CONSTRUCTION_RFP.doc
DOC document 445 KB Posted
- Solicitation number
- AG-0355-S-09-0022
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATCH_5_FY09Final Road Log.pdf | ||
| ATCH_3_.pdf | ||
| ATCH_2_.pdf | ||
| COVER_SHEET.doc | DOC document | |
| ATCH_1_wage_determination.doc | DOC document | |
| ATCH_4_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0355-S-09-0022
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
June 17, 2009
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
289573
6. PROJECT NO.
7. ISSUED BY
CODE
| 8. ADDRESS OFFER TO |
Lewis & Clark National Forest
P.O. Box 869
1101 15th Street North
Great Falls, MT 59401 See Block 7
9. FOR INFORMATION
CALL:
A. NAME
Jan Wenaas B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 406-791-7717
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
FY09 Riley Pass Sediment Pond Cleanout, Custer National Forest, Sioux Ranger District, Harding County, South Dakota
The Government's estimate is: between $250,000 and $500,000.
This project is open to large and small businesses in accordance with the Small Business Competitive Demonstration Program.
11. The Contractor shall begin performance within 10 calendar days and complete it within 106 calendar days after receiving
FORMCHECKBOX
award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See Section C, page 7.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM (hour) local time July 17, 2009, (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
FY09 RILEY PASS SEDIMENT POND
Custer National Forest
Sioux Ranger District, Harding County, South Dakota
| Pay Item |
| Description |
| Method of Measure |
| Pay Unit |
| Estimated Quantity |
| Unit Price |
| Total |
| 1 |
| Mobilization |
| LSQ |
| LS |
| All |
| * * * * * * |
| $ _________ |
| 2 |
| Construction Staking |
| LSQ |
| LS |
| All |
| * * * * * * |
| $ _________ |
| 3 |
| Sediment Removal |
| AQ |
| CY |
| 25000 |
| $ _________ |
| $ _________ |
| 4 |
| Excavation |
| DQ |
| CY |
| 2351 |
| $ _________ |
| $ _________ |
| 5 |
| Aggregate Surfacing |
| DQ |
| CY |
| 2940 |
| $ _________ |
| $ _________ |
| 6 |
| Low Water Crossing |
| LSQ |
| LS |
| All |
| * * * * * * |
| $ _________ |
| 7 |
| 15”x21” CMPA |
| AQ |
| LF |
| 212 |
| $ _________ |
| $ _________ |
| 8 |
| Barbed Wire Gate |
| AQ |
| EACH |
| 1 |
| $ _________ |
| $ _________ |
| 9 |
| Road Maintenance |
(Pre-haul)
| AQ |
| MILE |
| 5.6 |
| $_________ |
| $_________ |
| 10 |
| Road Maintenance |
(Haul & post haul)
| LSQ |
| LS |
| All |
| * * * * * * |
| $_________ |
| 11 |
| Pond 2 Inlet Structure Repair |
| LSQ |
| LS |
| All |
| * * * * * * |
| $_________ |
| 12 |
| Pond 3 Embankment Repair |
| LSQ |
| LS |
| All |
| * * * * * * |
| $_________ |
| 13 |
| Seeding |
| LSQ |
| LS |
| All |
| * * * * * * |
| $_________ |
| 14 |
| Dust Abatement |
| LSQ |
| LA |
| All |
| * * * * * * * |
| $_________ |
TOTAL: $__________________
B-1. BASIS OF AWARD: One contract will be awarded to the responsive and responsible offeror offering the best value to the Government. The Offeror must propose on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the Offeror, the unit price governs except as provided under Federal Acquisition Regulations (FAR) 14.406, Mistakes in Bids.
B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under item 1, Mobilization.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1
GENERAL
1.01 Intent of Contract - The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
1.02 Description of Work – The work shall consist of construction staking; removing, hauling, and placing sediment from the Riley Pass Sediment Ponds 1, 2, 3, 4 and 5; pond embankment and outlet drain reconstruction; road maintenance; road reconstruction including clearing, excavation, corrugated metal pipe arch (CMPA) installation; low water crossing construction; aggregate surfacing; and seeding.
A. Construction Staking –The work shall consist of determining Actual Quantites (AQ) of sediment removal from Ponds 1, 2, 3, 4, and 5. Each sediment pond shall be surveyed after dewatering and prior to sediment removal. Topographic surveys of each pond shall be provided to the COR prior to sediment removal. Each sediment pond shall be re-surveyed upon completion of sediment removal. As-built topographic surveys shall be provided to the COR in both hard copy and AutoCAD format. Work must be performed by a registered land surveyor or professional engineer licensed in the State of South Dakota. The Contractor shall provide quantity calculations stamped and signed by the land surveyor or engineer within 1 week of sediment removal from each individual pond.
The work shall also consist of staking approximately 750 feet of road reconstruction from staking notes shown on the drawings.
B. Sediment Removal The work shall consist of removing sediment from Ponds 1, 2, 3, 4, and 5; hauling sediment to a repository area; placing and contouring of sediment in the repository. Dewatering sediment ponds; construction and decommissioning of temporary access roads along the sediment ponds. A log of vehicle load counts & quantities shall be maintained.
C. Excavation – This work shall consist of excavation and embankment associated with the reconstruction of Road #3123 and Road #31232 as noted in the reconstruction logs. Blasting may be required. Clearing and grubbing is incidental to this work. Excess excavation suitable for riprap shall be stockpiled.
D. Aggregate Surfacing – This work shall consist of furnishing, hauling, and placing 3-inch minus scoria on Road #3123, 31232, and portions of Road #3120 as noted in the reconstruction logs.
E. Low Water Crossing – This work shall consist of construction of a low water crossing on Road #3120.
F. 15”x22” Corrugated Metal Pipe Arch – This work shall consist of furnishing and installing corrugate steel pipe arch (CMPA). Construction staking for culverts and riprap is incidental to this work.
G. Barbed-Wire Gate – This work shall consist of the removal of an existing barbed wire gate and furnishing and installing a new barbed wire gate on Road #3123. The gate is located on a rock bench. Installation of object markers on the gate on Road #31232 is incidental to this work.
H. Road Maintenance (Pre-Haul) – This work shall consist of blading and shaping Roads #3120 (4.8 miles), #3123 (0.5 miles), and #31232 (0.5 miles) prior to sediment haul. Drainage maintenance including construction of drainage dips on Road #31232 is incidental to this work.
I. Road Maintenance (Haul & Post-Haul) – This work shall consist of maintaining routes used for sediment pond access and removal during haul and upon completion of sediment haul.
J. Dust Pallative – This work shall consist of furnishing and applying one or more applications of dust palliative on a prepared surface.
K. Pond 2 Inlet Structure Repair – This work shall consist of removing the drop inlet section, elbow, coupling bank, and trash rack; furnishing and installing an anti-seep collar; furnishing and installing a new perforated drop inlet with non-perforated elbow; reinstalling the trash rack; and replacing compacted embankment material around the newly installed drop inlet structure.
L. Pond 3 Embankment Repair – This work shall consist of removing and replacing existing embankment material to repair damage caused by water piping through the existing embankment and from perforations in the end section of the existing CMP. The end section of the existing CMP shall be rotated so that perforations are on the top of the pipe prior to replacement of embankment material. Riprap shall be placed at the CMP outlet.
M. Seeding – This work shall consist of seeding all disturbed areas except those portions of the sediment pond below the rim elevation of the drop inlet structures and the traveled way on roads.
1.03 Project Location - The work to be performed is located in the North Cave Hills of the Sioux District, Custer National Forest in Harding County, South Dakota in Sections 23, 26, 27, and 34, Township 22 North, Range 5 East approximately 15 miles north of Buffalo, South Dakota.
1.04 Price Range - $250,000 to $500,000 1.05 Pre-Bid Tour - A pre-bid tour will not be held. All bidders are encouraged to visit the project site. Directional information may be obtained from the Sioux Ranger District Office in Camp Crook South Dakota, telephone 605-797-4432. For additional contract information contact the COR, MaryBeth Marks, On-Site Coordinator, Gallatin National Forest at (406) 587-6709 for contract information.
1.06 Pre-Bid Conference - A pre-bid conference will not be held.
1.07 Start Work - It is estimated that the work will begin in the summer of 2009 1.08 Performance Period - Work is to be completed by November 15, 2009 1.09 Government-Furnished Materials – No government furnished material is available for this project.
1.10 Work Schedule. The Contractor shall supply a work schedule before starting the project.
1.11 Use of Roads by the Contractor. The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in Road Order(s) or described in the contract, when such use will not damage the roads or National Forest System resources, and when traffic can be accommodated safely.
1.012 Traffic Control – The Contractor shall exercise due caution and care during road maintenance operations to prevent undue conflict with public users of the roads. Delays shall not exceed 30 minutes at one time.
All road and traffic related signing shall be in accordance with the most current Manual on Uniform Traffic Control Devices (MUTCD).
The Contractor is to furnish and post warning signs with flags on both ends of the section being worked to warn the road users of the work in progress. Signs shall be of size and colors as show below.
1.13
Camping – Camping will not be permitted in the project area without written authorization of the District Ranger, Sioux Ranger District, Camp Crook, SD.
1.14 Cleanup and Disposal – The Contractor shall be responsible for solid waste disposal. The Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges, and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System Lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.
1.15 Security and Protection – Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.
1.16 Existing Utilities - There are no utilities available for the Contractor’s use.
The Contractor is responsible for location of all under ground utilities prior to ground disturbance. Damaged utilities shall be repaired at the Contractor’s expense. Contact South Dakota One Call prior to any ground disturbance.
1.17 Sanitation, Health, & Safety
A. Observe rules and regulations of Federal, State, and local health officials. Do not permit any worker to work in surroundings or under conditions that are unsanitary, hazardous, or dangerous.
B. Sediment in the removal areas may contain airborne arsenic, molybdenum, and radiation, at concentrations that may pose a threat to human health. The Contractor shall exercise caution while working with the sediment to minimize exposure to workers. Aggregate surfacing on Road #3120 from the Forest Boundary to the junction with Pond 3 may contain erionite. The Contractor shall take measures to mitigate the risk of airborne exposure from sediment and erionite to workers and recreational users of the area. All dust emissions will be kept to a minimum. All site personnel shall be trained according to OSHA regulations, particularly 29 CFR 1910.120. This training is referred to as Hazardous Waste Operations and Emergency Response, or HAZWOPER. Emphasis shall be added in on-site safety meetings with respect to mitigating potential contaminant exposure through inhalation, ingestion, and/or skin contact.
C. Perform all operations in a prudent, conscientious, safe, and professional manner. Ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.
D. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) regulations for hazardous waste sites (29 CFR 1910.120-131). Due to the presence of hazardous materials on the project, the Contractor’s personnel working on the site are required to have completed OSHA 40-hour Hazardous Waste Operations and Emergency Response training and subsequent refresher training to be eligible to work on this project. Before work commences, the Contractor shall prepare and submit a list of qualified personnel and their certifications and ensure that all personnel at the site follow the requirements of the Site Health and Safety Plan (FAR 52.236-13 Alt 1).
E.
All earth-moving equipment and motorized equipment having an obstructed view shall be equipped with a reverse signal alarm which is audible above surrounding noise level.
1.18 Environmental Protection - Repair leaks on equipment immediately. Do not use equipment that is leaking. Keep a supply of acceptable absorbent materials at the job site in the event of spills. Acceptable absorbent materials are those that are manufactured specifically for the containment and clean up of hazardous materials.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
Perform all operations in a prudent, conscientious, safe, and professional manner. Ensure that all personnel involved in handling and packaging of hazardous materials are trained for the level of expertise required for the proper performance of the task, including the areas of chemical compatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120. Notify the Forest Service of all hazardous material that may be brought onto the National Forest.
1.19 Staging Area - The Contractor shall coordinate with the COR on staging area locations. Staging will be allowed at a specific area near Riley Pass. Access must be maintained to other facilities on the site. The Contractor shall operate all equipment and store, transport, and handle material in a manner that will not damage existing roads and ponds.
1.20 Toilet Facilities – There are no available toilets on the jobsite. The contractors shall provide portable toilet and is responsible for all cost related
C-2 PRODUCTS
2.01 Seeding - Conform to the Federal Seed Act, the Federal Noxious Weed Act, and applicable State and local seed and noxious weed laws. Do not use wet, moldy, or otherwise contaminated or damaged seed. Furnish each seed type in separate sealed container. Clearly label each container with the following:
(a) Name and type of seed;
(b) Lot number;
(c) Net mass;
(d) Percent of purity, germination, and hard seed;
(e) Percent of maximum weed seed content;
(f) Seed Origin;
(g) Noxious weeds present;
(h) Other crop seed;
(i) Inert matter;
(j) Name and address of seed distributor; and
(k) Mixture percent of each component. Inoculate legume seed with approved cultures according to the manufacturer's instructions.
Recommended Seed Mix
| Common name/variety |
| Scientific name |
| Quantity of |
PLS (Ibs/ac)
Broadcast
| western wheat / rosana or rodan |
| Agropyron smithii |
| 7.0 |
| thickspike wheat / critana |
| Agropyron dasystachym |
| 5.3 |
| slender wheat / pryor |
| Agropyron trachycaulum |
| 3.0 |
| green needle grass / lodorm |
| Stipa viridula |
| 2.3 |
| Total Pure Live Seed Ibs/acre* |
| 17.5 |
The mixes must be certified weed seed free
2.02 Rip Rap - Place hard, durable, angular rock that is resistant to weathering and water action and free of organic or other unsuitable material. Do not use shale, rock with shale seams, or other fissile or fissured rock that may break into smaller pieces in the process of handling and placing. Rip Rap source shall be from the reconstruction of Road #3123 and salvaged throughout the project. Size shall meet the following requirements and as shown on the drawings.
Ripap at culverts with diameters of 18” or less shall be 4” to 16”.
Riprap at culverts with diameters greater than 18” and at the low water crossing shall be 6” to 24”.
2.03 Corrugated Metal Pipe and Corrugated Metal Pipe Arch
A. Metallic-Coated Corrugated Steel Pipe. Furnish pipe, special sections, and coupling bands conforming to AASHTO M36 and either AASHTO M218, M274, or M289 for the dimensions and thicknesses specified or SHOWN ON THE DRAWINGS.
B. Damaged spelter coating caused by welding, field cutting, or mishandling shall be cleaned and painted as specified in AASHTO M36.
C. All culvert pipe shall be corrugated, galvanized steel, 16-gauge minimum. Pipe distorted more than 5 percent of nominal dimension, ruptured, or broken shall be replaced.
D. Bands, drop inlets, elbows, and anti-seep collars shall be of the same material and type as the pipe.
E. Drop Inlet with Elbow at Pond 2 – The vertical riser portion of the new drop inlet shall be perforated with ¼ inch diameter holes spaced 6” on center vertically on the riser and around the circumference. Joints between the drop inlet and elbow welded or otherwise joined to provide a rigid, water tight joint. The existing coupling band may be reused.
2.04 Aggregate Surfacing - Surfacing material shall be from a commercial source, approved by the Contracting Officer before hauling begins. Use sources that fulfill the contract quantity and quality requirements.
A.
Before use of the material, the source shall be inspected by the Government and be determined to be free of noxious weeds.
B.
The Contractor is responsible for any royalties, pit development/restoration costs and haul road maintenance. Determine the quantity and types of equipment and work necessary to select and produce acceptable material. Secure all permits and clearances for use of the source.
C.
Material shall be of a 3-inch minus scoria material suitable for surfacing. 3 inch minus material would pass a 3-inch sieve. No gradation other than maximum size will be required. Size may be attained by crushing, screening, or grid-rolling. After placement and compaction, no rock shall protrude above the finished road surface more than 2 inches. Oversized material shall be removed from the roadway; material shall not be scattered outside the roadway or placed in rock berms along the roadway.
2.05 Low-Water Crossing
A. Jersey Barriers shall be standard precast concrete barriers.
B. Geotextile Fabric shall be commercially available, non-woven fabric.
C. T-Posts shall be commercially available, standard grade steel, 1.33#/ft.
D. Riprap – See 2.02.
2.06 Fencing Material – shall be as shown on the drawings.
2.07 Explosives and Blasting Accessories - Only use explosives and initiating devices less than 1-year old. Explosives and initiating devices include, but are not necessarily limited to, dynamite and other high explosives, slurries, water gels, emulsions, blasting agents, initiating explosives, detonators, and detonating cord.
2.08 Bedding and Backfill Material - Furnish material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious materials.
2.09 Dust Pallative – conform to one of the following:
A.
Blotter – furnish sound durable particles of gravel or crushed stone conforming to the following:
1.
Material passing 3/8 sieve, AASHTO T27 – 100%
2.
Liquid limit, AASHTO T89 – 25 max.
3.
Free of organic matter and clay balls
4.
Containing no erionite
B.
Calcium chloride – conform to AASHTO M144, type L, for the specified concentration
C.
Calcium chloride flakes – conform to AASHTO M144, type S, grade 1,2, or 3, class A
D.
Lignosulfonate – furnish a water solution with a base cation of ammonia, calcium, or sodium. Conform to the following:
1.
Solids – 50%. Determine the percentage of solids according to the modified Technical Association of the Pulp and Paper Industry Standard T650-TM-84 or by a specific gravity/percent of solids versus temperature graph that correlates with the standard.
2.
Specific graveity – 1.25
3.
ph, AASHTO T289 – 4.5 min.
E.
Magnesium chloride – furnish a brine solution conforming to the following:
1.
Magnesium chloride by mass – 28% minimum
2.
Water by mass – 72% maximum
3.
Specific gravity, AASHTO T27 – 1.290 to 1.330
F.
Water – free of substances detrimental to the work.
C-3 EXECUTION
3.01 Construction Staking
A. Each sediment pond shall be surveyed after dewatering and prior to sediment removal. Shots shall be taken on a minimum 15-foot grid and at grade breaks. Ties shall be made to control points shown on the drawings. Topographic surveys shall be provided to the COR prior to sediment removal in both hard copy and AutoCAD formats. Each sediment pond shall be re-surveyed upon completion of sediment removal. As-built topographic surveys shall be provided to the COR in both hard copy and AutoCAD format. Work must be performed by a registered land surveyor or professional engineer licensed in the State of South Dakota. The surveys shall be used to determine pay quantities for sediment removed from each pond. Quantities removed from each individual sediment pond are required. The Contractor shall provide quantity calculations stamped and signed by the land surveyor or engineer within 1 week of sediment removal from each pond.
B.
Construction staking is incidental to this work. Staking information for excavation of Road #3123 (Sta. 0+00 to Sta. 7+50) is shown on the drawings. Cross sections shall be staked at each cross-section shown on the drawings. The Contractor shall stake roadway cross sections normal to centerline.
C.
Stake culverts SHOWN ON THE DRAWINGS to fit field conditions. The final culvert locations may differ from the plans. The Contractor shall set invert elevations and determine actual culvert lengths at each culvert location prior to ordering culverts. Record the diameter, actual field measured culvert length, and type of culvert. Record the vertical and horizontal distance from the reference stake to the invert at both ends of the culvert. Culverts shall have a catch basin AS SHOWN ON THE DRAWINGS. Minimum cover shall be 12” over culverts or AS SHOWN ON THE DRAWINGS.
3.02 Sediment Removal
A. Ponds shall be dewatered prior to survey and sediment removal.
B. The Contractor shall coordinate temporary access road locations with the COR. Remnants of prior access routes are evident in areas; the routes shall be re-used whenever possible.
C. Excavate material from the ponds to the limits and depths shown on the drawings unless otherwise designated by the COR.
D. Leave approximately 5 feet surrounding the stand pipes undisturbed.
E. Maintain routes during sediment haul commensurate with use.
F. Blade and shape all routes (Roads #3120, #3123, #31232, and access route to repository area) upon completion of sediment haul. The COR will designate up to 6 locations where driveable scoria mounds shall be constructed across the road. Approximately 0.5 CY of scoria shall be placed at each location.
G. Sediment shall be placed in one or more locations within the repository location as designated by the COR. Excessively wet material shall be field drained and dried before final placement in the repository area. Frozen material shall not be incorporated into embankments.
H. Obliterate the temporary access routes by restoring to the approximate original ground contours. Keep excavated material within the original construction limits. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks. Limit disturbance to soils and vegetation. Slope all areas to drain and return water to natural pathways. Scarify compacted areas prior to seeding.
I. Seed disturbed all disturbed areas except those portions of the sediment ponds below the rim elevation of the drop inlet structures.
J. The Contractor shall maintain a log containing the date with haul vehicle #, trips made, and approximate volume per load. The log shall be made available to the COR upon request. Copies of the log shall be provided to the COR upon completion of sediment removal from each pond. The logs will not be used for determining pay quantities.
3.03 Clearing and Grubbing – Within the clearing limits, clear trees, brush, downed timber, and other vegetation as follows:
A.
Cut all trees so they fall within the clearing limits.
B.
In areas of cut slope rounding, cut stumps flush with or below the final ground line.
C.
In areas outside excavation, embankment, and slope rounding limits, cut stumps to within 1 foot or 1/3 of the stump diameter of the ground, whichever is higher, measured on the side adjacent to highest ground.
D.
Trim tree branches that extend over the road surface and shoulders to attain a clear height of 20 feet. If required, remove other branches to present a balanced appearance. Trim according to accepted tree surgery practices. Treat wounds with tree wound dressing.
E.
Do not cut vegetation less than 3 feet in height and less than 3 inches in diameter that is within the clearing limits, but beyond the top of cut or toe of fill and that does not interfere with sight distance along the road.
F.
Dispose of excess material by:
(a) placing slash on completed embankment slopes to reduce soil erosion. Place slash as flat as practicable on the completed slope. Place slash from the toe of the embankment to a point at least 2 feet below subgrade elevation.
(b) scattering slash outside the clearing limits without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
3.04 Excavation and Embankment
A. This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material. Roadway excavation includes all material excavated regardless of its nature or characteristics. Embankment consists of placing and compacting roadway or borrow excavation.
B. Road pioneering, slash disposal, and grubbing of stumps may proceed currently with excavation. Conduct excavation and placement operations so that slash will not be incorporated into the embankment.
C. Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material. Snow and ice will not be incorporated into the embankment or be placed to cause damage.
D. Conserved topsoil from the roadway excavation that is suitable for growth of grass, cover crops, or native vegetation. Stockpile conserved topsoil in low windrows immediately beyond cut and fill slopes. Place conserved topsoil on completed slopes.
E. Do not disturb material and vegetation outside of construction limits.
F. Incorporate only suitable roadway excavation material into embankments.
G. For embankments on an existing slope steeper than 1V:3H, cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench.
H. At the end of each days operations, shape to drain and compact the embankment to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
I. During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
J. Compact embankment side slopes flatter than 1:1.75 with a tamping type roller or by walking with a dozer or similar equipment. For slopes 1;1.75 or steeper, compact the slopes as construction of the embankment progresses.
K. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch layer by reducing them in size or placing them individually. Compact each layer before placing the next layer.
L. Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24-inch thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing them individually. Place sufficient earth and smaller rocks to fill the voices. Compact each layer before proceeding to the next layer.
M. Place individual rock fragments and boulders greater than 24-inches in diameter as follows:
a. Reduce rock to less than 48 inches in the largest dimension
b. Distribute rock within the embankment to prevent nesting.
c. Place layers of embankment material around each rock to a depth not greater than permitted in K. and L. Fill all voids between rocks.
d. Compact each layer before proceeding to the next layer.
N. Layer Placement - Material may be initially placed by end dumping to the minimum depth needed for the operation of spreading equipment. Level and smooth each embankment layer before placement of subsequent layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rocks and fines in with the large rocks to fill the voids, and by operating hauling and spreading equipment over the full width of each layer as the embankment is constructed.
O. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or other similar material. Maintain all ditches in an open condition free from leaves, sticks, and other debris.
P. Finish the road surface to be reasonably smooth, uniform, and shaped to conform to the typical sections. Finished road width shall be within +1 foot of the width shown on the typical sections. Subgrade elevations shall be within 6 inches of the elevations shown on the drawings.
Q. Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Bring low sections, holes, cracks, and depressions to grade with suitable material. Maintain proper drainage.
R. Excess rock from 4” to 24” from the thru cut excavation on Road #3123 shall be stockpiled for later use. An area will be designated by the COR within 500 feet of Sta 7+50. Materials larger than 24” shall be reduced in size prior to placement in the stockpile or placed as individual rock fragments into the embankment.
3.05 Blasting
A.
General - This work consists of fracturing rock and constructing stable final rock cut faces using controlled blasting and production blasting techniques.
Controlled blasting uses explosives to form a shear plane in the rock along a specified backslope. Controlled blasting includes presplitting and cushion blasting.
Production blasting uses explosives to fracture rock.
B. Regulations. Furnish copies or other proof of all-applicable permits and licenses. Comply with Federal, State, and local regulations on the purchase, transportation, storage, and use of explosive material. Federal regulations include the following:
a. Safety and health. OSHA, 29 CFR Part 1926, Subpart U.
b. Storage, security, and accountability. Bureau of Alcohol, Tobacco, and Firearms (BATF), 27 CFR Part 181.
c. Shipment. DOT, 49 CFR Parts 171-179, 390-397.
d. National Park Service regulations. For projects in National Parks, also comply with NPS Director’s Order #65, Explosives Use and Blasting Safety.
C. Blaster-in-Charge. Designate in writing a blaster-in-charge. Submit evidence that the blaster-in-charge has a valid State blaster’s license or other license accepted by the State where the project is located and issued by an equivalent licensing body for the type of blasting required.
D.
Blasting Plans. Blasting plans are for quality control and record keeping purposes and are to be signed by the blaster-in-charge. The review and acceptance of blasting plans does not relieve the Contractor of the responsibility for using existing drilling and blasting technology, and for obtaining the required results.
Do not deliver explosives to the project until the general blasting plan is accepted.
a. General blasting plan. Submit a general blasting plan for acceptance at least 14 days before drilling operations begin. Include, as a minimum, the following safety and procedural details:
1) Working procedures and safety precautions for storing, transporting, handling, and detonating explosives.
2) Proposed product selection for both dry and wet holes. Furnish Manufacturer’s Material Safety Data Sheets for all explosives, primers, initiators, and other blasting devices.
3) Typical plan and section views for both production and controlled blasting, including maximum length of the shot, burden, hole spacing, hole inclination, hole depth, hole diameter, subdrill depth, and powder factor.
4) Proposed initiation and delay methods and delay times.
5) Proposed format for providing all the required information for the site specific blasting plans.
b. Site-specific blasting plans. After the general blasting plan is accepted, submit site-specific blasting plans for acceptance before drilling operations begin. Allow up to three days for review of these plans. Include the following information in the site-specific blasting plan.
1) Site drawings showing a scaled map of the blast area and cross-sectional views which indicate beginning and ending stations, free face location, hole spacing, hole diameter, hole depth, burden, hole inclination, and subdrill depth. Include on the drawings any significant joints or bedding planes within the blast zone and incorporate this geology into the blast design.
2) Where blasting may affect nearby structures or utilities, provide method of monitoring and controlling blast vibrations according to Subsection 205.06.
3) Loading pattern diagram showing the location and amount of each type of explosive to be used in the holes including primer and initiators and the location, type, and depth of stemming, column heights, and overall powder factor for each type of loading.
4) Delay and initiation diagram showing delay pattern, sequence, and delay times.
E.
Notify owners of nearby utilties at least 24 hours before blasting.
F. Blasting.
a. General. Drill and blast according to the blasting plan.
Before drilling, remove overburden soil and loose rock along the top of the excavation for at least 30 feet beyond the hole drilling limits or to the end of the cut.
Cap all holes to prevent unwanted backfill. Place a stake next to each hole with hole number and total depth drilled.
Use the types of explosives and blasting accessories necessary to obtain the required results. A bottom charge may be larger than the line charges if no overbreak results.
Free blast holes of obstructions for their entire depth. Place charges without caving the blast hole walls. Stem the upper portion of all blast holes with dry sand or other granular material passing the 3/8-inch sieve. Do not stem the hole with drill cuttings.
Following a blast, stop work in the entire blast area, and check for misfires before allowing worker to return to excavate the rock.
Remove or stabilize all cut face rock that is loose, hanging, or potentially dangerous. Scale by hand or machine methods as approved by the CO. Leave minor irregularities or surface variations in place if they do not create a hazard. Drill the next lift only after the cleanup work and stabilization work is complete.
If blasting operations cause fracturing of the final rock face, repair or stabilize it in an approved manner at no cost to the Government. Repair or stabilization may include removal, rock bolting, rock dowels, or other stabilization techniques.
Halt blasting operations when any of the following occur and perform additional test blast:
1) Slopes are unstable;
2) Slopes exceed tolerances or overhangs are created;
3) Backslope damage occurs;
4) Safety of the public is jeopardized;
5) Property or natural features are endangered;
6) Fly rock is generated; or
7) Excessive ground or airblast vibrations occur in an area where damage to buildings, structures, or utilities is possible.
b. Drill logs. Submit drill logs. Include the following:
1) Blast plan map showing designated hole numbers; and
2) Individual hole logs completed and signed by the driller that show total depth drilled, depths and descriptions of significant conditions encountered during drilling that may affect loading such as water or voids, and date drilled.
G. After Blast Reports. Within 3 days after a blast and before the next blast, submit an after-blast report that includes the following:
a. Results of the blast and whether or not blasting objectives were met. If blasting objectives were not met, submit proposed changes to future site-specific blasting plans that will produce acceptable results and proposed repair or stabilization plan for unstable or blast damaged backslopes.
b. Blasting logs that include the following:
1) All actual dimensions of the shot including blast hole depths, hole diameter, burden, spacing, subdrilling, stemming, powder loads, and timing; and
2) A drawing or sketch showing the direction of the face, or faces, and the physical shot layout.
3.06 Aggregate Surfacing
A.
Prior to placing scoria surfacing, blade, shape and compact the existing traveled way and shoulders, including turnouts, to remove surface irregularities. COR approval of the road surface prior to placement of aggregate is required.
A. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.
B. Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth, not to exceed 12 inches, that will provide a minimum 4-inch compacted thickness.
C. Route and distribute hauling and leveling equipment over the width and length of each layer.
D. Compact each layer of aggregate by operating spreading and hauling equipment over the full width of the travelway. Operate equipment from the sides to the center, parallel to the centerline of the roadway. Operate equipment over full width until visible deformation ceases, with a minimum of three passes.
E. Shape the top width to match the typical section designated. Finish the surface to be smooth, uniform, and free of irregularities or depressions. The maximum variation from the specified width shall not exceed +12 inches at any point.
F. Measure aggregate by the cubic yard in place after compaction. Measure thickness perpendicular to the grade of the traveled way. Measure width perpendicular to the centerline. Do not measure quantities outside the required dimensions.
3.07 Low Water Crossing A. All work shall be confined to within 33 feet on each side of existing road centerline.
B. Excavation – Excavate the Low-Water Crossing to the lines and grades shown in the drawings. Excavate a trench of suitable width to accommodate setting and backfilling the barriers. Oversized material may be used as riprap.
C. Placing Barriers – Place the barriers on a foundation of firm, non-disturbed or re-compacted soil. Pin barriers at the top of each section.
D. Placing Geotextile – Wrap fabric around barriers and downstream into spillway. Overlap joints a minimum of 2 feet, perpendicular to the spillway flow-line, with the downstream layer underneath the upstream layer.
E. Backfill –
1. Do not place structural backfill against concrete less than 7-days-old or until 80 percent of the design strength is achieved.
2. Place backfill in horizontal layers that do not exceed 6 inches in compacted thickness. Compaction shall consist of a minimum of three (3) complete passes with a mechanical compactor.
3. Bring backfill up evenly on all sides of the structure as appropriate. Extend each layer to the limits of the excavation or to natural ground.
4. Place and compact aggregate through the low-water crossing. Compact the aggregate by operating hauling and spreading equipment over the full width.
F. Install T-Posts at outlet of spillway, drive posts untill tops are flush with top of oversized rock.
G. Place riprap to its full thickness in one operation to avoid displacing the underlying material. Do not place riprap material by methods that cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical or hand methods to obtain a dense uniform blanket with a reasonably smooth surface.
3.08 Culvert Installation A. Excavation –
1. Excavations shall be of sufficient size to permit the placing and backfilling of culverts. Boulders, logs, and any other unsuitable materials encountered shall be removed and disposed of in areas DESIGNATED on the ground. The width of trenches shall permit satisfactory jointing and thorough tamping of the bedding material under and around the culvert.
2. Unsuitable foundation material shall be excavated below the invert of the culvert to an approximate depth of 2 feet and a width of at least the culvert diameter plus 4 feet. Unsuitable material shall be replaced with selected granular foundation material and compacted.
3. Where rock, hardpan, or other unyielding material is encountered, it shall be removed below the foundation grade for a depth of at least 1 foot. The width of the excavation shall be at least 2 feet greater than outside width of the culvert. This excavated material shall be replaced with selected granular foundation material and compacted.
B. Utilization of Excavated Materials – All suitable excavated material shall be utilized as backfill or embankment. No excavated material shall be placed in live streams. All surplus material shall be disposed of as DESIGNATED on the ground. No excavated material shall be deposited in a manner that will endanger the partly finished structure.
C. Bedding –The foundation surface after excavation shall be compacted and shaped to fit the pipe. The bedding material shall be selected mineral soil meeting the requirements for backfill. Bedding shall be placed to a depth of not less than 10 percent of the total pipe height.
D. Laying Pipe – No pipe shall be placed in service until a suitable outlet is provided. The final installed alignment of all pipe shall have no sag and no point shall vary from a straight line drawn from inlet to outlet by more than 2 percent horizontally and vertically of the culvert length or 1 foot, whichever is less. Helically corrugated lock-seam pipe shall be installed with the seam at the inlet end placed below the horizontal centerline.
E. Jointing Pipes – Pipe shall be firmly jointed with form-fitting coupling bands. Dimpled bands shall not be used.
F. Backfill –
1. Pipe shall not be placed or back-filled until the excavation and foundation have been approved by the COR.
2. After being placed, pipe shall be protected by an adequate cover of embankment before heavy equipment is permitted to cross during roadway construction.
3. Backfill shall be readily compactable material free of frozen lumps, chunks of highly plastic clay, or other objectionable material and have suitable moisture content for effective compacting. Rocks larger than 3 inches in diameter shall not be used within 1 foot of the pipe.
4. After the bedding is prepared and the pipe is placed, backfill material shall be placed in layers not exceeding 6 inches loose thickness and compacted under the haunches and alongside the pipe.
5. Backfill shall be compacted without damaging or displacing the pipe. The density of backfill shall be that of the surrounding embankment or greater.
6. Backfilling and compacting shall be continued until the backfill is to finished road grade, with a minimum of 12 inches cover above the top of the culvert.
G. Measurement of accepted culvert will be of the actual in-place length measured along the pipe.
3.09 Barbed-Wire Gate – Remove and dispose of existing barbed wire gate. Install new barbed wire gate as shown on the drawings. Install signs and object markers as shown on the drawings.
3.010 Road Maintenance - Blade and reshape the roadway. After the finish blading the roadway:
a. will have been bladed shoulder to shoulder
b. will be free of berms, both sides
c. existing crowned roads will be crowned(6% from centerline)
d. outsloped roads will have slope of 4%.
e. no surfacing or road material will be wasted
f. will have ruts/potholes cut out
g. drain dips will be cleaned and reshaped as necessary
h. all ditches and lead-out ditches will be free of obstructions and functioning properly
3.11 Pond 2 Inlet Structure Repair – shall be as shown on the drawings. Backfill and bedding material, obtained from the pond area, shall be placed in lifts not to exceed 6 inches. Material shall be at a suitable moisture content for compaction and compacted until visual displacement ceases. Backfill shall be placed a minimum of 5 feet around the vertical riser.
3.12 Pond 3 Embankment Repair – shall be as shown on the drawings. Backfill and bedding material, obtained from the existing embankment and pond area, shall be placed in lifts not to exceed 12 inches. Material shall have a moisture content suitable for compaction. Maintain existing embankment slopes.
The existing end section of CMP has perforations along the bottom of the pipe. Roate pipe so perforations are on the top of the pipe.
Salvage existing riprap. Provide a riprap apron at culvert outlet. Salvage existing riprap. Furnish and additional 10 CY of riprap.
3.013 Seeding
A. The areas to be seeded shall be finished to the lines and grades specified or shown on the drawings.