Amend_0001_PRICES.pdf
PDF 40 KB Posted
- Solicitation number
- AG-0398-S-16-0008
About this file
Price Schedule Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30.pdf | ||
| Plans_Drawings.pdf | ||
| work_items.pdf | ||
| VicinityMap.pdf | ||
| Experience_Questionaire.docx | DOCX document | |
| Wages_MT78.txt | TXT text file | |
| SF1442.pdf | ||
| AG0398S160008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-0398-S-16-0008
Placer Gulch Trail Construction
Big Timber Ranger District
PRICES - SCHEDULE OF ITEMS
Placer Gulch Trail Construction Park County, MT
ITEM
NO.
DESCRIPTION
MTHD
of
MEAS*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
911(02) Clearing and Grubbing DQ LF 18,223 $ $ 912(01) Excavation AQ LF 18,223 $ $ 915(01)a Trail Restoration AQ LF 1000 912(06)a Drain Dip – 72” tread AQ EA 60 $ $ 912(06)b Drain Dip – 72”+ tread – old existing jeep road/ATV trail. AQ EA 10 $ $
912(06)c Armored Drain Dip or Crossing
– 72” Tread (30SF or armor) AQ EA 1 $ $
991(06) Maintenance – Drainage Dips ATV/Road. Clean out deposited material and restore to as shown on drawings.
AQ EA 15
912(09) Ditch AQ LF 100 $ $ 914(06)a Retaining Wall, Type Rock –
Switchbacks DQ SF 18 $ $
921(01)a 15” dia Corrugated Pipe, Type
PE AQ LF 120 $ $
952(01) Install Sign Panel, Gov't Furnished AQ EA 3 $ $
952(03) Treated Posts, length 8', diameter 5"- 6" min. AQ EA 3 $ $
954(02) Obliteration AQ LF 100 $ $ 951(01) Mobilization LSQ LS 1 $ $ 914(01) Switchback – Type I – 10’ radius AQ EA 2 $ $ 990(01) Trail Excavator Rental. One each. Fully operated AQ HR 20 $ $
TOTAL QUOTE: _____________
Method of Measure LSQ Lump Sum Quantity, LS Lump Sum, AQ Actual Quantity, DQ Design Quantity, LF Lineal Foot, EA Each NOTE: Vendor must quote on all items. Round to the nearest cent.
NOTE: Payment for bond premiums, or any costs associated with irrevocable letters of credit, in accordance with Clause 52.232-5, Payments under Fixed-Price Contracts, shall not be in addition to the contract price. A good place to incorporate bonding costs is under mobilization.
Company Name DUNS # Authorized Signature
PRICES - SCHEDULE OF ITEMS
File details come from the government source that posted it. Updated .