B i g S k y N o r t h S n o w m o b i l e T r a i l # 9 1 2 C o n s t r u c t i o n W o r k I t e m s
Gallatin National Forest Page 1
Begin Station
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 321+34 Begin Project Work on Big Sky North Snowmobile Trail #912 at junction with Sage Creek Parking Area just ¼ mile south of the Taylor Fork Road #134 off Highway 191.
0+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 321+34 Clear trail for duration of contract 911-1 982 982(01) MI 6.0
0+00 321+34 Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 31+50 Clear 2500 LF to specified width 911-1 911 911(05) LF 2500
31+50 Junction with Taylor Fork road #134. Install 1 sign and post where staked, Gov’t furnished sign.
952-1 952 952(01) 952(03)
EA
EA
31+50 101+00 Follow exiting Taylor Fork Road #134 for approximately 1.3 miles.
101+00 Trail leaves Taylor Fork road #134. Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
101+00 168+00 Construct 6,700 LF of new trail as staked.
Includes clearing, grubbing, and excavation. 12’ tread.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
6,700 6,700
101+00 321+34 Construct 20 Drain Dips drained to daylight as staked.
912-5 912 912(06) EA 20
103+50 Existing Fence
106+50 Install one 18”x 30’ PE culvert without headwalls 921 921(01)b LF 30
B i g S k y N o r t h S n o w m o b i l e T r a i l # 9 1 2 C o n s t r u c t i o n W o r k I t e m s
Gallatin National Forest Page 2
Begin Station
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
107+00 Existing Fence
118+25 Install one 18”x 30’ PE culvert without headwalls 921 921(01)b LF 30
129+00 Install one 18”x 30’ PE culvert without headwalls 921 921(01)b LF 30
131+00 Install one 18”x 30’ PE culvert without headwalls 921 921(01)b LF 30
154+00 Install one 18”x 30’ PE culvert without headwalls 921 921(01)b LF 30
154+00 Wet area. Construct 20 LF Ditch to pipe. 912 912(09) LF 20
167+00 Trail leaves timber. Install 1 blazed route marker treated posts as staked.
952-3 952 952(10) EA EA 1
168+00 321+34 Install 40 blazed route marker treated posts as staked along remaining 3 miles of trail corridor.
952-3 952 952(10) EA EA 40
168+00 321+34 Clear 2500 LF of Sage brush to specified width along remaining 3 mile trail corridor.
911-1 911 911(05) LF 2500
233+00 Trail enters timber. Install 1 blazed route marker treated posts as staked.
952-3 952 952(10) EA EA 1
233+00 238+00 Clear 500 LF to specified width. 911-1 911 911(05) LF 500
238+00 Trail leaves timber. Install 1 blazed route marker treated posts as staked.
952-3 952 952(10) EA EA 1
308+00 Existing Fence
321+34 Trail intersects with existing trail #68.. Install sign and post where staked. Gov’t furnished sign.
END OF PROJECT
952-1 952 952(01) 952(03)
EA
EA