AG-0356-S-12-0011-0002.pdf

PDF 276 KB Posted

Attached to
BEAVERHEAD-DEERLODGE NATIONAL FOREST: Stone Lake Trail Construction & Reconditioning
Solicitation number
AG-0356-S-12-0011
Issued by

About this file

AG-0356-S-12-0011-0002

View the file

Other files

File Type Posted
AG-0356-S-12-0011-0001.pdf PDF
Stone-Lake-Specifications.pdf PDF
SF-1413.pdf PDF
Stone Lake Drawings.pdf PDF
AG-0356-S-12-0011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 5 JULY 2012

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

East Side Acquisition Team (ESAT) Attn: Alane Fitzpatrick Helena National Forest 2880 Skyway Drive, Helena, MT 59602

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0356-S-12-0011

9B. DATED (SEE ITEM 11)

7 June 2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended to 9 July 2012, 1600 hours Mountain Time, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

NOTE: Per Issuance of this solicitation amendment, the hour and date specified for receipt of offers IS extended to 9 July 2012, 1600 hours Mountain Time.

PART IV, Section L.2 Quote Submittal; Contractors wishing to submit a quote must include the following:

� Request for Quotation (SF‐1442); completed and signed.

� Section B – REVISED Schedule of Items (SEE ATTACHED PAGE).

� Experience Questionnaire included in Section J.

� Annual Representations & Certifications included in Section K.

� AGAR Provision 452.209‐70 included in Section K.

� Acknowledge Solicitation Amendments per the instructions in Block 11 of the SF‐30.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Alane Fitzpatrick, Contract Specialist

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

/s/ Alane Fitzpatrick 5 July 2012

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

AG‐0356‐S‐12‐0001

BEAVERHEAD‐DEERLODGE NATIONAL FOREST

Stone Lake Trail Construction & Reconditioning

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B1. REVISED SCHEDULE OF ITEMS: Stone Lake Trail Construction and Reconditioning, Beaverhead County, Montana, Wisdom & Wise River Ranger Districts, Beaverhead‐Deerlodge National Forest.

ITEM DESCRIPTION

MEASUMENT ESTIMATED

QTY

UNIT TOTAL

METHOD* UNIT** PRICE PRICE

15101 Mobilization LSQ LS 1 $ $

15102 Equipment Washing LSQ LS 1 $ $

15201 Stake Refreshing LSQ LS 1 $ $

15202 Stake Cleanup LSQ LS 1 $ $

20101 Clearing and Grubbing DQ LF 10558 $ $

20401 Excavation DQ LF 10558 $ $

20402 Drain Dip AQ EA 6 $ $

20405 Earth Waterbar AQ EA 25 $ $

20420 Rock Turnpike AQ LF 85 $ $

20430 Insloped Turn AQ EA 3 $ $

20502 Blast Boulder AQ LF 1 $ $

21110 Slash Barrier AQ LF 100 $ $

30301 Trail Reconditioning DQ LF 4175 $ $

60212 12‐inch PE pipe AQ LF 10 $ $

63302 10‐foot by 6‐inch Treated Post AQ EA 1 $ $

63304 Routed Oak Directional Sign AQ EA 1 $ $

63305 Bulletin Board AQ EA 1 $ $

Total Price – All Items: $

Special Notes:

1. The bidder must bid on all items. Round to the nearest cent.

2. In the event of an error in extending the bid prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.

3. Offers for Quantities less than those listed in the numbered items may be rejected.

4. Payment for bond premiums in accordance with FAR 52.232‐5. Payments under Fixed‐Price

Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.

Price quotation furnished by:

Name: _____________________________________ Phone: ________________________________

Address: _____________________________________ Cell: ________________________________

_____________________________________ FAX: ________________________________

E‐Mail: ________________________________

*DESIGNATED METHOD OF MEASUREMENT **PAY UNIT ABBREVIATIONS

AQ ‐‐‐‐‐‐‐ Actual Quantity LS ‐‐‐‐‐‐‐ Lump Sum

LSQ ‐‐‐‐‐‐ Lump Sum Quantity LF ‐‐‐‐‐‐‐ Lineal Foot

DQ ‐‐‐‐‐‐ Design Quantity EA ‐‐‐‐‐‐‐ Each

File details come from the government source that posted it. Updated .