AG-0398-S-17-0012_J6_Work_Items_10A.pdf
PDF 193 KB Posted
- Solicitation number
- AG-0398-S-17-0012
About this file
Work Items - Additive Item #1
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B u c k R i d g e T r a i l C o n s t r u c t i o n
B u c k R i d g e O v e r l o o k T r a i l # 1 0 A - A d d i t i v e # 1 – W o r k I t e m s
Gallatin National Forest Page 1
0+00 Begin work on Additive #1, (Overlook Trail
#10A), at the intersection of existing trail #10 and future loop trail to right, just northeast of the
Third Yellow Mule / Buck creek divide, at station
486+00 and 0+00.
0+00 62+85 Clear trail for duration of contract 911-1 982 982(01) MI 1.2
0+00 62+85 Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 62+85 Construct 50 feet of ditch as needed to prevent erosion.
912-9 912 912(09) LF 50
0+00 15+00 Construct 1500 LF of new ATV trail, mostly over existing single track trail. Includes clearing, grubbing and excavation.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
0+00 15+00 Construct 6 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 6
0+00 15+00 Construct 2 ATV turnouts as staked. 6’x20’. 911-1
912-1
912-2
911(02)
912(01)
LF
LF
0+00 15+00 Obliterate 100 LF of old trail as staked. 954-1 954 954(02) LF 100
0+00 15+00 Construct armored drain dip/crossing as staked in dry gully.
912-6 912 912(06)a EA 1
15+00 23+00 Follow existing ATV trail through meadow.
Install 1 blazed route marker posts as staked.
952-3 952 952(10) EA 1
23+00 Intersection with single track, non-motorized trail
#8 to left at ridgeline. Install 1 signs and 2 posts where staked, Gov’t furnished sign.
952-1 952 952(01)
952(03)
EA
EA
23+00 33+00 Follow existing ATV trail through meadow.
Install 2 blazed route marker posts as staked.
952-3 952 952(10) EA 2
33+00 62+85 Construct 2985 LF of new ATV trail. Includes clearing, grubbing and excavation.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
33+00 62+85 Construct 3 ATV turnouts as staked. 6’x20’. 911-1
912-1
911(02)
912(01)
LF
LF
B u c k R i d g e T r a i l C o n s t r u c t i o n
B u c k R i d g e O v e r l o o k T r a i l # 1 0 A - A d d i t i v e # 1 – W o r k I t e m s
Gallatin National Forest Page 2
912-2
33+00 62+85 Construct 8 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 8
62+85 End of Additive #1 and Overlook trail #10A.
Install sign and post where staked, Gov’t furnished sign. End of project.
952-1 952 952(01)
952(03)
EA
EA
File details come from the government source that posted it. Updated .