Work Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WestBridgerATV_Bridge Specs_sps.pdf | ||
| WestBridgerATV_Plans.pdf | ||
| AG0398S120013 Return Package.pdf | ||
| WestBridgerATV_Map.pdf | ||
| WestBridgerATV_Bridge 370-02.2_Plans.pdf | ||
| Standard Specifications for Trails.pdf | ||
| AG0398S120013 SF 18.pdf | ||
| AG0398S120013.pdf | ||
| WestBridgerATV_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W e s t B r i d g e r A T V T r a i l s P r o j e c t T i e C u t t e r s G u l c h T r a i l # 3 7 0 – W o r k I t e m s
( B A S E )
Gallatin National Forest Page 1
Begin Station
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 Begin Project Work on Tie Cutters Gulch trail #370 at end of road #488 and trailhead.
0+00 184+33 Clear trail for duration of contract 911-1 982 982(01) MI 3.49
0+00 184+33 Numerous sections of surface rock will need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 81+50 Light clearing/pruning on existing trail/road. 911 911 911(05) LF 500
0+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
8+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 8+00 Construct 3 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 3
8+00 10+09 Obliterate 10 LF of each end of existing trail below and in wet area.
954-1 954 954(02) LF 20
8+00 10+09 Construct 209 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
13+00 15+00 Restoration of 200 LF of existing Tread, including any additional clearing;
915-1
915 915(01)
LF
15+00 Construct armored stream crossing 912-6 912 912(06)a EA 1
15+10 Construct 50 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
15+60 Construct armored drain dip/crossing in dry gully 912-6 912 912(06)a EA 1
15+70 33+66 Follow existing trail. Construct 5 Drain Dips 912-5 912 912 912(06) EA 5
Gallatin National Forest Page 2
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty drained to daylight.
22+50 Construct 50 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
23+00 Construct armored stream crossing 912-6 912 912(06)a EA 1
33+66 41+81 Construct 815 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
33+66 41+81 Construct 2 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 2
37+00 Construct armored stream crossing 912-6 912 912(06)a EA 1
41+81 Construct armored stream crossing 912-6 912 912(06)a EA 1
44+00 Wet spring. Construct 10 LF of ditch to drain dip as staked.
912-9 912 912(09) LF 10
44+00 45+36 Construct 136 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1
912-2
911(02) 912(01)
LF
LF
44+00 Obliterate 10 LF of each end of existing trail below and in wet area.
954-1 954 954(02) LF 20
45+36 Construct armored drain dip/crossing in dry gully. 912-6 912 912(06)a EA 1
48+60 50+00 Constuct 40 LF of turnpike with log retainers using suitable material within 1000 feet:
913-1 913-2
913 912 913(01)b 913(03)b
LF
SY
48+75 Construct 20 LF of ditch to channel stream 912-9 912 912(09) LF 20
48+75 Install one 12”x10’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to 921(01)d)
921-2 921 921(01)b LF 10
50+00 Construct 20 LF of ditch to channel stream 912-9 912 912(09) LF 20
Gallatin National Forest Page 3
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
49+25 54+06 Construct 481 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1
912-2
911(02) 912(01)
LF
LF
49+25 54+06 Construct 2 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 2
52+00 Construct 3 armored stream crossings 912-6 912 912(06)a EA 1
49+25 Obliterate 10 LF on each end of existing trail adjacent to new construction.
954-1 954 954(02) LF 20
56+50 Construct armored drain dip/crossing in dry gully. 912-6 912 912(06)a EA 1
63+00 72+55 Construct 955 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
63+00 Obliterate 10 LF on each end of existing trail adjacent to new construction.
954-1 954 954(02) LF 20
72+55 Obliterate 290 LF of existing trail adjacent to new construction.
954-1 954 954(02) LF 290
72+55 Obliterate 50 LF of existing trail in bottom of draw to south.
954-1 954 954(02) LF 50
72+55 Construct armored drain dip/crossing in dry gully. 912-6 912 912(06)a EA 1
72+55 80+80 Construct 810 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
72+55 80+80 Construct 3 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 3
75+60 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01). Side slope 45%
912-9 912 EA 1
81+50 Intersection with trail #376. Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
Gallatin National Forest Page 4
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
81+50 Install ATV Cattleguard Commercial Item
932(01) EA 1
81+50 99+01 Construct 1821 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
81+50 99+01 Construct 8 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 8
84+00 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01). Side slope 55%
912-9 912 EA 1
94+00 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01). Side slope 50%
912-9 912 EA 1
94+00 Construct 1 ATV turnouts where staked at end of switchback. 20 LF
911-1 912-1 912-2
911(02) 912(01)
LF
LF
99+00 105+37 Restoration of 637 LF of existing Tread, including
99+00 105+37 Construct 3 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 3
105+37 184+33 Construct 8106 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
105+37 184+33 Construct 30 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 30
111+00 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01). Side slope 45%
912-9 912 EA 1
114+50 Construct 20-ft long Bridge #370-02.2 over creek, including delivery, superstructure, and
R1920 931 FP-03 931(01)A LS 1
Gallatin National Forest Page 5
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty approaches. Contractor furnished materials.
153+50 Construct armored drain dip/crossing in dry gully. 912-6 912 912(06)a EA 1
154+00 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01). Side slope 65%
912-9 912 EA 1
156+00 Construct armored drain dip/crossing in dry gully. 912-6 912 912(06)a EA 1
177+20 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01). Side slope 50%
912-9 912 EA 1
177+20 Construct 1 ATV turnouts where staked at end of switchback. 20 LF
911-1 912-1 912-2
911(02) 912(01)
LF
LF
184+33 End trail #370 and intersection with trail #5.
Install sign and post where staked, Gov’t furnished sign.
952-1 952 952(01) 952(03)
EA
EA
D e r b y G u l c h T r a i l # 3 7 3 – W o r k I t e m s
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 Begin Project Work on Derby Gulch Trail #373 @ intersection with road #6672 in section 35.
0+00 124+43 Clear trail for duration of contract 911-1 982 982(01) MI 2.40
0+00 124+43 Install 2 blazed route marker treated posts as staked.
952-3 952 952(10) EA 2
0+00 124+43 Numerous sections of surface rock will need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 3+00 Follow Existing road prism. No work needed
3+00 17+77 Construct 1432 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
3+00 17+77 Construct 10 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 10
7+47 Construct armored drain dip/crossing in dry gully 912-6 912 912(06)a EA 1
9+97 Construct 8’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01)
912-9 912 EA 1
12+47 Construct armored drain dip/crossing in dry gully 912-6 912 912(06)a EA 1
17+77 30+57 Follow existing road prism. Construct 5 Drain Dips drained to daylight.
912-5 912 912 912(06) EA 5
30+57 32+17 Construct 160 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
D e r b y G u l c h T r a i l # 3 7 3 – W o r k I t e m s
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
32+17 37+00 Follow existing road prism. Construct 2 Drain Dips drained to daylight.
912-5 912 912 912(06) EA 2
37+00 68+47 Construct 3750 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
32+60 68+47 Construct 18 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 18
61+00 Construct 1 ATV turnouts where staked. 20 LF 911-1 912-1 912-2
911(02) 912(01)
LF
LF
68+47 Intersection with trail #126. Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
68+47 124+43 Construct 5596 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
68+47 124+43 Construct 20 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 20
93+00 Construct armored drain dip/crossing in dry gully 912-6 912 912(06)a EA 1
98+00 Construct armored drain dip/crossing in dry gully 912-6 912 912(06)a EA 1
102+00 Existing Fence. Install ATV cattleguard Commercial Item
932(01) EA 1
108+00 Construct 1 ATV turnouts where staked. 20 LF 911-1 912-1 912-2
911(02) 912(01)
LF
LF
111+50 Construct armored drain dip/crossing in dry gully 912-6 912 912(06)a EA 1
124+43 End trail #373. Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
U p p e r D e r b y D i v i d e # 3 7 6 – W o r k I t e m s
( A D D I T I V E # 1 )
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 Begin Project Work on Upper Derby Divide Trail #376 @ intersection with trail #370 in section #4.
0+00 26+61 Clear trail for duration of contract 911-1 982 982(01) MI .50
0+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 26+61 Construct 2661 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
0+00 26+61 Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 26+61 Construct 8 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 8
D e r b y R i d g e T r a i l # 1 2 6 – W o r k I t e m s
( A D D I T I V E # 2 )
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 Begin Project Work on Derby Ridge Trail #126 @ intersection with trail #373 in Section #34.
0+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 141+52 Clear trail for duration of contract 911-1 982 982(01) MI 2.68
0+00 141+52 Light clearing/pruning on existing trail/road. 911 911 911(05) LF 500
0+00 141+52 Numerous sections of surface rock will need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 14+47 Construct 5 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 5
24+00 26+76 Restoration of 276 LF of existing Tread, including
26+76 28+56 Construct 180 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
26+76 87+50 Obliterate approximately 50 LF at beginning and end of old trail adjacent to each section of new construction. Total of 650 LF
954-1 954 954(02) LF 650
39+00 64+51 Construct 2551 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
39+00 64+51 Construct 10 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 10
67+00 84+90 Construct 1790 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
67+00 84+90 Construct 8 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 8
D e r b y R i d g e T r a i l # 1 2 6 – W o r k I t e m s
( A D D I T I V E # 2 )
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
87+50 141+52 Construct 5449 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
87+50 141+52 Construct 15 Drain Dips drained to daylight. 912-5 912 912 912(06) EA 15
95+00 Construct 1 ATV turnouts where staked. 20 LF 911-1 912-1 912-2
911(02) 912(01)
LF
LF
103+00 Intersection with Upper Derby Divide trail #376.
Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
123+00 Construct 1 ATV turnouts where staked. 20 LF 911-1 912-1 912-2
911(02) 912(01)
LF
LF
133+00 Construct 1 ATV turnouts where staked. 20 LF 911-1 912-1 912-2
911(02) 912(01)
LF
LF
141+52 End trail #126 on spur road of road #6674. Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
141+52+ Obliterate approximately 150 LF of old trail to south where it leaves existing road and crossing lower road.
954-1 954 954(02) LF 150
| 01_WestBridgerATV_Tie Cutters Gulch#370_WorkItems |
| 02_WestBridgerATV_DerbyGulch#373_WorkItems |
| 03_WestBridgerATV_UpperDerbyDivide#376_WorkItems |
| 04_WestBridgerATV_DerbyRidge#126_WorkItems |