Signed_Drawings.pdf

PDF 2 MB Posted

Attached to
Lewis and Clark National Forest Logging Creek ATV Trail
Solicitation number
AG-03K0-S-16-0017
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
Davis_Bacon_Wage_Determination.pdf PDF
AG-03K0-S-16-0017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

MAP

PROJECT AREA

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

HELENA-LEWIS & CLARK NF

D. WOODS 1/2016

STATIO

N

0+00

U

PPER SECTIO

N O

F PRO

JECT

STATIO

N

11+18

EXISTIN

G TRAIL 302

STATIO

N

27+57

STATIO

N

0+00

STATIO

N

67+26

EXISTIN

G TRAIL 302

CO

N

STRU

CT TRAIL O

N

EXISTIN

G RO

AD

N

EW

TRAIL CO

N

STRU

CTIO

N

LO

W

ER SECTIO

N

O

F PRO

JECT

N

EW

TRAIL CO

N

STRU

CTIO

N

TO

DIVIDE RO

AD 839

RO

AD 268

IN

STALL TRAIL M

ARKER

302A

IN

STALL TRAIL M

ARKER

302A

IN

STALL TRAIL M

ARKER

O

THER TRAIL M

ARKERS

LO

CATIO

N

W

ILL BE STAKED

BY CO

GENERAL NOTES

1. MATERIALS AND CONSTRUCTION FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF TRAILS AND THE SPECIAL PROJECT SPECIFICATIONS

2. ESTIMATE OF QUANTITIES ARE FOR CONTRACTOR CONVENIENCE ONLY, CONTRACTOR SHALL BE RESPONSIBLE TO

VERIFY ALL QUANTITIES, VOLUMES AND LENGTHS.

ESTIMATE OF QUANTITIES

NOTE - ESTIMATE OF QUANTITIES ARE FOR CONTRACTOR CONVENIENCE ONLY, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL QUANTITIES, VOLUMES AND LENGTHS.

SPECIFICATION NOTES

904 THE EXISTING TRAIL SHALL BE CLOSED DURING THE ENTIRE DURATION OF THE PROJECT. ALSO, THE CURRENT LEWIS AND CLARK TRAVEL PLAN MAP IS APPLICABLE TO THE CONTRACTOR, EXCEPT FOR TRAVEL AS ALLOWED IN

THE SPECIAL PROJECT SPECIFICATIONS.

907 THE EQUIPMENT USED ON THE PROJECT MUST BE WEED SEED FREE BEFORE ENTERING FOREST SERVICE LANDS.

908 THE FOREST SERVICE WILL PROVIDE CONSTRUCTION STAKING IN THE VICINITY OF CLIMBING TURN AND

SWITCHBACKS.

912 PAY ITEM 912(01) IS USED FOR TRAIL CONSTRUCTION WHEN ITEM 912(16) IS NOT USED.

PAY ITEM 912(16) IS USED WHEN TRAIL CONSTRUCTION IS DONE ON EXISTING ROAD.

EXCESS FILL GENERATED FROM STATIONS 0.0 TO 135.2 ON THE UPPER SECTION SHALL BE PLACED ON THE ROAD

TO RECONTOUR IT WITHIN 300 YARDS OF THE EXCAVATION AS SPECIFIED BY THE CO.

954 THE LOCATION OF THE TRAIL MARKER SIGNS WILL BE STAKED BY THE CO.

ITEM DESCRIPTION METHOD OF MEASURE PAY UNIT MEASURE

911 (02) Clearing & Grubbing DQ Linear Feet 7845

912 (01) Excavation DQ Linear Feet 3741

912 (05) Trail Turnout AQ Each 4

912 (06) Rolling Dip AQ Each 3

912 (16) Excavation Within Existing Road DQ Linear Feet 3969

914 (01) Switchback, Type I AQ Each 1

951 (01) Mobilization LSQ Lump Sum 1

952 (02) Furnish and Install Sign Panel AQ Each 6

952 (03) Treated Posts, Length 8 ft-Dia. 6 inch AQ Each 6

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

ESTIMATE OF QUANTITIES

PROJECT NOTES

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

HELENA-LEWIS & CLARK NF

D. WOODS 1/2016

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

1 0 123.3 11.978 12 6 INTERSECTION WITH TRAIL

302A

2 12 137.6 11.995 12 3

3 24 176.7 15.886 16 12

4 40 215.6 11.849 12 16

5 52 255.4 14.834 15 15

6 67 259.1 16.916 17 10

7 84 241.6 48.225 49 18

8 133 287.8 20.974 21 -5

9 154 254.8 40.352 41 18

10 195 243.9 52.488 53 14

11 248 243.7 49.7 50 11

12 298 225.9 25.815 26 12

13 324 187.4 38.722 39 12

14 363 169.5 28.929 29 7

15 392 137.9 43.98 44 3

16 436 126.3 43.991 44 2

17 480 153.1 71.871 72 6

18 552 132.3 35.993 36 2

19 588 107.2 30.975 31 -4

20 619 152 18.985 19 4

21 638 119.3 36.983 37 -3

22 675 96.3 38.876 39 -8

23 714 116.5 53.903 54 -6

24 768 153.8 98.955 99 -3

25 867 182.8 79.745 80 8

26 947 155.3 84.729 85 8

27 1032 140.1 22.836 23 -12

28 1055 172.9 49.752 50 10

29 1105 167.3 56.818 57 8

30 1162 150.3 37.932 38 -6

31 1200 189.8 59.698 61 21

32 1261 199.6 39.957 41 23

33 1302 160.7 32.919 33 -7

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

34 1335 171.6 58.259 59 16

35 1394 171.3 68.334 69 14

36 1463 137.6 27.648 28 -16

37 1491 176.9 48.619 50 24

38 1541 166.7 77.349 78 13

39 1619 143.8 21.868 22 -11

40 1641 177.8 61.123 62 17

41 1703 176.2 62.392 63 14

42 1766 149.3 92.538 93 -10

43 1859 175.4 69.226 70 15

44 1929 179.6 91.832 93 16

45 2022 179.4 58.58 59 12

46 2081 159 100.874 101 -5

47 2182 184.2 101.371 103 18

48 2285 154.3 49.644 50 -12

49 2335 189.3 73.814 75 18

50 2410 166.8 95.995 96 -1

51 2506 165.6 76 76 0

52 2582 165.8 67.969 68 -3

53 2650 179.5 42.787 43 10

54 2693 156.1 72.768 73 -8

55 2766 159.7 10.786 11 -20 HUB

56 2777 168.5 62.95 63 -4

57 2840 161.2 20.991 21 -3

58 2861 185.3 42.991 43 2

59 2904 170.3 56.989 57 2

60 2961 177.7 81.898 82 5

61 3043 176.7 49.998 50 1

62 3093 182.2 80.674 81 9

63 3174 184.7 74.817 75 7

64 3249 187.3 72.768 73 8

65 3322 186 40.9 41 7

66 3363 166.2 35 35 0

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

67 3398 188.9 75.814 76 7

68 3474 182.4 47.914 48 6

69 3522 191 61.889 62 6

70 3584 186.7 57.896 58 6

71 3642 160.7 12.999 13 1

72 3655 191.1 77.247 78 14

73 3733 187.5 73.556 74 11

74 3807 190.2 53.783 54 9

75 3861 170.3 66.97 67 3

76 3928 171.6 65.918 66 -5

77 3994 168.8 89.888 90 -5

78 4084 148.4 29 29 0

79 4113 92 24.995 25 -2

80 4138 49 58.997 59 -1

81 4197 36.5 60.997 61 -1

82 4258 45.6 79.996 80 -1

83 4338 59 46.998 47 -1

84 4385 41.6 92.995 93 -1

85 4478 44.3 65 65 0

86 4543 35.8 38.982 39 3

87 4582 47.6 75.996 76 1

88 4658 38.3 84.996 85 1

89 4743 44.2 95.995 96 1

90 4839 48 89.982 90 2

91 4929 33.2 85.961 86 -3

92 5015 31.4 97.922 98 -4

93 5113 36.2 94.981 95 2

94 5208 37.4 100.995 101 1

95 5309 26.7 115.948 116 -3

96 5425 31.2 98.995 99 -1

97 5524 33.5 132.94 133 3

98 5657 26 143.885 144 4

99 5801 32.3 125.774 126 6

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

100 5927 23.4 18 18 0

101 5945 27.5 90 90 0

102 6035 24.4 99.98 100 2

103 6135 23.7 117.994 118 1

104 6253 26.3 86.983 87 -2

105 6340 21.9 75 75 0

106 6415 32.4 96.922 97 4

107 6512 33 23.957 24 6

108 6536 8.7 85.484 86 11

109 6622 8.3 63.466 64 13

110 6686 3.1 64.841 65 7

111 6751 HUB BY EDGE OF ROAD

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

LOWER SECTION

SURVEY LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

34 1335 171.6 58.259 59 16

35 1394 171.3 68.334 69 14

36 1463 137.6 27.648 28 -16

37 1491 176.9 48.619 50 24

38 1541 166.7 77.349 78 13

39 1619 143.8 21.868 22 -11

40 1641 177.8 61.123 62 17

41 1703 176.2 62.392 63 14

42 1766 149.3 92.538 93 -10

43 1859 175.4 69.226 70 15

44 1929 179.6 91.832 93 16

45 2022 179.4 58.58 59 12

46 2081 159 100.874 101 -5

47 2182 184.2 101.371 103 18

48 2285 154.3 49.644 50 -12

49 2335 189.3 73.814 75 18

50 2410 166.8 95.995 96 -1

51 2506 165.6 76 76 0

52 2582 165.8 67.969 68 -3

53 2650 179.5 42.787 43 10

54 2693 156.1 72.768 73 -8

55 2766 159.7 10.786 11 -20 HUB

56 2777 168.5 62.95 63 -4

57 2840 161.2 20.991 21 -3

58 2861 185.3 42.991 43 2

59 2904 170.3 56.989 57 2

60 2961 177.7 81.898 82 5

61 3043 176.7 49.998 50 1

62 3093 182.2 80.674 81 9

63 3174 184.7 74.817 75 7

64 3249 187.3 72.768 73 8

65 3322 186 40.9 41 7

66 3363 166.2 35 35 0

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

67 3398 188.9 75.814 76 7

68 3474 182.4 47.914 48 6

69 3522 191 61.889 62 6

70 3584 186.7 57.896 58 6

71 3642 160.7 12.999 13 1

72 3655 191.1 77.247 78 14

73 3733 187.5 73.556 74 11

74 3807 190.2 53.783 54 9

75 3861 170.3 66.97 67 3

76 3928 171.6 65.918 66 -5

77 3994 168.8 89.888 90 -5

78 4084 148.4 29 29 0

79 4113 92 24.995 25 -2

80 4138 49 58.997 59 -1

81 4197 36.5 60.997 61 -1

82 4258 45.6 79.996 80 -1

83 4338 59 46.998 47 -1

84 4385 41.6 92.995 93 -1

85 4478 44.3 65 65 0

86 4543 35.8 38.982 39 3

87 4582 47.6 75.996 76 1

88 4658 38.3 84.996 85 1

89 4743 44.2 95.995 96 1

90 4839 48 89.982 90 2

91 4929 33.2 85.961 86 -3

92 5015 31.4 97.922 98 -4

93 5113 36.2 94.981 95 2

94 5208 37.4 100.995 101 1

95 5309 26.7 115.948 116 -3

96 5425 31.2 98.995 99 -1

97 5524 33.5 132.94 133 3

98 5657 26 143.885 144 4

99 5801 32.3 125.774 126 6

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

100 5927 23.4 18 18 0

101 5945 27.5 90 90 0

102 6035 24.4 99.98 100 2

103 6135 23.7 117.994 118 1

104 6253 26.3 86.983 87 -2

105 6340 21.9 75 75 0

106 6415 32.4 96.922 97 4

107 6512 33 23.957 24 6

108 6536 8.7 85.484 86 11

109 6622 8.3 63.466 64 13

110 6686 3.1 64.841 65 7

111 6751 HUB BY EDGE OF ROAD

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

LOWER SECTION

SURVEY LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

67 3398 188.9 75.814 76 7

68 3474 182.4 47.914 48 6

69 3522 191 61.889 62 6

70 3584 186.7 57.896 58 6

71 3642 160.7 12.999 13 1

72 3655 191.1 77.247 78 14

73 3733 187.5 73.556 74 11

74 3807 190.2 53.783 54 9

75 3861 170.3 66.97 67 3

76 3928 171.6 65.918 66 -5

77 3994 168.8 89.888 90 -5

78 4084 148.4 29 29 0

79 4113 92 24.995 25 -2

80 4138 49 58.997 59 -1

81 4197 36.5 60.997 61 -1

82 4258 45.6 79.996 80 -1

83 4338 59 46.998 47 -1

84 4385 41.6 92.995 93 -1

85 4478 44.3 65 65 0

86 4543 35.8 38.982 39 3

87 4582 47.6 75.996 76 1

88 4658 38.3 84.996 85 1

89 4743 44.2 95.995 96 1

90 4839 48 89.982 90 2

91 4929 33.2 85.961 86 -3

92 5015 31.4 97.922 98 -4

93 5113 36.2 94.981 95 2

94 5208 37.4 100.995 101 1

95 5309 26.7 115.948 116 -3

96 5425 31.2 98.995 99 -1

97 5524 33.5 132.94 133 3

98 5657 26 143.885 144 4

99 5801 32.3 125.774 126 6

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

100 5927 23.4 18 18 0

101 5945 27.5 90 90 0

102 6035 24.4 99.98 100 2

103 6135 23.7 117.994 118 1

104 6253 26.3 86.983 87 -2

105 6340 21.9 75 75 0

106 6415 32.4 96.922 97 4

107 6512 33 23.957 24 6

108 6536 8.7 85.484 86 11

109 6622 8.3 63.466 64 13

110 6686 3.1 64.841 65 7

111 6751 HUB BY EDGE OF ROAD

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

LOWER SECTION

SURVEY LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

100 5927 23.4 18 18 0

101 5945 27.5 90 90 0

102 6035 24.4 99.98 100 2

103 6135 23.7 117.994 118 1

104 6253 26.3 86.983 87 -2

105 6340 21.9 75 75 0

106 6415 32.4 96.922 97 4

107 6512 33 23.957 24 6

108 6536 8.7 85.484 86 11

109 6622 8.3 63.466 64 13

110 6686 3.1 64.841 65 7

111 6751 HUB BY EDGE OF ROAD

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

LOWER SECTION

SURVEY LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

INDEX NUMBER FIELD REFERENCE STATION (FEET)

MAGNETIC AZMITH AHEAD

(DEGREES)

HORIZONTAL DISTANCE AHEAD

(FEET)

SLOPE DISTANCE AHEAD

(FEET) GRADE AHEAD (%) SURVEYOR CALLS

1 0 354.6 13.989 14 4 HUB CL ROAD

2 14 357.9 13.999 14 4

3 28 11.3 15.987 16 4

4 44 335.2 11.99 12 4

5 56 290.6 10.199 12 15

6 66 249.4 10.415 11 15

7 77 203 12.669 13 15

8 89 181.7 20.991 21 15

9 110 174.9 25 25 4

10 135 192.1 53.549 54 13

11 189 197.4 64.184 65 13

12 253 157.1 38.905 39 -7

13 292 199.3 97.757 99 16

14 390 157.3 33.863 34 16

15 424 190.2 78.437 79 -9

16 502 201.9 62.988 64 12

17 565 163.2 32.895 33 18

18 598 207 55.38 56 -8

19 653 209.1 68.219 70 15

20 721 168 92.884 93 -5

21 814 195.4 75.864 76 -5

22 890 195.1 71.203 72 6

23 961 182.6 73.633 74 15 CROSS EXISTING TRAIL

24 1035 231 59.854 60 10

25 1095

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

UPPER SECTION

SURVEY LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

INDEX NUMBER FIELD REFERENCE STATION (FEET) LOCATION LINE STATION (FEET) WORK DESCRIPTION

1 0 0 BEGIN TRAIL CONSTRUCTION

2 12 12 BEGIN CONSTRUCTION CLIMBING TURN PC

6 67 66.5 END CONSTRUCTION CLIMBING TURN PT

7 84 83.5 CONSTRUCT ROLLING DRAIN DIP

9 154 152.7 GRADE REVERSAL

12 298 295.2 CONSTRUCT ROLLING DRAIN DIP

20 619 615.5 GRADE REVERSAL

28 1055 1050.5 GRADE REVERSAL

31 1200 1195 GRADE REVERSAL

32 1261 1254.7 CONSTRUCT TRAIL TURNOUT

34 1335 1327.6 GRADE REVERSAL

37 1491 1481.8 GRADE REVERSAL

40 1641 1629.6 GRADE REVERSAL

43 1859 1845.7 GRADE REVERSAL

44 1929 1914.9 CONSTRUCT TRAIL TURNOUT

47 2182 2166.2 GRADE REVERSAL

49 2335 2317.2 GRADE REVERSAL

51 2506 2487 CONSTRUCT TRAIL TURNOUT

56 2777 2757.3 END TRAIL CONSTRUCTION/BEGIN EXCAVATION WITHIN EXISTING ROAD

58 2861 2841.3 GRADE REVERSAL

62 3093 3073.2 GRADE REVERSAL

72 3655 3633.8 GRADE REVERSAL

89 4743 4720.1 GRADE REVERSAL

101 5945 5921.5 GRADE REVERSAL

111 6751 6726.3 END EXCAVATION WITHIN EXISTING ROAD

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

LOWER SECTION

CONSTRUCTION LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

INDEX NUMBER FIELD REFERENCE STATION (FEET) LOCATION LINE STATION (FEET) WORK DESCRIPTION

1 0 0 BEGIN TRAIL CONSTRUCTION/BEGIN SWITCHBACK CONSTRUCTION

10 135 159.1 END SWITCHBACK CONSTRUCTION

13 292 315.7 GRADE REVERSAL

15 424 447.3 GRADE REVERSAL

16 502 525.8 CONSTRUCT TRAIL TURNOUT

18 598 621.7 GRADE REVERSAL

21 814 838.1 GRADE REVERSAL

23 961 985.2 CONSTRUCT ROLLING DRAIN DIP

25 1095 1118.7 END TRAIL CONSTRUCTION

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

UPPER SECTION

CONSTRUCTION LOG

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

L LINE EXISTING GRADE

L LINE FINISHED GRADE

P LINE EXISTING GRADE

L LINE STATION

INDEX NUMBER

L-Stn

PLAN VIEW

PROFILE VIEW

00 30' 60'

HORIZONTAL

00 5' 10'

VERTICAL

00 20' 40'

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

PLAN & PROFILE-UPPER SECTION

STATION 0.0 TO 159.1

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

P LINE CENTERLINE

L LINE CENTERLINE

EXISTING GROUND

FINISHED GRADE

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

SECTION VIEW-UPPER SECTION

STATION 0.0 TO 159.1

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

HELENA-LEWIS & CLARK NF

D. WOODS 1/2016

1 H: 1 V FILL SLOPE

SEE DETAILS ON SHEET 13

1 H: 1 V FILL SLOPE

SEE DETAILS ON SHEET 13

1 H: 1 V FILL SLOPE

SEE DETAILS ON SHEET 13

1 H: 1 V CUT SLOPE

SEE DETAILS ON SHEET 13

1 H: 1 V CUT SLOPE

SEE DETAILS ON SHEET 13

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

SECTION VIEW-UPPER SECTION

STATION 0.0 TO 159.1

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

HELENA-LEWIS & CLARK NF

D. WOODS 1/2016

P LINE CENTERLINE

L LINE CENTERLINE

EXISTING GROUND

FINISHED GRADE

1 H: 1 V CUT SLOPE

SEE DETAILS ON SHEET 13

FINISHED SLOPE NOTES FOR STATION 0.00 TO 159.1

STATION 0+00 TO STATION 0+14

FILLSLOPE: 1.5 H:1.0 V

CUTSLOPE: 1.5 H:1.0 V

STATION 0+14 TO STATION 0+24

FILLSLOPE: TRANSITION

CUTSLOPE: TRANSITION

STATION 0+24 TO STATION 0+60

FILLSLOPE: 1.0 H:1.0 V

CUTSLOPE: 1.5 H:1.0 V

STATION 0+60 TO STATION 0+66

FILLSLOPE: TRANSITION

CUTSLOPE: TRANSITION

STATION 0+66 TO STATION 0+71

FILLSLOPE: 1.5 H:1.0 V

CUTSLOPE: 1.5 H:1.0 V

STATION 0+71 TO STATION 0+78

FILLSLOPE: TRANSITION

CUTSLOPE: TRANSITION

STATION 0+78 TO STATION 1+59

FILLSLOPE: 1.0 H:1.0 V

CUTSLOPE: 1.0 H:1.0 V

TYPICAL ROCK BUTTRESS FILL SLOPE ON SWITCHBACK

NO SCALE

NOTES:

ROCK FOR BUTTRESS SHALL BE GENERATED

FROM EXCAVATION IN SWITCHBACK OR

FROM A CO APPROVED SOURCE WITHIN 1

MILE OF THE SWITCHBACK

ROCK SHALL HAVE D50 OF 1' OR AS

APPROVED BY THE CO

ROCK BUTTRESS SHALL BE CONSTRUCTED

WHEN FILL SLOPES ARE 1 H:1 V IN THE

SWITCHBACK

APPROXIMATE VOLUME OF ROCK IN

BUTTRESS: 11 CY

ROCK PLACED IN BUTTRESS SHALL BE OF

VARYING SIZE TO PROVIDE DENSE, SOLID

MASS

NOT TO SCALE

Downhill

CLEARING LIMITS

*All heights measured on uphill side of stumps.

Side slope less than or=to 10%

Side slope less than or=to 10%

Stump Height Requirements* (ft)

Stumps outside the

Stump Position clearing limits

Uphill

Cut All Logs

5 FT

Side slope over 10%

Side slope over 10%

Cut

L

C

Side Slope

Clearing Limits (ft.)

Uphill

Cut

Height Downhill

5 FT

Cut

Uphill Downhill

Clearing Limit

Trailway

Trailbed

V e r t i c a l

Downhill

C l e a r i n g

L i m i t

C

L

Clearing Limit

Uphill

4' 4' 10'

5'

Trim branches flush with trunk rather than remove tree.

Stumps between the trailway and clearing limits.

3"

5"

3"

5"

3"

5"

3"

5"

Trail

Width

5' 5' 10'

8'

NOT TO SCALE

TYPICAL TRAIL CROSS SECTIONS

L

C

NOTE:

Fill slope

Fill slope

Above 50%

Sideslope

30% to 50%

Sideslope

Slope rounding in commom material

10% to 30%

Sideslope

Slope rounding in commom material

0% to 10%

Sideslope

Amount of bench varies with % of sideslope. Outslope trailbed 5%

Trailbed

3/4 Bench

Full Bench

Balanced

Section

Slope rounding in commom material

THE SPECIFIED STANDARD

TRAIL WIDTH IS 5 FEET,

EXCEPT FOR SEGMENTS OF

TRAIL WHICH HAVE A

SPECIFIED WIDTH AS SHOWN

ON THE INCLUDED CROSS

SECTIONS. A TOLERANCE OF

PLUS 0.5 FEET IS APPLICABLE

FOR ALL SPECIFIED TRAIL

WIDTHS. TRANSITION

DISTANCE TO CHANGING

WIDTHS SHALL BE 50 FEET.

CLEARING LIMITS 911 TYPICAL TRAIL CROSS SECTIONS 912

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

TYPICAL TRAIL CROSS SECTIONS

CLEARING LIMITS

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

TRAILBED AND SLOPE FINISH

Slope Finish

Trailbed Finish

Backslope Ratio

Rock 1H:4V

Common 1.5H:1V

Fill Slope Ratio

Remove roots over 1 inch in diameter that protrude from the backslope.

Remove or reduce embedded rock that protrudes more than 2 inches above the trailbed.

Remove loose rock on the trailbed surface over 1 inch in the smallest dimension.

NOT TO SCALE

Rock 1H:1V

Common 1.5H:1V diameter that protrude from the

Remove roots over 1 inch in

SEE SHEET 14 FOR TRAIL WIDTH

Trailbed trailbed.

Backslope ratios will vary.

Backslope ratios shall be as stated below, except where show differently in the section views.

TRAILBED AND SLOPE FINISH 912 ROLLING DIP 912

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

ROLLING DIP

TRAILBED AND SLOPE FINISH

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

A

A

RADIUS

POINT

M

I

N

I

M

U

M

R

A

D

I

U

S

D

O

W

N

G

R

A

D

E

U

P

G

R

A

D

E

SEE WORK LIST SHEET

FOR CROSS DRAIN TYPE AND LOCATION

CUT SLOPE

FILL SLOPE

FILL SLOPE

CUT SLOPE

BACKSLOPE,

REFER TO TRAIL

EXCAVATION

DETAILS

EXISTING GROUND

FILL

SLOPE3%

IN

S

LO

P

E

3%

IN

S

LO

P

E

PLAN VIEW

SECTION A-A

CLIMBING TURN 912TURNOUT AND PASSING SECTIONS 912

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

CLIMBING TURN

TURNOUT AND PASSING SECTIONS

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

EXCAVATION IN EXISTING ROAD

FLAT SLOPES

AFTER CONSTRUCTION

BEFORE CONSTRUCTION

NOT TO SCALE

Compacted Suitable Material

2 Inch Crown

S lo p e

Existing Ground

Berm

Existing Road

Existing Ground

Road Width Varies

Do Not Disturb

This Section Of Road

Trailbed

5 FT

Trailbed

5 FT

Do Not Disturb

This Section Of Road

The trailbed shall be located either near the cutslope side of the existing road or the fill slope side of the road as specified by the P-Line.

Clearing and grubbing shall be paid for under the clearing and grubbing pay item. See typical 911-1 for clearing and grubbing typcial.

EXCAVATION IN EXISTING ROAD 912 SWITCHBACK, TYPE I 914

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLAND

SWITCHBACK, TYPE I

EXCAVATION IN EXISTING ROAD

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

2 FOOT

MINIMUM

60 INCHES

MINIMUM

TO LOWEST

SYMBOL

SIGN AND POST INSTALLATION

NOT TO SCALE

30°

(TYP)

TREAD

BACKFILL WITH

SUITABLE MATERIAL

(TYP)

AS

STAKED

1 INCH

TYP

NOTES:

REFER TO "EM-7100-15 SIGN AND POSTER GUIDELINES

FOR THE FS" FOR SIGN SPECIFICATIONS, MATERIALS, AND PLACEMENT.

ALL HARDWARE SHALL BE ALUMINUM OR GALVANIZED.

LAG SCREW FASTENERS REQUIRE LEAD HOLES IN POSTS AND SHALL BE

DRILLED PRIER TO INSTALLATION.

BOLT HOLES IN POSTS TO BE 1/16 INCH LARGER (MAXIMUM) LARGER

THAN THE BOLT HOLE REQUIREMENT.

SIGN AND MARKER POSTS ONLY SHALL BE TREATED WITH CCA

(CHROMATED COPPER ARSENATE) FOR UC4A GROUND CONTACT FOR

GENERAL USE.

COMPACT BACKFILL IN 6 INCH LIFTS UNTIL NO VISUAL DISPLACEMENT.

SIGNS: SHALL BE RETROREFLECTIVE, CAPITAL ASA SERIES C, 2

INCHTEXT, WHITE LEGEND ON BROWN BACKGROUND, FRD SHAPE,

ALUMINUM MATERIAL

4" X 4" WOOD POST

TRAIL MARKERS: PROVIDE THE FOLLOWING SIGNS. SEE PAGE 2 FOR

INSTALLATION LOCATIONS.

QUANTITY: 2

POSTS: 1 EACH

QUANTITY: 4

POSTS: 1 EACH

T

R

T

R

A

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

LOGGINGCREEK.DWG

1/2016

1/2016

1/2016

S. VANSICKLE

J. NOLAND

J. NOLANDSIGN AND POST INSTALLATION

TRAIL CONSTRUCTION

LOGGING CREEK ATV

GREAT FALLS, MT

HELENA-LEWIS & CLARK NF

SIGN AND POST INSTALLATION 952

cover
LOGGING CREEK DRAWINGS 022216

File details come from the government source that posted it. Updated .