Amend_0001_PRICES.pdf

PDF 40 KB Posted

Attached to
CUSTER GALLATIN NATIONAL FOREST - Placer Gulch Trail Construction
Solicitation number
AG-0398-S-16-0008
Issued by

About this file

Price Schedule Amendment 0001

View the file

Other files

File Type Posted
SF_30.pdf PDF
Plans_Drawings.pdf PDF
work_items.pdf PDF
VicinityMap.pdf PDF
Experience_Questionaire.docx DOCX document
Wages_MT78.txt TXT text file
SF1442.pdf PDF
AG0398S160008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0398-S-16-0008

Placer Gulch Trail Construction

Big Timber Ranger District

PRICES - SCHEDULE OF ITEMS

Placer Gulch Trail Construction Park County, MT

ITEM

NO.

DESCRIPTION

MTHD

of

MEAS*

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

911(02) Clearing and Grubbing DQ LF 18,223 $ $ 912(01) Excavation AQ LF 18,223 $ $ 915(01)a Trail Restoration AQ LF 1000 912(06)a Drain Dip – 72” tread AQ EA 60 $ $ 912(06)b Drain Dip – 72”+ tread – old existing jeep road/ATV trail. AQ EA 10 $ $

912(06)c Armored Drain Dip or Crossing

– 72” Tread (30SF or armor) AQ EA 1 $ $

991(06) Maintenance – Drainage Dips ATV/Road. Clean out deposited material and restore to as shown on drawings.

AQ EA 15

912(09) Ditch AQ LF 100 $ $ 914(06)a Retaining Wall, Type Rock –

Switchbacks DQ SF 18 $ $

921(01)a 15” dia Corrugated Pipe, Type

PE AQ LF 120 $ $

952(01) Install Sign Panel, Gov't Furnished AQ EA 3 $ $

952(03) Treated Posts, length 8', diameter 5"- 6" min. AQ EA 3 $ $

954(02) Obliteration AQ LF 100 $ $ 951(01) Mobilization LSQ LS 1 $ $ 914(01) Switchback – Type I – 10’ radius AQ EA 2 $ $ 990(01) Trail Excavator Rental. One each. Fully operated AQ HR 20 $ $

TOTAL QUOTE: _____________

Method of Measure LSQ Lump Sum Quantity, LS Lump Sum, AQ Actual Quantity, DQ Design Quantity, LF Lineal Foot, EA Each NOTE: Vendor must quote on all items. Round to the nearest cent.

NOTE: Payment for bond premiums, or any costs associated with irrevocable letters of credit, in accordance with Clause 52.232-5, Payments under Fixed-Price Contracts, shall not be in addition to the contract price. A good place to incorporate bonding costs is under mobilization.

Company Name DUNS # Authorized Signature

PRICES - SCHEDULE OF ITEMS

File details come from the government source that posted it. Updated .