FBO-ANNOUNCEMENT.pdf
PDF 122 KB Posted
- Solicitation number
- AG-03R6-S-13-0075
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO-ANNOUNCEMENT-Rev-01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presolicitation Notice for AG-03R6-S-13-0075
U.S. FOREST SERVICE, REGION 1, ARCHITECT AND ENGINEER DESIGN IDIQ
Interested Vendors are advised that this is a 30-day pre-solicitation notice for an Architect & Engineer
Design Services contract. A single firm fixed-price Indefinite-Delivery, Indefinite Quantity (IDIQ) contract will be awarded. This acquisition is being conducted under the authority of the Brooks Act, and in conformance with FAR Part 36. No solicitation will be downloaded onto the FedBizOpps website.
Architect & Engineer firms are advised to respond to this announcement. Instructions on what to submit are provided in the announcement text below.
MINIMUM AND MAXIMUM CONTRACT AMOUNTS
The maximum contract value may not exceed $3,750,000.00 aggregate total. The minimum guarantee is
$10,000/year for the initial contract period and each option year exercised by the Government. The contract contains 4 option years. The value of individual Task Orders executed under this contract may range from <$1,000 to $400,000, or more if not rejected by the Contractor. Multiple Task Orders may be awarded with similar completion schedules and overlapping delivery dates.
DESCRIPTION OF SERVICES
C- 1 Introduction
(a) Scope of Contract
The Contractor shall provide Architect & Engineer Design services and related work in compliance with the contract requirements, provisions, specifications, terms and conditions. “Architect & Engineer
Design services and related work” includes, but is not limited to architecture, civil, structural, mechanical, electrical, geotechnical and landscape survey and design, inspection services, and construction management services. The Government will order work under this contract by the issuance of Task Orders for specific projects. The Contractor shall provide everything necessary to perform the work of this contract and Task Orders issued under this contract, including but not limited to all labor, supervision, equipment, transportation, materials, operating supplies, and incidentals.
(b) General Description of Typical Projects
Prospective Projects will primarily involve providing new construction or reconstruction needs of the
Forest Service, buildings, roads, landscape, mechanical and electrical systems at Forest Service recreation and administration sites. Typical projects include designing for a variety of repair, rehabilitation, and new facility construction projects. Typical projects may include a variety of landscaping or reconstruction needs for office buildings, laboratory buildings, warehouses and other industrial buildings, residences, garages, picnic shelters, campground recreation buildings, and landscapes.
Architectural Projects may be for total project design, or only segments of the work such as building, mechanical, plumbing, landscaping, civil, HVAC, fire protection and alarm system, geotechnical, or electrical projects. The work may include A/E services professional support for in-house Forest Service designs as well.
The contract requires complete design services and may include everything from survey and design through contract management. Subcontractors performing specific design and services shall be responsible to the design professional. The Contractor shall have the ability to:
• Inspect, document and provide condition surveys for existing facilities in accordance with
Forest Service requirements – Contractor will be required to take Forest Service training to accomplish this.
• Provide preliminary through final design engineering services including all contract documents, specifications and drawings.
• Estimate the cost of the design and construction work.
• Manage a contract with multiple Task Orders concurrently on multiple forests as well as oversite of all staff and sub-contractors
C- 2 Required Expertise
The Contractor shall provide professional expertise for Architect & Engineer design services and related work.
The required expertise and engineering disciplines include, but are not limited to:
• Total Project Management.
• Architect.
• Civil Engineering.
• Surveying.
• Structural Engineering.
• Environmental Engineering.
• Geotechnical Engineering.
• Electrical Engineering.
• Mechanical Engineering.
• Landscape Architecture.
• Interior Design Services.
• Archival and Curation Services.
• Construction Support Services and Testing.
• Construction Inspection expertise with materials, equipment, methods and systems on typical Forest Service projects.
• Historic Preservation and Architectural expertise, including expertise to comply with the
Secretary of the Interior’s Standards for Historic Preservation.
• Leadership in Energy and Environmental Design (LEED) accredited professional(s) with history of completed LEED certified projects.
• Certified Green Globes Professional (GGP) within 1 year of award of this contract. Certified individuals must have experience in project management as well as commissioning of buildings and knowledge of all documentation requirements.
C- 3 Location of Work
Task Orders under this contract may be issued for projects located within the boundaries of the USDA
Forest Service, Northern Region (Region 1), including MTDC, RMRS and any other USDA office located within the Northern Region boundaries. The Northern Region (Region 1) of the USDA Forest Service includes Montana, North Dakota, portions of Idaho and South Dakota. In addition, Task Orders under this contract may be issued for RMRS projects anywhere within the boundaries of the State of Idaho.
Facilities, National Forests, and National Grasslands within these boundaries, include, but are not limited to:
• Regional Office Facilities
• Rocky Mountain Research Station (RMRS – Facilities located in Montana and Idaho only)
• Missoula Technology and Development Center (MTDC)
• Bitterroot National Forest
• Beaverhead-Deerlodge National Forest
• Clearwater National Forest
• Custer National Forest
• Dakota Prairie National Grasslands
• Flathead National Forest
• Gallatin National Forest
• Helena National Forest
• Idaho Panhandle National Forest
• Kootenai National Forest
• Lewis and Clark National Forest
• Lolo National Forest
• Nez Perce National Forest
• Any other USDA unit with facilities located within the Forest Service Northern Region in
Idaho, Montana, North Dakota, and South Dakota.
Project site access can vary from easily accessible to sites in the wilderness where motorized vehicle use is restricted or prohibited.
C- 4 Task Orders
The Government will order work under this contract by the issuance of Task Orders for specific projects.
The typical task order would be for work with a design cost estimated at approximately $400,000 or less.
However, task orders for larger projects may be issued.
The Contracting Officer will initiate a Task Order by issuing a Task Order Request for Proposal (RFP) and
Statement of Work that describes the Government’s project requirements. Contracting Officers are authorized to include additional clauses in individual Task Orders as desired or required by the CO. The
Statement of Work will include:
• Description of project
• Project Location
• Scope of work
• Report and record keeping requirements
• Time constraints or schedules
• Submittal requirements
• Technical contacts for coordinating work
• Government-furnished property
The Contractor shall submit a detailed proposal in response to the RFP, indicating hours of each skill and other costs needed to complete the project, along with any narrative supporting the level of work and total cost of the proposal. To support the proposed Task Order price, the Contractor’s proposal shall include detailed backup cost details. Examples of such detail include, but are not limited to:
• Subcontractor price quotations.
• Proposed materials and supplies and price quotations.
• Laboratory testing standard price list items for specific tasks requirements.
• Equipment costs.
• Travel and related management costs.
• Labor burden, Overhead (G&A/home office overhead) and proposed profit/fee.
Site visits for individual Task Orders may be required by the Government to familiarize the Contractor with site conditions, issues, project scope of work, or for project information exchange. Site visits may be required prior to submission of a price proposal, and/or after the submission of a price proposal. The
Contractor will be reimbursed for site visits, under a separate Task Order.
If needed, the Contractor and the Government will meet to clarify the project. Meetings will be held in
Missoula, Montana unless the CO determines it is more advantageous to meet elsewhere, or unless the
CO agrees to an alternate location in advance. The Contractor will not be reimbursed for meetings necessary for proposal preparation or negotiations.
If the A-E proposal is unacceptable, negotiations will be conducted. Upon agreement of the work and price, a Task Order will be issued for signature. A signed order will constitute acceptance and also serve as Notice to Proceed on that specific order.
The A-E Contractor shall complete the services ordered. The deliverables will be defined in the
Statement of Work furnished for each Task Order.
After the Forest Service review of the completed deliverables, they may be returned to the A-E for correction, changes, or additions, if required. The corrected deliverables shall be returned to the project manager.
C- 5 General Type Work Activities
The following is a list of typical work activities contemplated to be performed for a specific Task Order.
This list is not all-inclusive.
• Condition Inspection: Performance of inspections to evaluate the condition of the facility identifying corrective actions.
• Site Visit: The Contractor may visit an installation or facility to obtain specific information pertaining to a project. A separate Task Order for the site visit will be issued.
• Topographic Site Surveys: Site survey and mapping.
• Report Preparation: Engineering reports and studies may be required.
• Work Plan: The Contractor shall prepare a document outlining the scope, schedule, costs, codes, standards, etc. in order to perform a Task Order. The work plan’s level of detail will be commensurate with the complexity of the project. Ultimately, the approved work plan represents the final scope of work for the project.
• Design Calculations: The Contractor shall perform design analysis and calculations needed to prepare construction documents.
• Plans and Specifications: The Contractor shall prepare construction drawings, as-built plans, and specifications to complete the construction action.
• Geotechnical Services: The Contractor shall perform services related to the following typical areas (this list is not all inclusive): Routine Laboratory materials testing; mix design testing;
field construction inspection, reporting, and field testing like nuclear density tests;
pavement investigations, testing, analysis, and design. The Contractor shall have access to a laboratory nationally accredited by AASHTO in asphalt testing. The Contractor shall submit their associated laboratory standard price list on a yearly basis. Other instructions to be included in specific Task Orders.
• Landscape Services: The Contractor shall perform design services required by this contract and individual project specifications. Work usually requires the Landscape
Architect/Engineer to consider the nature and purpose of the project; analyze the natural elements of the site; observe sunlight and shade considerations; assess the effect of existing buildings, roads, walkways, and utilities; prepare a preliminary design, take into account local, state, and federal regulations; consult with other professionals involved in the project;
and produce detailed plans of the site, including written reports, sketches, models, photographs, land-use studies, and cost estimates. Work may also include preparation of working drawings showing all existing and proposed features including selection of plant materials, construction work plan development, and monitor/inspect the installation of the design.
• Submittals/Certifications: The Contractor shall submit documents to support or record the actions being taken under the Task Order requirements. Each Task Order will specify what submittals are required. Examples are: site investigation/survey reports; work plans; site safety and health plan; quality control program; work schedules; as-built/progress and final drawings; design calculations, detailed cost estimates, preliminary design reports, LEED documentation certifications; and correspondence records.
• Presentations and Meetings: The Contractor shall conduct presentations and meetings as identified in each Task Order. These may include informational/project related presentations or meetings to the forest supervisors, forest engineers and various specialists, as well as public meetings to answer project related questions.
• Expert Testimony for Litigation: As identified on individual Task Orders, the Contractor shall provide expert testimony as needed; however this is not a typical activity. This will be outlined in specific Task Orders.
C- 6 Contract Performance and Requirements
The following performance and requirements shall be incorporated into each Task Order unless otherwise noted within a specific project Task Order.
• Overall Responsibility: The Design Professional Contractor shall be responsible for all design unless otherwise indicated in the Task Order or as directed by the Contracting Officer.
• Sub-consultants: The primary Contractor (design professional) may use a number of
Sub-consultants (subcontractors) to complete various task orders. Sub-consultants for a specific task shall be identified with qualifications in the work plan to be accepted by the
Contracting Officer.
• Brand Name or Equal Descriptions: When the Contractor specifies end products using a brand name or equal description, the description must include, in addition to the brand name, a description of those salient physical, functional, or performance characteristics of the brand name item that an “equal” item must meet to be acceptable. The Contractor may use brand name or equal descriptions when the salient characteristics are firm requirements. (Source FAR 11.104)
• Buy American Act: The Buy American Act requires that U.S. manufactured end products be used as long as the domestic items are of satisfactory quality and are available in sufficient quantity. This federal law shall be considered in all design decisions. When the Contractor uses a brand name or equal description, the Contractor shall specify a U.S. manufactured end product. Any exception to this Act must have prior approval from the Contracting
Officer.
• Green Purchasing: Construction designs shall use the maximum practicable amount of recovered materials consistent with the performance requirements, availability, price reasonableness, and cost-effectiveness. Contractor shall consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable.
• Codes and Standards: The Contractor shall provide design in accordance with the specifications designated for each Task Order or outlined in the approved work plan. The
Forest Service recognizes many national model building codes and standards. While it is impractical to cite all of the required codes, specific major codes and standards are identified herein for technical uniformity. In general the following shall apply:
o Technical Code Requirements
� Facilities Owned and Operated by the Forest Service. The following design and operating codes and standards apply. The more stringent requirement shall apply when conflicting direction occurs. Conflicts in code requirements should be resolved by the Regional Director responsible for engineering activities or the
Assistant Director for Administration.
• Americans with Disabilities Act and Architectural Barriers Act
Guidelines(ADAABAG). These documents can be found on the United
States Access board website: www.access-board.gov.
• Forest Service Health and Safety Code Handbook. (FSH 6709.11)
• National Electrical Code. Published by the National Fire Protection
Association.
• National Electrical Safety Code. Published by the Institute of Electrical and
Electronics Engineers, Inc.
• National Fire Codes. Published by the National Fire Protection
Association.
• Occupational Safety and Health Standards for Construction. Title 29, Code of Federal Regulations, Part 26 (29 CFR Part 1926).
• Occupational Safety and Health Standards for General Industry. (29 CFR
Part 1910).
• International Building Code. Published by the International Code Council.
• International Housing Code. Published by the International Code Council.
• International Mechanical Code. Published by the International Code
Council.
• Handbook on Fundamentals, Design, and Evaluation Criteria for Energy
Conservation in New Buildings Standard 90. Published by the American
Society of Heating, Refrigerating, and Air-Conditioning Engineers.
• International Plumbing Code. Published by the International Code
Council.
• Green Building Initiative. Green Globes certification and oversight and design by Green Globe accredited professionals.
• US Green Building Council and the Green Building Certification Institute.
LEED certification and oversight and design by LEED accredited profesionals.
• Forest Service – Built Environment Image Guide.
• All other International Codes. Published by the International Code
Council.
o Geotechnical Systems:
� Design – American Association of State, Highway and Transportation Officials
(AASHTO) Specifications; American Society for Testing and Materials (ASTM);
Forest Service Specifications for Construction of Roads and Bridges.
o Special Projects:
� Design – International Building Code.
All codes and specifications shall be the latest edition of applicable codes including interims.
• Professional Certification: Registered professional architect and/or engineers shall certify with their signature and stamp all items identified in the individual Task Orders. In general, all design calculations, drawings, reports, inspections, and construction certifications, will require professional certification. The design professional shall have licenses in Idaho, Montana, North Dakota, and South Dakota or shall be able to obtain certified and stamped designs for all above states.
• Civil, Electrical, Mechanical, Structural Engineers: Professional engineers in fields stated with documented project investigations and problem solving experiences. Requires a baccalaureate degree in engineering from an accredited institution with the state licensing board. A minimum of 5 year’s experience in carrying engineering design through all stages of development and implementation including attention to budget and schedule.
• Architect: Professional architect with documented project investigation and problem solving experience. Requires a baccalaureate degree in architecture from an accredited institution and registration with the state licensing board. A minimum of 5 year’s experience in carrying design and land-use planning through all stages of development and implementation, including attention to budget and the schedule.
• Construction Certification: The design professional may be required to provide written certification with their signature and stamp that the construction has been completed per approved plans and specifications if required in the task order.
• Construction Inspections: Construction inspectors shall have the experience, training and skills needed to accomplish specific task order requirements.
• Geotechnical Engineer: Professional civil engineer with documented geotechnical investigation and problem solving experience. Requires a baccalaureate degree in civil or geotechnical engineering from an accredited institution and registration with state licensing board. A minimum of 5 year’s experience in field testing, geotechnical investigation, and geotechnical analysis and design is required.
• Landscape Architect/Engineer: Professional landscape architect/engineer with documented landscape project investigation and problem solving experience. Requires a baccalaureate degree in landscape architecture/engineering from an accredited institution and registration with the state licensing board. A minimum of 5 year’s experience in carrying a landscape design and land-use planning through all stages of development and implementation, including attention to budget and the schedule.
Documentation: The Contractor shall implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation, dates and information necessary for its internal management as well as Government management of the individual Task
Orders.
PACKAGING AND MARKING
D- 1 Marking and Labeling
(a) Each package, report, or other deliverable product shall be accompanied by a transmittal letter or other document that:
(1) Identifies the Contract and Task Order by number for which the item is being delivered.
(2) Identifies the deliverable Item Number or Report Requirement, which requires the delivered item(s), IF stated in the Task Order.
(3) Indicates whether the Contractor considers the delivered item to be a partial or full satisfaction of the requirement.
(b) For any package, report or other deliverable being delivered to a party other than the Contracting
Officer (CO), a copy of the transmittal letter for the document required above shall be simultaneously provided to the Contracting Officer issuing the Task Order.
D- 2 Formats
(a) Specifications shall be provided in Microsoft Word and delivered either by email, CD, or other electronic format as stated in the Task Order.
(b) Drawings shall be provided in electronic format (AutoCad) as stated on the Task Order. In addition to the electronic format, at least one set drawings, signed and stamped by the A/E shall be provided. If additional hardcopies are required, it will be stated on the Task Order.
(c) Cost Estimates and Fee Proposals shall be provided in Microsoft Excel spreadsheets or other similar products approved by the Contracting Officer.
(d) If the Contractor prepares, or the Task Order requires, a site plan be created with the existing features, utilities, and improvements, the Government will be provided a copy.
CONTRACT PERIOD AND TIME
F- 2 Contract Period
The contract period of this contract is from the date of contract award through last option period exercised by the Government. Task Orders may be issued at any time during the contract period.
Contract time for individual Task Orders will be negotiated and identified in each Task Order. Contract time for individual Task Orders may extend past the last day of the total contract period.
Contract Year Start of Contract/Option Date Last Date A Task Order may be executed
Year One
(Base Year)
Award Date of Contract May 31, 2014
Year Two
(Option Year)
June 1, 2014 May 31, 2015
Year Three
(Option Year)
June 1, 2015 May 31, 2016
Year Four
(Option Year)
June 1, 2016 May 31, 2017
Year Five
(Option Year)
June 1, 2017 May 31, 2018
F- 3 Contract Time and Required Rate of Progress
The start work date and the contract time for each Task Order will be negotiated prior to issuance of each Task Order. The Contractor shall maintain progress at a rate that will assure completion of work within the contract time specified in the Task Order. Contract time on Task Orders issued by the
Government may overlap and/or run concurrently.
CONTRACT ADMINISTRATION DATA
G- 4 Ordering Process
(a) New Project Identification and Approval
Projects will be identified on an as-needed basis. Projects may be initiated by any USDA Forest Service unit located in the Northern Region (Region 1) of the USDA Forest Service (See Paragraph C- 3). In addition to units located in the Northern Region, any RMRS units within the Northern Region or anywhere in the State of Idaho may initiate projects under this contract. USDA Forest Service units will obtain approval of all proposed projects from the Contract Contracting Officer’s Representative (See
Paragraph G- 3.1) prior to submitting the proposed project to their unit’s servicing Contracting Office for processing.
(b) Initiation of Task Orders
Once project approval is obtained from the Contract COR, Task Orders shall be initiated by submitting the following to the unit’s servicing Contracting Office:
• IAS Requisition
• FS-6300-4, Request for Contract Action
• Evidence of the project’s approval by the Contract COR
• Government Cost Estimate
• Task Order Form
• Statement of Work (Specifications, Plans, Drawings, etc.)
(c) Task Order Solicitation and Negotiation
The unit Issuing Contracting Officer will prepare a Task Order Solicitation, and, with the assistance of technical personnel, negotiate a fair and reasonable price for the work.
(d) Task Order Issuance
The unit issuing Contracting Officer will award the Task Order and provide a copy to the IDIQ Contract
Contracting Officer for maintenance of the contract and monitoring contract totals. Orders may be issued by hard copy, facsimile, or by electronic means.
(e) Evaluation of Task Order Effort Completed by Contractor
The Task Order COR, with input from the Forest/Grassland Engineer, shall complete an evaluation of the
Contractor’s performance on individual Task Orders and forward a copy to the Parent Contract
Contracting Officer for filing with the basic contract.
EVALUATION FACTORS
L- 5 Instructions for the Preparation of Technical Proposals; &
M- 1 Evaluation Criteria
(a) Technical Proposal.
The Government will evaluate each potential contractor in terms of the following evaluation criteria, which are of equal value in the evaluation process, in order to determine the most highly qualified firms. In conducting evaluations, the Government will consider information provided by the offeror, and may also acquire and consider other information provided from references, previous and current customers, other individuals familiar with the offeror, Government databases, and publicly available sources.
1. Professional Qualifications. Professional qualifications necessary for satisfactory performance of required services.
The offeror shall submit a completed SF-330. The information provided in the SF-330 and other information gathered by the Government will be used to evaluate the general qualifications and experience of the proposed team, including key personnel and sub-contractors.
2. Specialized Experience and technical competence.
The offeror shall provide specific information on completed projects which are similar in nature to Forest Service facilities described in this announcement. Offeror shall also provide other information on specialized experience and technical competence, including, experience in energy conservation, pollution prevention, waste reduction, the use of recovered materials, and historic preservation.
3. Capacity to accomplish the work in the required time:
The Offeror shall provide specific information supporting that their office, including subcontractors will have the capacity to perform work in a timely manner, and perform multiple task orders in addition to existing work load. Multiple task orders, up the maximum allowable under the contract may be placed at one time, and contract time for those task orders may run concurrently.
4. Past Performance. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.
The offeror shall identify all contracts and subcontracts currently in process and completed by the offeror’s firm in the past 3 years. Include contracts and subcontracts similar in nature and complexity to that required by this solicitation and contracts entered into with Federal, State and local governments and commercial customers. Provide additional specific information of recent relevant contracts which support past and present performance in the past three years.
Provide references who can confirm your past performance. For each relevant contract or reference, the offeror is requested to provide:
• Agency/company and contact information (contact name, and phone number or email address)
• Contract number and type (i.e. design, design-build, construction management)
• A description of the project
• Dollar value of contract
• Period of Performance – include contract duration and completion date
• A description any problems encountered and the efforts made to correct and prevent future occurrences.
The Offeror may discuss past accomplishments and recognition that indicates the firm's ability to perform the work required by the contract.
Offerors with no record of relevant past performance will be evaluated neither favorably nor unfavorably.
5. Location in the general geographical area of the project and knowledge of the locality of the project.
The offeror shall demonstrate proposed team is located near, or can readily meet with Forest
Service personnel in Missoula, MT. The Offeror shall demonstrate knowledge of areas the work may be performed; familiarity with the work sites in the area (including local historical facilities), and familiarity with the various types of work sites for which the Forest Service may require services, including administrative sites, research centers, work centers, training facilities
(classrooms, training apparatus for fire fighters, IT training, etc), bunkhouses, and historical buildings. The offeror shall demonstrate knowledge of U.S. Forest Service Agency architecture, history and culture, and other architecture, history and culture that may be relevant to projects being designed in the area covered by the contract.
(b) Price Proposal. After the selection board evaluates and ranks each offeror, the Contracting Officer will request price proposals from the highest ranked offeror(s). The Government will evaluate the offeror’s proposed prices for the base and all option years to determine if proposed prices are fair and reasonable.
(c) Evaluation and Award Statement. Technical Proposals, including Past Performance will be evaluated.
Technical interviews (aka “discussions” per FAR Part 36, not FAR Part 15) will be held with at least three of the most highly qualified firms as identified by the selection board. Upon review and approval of the selection report, the Contracting Officer will request prices from the most highly qualified firm. An evaluation will be conducted to determine if prices offered are fair and reasonable or require price negotiations to be conducted. In the event a fair and reasonable price cannot be reached with the most highly qualified firm, the Contracting Officer may enter into negotiations with another firm on the selection report. A selection report indicating the final recommendations of the selection board will be prepared for review and approval by the Source Selection Authority.
Award will be made to the most highly qualified firm for which a fair and reasonable price is agreed to.
The Government reserves the right to make cost/technical trade-offs that are in the best interest and advantageous to the Government. The critical factor in making any cost/technical trade-off is not the difference between the technical evaluations but the significance of the difference. The significance of the difference between the technical evaluations will be determined on the basis of what the difference might mean in terms of performance and what it would cost the Government to take advantage of that difference. The Government may reject any or all offers if such action is determined to be in the best interest of the Government.
ADDITIONAL INFORMATION
All information must be included in the SF 330 package and response to Evaluation Criteria. Firms must be registered with Central Contractor Registration (CCR) prior to contract award. Registration information is available at the CCR website, http://www.ccr.gov.
Those firms that meet the requirements of this announcement and wish to be considered must submit the SF-330 package and responses to the Evaluation Criteria identified above to the following address.
Please reference Solicitation No. AG-03R6-S-13-0075 in your cover letter or on the submittal.
USDA Forest Service
Western Montana Acquisition Zone
Building 24 – Fort Missoula
Missoula, MT 59804
Responses must be received at the above address by no later than 4:00 p.m. Mountain Daylight Time on
Monday, July 22, 2013. Firms not providing the required information may be negatively evaluated.
Facsimile and E-mail submittals will not be accepted.
Point of contact is Mr. Loren Ebner, Contracting Officer, Phone 406-329-3858. E-mail address for inquiries is: lebner@fs.fed.us
File details come from the government source that posted it. Updated .