price is provided in the contract.

Payment Bond — The security executed by the Contractor and surety or sureties and furnished to the Government to ensure payments as required by law to all persons supplying labor or material according to the contract.

Attachments, Page 17 of 138

Performance Bond — The security executed by the Contractor and surety or sureties furnished to the Government to guarantee completion of the contract work.

Pioneer Road — Temporary construction access built along the route of the project.

Plans — The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.

Production Certification — See Subsection 106.03.

Professional Engineer — Engineers who hold valid State licenses permitting them to offer engineering services directly to the public, who are experienced in the work for which they are responsible, who take legal responsibility for their engineering designs, and who are bound by a code of ethics to protect the public health.

Profile Grade — The trace of a vertical plane intersecting a particular surface of the proposed road construction located as shown on the plans, usually along the longitudinal centerline of the roadbed. Profile grade means either elevation or gradient of the trace according to the context.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Project — The specific section of the highway or other property on which construction is to be performed under the contract.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Roadbed — The graded portion of a highway prepared as a foundation for the pavement structure and shoulders.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Roadside — All area within the right-of-way excluding the traveled way and shoulders.

Roadway — In general, the portion of a highway, including shoulders, for vehicular use. A divided highway has two or more roadways. In construction specifications, the portion of a highway within the construction limits.

Roadway Prism — The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance along the centerline of the roadway.

Roller Pass — One trip of a roller in one direction over any one spot.

Schedule of Items — A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Shoulder — The portion of the roadway contiguous to the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of the pavement structure.

Sieve — See AASHTO M 92.

Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Special Contract Requirements — Additions and revisions to the standard specifications applicable to an individual project.

Attachments, Page 18 of 138

Specifications — The written requirements for performing work.

Standard Forms — Numbered forms issued by the General Services Administration for use as contract documents.

Standard Plans — Detailed plans approved for repetitive use and included as part of the plans.

Standard Specifications — The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects approved for general application and repetitive use.

Station — (1) A measure of distance used for highways and railroads. A station is equal to 100 feet. (2) A precise location along a survey line.

Structures — Bridges, culverts, catch basins, drop inlets, retaining walls, cribbing, manholes, endwalls, buildings, sewers, service pipes, underdrains, foundation drains, and other constructed features that may be encountered in the work.

Subbase — The layer or layers of material placed on a subgrade to support a base.

Subcontract — The written agreement between the Contractor and an individual or legal entity prescribing the performance of a specific portion of the work.

Subcontractor — An individual or legal entity with which the Contractor sublets part of the work. This includes all subcontractors in any tier.

Subgrade — The top surface of a roadbed upon which the pavement structure, shoulders, and curbs are constructed.

Substantial Completion — The point at which the project is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments. For conventional bridge and highway work, the point at which all bridge deck, parapet, pavement structure, shoulder, drainage, sidewalk, permanent signing and markings, traffic barrier, safety appurtenance, utility, and lighting work is complete.

Substructure — All of the bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.

Suitable Material — Rock or earth material that will provide stable foundations, embankments, or roadbeds, and is reasonably free of organic matter, roots, muck, sod, or other detrimental material. Suitable material may require drying or adding water, root picking, and other methods of manipulation before use. Suitable material includes the classifications of materials for which the project was designed.

Superintendent — The Contractor's authorized representative in responsible charge of the work.

Superstructure — The entire bridge except the substructure.

Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a contract obligation.

Surface Course — The top layer or layers of a pavement structure designed to accommodate the traffic load and resist skidding, traffic abrasion, and weathering.

Surfacing — Material placed on top of the trailbed or base course that provides the desired tread.

Target Value (TV) — A number established as a center for operating a given process. Once established, adjustments should be made in the process as necessary to maintain a central tendency about the target value. Test results obtained from a well-controlled process should cluster closely around the established target value and the mean of the test results should be equal to or nearly equal to the established target value.

Attachments, Page 19 of 138

Traveled Way — The portion of the roadway designated for the movement of vehicles, including curve widening, exclusive of shoulders.

Unsuitable Material — Material not capable of creating stable foundations, embankments, or roadbeds. Unsuitable material includes muck, sod, or soils with high organic contents.

Utilization Standards — The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Work — The furnishing of all labor, material, equipment, and other incidentals necessary to successfully complete the project according to the contract.

Attachments, Page 20 of 138

Section 103. — SCOPE OF WORK

103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described.

The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

Attachments, Page 21 of 138

Section 104. — CONTROL OF WORK

104.01 Reserved.

104.02 Reserved.

104.03 Specifications and Drawings. Follow the requirements of FAR Clause 52.236-21 Specifications and Drawings for Construction.

(a) General. Prepare drawings as necessary to construct the work. Drawings include, but are not limited to, layouts that show the relative position (vertical and horizontal as appropriate) of work to be performed, fabrication details for manufactured items and assemblies, installation and erection procedures, details of post-tensioning and other systems, detailed trench and excavation procedures that conform to OSHA requirements, traffic control implementation drawings, and methods for performing work near existing structures or other areas to be protected. Show all the drawing dimensions in United States customary units.

Limit drawings to a maximum size of 24 by 36 inches. Include on each drawing and calculation sheet, the project number, name, and other identification as shown in the contract.

Furnish 5 sets of drawings and supporting calculations for acceptance before performing work covered by the drawings. If drawings are returned for revision, correct and resubmit for acceptance. Allow 40 days per submission for railroad structures and 30 days per submission for all other structures. The review time as specified is applied separately to each drawing submitted. The CO may request additional specific drawings for unique situations in order to clarify layout, construction details, or methodology. If drawings must be resubmitted, the time for acceptance starts over. Obtain written approval before changing or deviating from the accepted drawings.

(b) Specific requirements for concrete and miscellaneous structures.

(1) Furnish drawings for the following:

(a) Site-specific layouts for all wall types and gabion installations;

(b) Gabion and revet mattress details and installation procedures;

(c) Forms and falsework for reinforced concrete box culverts less than or equal to 6 feet in height;

(d) Fabrication drawings for bridge railings and parapets;

(e) Fabrication drawings for prestressed members;

(f) Fabrication and installation drawings for expansion joint assemblies;

(g) Fabrication drawings for bearing assemblies;

(h) Construction joint location and concrete deck placement sequences not shown on the plans;

(i) Erection diagrams for Soil-Corrugated Metal Structure interaction systems (multi-plate structures);

(j) Structural steel fabrication drawings;

(k) Utility hangar details; and

(l) Fabrication and installation drawings for precast items.

(2) Furnish drawings that bear the seal and signature of a professional engineer proficient in the pertinent design field for the following:

(a) Erection plans;

(b) Reinforced soil slopes details;

(c) MSE wall and crib wall details;

(d) Details and installation procedures for proprietary wall systems;

Attachments, Page 22 of 138

(e) Temporary bridge structures for public use;

(f) All bridge forms except for railings, parapets, and components less than 6 feet in height;

(g) Shoring systems and cofferdams greater than 6 feet in height;

(h) All shoring systems that support traffic loadings;

(i) Forms and falsework for all structures greater than 6 feet in height;

(j) Post-tensioning systems;

(k) Ground anchors, soil nail, and rock bolt assembly details, layout, and installation and testing procedures;

(l) Tie back wall details; and

(m) Alternate retaining wall details.

(3) Furnish drawings that bear the seal and signature of a professional engineer who is proficient in forms and falsework design and licensed in the state where the project will be constructed for the following:

(a) Falsework for any structure with a span exceeding 16 feet;

(b) Falsework for any structure with a height exceeding 14 feet; and

(c) Falsework for structures where traffic, other than workers involved in constructing the structure, will travel under the structure.

104.04 Reserved.

104.05 Load Restrictions. Follow the requirements of FAR Clause 52.236-10 Operations and Storage Areas, paragraph (c).

Comply with all legal load restrictions when hauling material and equipment on public roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment.

Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures, or pavements within the project except those pavements intended to be removed.

104.06 Use of Roads by Contractor. The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Attachments, Page 23 of 138

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements. Follow the requirements of FAR Clause 52.236-5 Material and Workmanship.

Select sources and provide acceptable material. Notify the CO of all proposed sources before delivery to the project to expedite material inspection and testing. Do not incorporate material requiring submittal into the work until approved.

Material may be approved at the source of supply before delivery to the project. Approval does not constitute acceptance. If an approved source does not continue to supply acceptable material during the life of the project, further use of that source may be denied.

105.02 Material Sources.

(a) Government-provided sources. The Government will acquire the permits and rights to remove material from provided sources identified in the contract and to use such property for a plant site and stockpiles. Test reports and available historical performance data verifying the presence of acceptable material are available upon request.

Do not perform work within a Government-provided source until a plan of operation for the development of the source is accepted. Perform all work necessary to produce acceptable material including site development, preparation, erosion control, and restoration.

The quality of material in provided sources is acceptable in general, but may contain layers or pockets of unacceptable material. It is not feasible to ascertain from samples the quality of material for an entire deposit, and variations may be expected. Determine the quantity and type of equipment and work necessary to select and produce acceptable material.

Strip and stockpile the overburden. After operations are complete, move all waste back into the source. Neatly trim and flatten the side slopes to the extent practicable. Spread the stockpiled overburden uniformly over the sides and bottom of the mined area. Shape the mined area to blend into the surrounding natural terrain.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to Section 625.

(b) Contractor-located sources. The Contractor is responsible for located sources, including established commercial sources. Use sources that fulfill the contract quantity and quality requirements. Determine the quantity and types of equipment and work necessary to select and produce acceptable material. Secure all permits and clearances for use of the source and provide copies of the documents.

Provide laboratory test reports and available historical performance data indicating that acceptable material is available from the source. Do not use material from a source that is unacceptable to the Government. Dispose of unacceptable material and locate another source at no cost to the Government.

105.03 Material Source Management. Notify the CO 14 days before starting pit operations. Develop and operate within a material source according to the accepted plan of operation or written agreement for developing the source.

Before developing a material source, measure the sediment content of bodies of water adjacent to the work area that will receive drainage from the work area. Control all erosion so the sediment levels in the bodies of water within the drainage area of the work area do not increase. Control erosion so that sediment does not leave the work area.

105.04 Storing and Handling Material. Store and handle material to preserve its quality and fitness for the work. Stored material approved before storage may again be inspected before use in the work. Locate stored material to facilitate prompt inspection.

Use only approved portions of the right-of-way for storing material and placing plants and equipment. Provide all additional space needed. Do not use private property for storage without written permission of the owner or lessee. Furnish copies of all agreements. Restore all Government-provided storage sites to their original condition.

Attachments, Page 24 of 138

The Contractor is responsible for the security of all stored material.

105.05 Use of Material Found in the Work. Material, such as stone, gravel, or sand, found in the excavation may be used for another pay item when acceptable. When there is an applicable excavation item in the bid schedule, such material will be paid both as excavation and as the other pay item for which it is used. Replace material so used and needed for embankment or backfill with acceptable material at no cost to the Government. Excavate or remove material only from within the grading limits, as indicated by the slope and grade lines.

The right to use and process material found in the work does not include the use and processing of material for nongovernment contract work except for the disposal of waste material. Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

Attachments, Page 25 of 138

Section 106. — ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements. Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform work according to the contract requirements. Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is stricter.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

As an alternative to removal and replacement, the Contractor may submit a written request to:

(a) Have the work accepted at a reduced price; or

(b) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

106.02 Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.

106.03 Certification. For material manufactured off-site, use a manufacturer with an ISO 9000 certification or an effective testing and inspection system. Require the manufacturer to clearly mark the material or packaging with a unique product identification or specification standard to which it is produced.

Other than references in or to the FAR or Federal Law, when these Standard Specifications reference certifications; certificates;

or certified documents, equipment, or individuals, these references are not certifications under Section 4301 of Public Law 104-106, National Defense Authorization Act for Fiscal Year 1996. These references refer to documentation of non-

Attachments, Page 26 of 138 regulatory, peripheral contract requirements that are required to be validated by an individual or organization having unique knowledge or qualifications to perform such validation.

Material accepted by certification may be sampled and tested at any time. If found not in conformance with the contract, the material will be rejected whether in place or not.

One of the following certifications may be required:

(a) Production certification. Material requiring a production certification is identified in the Acceptance Subsection of each Section. Require the manufacturer to furnish a production certification for each shipment of material. Include the following with each production certification:

(1) Date and place of manufacture;

(2) Lot number or other means of cross-referencing to the manufacturer’s inspection and testing system; and

(3) Substantiating evidence that the material conforms to the contract quality requirements as required by FAR 46.105(a)(4), including all of the following:

(a) Test results on material from the same lot and documentation of the inspection and testing system;

(b) A statement from the manufacturer that the material complies with all contract requirements; and

(c) Manufacturer’s signature or other means of demonstrating accountability for the certification.

(b) Commercial certification. When a certification is required, but not a production certification, furnish one commercial certification for all similar material from the same manufacturer.

A commercial certification is a manufacturer's or Contractor's representation that the material complies with all contract requirements. The representation may be labels, catalog data, stamped specification standards, or supplier's certifications indicating the material is produced to a commercial standard or specification.

106.04 Measured or Tested Conformance. Provide all necessary production and processing of the work and control performance of the work so that all of the work complies with the contract requirements.

Results from inspection or testing shall have values within the specified tolerances or specification limits. When no tolerance values are identified in the contract, the work will be accepted based on customary manufacturing and construction tolerances.

106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work). Statistical evaluation of work is a method of analyzing inspection or test results to determine conformity with the contract requirements. The work will be accepted as follows:

(a) General. For work evaluated based on statistical evaluation, both the Government and Contractor assume some risk.

The Government's risk is the probability that work of a rejectable quality level is accepted. The Contractor's risk is either the probability that work produced at an acceptable quality level (AQL) is rejected (α) or the probability that the work produced at the AQL is accepted at less than the contract price (α100).

Acceptable quality level is the lowest percentage of work within the specification limits that is considered acceptable for payment at contract price. There are 2 categories. Category I is based on an AQL of 95 percent. Category II is based on an AQL of 90 percent. In both cases, the Contractor's risk (α100) is 5 percent and the risk of rejection (α) is significantly lower.

As an incentive to produce uniform quality work and to offset the Contractor's risk, a final payment greater than the contract price may be obtained under certain conditions.

The quality characteristics to be evaluated, lot size, sampling frequency, sampling location, test methods, specification limits, and category are as follows:

(1) Quality characteristics. The quality characteristics to be evaluated are listed in the Acceptance Subsection of each Section.

(2) Lot size. A lot is a discrete quantity of work to which the statistical evaluation procedure is applied. A lot

Attachments, Page 27 of 138 normally represents the total quantity of work produced. More than one lot may occur if changes in the target values, material sources, or job-mix formula are requested in writing and approved.

(3) Sampling frequency. The frequency of sampling is listed in the Acceptance Subsection of each Section. The frequency rate shown normally results in a minimum of 5 samples. The minimum number required to perform a statistical evaluation is 3. The maximum obtainable pay factor with 3, 4, or 5 samples is 1.01. A minimum of 8 samples are required to obtain a 1.05 pay factor.

If the sampling frequencies and quantity of work would otherwise result in fewer than 8 samples, a written request is required to increase the sampling frequency to provide for a minimum of 8 samples. Provide the request to increase the sampling frequency at least 48 hours before beginning production. An increase in the sampling frequency may result in a reduced pay factor.

(4) Sampling location. The point of sampling is listed in the Acceptance Subsection of each Section. The exact location of sampling will be specified by the CO based on random numbers.

(5) Test methods. The test methods used to test the sample are listed in the Acceptance Subsection of each Section.

(6) Specification limits. The specification limits for the quality characteristics are listed in the contract provisions for the work in question.

(7) Category. The category for the quality characteristics to be analyzed is listed in the acceptance subsection of each Section.

(b) Acceptance. The work in the lot will be paid for at a final pay factor when all inspections or test results are completed and evaluated.

Before determining the final pay factor, the work may be incorporated into the project provided the current pay factor does not fall below 0.90. If a lot is concluded with fewer than 3 samples, the material will be evaluated under Subsection 106.04.

If the current pay factor of a lot falls below 0.90, terminate production. Production may resume after the Contractor takes effective and acceptable actions to improve the quality of the production.

A lot containing an unsatisfactory percentage of nonspecification material (less than 1.00 pay factor) is accepted provided the lowest single pay factor has not fallen into the reject portion of Table 106-2.

A lot containing an unsatisfactory percentage of nonspecification material with the lowest single pay factor falling into the reject portion of Table 106-2 is rejected. Remove all rejected material from the work.

When approved, it is permissible to voluntarily remove nonspecification material and replace it with new material to avoid or minimize a pay factor of less than 1.00. New material will be sampled, tested, and evaluated according to this Subsection.

Any quantity of material may be rejected based on visual inspection or test results. Do not incorporate rejected material in the work. The results of tests run on rejected material will be excluded from the lot.

(c) Statistical evaluation. The Variability-Unknown/Standard Deviation Method will be used to determine the estimated percentage of the lot that is within specification limits.

The number of significant figures used in the calculations will be according to AASHTO R 11, absolute method.

The estimated percentage of work that is within the specification limits for each quality characteristic will be determined as follows:

(1) Calculate the arithmetic mean ( x ) of the test values: x = n x∑ where: ∑ = summation of x = individual test value n = total number of test values

Attachments, Page 28 of 138

(2) Calculate the standard deviation (s):

s = ( ) ( ) ( )1 nn xxn where: ∑(x2) = summation of the squares of individual test values

(∑x)2 = summation of the individual test values squared

(3) Calculate the upper quality index (QU): QU = s

X-USL

where: USL = upper specification limit Note: The USL is equal to the contract specification limit or the target value plus the allowable deviation.

(4) Calculate the lower quality index (QL): QL = s

LSLX −

where: LSL = lower specification limit Note: The LSL is equal to the contract specification limit or the target value minus the allowable deviation.

(5) From Table 106-1, determine PU (the estimated percentage of work within the USL). PU corresponds to a given QU. If a USL is not specified, PU is 100.

(6) From Table 106-1, determine PL (the estimated percentage of work within the lot within the LSL). PL corresponds to a given QL. If an LSL is not specified, PL is 100.

(7) Calculate the total estimated percentage of work within the USL and LSL:

PU + PL - 100

(8) Repeat steps 1 through 7 for each quality characteristic listed for statistical evaluation.

(d) Pay factor determination (value of the work). The pay factor for a lot will be determined as follows:

(1) From Table 106-2, determine the pay factor for each quality characteristic using the total number of test values and the total estimated percentage within the specification limits from step (c)(7).

(2) When all quality characteristics for a lot are Category I, the lot pay factor is based on the lowest single pay factor for any Category I quality characteristic. The maximum obtainable pay factor is 1.05 (with a minimum of 8 test values).

(3) When quality characteristics for a lot are both Category I and II, the lot pay factor is based on the following:

(a) When all Category II quality characteristics are 1.00, the lot payment is based on the lowest single pay factor for all category I characteristics. The maximum obtainable pay factor is 1.05 (with a minimum of 8 test values).

Attachments, Page 29 of 138

Table 106-1 Estimated Percent of Work Within Specification Limits

Estimated Percent within

Specification Limits (PU or PL)

Upper Quality Index QU or Lower Quality Index QL n=3 n=4 n=5 n=6 n=7 n=8 n=9 n=10 to n=11 n=12 to n=14

1.16

1.15

1.14

1.49 1.46 1.43 1.40 1.37 1.34

1.72 1.64 1.58 1.52 1.47 1.42

1.88 1.75 1.66 1.59 1.52 1.47

1.99 1.82 1.72 1.63 1.56 1.49

2.07 1.88 1.75 1.66 1.58 1.51

2.13 1.91 1.78 1.68 1.60 1.52

2.20 1.96 1.81 1.71 1.62 1.54

2.28 2.01 1.84 1.73 1.64 1.55

1.13 1.12 1.11 1.10

1.31 1.28 1.25 1.22 1.19

1.38 1.33 1.29 1.25 1.21

1.41 1.36 1.31 1.27 1.23

1.43 1.38 1.33 1.28 1.23

1.45 1.39 1.33 1.28 1.24

1.46 1.40 1.34 1.29 1.24

1.47 1.41 1.35 1.29 1.24

1.48 1.41 1.35 1.30 1.25

1.09 1.07 1.06 1.04 1.03

1.16 1.13 1.10 1.07 1.04

1.18 1.14 1.10 1.07 1.03

1.18 1.14 1.10 1.07 1.03

1.19 1.15 1.10 1.07 1.03

1.19 1.15 1.10 1.06 1.03

1.19 1.15 1.10 1.06 1.02

1.19 1.15 1.10 1.06 1.02

1.20 1.15 1.11 1.06 1.02

1.01 0.99 0.97 0.95 0.93

1.01 0.98 0.95 0.92 0.89

1.00 0.97 0.93 0.90 0.87

0.99 0.96 0.92 0.89 0.86

0.99 0.95 0.92 0.88 0.85

0.99 0.95 0.92 0.88 0.85

0.99 0.95 0.91…