7__WarrantyAdminGuide-SealCoat.pdf

PDF 4 MB Posted

Attached to
Chip Seal Federal contract opportunity
Solicitation number
AG-0343-S-16-0059
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Montana DOT Seal Coat Warranty Administrative Guide

View the file

Other files for this federal contract opportunity

Other files attached to Chip Seal, newest first.
File Type Posted
6__ChipSealSpec.pdf PDF
4__Drawings.pdf PDF
5__FSSS-FDR-ChipSeal-PhaseII.pdf PDF
KNF_food_storage_order.pdf PDF
S-16-0059Solicitation_for_FDR_Chip_Seal_Phase_II_2016.pdf PDF
WageDetermination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Montana Department of Transportation

Seal Coat Warranty Administration Guide

Introduction

The purpose of this guide is to present guidelines for the evaluation of the finished seal coat. This guide presents examples of desirable seal coat appearance and acceptable longitudinal joint location as well as other conditions, which include tracking, flushing, bleeding, equipment damage to seal coat, and cover material loss. An emphasis is placed on recommended solutions in cases where unacceptable conditions exist.

Throughout the warranty period, MDT personnel must carefully document (photos, video, diary) the progression of the seal coat cure. Frequency and type of documentation will be dictated by the number and severity of potential problem areas.

At the end of the warranty period, the Project Manager will facilitate and conduct an on- site inspection. Based on findings from this inspection, the Project Manager will send a letter to the Contractor stating whether or not repairs are required and at which locations. Copies of this letter will be sent to the District Construction Engineer, Materials Bureau, Construction Engineering Services Bureau, Construction Administration Services Bureau, and the project file.

In the interest of uniform seal coat warranty administration statewide; coordinate warranty determinations with the appropriate Construction Bureau staff.

2008 Edition – Third Printing

The changes to this version are listed below.

Pages 4 - 21 Minor errata changes Pages 15- 19 New examples of cover material loss, defined causes, and administration guidance.

Condition: Desired Final Appearance

Condition: Longitudinal Joint Location

• Per Subsection 409.03.7, Locate Longitudinal Joints at The Centerline or Lane Line.

• Obtain Approval From The Project Manager to Construct The Joint at Any Other Location.

Condition: Light Tracking

Recommended Solutions:

• Move Traffic Control Devices as Needed; Keep Vehicle

Tires Off of Oil Tracking Areas.

• Apply Blotter Material on Live Oil Areas For Duration of

Warranty Period. Refer to Subsection 409.03.9.

Application of Blotter Material.

Condition: Light Tracking at Intersection

• Blot Live Oil Areas Throughout Warranty Period. Refer to

Subsection 409.03.9. Application of Blotter Material.

• This Level of Tracking is Considered Acceptable And is

Expected to Diminish With Cooler Temperatures.

Condition: Moderate Tracking

• Move Traffic Control Devices as Needed; Keep Vehicle

Tires Off of Oil Tracking Areas.

• Apply Blotter Material on Live Oil Areas For Duration of

Condition: Moderate Tracking

• Move Traffic Control Devices as Needed to Keep Vehicle

Tires Off of Oil Tracking Areas.

• Apply Blotter Material on Live Oil Areas For Duration of

Condition: Heavy Tracking in Curve Section

Subsection 409.03.9. Application of Blotter Material.

• In Cases Where This Condition Persists at The End of

The Warranty Period, Acceptance is Made Under Subsection 105.03.1.

• Due to The Loss of Service Life, Skid Resistance and Headlight Reflectivity, a 50% Price Reduction is Recommended for Affected Area.

• During Seal Coat Placement in High ADT And/or Turning

Movement Areas, Consider Reducing Traffic Speeds And Continually Monitor Device Placement (i.e. Flagging Station Locations), to Avoid Aggregate Rollover During Curing Period.

Condition: Heavy Tracking, Bleeding

Subsection 409.03.9. Application of Blotter Material.

• In Cases Where This Condition Persists at The End of

The Warranty Period, Acceptance is Made Under Subsection 105.03.1.

• Due to The Loss of Service Life, Skid Resistance and

Continually Monitor Device Placement (i.e. Flagging Station Locations) to Avoid Aggregate Rollover During Curing Period

Condition: Heavy Tracking, Bleeding

Subsection 409.03.9. Application of Blotter Material.

• In Cases Where This Condition Persists at The End of

The Warranty Period, Acceptance is Made Under Subsection 105.03.1.

• Due to The Loss of Service Life, Skid Resistance and

Continually Monitor Device Placement (i.e. Flagging Station Locations) to Avoid Aggregate Rollover During

Condition: Flushing, Excess Bituminous Material

• Decrease Bituminous Material Application Rate.

• Increase Cover Material Application Rate.

• * Reduce The Amount of Water Applied to Cover

Material.

• Modify Aggregate Wetting Method to More Uniformly

Distribute Water.

Subsection 409.03.9. Application of Blotter Material.

• * This Condition Typically Occurs When Cover Material is

Saturated to The Point Where Free Water Runs From The Bed of The End Dump at The Chip Spreader. Bituminous Materials Are Then Drawn to The Surface by Seal Coat Equipment Tires.

Condition: Equipment Damage During Seal Coat Cure

• Clean Surface, Patch Bare Areas With Additional

Bituminous Material And Cover Aggregate.

• Per Subsection 409.03.8 Warranty, Submit a Detailed

Repair Plan to The Project Manager For Approval Within 14 Calendar Days of Notification of Required Repairs.

• Turning Movements Resulting in Damage of This Severity Should Not Occur at Any Time During The

Condition: Cover Material Loss Attributed to Insufficient Embedment.

Comments:

• Per Subsection 409.03.8 Warranty, Submit a Detailed

Repair Plan to The Project Manager For Approval Within 14 Calendar Days of Notification of Required Repairs.

• This Condition is Unacceptable And Must be Repaired Prior to Final Acceptance.

Embedment.

Repair Plan to The Project Manager For Approval Within 14 Calendar Days of Notification of Required Repairs.

• This Condition is Unacceptable And Must be Repaired Prior to Final Acceptance.

Characteristics:

• Cover Material Removed From Roadway Found to Have

Less Than 20% Embedment.

• Condition Attributed to a Distributor Calibration Issue.

• Project Was Sealed in Late August; Weather Conditions

Included High Humidity and Heavy Fog.

• Cover Material Loss Began to Occur Within Days of

Application.

Embedment Caused From Plant Mix Surfacing Segregation.

• Segregated Plant Mix Surfacing Sections Should be

Identified And Addressed Prior to Seal Coat Application.

• Condition Attributed to Plant Mix Surfacing Segregation.

Repair Plan to The Project Manager For Approval Within 14 Calendar Days of Notification of Required Repairs.

Embedment Caused From Plant Mix Surfacing Segregation.

• Water Poured on Plant Mix Surface Illustrates Effects of

Segregation. Bituminous Materials Will Behave Similarly, Resulting in Insufficient Quantities Remaining on the Plant Mix Surface to Embed Cover Material.

• Segregated Plant Mix Surfacing Sections Should be Identified And Addressed Prior to Seal Coat Application.

• Cover Material Loss Attributed to Plant Mix Surfacing

Segregation.

• Per Subsection 409.03.8 Warranty, Submit a Detailed

Repair Plan to The Project Manager For Approval Within 14 Calendar Days of Notification of Required Repairs.

Condition: Cover Material Loss- Snow Plow Damage

Characteristics:

• Condition Typically Presents Itself in a Transverse Fashion.

• Accompanied by Tell Tale “Chatter Mark” Effect.

• Damage Typically Located at, or Near, Roadway Crown, Quarter Line, And Shoulder.

• Contributing Factors Include Plant Mix Surfacing

Smoothness & Snow Plow Speed.

• Areas Determined as Having Damage Resulting From

Snow Plow Activities Are Not Subject to Seal Coat Warranty Provisions.

Condition: Cover Material Loss- Snow Plow Damage

• Condition Typically Presents Itself in a Transverse Fashion.

• Accompanied by Tell Tale “Chatter Mark” Effect.

• Damage Typically Located at, or Near, Roadway Crown, Quarter Line, And Shoulder.

• Contributing Factors Include Plant Mix Surfacing

Smoothness & Snow Plow Speed.

• Areas Determined as Having Damage Resulting From

Snow Plow Activities Are Not Subject to Seal Coat Warranty Provisions.

Condition: Cover Material Loss- Tire Chain Damage

• Condition Typically Present in Steep Grade Sections.

• Grooved Surface Texture Shown Indicates Damage

Induced by “V Bar” Style Tire Chain.

Comments:

• Areas Determined as Having Damage Resulting From

Tire Chains Are Not Subject to Seal Coat Warranty Provisions.

Condition: Acceptable Appearance After Repairs

• Aggregate Colors Are Uniform, Longitudinal Joints Match

Reasonably.

• Per Subsection 409.03.7 Application of Seal Coat

Materials, Ensure That Transverse And Longitudinal Joints Are Smooth And Match Adjacent Surfaces.

Example- Seal Coat Warranty Deduction Calculation

This example relates to the photos shown on page 11 of the Seal Coat Warranty Administration Guide.

Given:

• Area affected- 3,624 yd2.

• Emulsified asphalt price- $370.00/ton.

• Weight of emulsified asphalt- 8.49 lbs./gal.

• Application rate of bituminous material- 0.40 gals./yd2.

• Cover material price- $0.50/yd2.

Asphalt:

3,624 yd2 * 0.40 gals./yd2 = 1,450 gallons.

1,450 gals. * 8.49 lbs./gallon = 12,311 lbs. or 6.16 tons.

6.16 tons * $370.00/ MT= $2,279.20.

Cover Material:

3,624 yd2 * $0.50/ yd2 = $1,812.00

Total Materials- $4,091.20

In this case, the recommended 50% price reduction would total $2,045.60.

Alternative accessible formats of this document will be provided upon request.

For further information please contact 444-7606 (TTY 444-7696 or TTY 1-800-335-7592).

200 copies of this public document were published at an estimated cost $4.95 per copy, for a total cost of $990.00, which includes $990.00 for printing and $0.00 for distribution.

WARRANTY_ADMIN_COVER_2008
2008
Seal Coat Warranty Administration Guide
WARRANTY_ADMIN_INTRO_2008
2008 Edition – Third Printing
WARRANTY_ADMIN_GUIDE_2008
EXAMPLE_DEDUCT_CALC_2008
BACK COVER_2008