S130085Attachments.pdf
PDF 9 MB Posted
- Attached to
- 2014 Trail Maintenance Federal contract opportunity
- Solicitation number
- AG-03R6-S-13-0085
About this file
02 - Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S130085CompleteSolicitationPkg.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-03R6-S-13-0085
2014 Trail Maintenance/Lolo NF Attachments, Page 1 of 38
ATTACHMENTS
Service Contract Act of 1965: If this is a contract in excess of $2,500 the Act requires the Contractor to pay certain minimum wages to all service employees working under this contract.
These required minimum wages are stated in the attached Register of Wage Determinations under the Service Contract Act. If no such Register is attached, the Contractor is required to pay no less than the minimum wage specified under Section 6(a)(1) of the Fair Labor Standards Act of 1938, As Amended.
The following attachments are a part of this solicitation and any resulting contract.
J- 1 Wage Determination No. 2005-2317 (Rev. 13), dated 06/19/2013; 9 pages Occupation Code 23470 – Laborer
J- 2 Trail Specifications
Section 901 – Abbreviations, Acronyms, and Terms Section 902 – Definitions Section 951 – Mobilization Section 982 – Logging Out Section 984 – Loose Rock Removal Section 991 – Drainage Maintenance
J- 3 Drawings
900-1 – Illustration of Trail Structure Terms 911-1 – Clearing Limits 912-1 – Typical Trail Cross Sections 912-4 – Drain Dip 922-1 – Waterbars
J- 4 Maps Vicinity Map, 1 page Project Maps, 2 pages
J- 5 Food Storage Special Order LC_10_D1_01, 7 pages
J- 6 Forest Supervisor’s Order LC_10_D1_02, 2 pages
J- 7 Invoice Procedures for the Western Montana Acquisition Zone, 4 pages
Attachments, Page 2 of 38
Wage Determination No. 2005-2317 (Rev. 13), dated 06/19/2013
Attachments, Page 3 of 38
Attachments, Page 4 of 38
Attachments, Page 5 of 38
Attachments, Page 6 of 38
Attachments, Page 7 of 38
Attachments, Page 8 of 38
Attachments, Page 9 of 38
Attachments, Page 10 of 38
Attachments, Page 11 of 38
Trail Specifications
Section 901 - Abbreviations, Acronyms, and Terms
901.01 Terms, Organizations, and Standards
(a) Specification Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject "the Contractor”, is implied. Also implied in this language is "shall”, "shall be”, or similar words or phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.
Wherever "directed”, "required”, "prescribed”, or similar words are used, the "direction”, "requirement”, or "order" of the Contracting Officer is intended. Similarly, wherever "approved”, "acceptable”, "suitable”, "satisfactory”, or similar words are used, they mean "approved by”, "acceptable to”, or "satisfactory to" the Contracting Officer.
The word "will" generally pertains to decisions or actions of the Contracting Officer.
Whenever in these specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows: reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for the public works contracts.
(b) Abbreviations and Acronyms
AASHTO American Association of State Highway and Transportation Officials ABS Acrylonitrile-Butadiene-Styrene AQ Actual Quantities APA American Plywood Association ASTM American Society for Testing and Material AWPA American Wood Preservers Association CO Contracting Officer CF Cubic Foot CY Cubic Yard DQ Designed Quantities EA Each HDPE High-Density Polyethylene hr Hour LF Linear Foot LS Lump Sum LSQ Lump Sum Quantities NBS National Bureau of Standards NCMA National Concrete Masonry Association PE Polyethylene PS Product Standard Issued by the U.S. Department of Commerce PVC Polyvinyl Chloride SF Square Foot SQ Staked Quantities STA Station SY Square Yard WCLIB West Coast Lumber Inspection Bureau WWPA Western Wood Products Association
Attachments, Page 12 of 38
Section 902 - Definitions
When the following terms, or pronouns in place of them, are used in these specifications or in other contract documents, the intent and meaning are as follows:
Berm. The ridge of material formed on the outer edge of the trail that projects higher than the tread.
Compacted. Consolidation that is obtained by tamping or rolling suitable material until no noticeable displacement of material is observed.
Contracting Officer (CO). An official of the Government with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Cushion Material. Native or imported material, generally placed over rocky section of unsurfaced trail to provide a usable and maintained traveled way.
Designated on the Ground. The location of materials, work areas, and construction items, including lines and grades, marked on the ground with stakes, flagging, tags, or paint.
Drawings. Documents showing details for construction of a facility, including but not limited to straight-line diagrams, trail logs, standard drawings, construction logs, plan and profile sheets, cross-sections, diagrams, layouts, schematics, descriptive literature, and similar materials.
Duff. Organic material overlying rock or mineral soil.
Embankment. A structure of suitable material placed on the prepared ground surface and constructed to the trail bed elevation.
Excess Excavation. Material in the trail way in excess of that needed for construction of designed trail ways.
Full Bench. Trail bed constructed entirely on undisturbed material.
Grade. The vertical distance of ascent or descent of the trail expressed as a percentage of the horizontal distance.
Header Rock. Rock laid with the narrow end towards the face of the wall.
Mineral Soil. Soil or aggregate that is free from organic substances and contains no particles larger than 2 inches at their greatest dimension.
Outslope. Where the trail tread is sloped downward toward the embankment or daylight side of the trail way.
Retreading. Reshaping the trail tread to restore to the original trail template.
Select Borrow. Suitable materials taken from borrow sources DESIGNATED ON THE TRAIL LOG, to be used for embankments and backfilling.
Attachments, Page 13 of 38
Sideslope. The natural slope of the ground, usually expressed as a percentage.
Suitable Material. Rock that can be accommodated in the trail structure, and soil free of duff with a recognizable granular texture.
Surfacing. Material placed on top of the trail bed or base course that provides the desired tread.
Water Courses. Any natural or constructed channel where water naturally flows or will collect and flow during spring runoff, rainstorms, etc.
Attachments, Page 14 of 38
Section 951 - Mobilization
Description
951.01 Work. This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.
Payment
951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN IN THE
SCHEDULE OF ITEMS.
Make progress payments for mobilization as follows:
(a) When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.
(b) When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.
(c) Pay any unpaid amount for mobilization upon final acceptance of all work items.
The total of all payments shall not exceed the original contract amount for this item.
Make payment under:
PAY ITEM PAY UNIT
951(01) Mobilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LS
Attachments, Page 15 of 38
Section 982 – Logging Out
982.01 Work. This work consists of removing brush, logs, and down trees from the clearing limits.
Requirements
982.02 Clearing Out. Cut and remove all logs that extend across or into the clearing limits. The portions of cut logs that remain on the upper side of the trail shall be either firmly anchored to prevent sliding or rolling onto the trail way or moved across the trail to the lower side and scattered outside the clearing limits.
Fell all trees over 4 inches in diameter that are leaning into the clearing limits and that are within 10 feet above the trail bed. Stump height of leaning trees that are cut outside the clearing limits shall not exceed one (1) foot as measured on the uphill side of the stump. Disposal for the leaning trees described above will be the same as for down logs and trees.
Remove roots and stumps from trees within the trail way that have been uprooted.
Rerouting the trail around windfalls, uprooted trees, and other obstacles will not be permitted. Ramp or reroute sections of the trail tread that have been damaged by uprooted stumps as necessary to provide safe passage on the trail.
Remove sticks or wood chunks exceeding 2 inches in diameter and 1 foot in length that have fallen on to the trail bed.
Scatter the down trees on the lower side of the trail way outside the clearing limits. Do not place such materials in stream channels, drainage ways, ditches, culvert catch basins, or other locations where they would prevent the free flow of water away from the trail bed.
Measurement and Payment
See Section G- 1 of the contract.
Attachments, Page 16 of 38
Section 984 – Loose Rock Removal
984.01 Work. This work consists of removal and disposal of loose rock from the trail tread.
Requirements
984.02 General. Remove loose rocks that are larger than two (2) inches at their greatest dimension from the trail bed. Remove any loose rock in drainage dips or ditches that may impede water flow off the trail.
Loose rocks are rocks that are not firmly embedded in the trail and can be removed by hand. Where the trail bed consists predominantly of rock with little or no soil present, remove all loose rock larger than 3 inches.
Fill any holes remaining from rock removal with suitable material and compact. If the rock removed is not needed for other items of maintenance work, scatter the rock by side casting to the lower side of trail way beyond the clearing limits, and distribute rock to ensure that no blockage of drainage or creation of a windrow occurs. Do not dispose of waste materials in watercourses.
Attachments, Page 17 of 38
Section 991 – Drainage Maintenance
991.01 Work. This work consists of maintaining drainage structures as specified herein.
Requirements
991.02 General. Where trail drainage facilities have been plugged and the water has been diverted from the intended channel, remove the debris causing the diversion and return the drainage to the channel.
Divert water off and away from the trail bed. If washing or ponding of water has been or is occurring, dig a shallow ditch sloped 2 percent to 5 percent to the downstream side of the trail and 3 inches minimum deep and one (1) foot minimum wide across the trail at the point where water enters the trail.
Clean ditches to permit the free flow of water into culverts and away from the trail.
Scatter all unusable or unneeded material that is cleared from the drainage structures 3 feet or more beyond and below the trail or drainage facility and out of watercourses.
991.03 Culverts. Remove debris and soil from catch basins and inlet and outlet ditches and inside culverts to permit the unobstructed flow of water into, through, and away from the culvert. Replace any missing or loose rocks or logs in culvert headwalls.
Fit replacement rocks for rock culverts so that they have a firm bearing on adjacent and underlying rocks.
Place rocks snugly and fill voids with small rocks to prevent material from sifting into the drain. Fill and compact with suitable material all disturbed areas in the trail tread over or adjacent to rock culverts.
991.04 Water bars. Clean the upgrade side of all existing waterbars and maintain them as SHOWN ON THE DRAWINGS. Remove material accumulated against rubber belting water bars. Use and compact suitable material removed from the upgrade side of all water bars to bring the trail tread flush with the top of those water bars on the downgrade side. Remove all debris from the leadoff area of all water bars that restricts the free flow of water away from the trail.
Firmly embed replacement rocks for rock water bars into the trail bed and fit the rocks together. Make the tops of the rocks even, with no sharp points. Peel native replacement logs before using them. Anchor stakes tightly in the ground without splits and nail tightly to the log.
991.05 Drainage Dips. Clean deposited material and restore drainage dips as SHOWN ON THE DRAWINGS. Remove all debris from the leadoff area of dips that restricts the free flow of water away from the trail. Use suitable material obtained by cleaning dips for fill on the downgrade side, removing rock more than 3 inches at its greatest dimension. Compact all material placed in the trail tread.
Attachments, Page 18 of 38
Drawings
Attachments, Page 19 of 38
Attachments, Page 20 of 38
Attachments, Page 21 of 38
Attachments, Page 22 of 38
Attachments, Page 23 of 38
Vicinity Map
Attachments, Page 24 of 38
Project Maps
Attachments, Page 25 of 38
Attachments, Page 26 of 38
Food Storage Special Order LC_10_D1_01
Attachments, Page 27 of 38
Attachments, Page 28 of 38
Attachments, Page 29 of 38
Attachments, Page 30 of 38
Attachments, Page 31 of 38
Attachments, Page 32 of 38
Attachments, Page 33 of 38
Forest Supervisor’s Order LC_10_D1_02
Attachments, Page 34 of 38
Attachments, Page 35 of 38
Invoice Procedures for the Western Montana Acquisition Zone
Attachments, Page 36 of 38
Attachments, Page 37 of 38
Attachments, Page 38 of 38