Amendment AG-0343-S-16-0036-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0343-S-16-0036-0003.pdf | ||
| AG-0343-S-16-0036-0002.pdf | ||
| REVISED_AG-0343-S-16-0036.pdf | ||
| J-4_MainFkRockCrkRd-2421_FSSS.pdf | ||
| AG-0343-S-16-0036.pdf | ||
| J-7_SF-1413.pdf | ||
| J-5_CGNF_Food-Storage-Order.pdf | ||
| J-3_MainFkRockCrkRd-2421_Plans.pdf | ||
| J-6_SF-24_BidBondForm.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 05/20/2016
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
FOREST SERVICE NORTHERN REGION
R1 AQM
24 FORT MISSOULA ROAD
MISSOULA, MT 59804
FOREST SERVICE NORTHERN REGION
R1 AQM, CUSTER GALLATIN NATIONAL FOREST
ATTN: ALANE FITZPATRICK
PO BOX 130, 10 E BABCOCK AVE
BOZEMAN, MT 59771
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0343-S-16-0036
9B. DATED (SEE ITEM 11)
04/21/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
NOTE: Per Issuance of this solicitation amendment, the hour and date specified for receipt of BIDS IS extended to 05/26/2016 at 1400 hours
MDT.
PART IV – REPRESENTATIONS AND INSTRUCTIONS
L‐4 BID SUBMITTAL
**ALL BIDS MUST BE RECEIVED PRIOR TO THE ESTABLISHED BID OPENING TIME OF THURSDAY, 26 MAY 2016, AT 1400 HOURS (2:00 P.M. MOUNTAIN DAYLIGHT
TIME).**
(continued on page 2)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ALANE FITZPATRICK, CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
/s/ Alane Fitzpatrick 05/20/2016
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 Page 2 of 2
SOLICITATION NUMBER: AG‐0343‐S‐16‐0036
Part IV, REPRESENTATIONS & INSTRUCTIONS
L‐4 BID SUBMITTAL
**ALL BIDS MUST BE RECEIVED PRIOR TO THE ESTABLISHED BID OPENING TIME OF
THURSDAY, 26 MAY 2016, AT 1400 HOURS (2:00 P.M. MOUNTAIN DAYLIGHT
TIME).**
Contractors wishing to submit a Bid MUST include the following documents (one original only). Failure to respond to this solicitation with ALL of these documents shall render a bid non‐responsive to the requirements of the solicitation, resulting in rejection of the bid in its entirety.
SF‐1442 – Solicitation, Offer, and Award (completed and signed/dated).
Section B – Schedule of Items (reference Section L, FAR 52.214‐18 –
Preparation of Bids‐Construction) and ‘Bid furnished by’ information (pp. 5‐6).
Do NOT round prices up or down; check all calculations for accuracy.
Experience Questionnaire included in Section J (form must be completed in entirety; additional pages may be attached).
Annual Representations & Certifications, included in Section K (sign and date at paragraph (d)), and SAM registration current and complete (https://www.sam.gov) (pp. 38‐40).
Properly executed, original Bid Bond, SF‐24 form (20% of Bid or $100,000, whichever is less).
Statement of Affiliates (reference Section M Acknowledgement of Solicitation Amendments per the instructions in Block 11 of the SF‐30 form. If applicable, Solicitation Amendments (Solicitation # AG‐ 0343‐S‐16‐0036) will be posted to www.fbo.gov.
SOLICITATION RELATED QUESTIONS SUBMITTED BY CONTRACTORS AND CORRESPONDING
ANSWERS:
QUESTION:
“We have been approached by a prime contractor to provide a Storm Water Pollution Prevention Plan (SWPPP) as part of the project. I would like to inquire if the USFS has a specific format requirement for the SWPPP or if we should utilize the Montana Department of Environmental Quality template format? Additionally, does the USFS require a submittal or review of the SWPPP prior to commencement of construction?
I read through the entire solicitation offer and did not note any such requirements with the exception of reference to section 452.236‐74 Control of Erosion, Sedimentation, and Pollution (NOV 1996), and 107.10 Environmental Protection, requiring a hazardous spill plan.”
ANSWER:
The Contract does not require a formal Storm Water Pollution Prevention Plan (SWPPP). This does not waive the Contractor’s responsibility under Forest Service Supplemental Specification (FSSS), Section 107 to perform in a workmanlike manner to protect local resources as described in the Section.
The Contract does require a Hazardous Spill Plan under Supplemental Section 107.10.
PROJECT:
Main Fork Rock Creek Road #2421 Reconstruction, Phase I
UNIT:
Custer Gallatin National Forest