Pre-bid Tour Questions and Answers

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Beal Mountain Mine Barren Pond Phase II Removal

RFP AG-0343-S-16-0042

Pre-Bid Walkthrough Meeting Questions and Answers

May 27, 2016

1. What is the surveyed volume of the biosolids?

Answer:

The surveyed volume of the biosoilds is 2675 cubic yards. Please refer to the attached survey documents showing stockpile volumes.

2. What was the conversion factor used to calculate the estimated tonnage of the biosolids, item

204.03(a)?

Answer:

The 5,000 ton estimate for item 204.03(a) includes the volume of west clay stockpile (1180 cubic yards) and the biosolids (2675 cubic yards). This results in a volumetric mass density of approximately 96 pounds per cubic foot (1.3 tons per cubic yard) for the clay/biosolid mixture.

3. How many culverts are on the 12 miles of road work under Additive Bid Item 303?

Answer:

The number of culverts has not been counted. It is believed there are approximately 40 culverts along the 12 mile route. Please contact Sonny Thornborrow (406.494.0202) if you would like to inspect the culverts again before submitting a bid.