AG-0398-S-09-0010-0003.pdf

PDF 2 MB Posted

Attached to
Recovery - GALLATIN NATIONAL FOREST Shields River Road & Bridges Reconstruction
Solicitation number
AG-0398-S-09-0010
Issued by

About this file

Amendment #3

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

1 67

2. AMENDMENT/MODIFICATION NO.

Amendment #3

3. EFFECTIVE DATE

5/5/2009

4. REQUISITION/PURCHASE REQ. NO

265499

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE

East Side Acquisition Team Gallatin National Forest PO Box 130 Bozeman, MT 59771-0130

Same as 6

9A. AMENDMENT OF SOLICITATION NO. AG-

0398-S-09-0010

9B. DATED (SEE ITEM 11) 4/13/2009

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and Zip Code)

10A. MODIFICATION OF CONTRACT/ORDER NO.

CODE:

FACILITY CODE:

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered, solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers, FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If Required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO., AS DESCRIBED IN ITEM 14

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43,103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is NOT is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

This amendment provides information from the the pre-bid tour held April 29, 2009. List of firms attending the tour are: Montana Civil Contractors, Western Reclamation, Oftadahl Construction, AM Wells, Bainter Construction, Omdahl Excavating, Knife River, Hanes Geo Components, Stillwater Excavating, Riverside Contractors, Hall Construction, Mongus Company, HL Construction, Trapper Peak Construction, Sime Construction, Jim's Backhoe, Smith River Fencing, & Prairie Management.

Discussion items raised: Movement of power poles - this will be up to contractors to coordinate with the utility. The same is true of the requirements for fencing, which will need to be coordinated with the appropriate land owner for each fence installation. In stream permits - The Forest Service has coordinated the required stream permits.

Pit site was available for inspection and the Forest Service, by way of this amendment is posting the pit report - 66 pages. Also Jamie Hillman with Jim's Backhoe has other possible sites for material such as riprap. The District will be removing some post and pole material from the pit site. Additionally the pit site will be used for the disposal of all other woody debris material generated during construction.

Attahment to this amendment is the pit report generated by Orin Engineering - 66 pages.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE

SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous Edition Unusable Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .