Carpenter-Snow Creek NPL Tailings Site Stabilization

Table of Contents

Table of Contents

PREFACE

101 - TERMS, FORMAT, AND DEFINITIONS

102 - BID, AWARD, AND EXECUTION OF CONTRACT

103 - SCOPE OF WORK

104 - CONTROL OF WORK

105 - CONTROL OF MATERIAL

106 - ACCEPTANCE OF WORK

107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

108 - PROSECUTION AND PROGRESS

109 – MEASUREMENT AND PAYMENT

151 - MOBILIZATION

152 – CONSTRUCTION SURVEY AND STAKING

153 – CONTRACTOR QUALITY CONTROL

155 - SCHEDULES FOR CONSTRUCTION CONTRACTS

157 - SOIL EROSION CONTROL

158 – WATERING FOR DUST CONTROL

201 - CLEARING AND GRUBBING

203 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

204 – EXCAVATION AND EMBANKMENT

208 – STRUCTURE EXCAVATION & BACKFILL FOR SELECTED MAJOR

STRUCTURES

209 - STRUCTURE EXCAVATION AND BACKFILL

251 – RIPRAP

602 – CULVERTS AND DRAINS

608 – PAVED WATERWAYS

619 – FENCES, GATES, AND CATTLE GUARDS

622 – RENTAL EQUIPMENT

623 – GENERAL LABOR

625 – TURF ESTABLISHMENT

629 - ROLLED EROSION CONTROL PRODUCTS AND CELLULAR CONFINEMENT

SYSTEMS

633 - PERMANENT TRAFFIC CONTROL

704 – SOIL

705 – ROCK

713 – ROADSIDE IMPROVEMENT MATERIAL

718 - TRAFFIC SIGNING AND MARKING MATERIAL

725 – MISCELLANEOUS MATERIAL

PREFACE

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

101 - TERMS, FORMAT, AND DEFINITIONS

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - BID, AWARD, AND EXECUTION OF CONTRACT

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - SCOPE OF WORK

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

Add the following to Subsection 103.01.

The Lewis and Clark National Forest desires to stabilize tailings located in the Carpenter Creek drainage. These tailings are highly erosive and are currently actively being eroded by wind and runoff. Work includes, but is not limited to, the excavation of ditches, the lining of the ditches with pre-formed trapezoidal high density polyethylene channel liner, the placement of erosion control blankets, the construction of riprap splash pads, the construction of check dams, and the placement of wood mulch. Also included in this project is the stabilization of tailings using straw bales, and culvert installation using equipment rental.

The project is located adjacent to the Carpenter Creek County Road near Neihart, MT. The project is located in Section 16 and Section PB57, Range 8E Township 14N.

To access the project from Great Falls, MT take US Highway 89/87/MT 200 East for approximately 20 miles, then turn right onto US Highway 89. Continue on US Highway 89 for approximately 33 miles. Turn left onto the Carpenter Creek Road. Continue on the Carpenter

Creek Road for approximately 2.1 miles. The lower and upper tailings piles will be on your right.

Bear left onto Pioneer Lane and travel for approximately 1.1 miles. The Silver Dyke tailings pile will be on your left.

104 - CONTROL OF WORK

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - CONTROL OF MATERIAL

105.02_nat_us_01_18_2007

105.02 Material Sources

Add the following before the first paragraph:

Riprap Source – Contractor Furnished – There is no Government source for riprap.

Materials Stockpile Site- Government Provided – The contractor is allowed to stockpile construction materials in the area of the tailings piles. The stockpile of material must be in such a manner as to allow safe passage by the general public and local landowners on all roads.

Bed Course material - Contractor Furnished – There is no available Government source for Bed

Course material.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - ACCEPTANCE OF WORK

106.07_nat_us_05_11_2004

106.01_nat_us_01_17_2013

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the

Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to

106.05 inclusive. The primary method of acceptance is specified in each Section of work.

However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.

Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and

Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07 Delete

Delete subsection 106.07.

107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.02 Protection and Restoration of Property and Landscape.

Add the following:

Minimize disturbance of the tailings to the maximum extent possible with tracked or wheeled equipment. The equipment shall be of reasonable size and operate in a manner that shall minimize the disturbance of the site. Submit a list of equipment to be utilized on the project for approval from the CO two (2) weeks prior to the start of construction.

When crossing the tailings to a location of construction, use the same route to transport equipment, so as little disturbance takes place as possible.

Work done within the stream corridor shall be done during low flow conditions.

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.08 Sanitation, Health, and Safety.

Add the following.

Site work will require the handling of mine waste containing metals that are listed as hazardous substances under the comprehensive Environmental Response, Compensation and Liability Act.

(CERCLA) 42 USC 9601 and 9602. Hazardous materials are present at the site and present a threat to human health.

The contractor shall submit a Health and Safety Plan to the CO prior to commencement of work.

Minimum information to be included in the health and safety plan are:

1. Proposed Equipment

2. Proposed Communication System

3. Proposed Personal Protective Equipment

4. First Aid Station

All employees working on the site are required to have completed OSHA 40 hour Hazardous

Waste Operations Training (HAZWOPER). The Contractor shall provide written documentation that all employees working on the site have completed and are current with the HAZWOPER training required under 29 CFR 1910.120.

The Contractor shall prepare and submit a Vehicle Decontamination Plan before work commences. The plan shall include at a minimum:

1. Methods of decontaminating vehicles.

2. Locations of decontamination stations.

The Vehicle Decontamination Plan shall be subject to review and approval, in writing, by the

CO. No work may commence until approvals of the Vehicle Decontamination Plan have been secured.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - PROSECUTION AND PROGRESS

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 – MEASUREMENT AND PAYMENT

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

One of the following Methods of Measurement for determining final payment is designated in the Schedule of Items for each Pay Item:

[a] Contract Quantities (CQ) – As previously defined.

[b] Actual Quantities (AQ) – These quantities are determined from measurements of completed work.

[c] Lump Sum Quantities (LSQ) – These quantities denote one complete unit of work as described in 109.02 (h).

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 - MOBILIZATION

151.00_01_us_10_11_2006

Delete Section 151 in its entirety and replace with the following.

Description

151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.

Construction Requirements

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the CO.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either

Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

Measurement

151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

Measure mobilization according to Subsection 109.02.

Payment

151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection

109.05.

Progress payments for mobilization lump sum will be paid as follows:

(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5

Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Include all costs associated with the initial cleaning of equipment in the unit bid price for

Mobilization. Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.

152 – CONSTRUCTION SURVEY AND STAKING

152.03 Survey and Staking Requirements.

Add the following

Conduct all construction staking under the direction of a licensed professional engineer or land surveyor who is closely associated and familiar with construction staking.

153 – CONTRACTOR QUALITY CONTROL

153.07. Project Submittals

At a minimum the contractor shall provide project submittals as shown on the below Submittal

Log. Submittal requirements are listed in the Standard Specifications, Supplemental

Specifications, and Plans.

SUBMITTAL LOG

No. Description Applicable Spec.

Section or Plans Date Rec’d

Date

Approved

1 Material Stockpile Locations 105

2 Hazardous Spill Plan 107

3 Equipment List 107

4 Health and Safety Plan 107

5 Vehicle Decontamination Plan 107

6 Noxious Weed Control 151

7 Soil Erosion and Pollution Control Plan 157

8 Geotextile-Material Certification 157

9 Riprap-Material Certification 251

10 Corrugated Steel Pipe-Material Certification 602

11 Bed Course-Material Certification 608

HDPE Ditch Liner-Shop Drawings/Material

Certification

13 HDPE Mat-Material Certification 608

HDPE Ditch Liner T Intersection-Shop

Drawings/Material Certifications

HDPE Ditch Liner Straight Bulkhead-Shop

Drawings/Material Certifications

HDPE Ditch Liner Flared End Section-Shop

Drawings/Material Certifications

17 Jackleg Fence-Material Certification 619

18 Mulch-Material Certification 625

Turf Reinforcement Mat -Material

Certification

20 Signs-Material Certification 633

155 - SCHEDULES FOR CONSTRUCTION CONTRACTS

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

157 - SOIL EROSION CONTROL

157.03_nat_us_02_24_2005

157.02 Materials.

Provide bales, wattles, logs, and rolls from a certified noxious weed free source.

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.

Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

157.10 Waterway and Slope Protection and Stabilization.

(c) Check dams.

Delete the entire subsection (c) Check dams and replace with the following:

Construct check dam cores with excess excavation as shown on the drawings. Use Type IV-A geotextile, and place as shown in the drawings.

Excess excavation is the material excavated for the construction of Paved Waterway, HDPE

Ditch Liner, Pay Item 60802, and not needed for ditch liner backfill.

158 – WATERING FOR DUST CONTROL

158.01

Delete and replace with the following:

This work consists of furnishing and applying water for the control of dust caused by the work.

158.03 General

Provide adequate water supply and apply water needed at all hours as necessary to control dust.

Uniformly apply water using pressure-type distributors, pipelines, pipelines equipped with spray systems, or hoses with nozzles.

158.05

Do not measure dust control for payment.

201 - CLEARING AND GRUBBING

201.01

Delete this subsection and replace with the following

This work consists of clearing and grubbing within clearing limits and other designated areas.

Material

201.02

Delete the Tree wound dressing reference.

Construction Requirements

201.03 General

Delete the last sentence

201.04 Clearing.

(d) – Delete this paragraph and replace with the following:

(d) Trim tree branches that extend over the ditch surface to attain a height sufficient to accommodate construction equipment. If required, remove other branches to maintain a balanced appearance.

201.06 Disposal

Delete the first sentence of this paragraph and replace with the following:

There is no merchantable timber. All timber will be treated and retained on the project.

201.07 Acceptance.

Delete the second sentence reference to tree wound dressing.

203 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.03 Salvaging Material.

Delete the last sentence and replace with the following:

No materials on the project are designated for salvage.

203.05 Disposing of Material.

Delete the methods shown and replace with the following:

(a) Scattering. Scatter construction slash outside the clearing limits in areas designated by the

CO. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll and are not on top of another. Limb and scatter other construction slash to reduce slash concentrations.

(b) Hydrological Sensitive Placement. Use this method in combination with method (a), in disposing of material, to reduce erosion and to aid in re-vegetation:

1. Place logs on contours to act as erosion barriers. Place logs so that 80% of their length is on the ground surface.

2. Scatter slash on bare or disturbed areas outside the clearing limits as directed.

3. Place larger stumps in an upright position in created swales/divots to form planting pockets.

204 – EXCAVATION AND EMBANKMENT

204.14 Disposal of Unsuitable or Excess Material.

Place excess excavation as shown on the drawings or as directed by the CO.

Shape and compact the waste material in its final location. Do not mix clearing or other material in the excess excavation material.

208 – STRUCTURE EXCAVATION & BACKFILL FOR SELECTED

MAJOR STRUCTURES

208.04 General.

Add the following:

Use all suitable material in the construction of paved waterway ditch liners; check dam cores;

and for embankment within the “approximate excess excavation placement extents” shown on the Drawings. Field drain and dry excessively wet material that is otherwise suitable for embankment before placement. Place and shape unsuitable or excess material at designated sites shown on the drawings or as directed by the CO.

208.10 Backfill.

Add the following:

Backfill with material according to Section 608.

Compact backfill according to section 208.11.

208.11 Compacting.

Delete this section and add the following:

Ditch subgrade and check dam core construction shall be layer compacted with mechanical tampers until surface deformation is no longer visible. Embankment from “placement of excess excavation” as shown on drawings shall be equipment compacted until surface deformation ceases. Adjust the moisture content of all backfill material to a moisture content suitable for compaction.

208.12 Acceptance.

Delete reference to Table 208-1:

Delete Table 208-1:

209 - STRUCTURE EXCAVATION AND BACKFILL

209.01

Delete the second sentence and replace with the following:

The work includes preserving channels; shoring and bracing; sealing foundations; dewatering;

excavating for the construction of Paved Waterway, Section 608; stockpiling; preparing foundations; bedding; and backfilling.

209.11 Compacting.

Delete this subsection and replace with the following:

Compact according to Subsection 208.11.

251 – RIPRAP

251.01

Replace the first sentence with the following:

This work consists of furnishing, hauling, and placing riprap for bank protection, slope protection, drainage structures, erosion control, and rock cross-vane structures.

Material

251.02 Material.

Add the following:

Project allows use of suitable on-site Riprap as designated on the plans. All of the other riprap material must come from a commercial source. Contractor must get CO approval on all riprap material to be used on this project.

Construction Requirements

251.04 Placed Riprap.

Add the following category and description:

251.04A Cross-Vane Structure. Rock cross-vane material shall be furnished by the contractor.

Obtain rock at the size shown in the cross-vane structure details. Place or re-arrange individual rocks by mechanical methods to obtain a shape matching cross-vane structure details. The exact location for cross-vane structure must be approved by the CO prior to excavation and placement of rock.

251.07 Acceptance.

First two sentences: Delete the sampling and testing requirements of Table 251-1 and make inapplicable the certification requirements of Subsection 106.03.

251.08

Measure Cross-Vane Structures by the number of structures constructed.

602 – CULVERTS AND DRAINS

Replace Section 602 in its entirety with the following:

Description

602.01 Description.

This work consists of furnishing and delivering culvert to the project site to be installed under

Sections 622 and 623.

Materials

602.02

Forty linear feet of zinc coated, .079” thickness corrugated steel pipe, 2 2/3 inch x 1/2 inch corrugations, with the appropriate number of couplings. Couplings shall be of the same thickness and type of corrugations as the pipe. Meet AASHTO M 36 and AASHTO M 218

Standards for the material specified.

Construction Requirements

602.03 General.

Install culvert as directed by the CO in accordance with Sections 622 and 623.

602.04 Acceptance.

Material will be evaluated under Subsections 106.02 and 106.03. Installation will be evaluated under Subsection 106.04 and under Sections 622 and 623.

602.05 Measure the Section 602 items listed in the bid schedule according to Subsection 109.02.

602.06 The accepted quantities will be paid at the contract price per unit of measurement for the

Section 602 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section, furnishing and delivering pipe. See Subsection 109.05. Installation of pipe will be paid for Sections 622 and 623.

608 – PAVED WATERWAYS

608.01

Delete the entire subsection and replace with the following:

This work consists of constructing paved and lined ditches, gutter, spillways, and similar waterways.

Paved waterways are designated as follows:

Type 1 – High Density Polyethylene Ditch Liner.

Type 2 – Placed Riprap

Material

608.02

Conform to the following Sections and Subsections:

Bed course 704.09

Granular backfill 704.03

Riprap rock 705.02

HDPE Ditch Liner 725.30

HDPE Mat 725.31

Self-tapping screws 725.32

Joint sealant 725.33

Earth anchor 725.34

Erosion control blanket 629

608.03 General

After the first paragraph, add the following:

High Density Polyethylene Lined Waterway-

Subgrade on which the HDPE lining will be placed shall be prepared to remove all large clumps, roots, brush, sod or rocks that might endanger the liner. Trim and remove any tree roots.

Remove unstable soils and replace with compacted granular backfill material. In rocky areas, a bedding layer of fine granular soil shall be provided as a protection against irregularities that cannot be removed. Subgrade shall be approved by the CO prior to installing the liner. The ditch shall be excavated to the shape and size of the HDPE ditch liner prior to placement.

The ditch subgrade of suitable material shall provide uniform and continuous support against the

HDPE ditch liner sidewalls.

Bedding backfill and general installation requirements shall be in accordance with section 209 and manufacturer’s recommendations.

The moisture content and methods of placing and compaction the material shall ensure a firm and stable embankment results. The fill material shall be placed in horizontal lifts of such thickness that proper compaction and prescribed densities are obtained. Fill material shall be compacted according to Section 209.

Install foam gasket sealant at each joint as supplied by the manufacturer. All joints shall be free of debris prior to placement. Contractor shall ensure a tight seal.

HDPE ditch liner sections shall be connected using self-tapping screws as supplied by the manufacturer. Install a minimum of 9 self-tapping screws per joint for the 24” trapezoidal HDPE ditch liner.

Earth anchor kits, as supplied by the manufacturer of the HDPE ditch liner, shall be installed to secure the HDPE ditch liner. At a minimum, install anchors at each joint and mid-section along the top knuckle on each side of the HDPE ditch liner. A minimum anchor depth of 30 inches is required.

HDPE ditch liners offers a variety of fitting pieces for trapezoidal HDPE ditch liners such as tees, bulkhead end sections, directional gates, and flared end sections. When these are specified on the plans, install as per manufacturers recommendation. These fitting must be supplied by the same manufacturer as the HDPE ditch liner. These fitting must seal, and be installed as per the manufacturer’s recommendations.

In locations where the ditch will receive lateral flows, edge protection shall be installed. Edge protection shall be attached to the HDPE ditch liner, overlap the top knuckle and be buried into the side slope along ditch. Refer to standard detail drawings for edge protection.

All HDPE products shall have shop drawings and specifications submitted for approval to the

CO prior to ordering any material.

608.04 Grouted Rubble Paved Waterway (type 1)

Delete the entire subsection:

608.05 Mortared Rubble Paved Waterway (Type 2)

Delete the entire subsection:

608.06 Concrete and Rubble Paved Waterway (Type 3)

Delete the entire subsection:

608.07 Concrete Paved Waterway (Type 4)

Delete the entire subsection:

608.08 Asphalt Paved Waterway (Type 5)

Delete the entire subsection and replace with the following:

608.08 HDPE Ditch Liner Waterway (Type 1)

608.09 Placed Riprap Waterway (Type 6)

Delete this subsection and replace with the following:

608.09 Placed Riprap Waterway (Type 2)

608.10 Acceptance.

Add the following:

HDPE ditch liner will be evaluated under subsections 106.02 and 106.03.

Measurement

608.11

Add the following:

Do not measure excavation required for construction of HDPE Ditch Liner and do not measure excess excavation placements.

619 – FENCES, GATES, AND CATTLE GUARDS

619.03 Fences and Gates

(a) General. – In the first paragraph, delete the last sentence and replace with the following:

Clear a 10-foot width for jackleg fence and a 5-foot width for wire fence.

Add the following type of fence to this subsection:

(d) Jackleg fence. Construct jackleg fence as shown on the Drawings.

622 – RENTAL EQUIPMENT

622.01

Delete this subsection and replace with the following:

This work consists of furnishing and operating equipment for contract work within the scope of the contract and not otherwise provided for under other contract items. The primary purpose of rental equipment is for the installation of a culvert at the Silver Dyke Site.

622.02 Rental Equipment.

Delete the first two sentences of the first paragraph and add the following to this subsection:

Hydraulic Excavator – Provide a track mounted hydraulic excavator, 1990 model year or newer, minimum 90 flywheel H.P., bucket equipped with a hydraulic “thumb”. It is anticipated that an excavator of the size used for other phases of the project will be of an adequate size for any work that the Government directs the contractor to perform.

Articulated Wheel Loader. Provide an articulated wheel loader, 1990 model year or newer, capable of transporting borrowed earthen material for culvert embankment. It is anticipated that a loader of the size used for other phases of the project will be of an adequate size for any work that the Government directs the contractor to perform.

When rental work is being performed a Government employee must be on site and contractor is required to give Government 2 (two) work days notice before starting work.

Measurement and Payment

622.04 and 622.05

The contractor shall be aware of the following statement within Section F of the Contract under

FAR 52.211-18 Variation in Estimated Quantities: “Adjustment of contract prices as described in this section shall not apply to Section 622…the Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in the contract unit price.”

623 – GENERAL LABOR

623.01

Add the following to this subsection:

This work consists of the necessary labor to accompany work accomplished by Rental

Equipment.

Measurement and Payment

623.04 and 623.05

The contractor shall be aware of the following statement within Section F of the Contract under

FAR 52.211-18 Variation in Estimated Quantities: “Adjustment of contract prices as described in this section shall not apply to Section 623…the Government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in the contract unit price.”

625 – TURF ESTABLISHMENT

Replace Section 625 in its entirety with the following:

625.01 This work consists of applying wood fiber mulch for soil erosion protection at the rates shown in Table 625-1.

Material

625.02 Conform to the following Subsection:

Mulch 713.05

625.03 General. As the last stage of the project, apply mulch to all areas disturbed by construction activities, areas shown on the Drawings, and as directed by the CO. Do not apply mulch during excessively windy weather and when the ground is excessively wet or snow covered. Apply, dry, by hand methods or mechanical methods.

Table 625-1

Application Rates for Wood Fiber Mulch

Soil Cover :

Slope

Regular Bales (50 lb) Large Bales (600 lb)

Sq Ft per

Bale

Bales per

Acre

Sq Ft per

Bale

Bales per

Acre

70% soil cover

158 276 1,815 24

625.04 Acceptance. Turf establishment will be evaluated under subsections 106.02; 106.03 and

106.04. Submit mulch product Certification for approval prior to ordering material.

625.05 Measure the Section 625 items listed in the bid schedule according to Subsection 109.02 and the following:

Measure mulching by the ton, dry.

625.06 The accepted quantities will be paid at the contract unit price per unit of measurement for the Section 625 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

629 - ROLLED EROSION CONTROL PRODUCTS AND CELLULAR

CONFINEMENT SYSTEMS

629.05 Erosion Control Blanket, Open Weave Textile, and Turf Reinforcement Mat

(RECP, Types 1.B, 1.C, 1.D, 2.B, 2.C, 2.D,3.B, 4, 5.A, 5.B, and 5.C).

First paragraph, add the following type of RECP:

RECP, Type 5.D, Permanent Turf Reinforcement Mat

Delete the third paragraph and replace with the following:

Use staples that are at least 24 inches long, of the type recommended by the manufacturer, to secure the RECP.

Add the following to this subsection:

Submit a material Certification for approval prior to ordering material.

633 - PERMANENT TRAFFIC CONTROL

633.01

Delete the first paragraph and replace it with the following:

This work includes furnishing, installing, removing and reinstalling guide signs, information/warning signs, route markers (with or without arrows), gate signs, object markers, gate barricades, sign posts, and sign bases.

Delete the third paragraph of this subsection.

Material

633.02 Conform to the MUTCD and the following Section and Subsections:

Add the following subsections:

Protective Overlay Film 718.02

Edge Film

718.02

633.03 General.

Delete the subsection and replace with the following:

Furnish traffic control devices and guide signs according to the MUTCD; approved USDA-FS and state supplements; and Standard Highway Signs published by FHWA. Submit the sign list for approval before ordering.

633.05 Panels.

Delete the first sentence in first paragraph.

Apply protective overlay film and top edge film as required and in accordance with manufacturer’s recommendations.

Modify the following:

“Use antitheft fasteners where possible” in the fifth paragraph and replace it with the following:

“For each sign panel, use at least one antitheft fastener.”

633.09

Delete all of this subsection and replace with the following:

Measure the Section 633 items according to Subsection 109.02 (h) Lump Sum.

Measure signs as a collective unit for all signs needed.

LEWIS AND CLARK NATIONAL FOREST SIGN SPECIFICATIONS

Supplemental Attachment to Section 633.

SUBSTRATE: Aluminum

SHEETING: Vinyl

HOLES: Pre-drilled, 3/8 inch diameter, Standard Spacing.

POSTS: Galvanized steel U post

REFERENCE: All signs must comply with the “Manual on Uniform Traffic Control

Devices” 2009 Edition, U.S. Department of Transportation, Federal

Highway Administration.

704 – SOIL

704.03 Backfill Material.

(b) For plastic pipe:

Delete (b) and replace with the following:

(b) For plastic pipe and HDPE Ditch Liner:

705 – ROCK

705.02 Riprap Rock

Delete the second sentence of this subsection. Additionally delete the requirements specified for

(a), (b), and (c).

713 – ROADSIDE IMPROVEMENT MATERIAL

713.05 Mulch.

(b) Wood fiber.

Delete and replace with the following:

Furnish processed wood fiber from an all-wood long-strand material comprised of a blend of loose thin wood pieces, each with a high length-to-width ratio such that the pieces form a protective matrix when distributed on the soil The matrix shall have the following nominal properties:

“L” Length: 6.3 inch

“S” Length: 2.5 inch

Width: 3/16 inch

Thickness: 1/10 – 1/8 inch

Ratio of L:S 50:50 by area (mass)

Companies that have indicated they are suppliers of materials or equipment as called for in this contract are:

Forestconcepts

3320 West valley Hwy. N., Suite D-110

Auburn, WA 98001-2457

Phone: (253) 33-9663

(877) 838-4759 www.forestconcepts.com

These suppliers or an approved alternative must be utilized.

713.18 Permanent Rolled Erosion Control Products.

(d) Type 5.D, permanent turf reinforcement mat. Furnish a non-degradable turf reinforcement mat with sufficient thickness, strength and void space for permanent erosion protection and void space for permanent erosion protection on geotechnical stable slopes up to 2V:1H, channels with design shear stress up to 16 pounds per square foot, and other areas where design flow conditions exceed the natural limits of soil stability.

Companies that have indicated they are manufacturers of materials or equipment as called for in this contract are:

Propex Operating Company, LLC

6025 Lee Highway, Suite 425

Chattanooga, TN 37422

Phone: (423) 899-0444

(800) 621-1273 www.geotextile.com

This manufacturer and its suppliers or an approved alternative must be utilized.

Delete Table 713-4 and replace with the following:

Table 713-4

Permanent Turf Reinforcement Mat

Properties (1)

Rolled Erosion Control Product

Type

Test Method

5.A 5.B 5.C 5.D

Minimum tensile strength (2)(3)

(pounds per foot)

125 150 175 3000 ASTM D4595

UV stability (minimum % tensile retention)

80 80 80 80 ASTM D 4355 (500-

hour exposure)

Minimum thickness (2)

(inches)

1/4 1/4 1/4 0.4 ASTM D 6525

Minimum permissible shear stress (4)

(pounds per square foot )

6.0 8.0 10.0 16.0 ASTM D 6460 or other qualified independent test(5)

(1) For turf reinforcement mats containing degradable components, obtain all property values on the nondegradable portion of the matting alone.

(2) Minimum average roll values, machine direction only.

(3) Field conditions with high loading and high survivability requirements may warrant the use of turf reinforcement mats with tensile strengths of 3,000 pounds per foot or greater.

(4) Minimum shear stress the turf reinforcement mat (fully vegetated) can sustain without physical damage or excess erosion (>1/2-inch soil loss) during a 30-minute flow event in large-scale testing. These performance test values should be supported by periodic bench scale testing under similar test conditions and failure criteria using Erosion Control Technology Council Test Method #3.

(5) Other large-scale test methods determined acceptable by the CO.

718 - TRAFFIC SIGNING AND MARKING MATERIAL

718.05_nat_us_08_05_2009

718.02 Reserved.

Replace this subsection with the following:

718.02 Protective Overlay Film and Edge Film.

Protective overlay film will be a high performance flouropolymer film such as 3M Scotchlite

Premium Protective Overlay Film Series 1160 or approved equal.

Edge film will be a pressure-sensitive, premium-quality, clear, ultraviolet-resistant, 3 inches wide vinyl film.

718.05 Aluminum Panels.

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

725 – MISCELLANEOUS MATERIAL

725.30 HDPE Ditch Liner

Add the following subsection:

Companies that have indicated they are suppliers of materials or equipment as called for in this contract are:

HD Fowler

Bozeman Branch

401 East Main Street

Belgrade MT 59714

Phone: (406) 388-1169

Northwest Pipe Company

404 17th Ave Ne

Great Falls, MT 59404

Phone: (406) 727-9843

These suppliers or an approved alternative must be utilized.

725.31 HDPE Mat

The HDPE mat shall be high density polyethylene material. The minimum thickness of the liner shall be 30 mil. The HDPE mat shall meet the HDPE ditch liner manufacturer’s recommendation.

725.32 Self Tapping Screws

Add the following subsection:

The self-tapping screws shall meet the HDPE ditch liner manufacturer’s recommendation.

725.33 Joint Sealant

Add the following subsection:

The joint sealant shall meet the HDPE ditch liner manufacturer’s recommendation.

725.34 Earth Anchor

The earth anchor shall meet the HDPE ditch liner manufacturer’s recommendation.