Attachment J2 Supplemental Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ConstructionRFP.docx | DOCX document | |
| Attachment_J3_Drawings.pdf | ||
| AttachmentJ6_AD3031.pdf | ||
| AttachmentJ5_AD3030.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST SERVICE
SUPPLEMENTAL SPECIFICATIONS
FOR
MILL CREEK BRIDGE #1
ROAD NO. 309 – M.P. 0.9
U.S.D.A Forest Service, Region 1 Nez Perce-Clearwater National Forest Clearwater Ranger District Idaho County, Idaho
Prepared by:
GREAT WEST ENGINEERING
2501 Belt View Drive Helena, MT 59604
MILL CREEK BRIDGE #1
Road No. 309 – M.P. 0.9
FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
TABLE OF CONTENTS
| PREFACE | 1 |
| 101 - TERMS, FORMAT, AND DEFINITIONS | 2 |
| 102 - BID, AWARD, AND EXECUTION OF CONTRACT | 5 |
| 103 - SCOPE OF WORK | 6 |
| 104 - CONTROL OF WORK | 7 |
| 105 - CONTROL OF MATERIAL | 8 |
| 106 - ACCEPTANCE OF WORK | 9 |
| 107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC | 10 |
| 108 - PROSECUTION AND PROGRESS | 11 |
| 109 - MEASUREMENT AND PAYMENT | 12 |
| 151 - MOBILIZATION | 13 |
| 152 – CONSTRUCTION SURVEY AND STAKING | 14 |
| 153 – CONTRACTOR QUALITY CONTROL | 15 |
| 155 – SCHEDULES FOR CONSTRUCTION CONTRACTS | 18 |
| 156 - PUBLIC TRAFFIC | 19 |
| 157 – SOIL EROSION CONTROL | 20 |
| 203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 21 |
| 204 - EXCAVATION AND EMBANKMENT | 22 |
| 208 - STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES | 23 |
| 251 - RIPRAP | 24 |
| 308 – MINOR CRUSHED AGGREGATE | 25 |
| 553 – PRESTRESSED CONCRETE | 27 |
| 553A – PRECAST CONCRETE STRUCTURES | 28 |
| 622 - RENTAL EQUIPMENT | 31 |
| 625 – TURF ESTABLISHMENT | 32 |
| 703 - AGGREGATE | 33 |
| 704 – SOIL | 34 |
| 705 – ROCK | 35 |
| 725 – MISCELLANEOUS MATERIAL | 36 |
i
PREFACE
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms.
Add the following:
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - BID, AWARD, AND EXECUTION OF CONTRACT
102 Bid, Award, and Execution of Contract Delete Section 102 in its entirety.
103 - SCOPE OF WORK
Deletions Delete all but subsection 103.01 Intent of Contract.
The project consists of the removal of an existing timber bridge and the construction of a new 67’-0” span by 16’-0” useable width concrete bulb tee bridge with a concrete grade beam foundation. The bridge is located on Forest Service Road No. 309 (milepost 0.9) at the Mill Creek stream crossing. Improvements consist of, but are not limited to: structure excavation, placement of riprap, installation of foundation fill, installation of concrete grade beams, installation of bulb tee beams, installation of cast-in-place concrete end diaphragms/wingwalls and curb, embankment and excavation of the roadway approaches, and placing new crushed aggregate surfacing.
The project is located in the Clearwater Ranger District of the Nez Perce-Clearwater National Forests, southeast of Grangeville in Idaho County, Idaho (Section 27, Township 29 North, Range 4 East). Refer to the location map on the title sheet of the plans.
104 - CONTROL OF WORK
104 Control of Work.
Delete sections 104.01, 104.02, and 104.04.
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - CONTROL OF MATERIAL
105.02 Material Sources.
Add the following before the first paragraph.
Sources have been designated for this project as follows:
Waste Site – Government Furnished - A waste site for excess or unsuitable material will be located by the CO within 3 miles of the project site in National Forest lands.
Materials Stockpile Site – Government Furnished – The Contractor will be allowed to stockpile material, including riprap, foundation fill, crushed aggregate, and bridge components at the site adjacent to the existing roadway. Materials must be stockpiled in such a manner as to allow for safe passage of the general public along the road access and to avoid damage to any trees at the project site. Provide the CO 72 hours advance notification prior to stockpiling any materials at the construction sites.
Roadway Embankment Source – Government Furnished - The Contractor shall use suitable onsite material (estimated at 40% useable) from structure excavation and roadway excavation for embankment construction. All material must be approved by the CO before placement. A source for additional roadway embankment material (if necessary) will be located by the CO within 3 miles of the project site.
Riprap Source – Government Furnished – The Contractor shall use suitable on-site riprap material from the location shown on the plans. The material shall be approved by the CO before placement.
Backfill Material – Government Furnished – Suitable structure excavation material (estimated at 40% useable) may be utilized as backfill. Any additional material shall come from a material source located by the CO within 3 miles of the project site. If utilized, this material shall be approved by the CO.
Crushed Aggregate Source – Contractor Furnished
Foundation Fill Source – Contractor Furnished
Add the following to section (b) Contractor-located sources:
Prior to any pit development or use of materials, the Contractor shall provide to the CO a State certification that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.
106 - ACCEPTANCE OF WORK
106.07 Delete
Delete subsection 106.07.
107 - LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”
107.09 Legal Relationship of the Parties.
Delete the entire subsection:
108 - PROSECUTION AND PROGRESS
108 Delete Delete Section 108 in its entirety.
109 - MEASUREMENT AND PAYMENT
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
Add the following Definition:
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
(q) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
151 - MOBILIZATION
151.01 Description
Add the following at the end of the last sentence:
A preliminary construction schedule shall be submitted 7 days prior to the preconstruction meeting.
All temporary or portable signs shall be included as a subsidiary item to section 151. Signs and sign placement shall meet the requirements of the “MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES” (MUTCD), published by the U.S. Department of Transportation, Federal Highway Administration. Work on the project shall not be started until all required signs are in place and approved by the C.O.
Removal and replacement of road closure devices such as concrete barriers or earth barriers to gain access to the project shall be included as incidental to Section 151 Mobilization.
Work also includes cleaning all construction equipment prior to entry on to Forest Lands. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area. The Contractor shall give the Forest Service at least 24 hours advance notification when equipment is ready for inspection. The location for inspection shall be as agreed upon in the preconstruction meeting.
151.03 Payment
Include all costs associated with the cleaning of equipment in the unit price for Mobilization.
152 – CONSTRUCTION SURVEY AND STAKING
152.03 Survey and Staking Requirements.
Add the following:
Conduct all construction staking under the direction of a licensed professional engineer or land surveyor who is closely associated and familiar with construction staking.
153 – CONTRACTOR QUALITY CONTROL
Add the following.
153.07. Project Submittals
At a minimum the contractor shall provide project submittals as shown on the below Submittal Log. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
Submittal Log
| Log No. |
| Incidental to |
Pay Item(s)
| Description of Submittal |
| Type of Submittal |
| Requirement found in Specification No. |
/Drawings Additional Specification References
| 1 |
| 151 |
| Submittal Schedule |
| Schedule |
| 2 |
| 151 |
| Weed Free Material Source Certification |
| Material |
Certification FSSS 105.02(b)
| 3 |
| 151 |
| Hazardous Spill Plan |
| Plan |
| FSSS 107.10 |
| 4 |
| 151 |
| Contractor Quality Control Plan |
| Plan |
| 153.02 |
| 552.09 |
| 5 |
| 151 |
| Traffic Control Plan |
| Plan |
| FSSS 156.03 |
| 6 |
| 151 |
| Material Storage/Staging Plan |
| Plan and Description |
| FSSS 151 |
| Drawings |
| 7 |
| 152 |
| Surveyor Credentials |
| Certification |
| FSSS 152 |
| 8 |
| 157 |
| Dewatering Plan |
| Plan |
| Drawings |
| FSSS 157 |
| 9 |
| 157 |
| Soil Erosion and Pollution Control Plan |
| Plan |
| FSSS 157.03 |
| 10 |
| 208 |
| Excavation Plan |
| Plan |
| Drawings |
| 11 |
| 208 |
| Backfill Proctor |
| Test Results |
| 208.11 |
| 12 |
| 208 |
| Backfill Density Testing |
| Test Results |
| 208.11 |
| 13 |
| 208 |
| Foundation Fill |
| Material Certification/ |
Proctor
| 208.12 |
| 106 |
| 14 |
| 208 |
| Foundation Fill Density Testing |
| Test Results |
| 208.12 |
| 106 |
| 15 |
| 308 |
| Crushed Aggregate |
| Material Certification |
| 308 |
| 703.06 |
| 16 |
| 552 |
| Structural Concrete: Mix Design |
| Mix Design |
| 552.03 |
| 553,553A, Drawings |
| 17 |
| 552 |
| Structural Concrete: Testing |
| Test Results |
| 552.19 |
| 106, Drawings |
| 18 |
| 553 |
| Miscellaneous Material: High Strength – Non Shrink Grout (Beams) |
| Material |
Certification
| FSSS 725.40 |
| 553, Drawings |
| 19 |
| 553 |
| Miscellaneous Material: High Strength – Non Shrink Grout (Beams) |
| Product Approval |
| FSSS 725.40 |
| 553, Drawings |
| 20 |
| 553A |
| Miscellaneous Material: High Strength – Non Shrink Grout (Grout Pads) |
| Material Certification |
| Drawings |
| 21 |
| 553A |
| Miscellaneous Material: High Strength – Non Shrink Grout (Grout Pads) |
| Product Approval |
| Drawings |
| 22 |
| 553 |
| Miscellaneous Material: Flexible Gasket Type Sealant |
| Material Certification |
| Drawings |
| 23 |
| 553 |
| Miscellaneous Material: Joint Sealant |
| Material Certification |
| Drawings |
| 24 |
| 553/553A |
| Precast/Prestressed Concrete |
| Shop Drawing |
| 104.03 |
| 553, Drawings |
| 25 |
| 553/553A |
| Precast/Prestressed Concrete: PCI/NPCA Certification |
| Fabrication Certification |
| FSSS 553.02 |
| 26 |
| 553 |
| Prestressed Concrete: Prestressing |
| Method |
Approval
| 553.03 |
| Drawings |
| 27 |
| 553/553A |
| Precast/Prestressed Concrete: Materials |
| Material |
Certification
| 553 |
| 106, 552, 554, 709, Drawings |
| 28 |
| 553/553A |
| Precast/Prestressed Concrete: Testing |
| Test Results |
| 553.11 |
| 106, 552, Drawings |
| 29 |
| 553 |
| Precast Concrete Structures: Erection Plan |
| Plan |
| Drawings |
| 30 |
| 553 |
| Precast Concrete Structures: Beam Flange Joint Measurements |
| Results |
| Drawings |
| 31 |
| 553/553A/ |
| Reinforcing Steel |
| Order List, Material Certification |
| 554.03 |
| 553, 709, Drawings |
| 32 |
| 622 |
| Equipment Rental |
| Equipment |
Approval
FSSS 622.02
| 33 |
| 625 |
| Seed Mix |
| Material Certification |
| 625.10 |
| 106, FSSS 625, 713 |
| 34 |
| 633 |
| Signs & Sign Posts |
| Material Certification |
| 633 |
| Drawings |
155 – SCHEDULES FOR CONSTRUCTION CONTRACTS
155 Delete Delete Section 155 in its entirety.
156 - PUBLIC TRAFFIC
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
According to Subsection 106.07(b)
Delete the first paragraph and replace with the following:
Accommodate traffic according to the requirements set forth below, MUTCD, and Section 635. Submit a traffic control plan for acceptance at least 30 days before intended use.
Add the following project specific requirements:
The Contractor will be allowed to close Road No. 309 at the bridge site to through traffic for up to 45 calendar days. It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the bridge can be substantially completed within the above specified contract time. The Contractor shall give the CO at least three weeks advanced written notice prior to any road closure. The Contractor shall be responsible for providing, installing, maintaining, and removal of warning signs and type 3 barricades required for the road closure period. At the Contractor’s written request, traffic delays up to one hour will be approved should the project work necessitate short traffic delays outside the closure period.
Contractor shall provide and install two ‘road closed ahead’ signs for the duration of the work. The sign shall be located at the Junction of Highway 14 and Road No. 309, and at mile post 3.0 on the 309 road.
ROAD CLOSED
XX MILES AHEAD
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
156.10 Measurement and payment.
Delete this subsection in its entirety and replace with the following:
Do not measure Public Traffic for payment. Compensation for this item shall be incidental to Mobilization.
157 – SOIL EROSION CONTROL
157.02 Materials.
Add the following:
Provide bales, wattles, logs, in-stream sediment trapping devices, and rolls from a certified noxious weed free source.
157.03 General.
Delete the first two paragraphs and replace with the following:
Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.
Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:
(a) The construction activities and sequence of implementation relating to specific erosion control measures.
(b) The location and type of permanent controls to be implemented during construction.
(c) The location and type of temporary controls to be implemented during construction.
(d) For work in stream channels with running water a detailed dewatering plan.
(e) For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
(f) Description of the monitoring plan.
Add the following to the third paragraph:
Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property and reclaim all disturbed areas.
203 – REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.01 Delete and replace with the following:
This work consists of disposing of clearing slash, salvaging, removing and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
203.05 Disposing of Material.
Modify this subsection as follows:
(a) Remove from project. Add the following:
All materials designated for removal become property of the Contractor and are to be disposed of by removing off of National Forest Lands in accordance with all local, state, and federal requirements.
(b) Burn. Delete this section.
(c) Bury. Delete this section.
Add the following:
(e) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes or scatter as directed by the CO to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets. All slash material not suitable for embankment slopes shall be disposed off Forest Service Lands in accordance with all local, state and federal requirements or as approved by the CO.
204 - EXCAVATION AND EMBANKMENT
204.11 Compaction.
Delete and replace with the following:
Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases. Make at least six complete passes.
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at designated sites or as directed by the CO.
204.15 Acceptance.
Delete reference to Table 204-1.
208 - STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES
208.02 Material.
Delete Structural Backfill and Add the Following:
Backfill 704.03
208.04 General.
Add the following:
Use all suitable material in the construction of the roadway embankment and for backfill. Field drain and dry excessively wet material that is otherwise suitable for embankment before placement. Place and shape unsuitable or excess material in the designated sites or as directed by the CO.
208.08 Dewatering.
Delete the subsection and add the following:
Submit a dewatering plan according to Section 157.03.
Construct diversion prior to performing any excavation and according to Section 157.09. Construct diversions using water tight, non-eroding methods. Employ settling basins or other methods so that muddy water is not returned to stream. Install, operate, and remove diversions in a manner that minimizes erosion and sedimentation.
208.11 Compacting.
Add the following:
Compact backfill material behind the bridge structure in accordance with FP-03Section 208.
Backfill material shall be tested per FP-03 208 (AASHTO T99, Method C).
251 - RIPRAP
251.01 Description.
Delete the first sentence and add the following:
This work consists of furnishing, hauling, and placing riprap for bank protection, slope protection, drainage structures, erosion control, and other features shown on the plans.
251.07 Acceptance.
Delete the first sentence and add the following:
Government furnished material will not require sampling and testing. The CO will visually inspect and approve rock.
Delete the fourth sentence and add the following:
Structure excavation and backfill will be evaluated under section 208.
251.09 Payment.
The cost of excavation, embankment, and haul required for placement of riprap is incidental to the riprap pay item.
308 – MINOR CRUSHED AGGREGATE
Delete section 308 in its entirety and replace with the following:
Description
308.01 This work shall consist of hauling, placing, finishing, and compacting roadway aggregate.
Material
308.02 Conform to the following Subsections:
| Crushed aggregate | 703.06 | |
| Water | 725.01 |
Construction Requirements
308.03 Preparing Surface. Prepare the roadway surface on which aggregate course is placed as shown on the plans.
308.04 Placing Crushed Aggregate.
(a) Roadway aggregate.
Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for compaction. Watering, if needed for suitable moisture content, is incidental to this Item. Spread and shape the mixture on the prepared surface in a uniform layer.
Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection 308.05(a) before placing the next layer.
308.05 Compacting and Finishing Crushed Aggregate.
(a) Roadway aggregate.
Compact the aggregate by operating compaction equipment over the total width until visible deformation ceases. A minimum of six complete roller passes shall be made at a moisture content suitable for compaction. Watering, if needed for suitable moisture content, is incidental to this Item.
Blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface.
Shape the final surface to the required template shown in the drawings. The final road template shall not vary more than ±1 inch.
308.06 Acceptance. Crushed aggregate will be evaluated under Subsections 106.02.
Construction of roadway aggregate courses will be evaluated under Subsections 106.02 and 106.04. Compaction of roadway aggregate courses will be evaluated under Section 106.04.
Preparation of the surfaces on which crushed aggregate is placed will be evaluated under Section 303 as applicable.
Measurement
308.07 Measure the Section 308 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure crushed aggregate by the cubic yard in the hauling vehicle.
Payment
308.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 308 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
553 – PRESTRESSED CONCRETE
553.05 Method Approval.
Precast prestressed concrete members must be manufactured by a plant certified by the Prestressed Concrete Institute (PCI) or the National Precast Concrete Association (NPCA) or as required in Supplemental Specification 553A. Submit a copy of the transmittal letter of the latest PCI inspection or NPCA inspection with the shop drawings.
553A – PRECAST CONCRETE STRUCTURES
Description
553A.01 Work. Construct precast concrete members. In addition, manufacture, test materials for, transport, store, and install all precast concrete portions except piling, and perform all necessary grouting, welding, or other connections. Furnish precast concrete members complete and in place, including all concrete reinforcing steel and incidentals connected therewith.
Materials
553A.02 Requirements. Provide materials that meet the requirements specified in the following subsections:
| High-Strength Nonshrink Grout ……………………………… 725.40 |
| Mortar ………………………………………………………… 725.40 |
| Reinforcing Steel ……………………………………………… 709.01 |
| Sealants, Fillers, Seals, & Sleeves …………………………….. 712.01 |
| Structural Concrete ……………………………………………. 552 |
| Structural Steel ………………………………………………… 717.01 |
Provide precast concrete members of the size, shape, strength, air content, and finish that are SHOWN ON THE DRAWINGS. Precast concrete members must be manufactured by a plant with the following certifications:
Precast, Prestressed Concrete Superstructure
· Precast / Prestressed Concrete Institute (PCI)
· Bridge 4, Prestressed Deflected-Strand Bridge Beams (superstructure).
· National Precast Concrete Association (NPCA)
· Precast and Prestressed
Precast Concrete Grade Beam
· Precast/Prestressed Concrete Institute (PCI)
· Bridge 1, Precast Bridge Products (no prestressed reinforcing)
· Commercial 1, Precast Concrete Products (no prestressed reinforcing).
· National Precast Concrete Association (NPCA)
· Precast
· American Concrete Pipe Association (ACPA)
· QCast
Submit a copy of the transmittal letter of the latest PCI or NPCA inspection/certification with the shop drawings.
In lieu of industry certification, Contractor shall retain a professional engineer to provide quality assurance for the work by inspecting and certifying in writing the concrete members are constructed in accordance to the specification and shall include but not limited to:
a) Shop drawing review.
b) Concrete member dimensions.
c) Concrete mix design.
d) Aggregate sources and test results.
e) Steel reinforcing placement.
f) Concrete curing and strength test results.
g) Concrete material certifications.
h) Placement mixing, delivery and sampling.
Certification of the above shall be received by the CO prior to shipment and installation at the job site.
Perform all sampling, testing, and inspection necessary to ensure quality control of the component materials and the concrete. Sample and test for quality control and acceptance testing in accordance with the AASHTO or ASTM test methods prescribed in Section 552.
Maintain adequate records of all inspections and tests. Keep records that indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of any corrective action taken.
Construction
553A.03 Performance. Construct precast concrete structural members in accordance with the following sections and subsections, as applicable:
| Reinforcing Steel ………………………………………………... 554 |
| Storing, Transporting, & Erecting ………………………………. 553.08 |
| Structural Concrete ……………………………………………… 552 |
Submit four sets of shop drawings to the CO for approval, including the concrete mix design for each class of concrete proposed for use, a minimum of 21 days before fabrication of the precast member(s).
553A.04 Casting Yard. The precasting of concrete structural members may be done at a casting yard location selected by the Contractor.
553A.05 Handling, Transporting, & Erecting. Provide additional reinforcement, as needed, to meet the requirements of handling, transporting, and erecting precast members.
553A.06 Acceptance. Reinforcing steel, anchor devices, elastomeric bearings, and material for concrete and grout will be evaluated under Subsection 106.03. Furnish production certifications for hydraulic cement, and reinforcing steel.
Concrete for precast concrete members will be evaluated under Subsections 106.02, 106.03, and 106.04.
Construction of precast concrete members will be evaluated under Subsections 106.02 and 106.04.
Reinforcing steel will be evaluated under Section 554.
Falsework and forms will be evaluated under Section 562.
Measurement 553A.07 Measure the Section 553A items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Do not measure reinforcing steel, concrete, anchorages, plates, nuts, and other material contained within or attached to the unit for precast concrete structural members.
Payment 553A.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 553A pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
622 - RENTAL EQUIPMENT
622.02 Rental Equipment.
Delete the first two sentences of the first paragraph and add the following:
Hydraulic Excavator. Provide a track mounted hydraulic excavator. Excavator shall be shall be reasonably free of leaks and other mechanical deficiencies. Bucket must be equipped with a hydraulic "thumb". Contractor shall supply an excavator of a size capable of performing the excavation needs for the project, i.e. structure excavation, riprap construction, in-stream structures, etc., or other work that may be directed under this section. Submit the model number of the equipment to the CO for approval before delivery to the project site. Contractor is required to get approval of the size of the Hydraulic Excavator from the Contracting Officer prior to any work taking place.
Large Dump Truck. Provide a large dump truck with a minimum capacity of 12 cubic yards, 1990 model year or newer. Contractor is required to get approval of the size of the Dump Truck from the Contracting Officer prior to any work taking place.
Submit the model number of the equipment to the CO for approval before delivery to the project site. Equipment shall be no more than 15 years old and shall be reasonably free of leaks and other mechanical deficiencies.
622.04 & 622.05 Measurement and Payment.
The contractor shall be aware of the following statement within section F of the Contract under FAR 52.211-18 Variation in Estimated Quantities: “Adjustment of contract prices as described in this section shall not apply to section 622…. The government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in the contract unit price.”
625 – TURF ESTABLISHMENT
625.04.
Delete this entire subsection:
625.05.
Delete this entire subsection:
625.06.
Delete this entire subsection:
625.07 Seeding.
Add the following after subsection (b):
Application Methods for Seed:
Apply seed by the Dry Method. The kind of seed to be furnished and the amounts to be applied in terms of pure live seed shall be as follows:
| Quantity of Pure Live Seed | |||
| Common Name | Scientific Name | (Pounds/ Acre) | |
| Blue Wildrye | Elymus glaucus | 8 | |
| Annual Rye | 6 | ||
| Bromar Mountain Brome | Bromus Marginatus | 10 | |
| Canbar Canby’s Bluegrass | Poa Canbyi | 2 | |
| Total | 26 | Pounds/ Acre |
Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed (PLS) required per acre by the product of the percent purity & percent germination.
| Example: | (5 lbs. PLS/acre) = 6.55 lb. | ||
| (0.90 x 0.85) | where purity = 90% & germination = 85% |
Seed Certification:
Certified, blue-tagged seed shall be used where a named variety or cultivar is specified. Blue Tags that are removed to mix or spread the seed will be saved and provided to the forest. All seed purchased will be certified free of seeds from weeds listed on the current “All States Noxious Weeds List.”
625.08.
Delete this section and replace with the following:
No fertilizer will be required.
703 - AGGREGATE
703.06 Crushed Aggregate.
Delete this subsection and add the following:
Furnish crushed surface aggregate meeting the following gradations. Variations may be approved by the CO.
| Sieve Size |
| Percent Passing |
| 1 inch |
| 100 |
| ¾ inch |
| 70 – 98 |
| No. 4 |
| 36 – 60 |
| No. 8 |
| 22 - 43 |
| No. 30 |
| 12 – 31 |
| No. 200 |
| 6 - 15 |
704 – SOIL
704.03 Backfill Material.
Delete this section and replace with the following:
Utilize onsite material that is well-graded, compactable material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material. Maximum particle size cannot exceed 6 inches. Material must be stockpiled and sampled to develop a proctor for use in density compaction testing.
705 – ROCK
705.02 Riprap Rock.
All riprap material shall be Government Furnished from the location shown on the Drawings. Any material to be used shall be approved by the CO prior to placement and should be hard, durable rock meeting the required riprap class gradation. No sampling or testing of rock samples is required.
725 – MISCELLANEOUS MATERIAL
Add the following section:
725.40 High-Strength Nonshrink Grout
Furnish grout that is packaged and ready for use with the addition of water at the construction site. Ensure that each bag is stamped to show the last date on which it may be used. Use grout that consists of a hydraulic cementitious system, graded and processed natural fine aggregate, and additional technical components such that the product meets the following conditions:
(a) Free of inorganic accelerators, including chlorides.
(b) Free of oxidizing catalysts.
(c) Free of gas-producing agents.
(d) When mixed to 130 percent flow on flow table (ASTM C 230 at 10 drops), it does not reduce in linear dimension when tested in accordance with ASTM C157. Take measurements at 72 hours and 7 days.
(e) Produces no bleeding for the first 2 hours after mixing when mixed to 130 percent flow on flow table (ASTM C 230 at 10 drops), as tested in accordance with ASTM C232.
(f) Has a minimum strength as follows when tested in accordance with ASTM C 109:
| (1) | After 72 hours, 25 MPa (3500 psi). |
| (2) | At 7 days, 40 MPa (6000 psi). |
| (3) | After 28 days, 50 MPa (7200 psi). |
Provide performance characteristics at 115 to 120 percent flow on flow table (ASTM C 230 at 10 drops).
(g) It must be designed, as stated by the manufacturer, to be mixed, placed, and cured at atmospheric temperatures of 5O C to 30O C (40O F to 85O F). Submit products proposed for use for approval by the CO and accompany them with manufacturer’s submittals substantiating all requirements in this subsection, including graphs or charts showing the time, temperature, and humidity requirements for curing to achieve the specified grout strengths; and recommendations for storage, mixing, application, and curing procedures.
As specified as grout on the contract plans, the following products meet the above requirements.
1. MASTERFLOW 928 GROUT, manufactured by Chemrex.
2. CRYSTEX GROUT, manufactured by L&M Construction Chemicals, Inc.
3. CEMENT ALL, manufactured by CTS Cement Manufacturing Co.
4. SURE-GRIP HIGH PERFORMANCE GROUT manufactured by Dayton Superior.
725.41 Mortar
Furnish mortar that is packaged and ready for use with the addition of water at the construction site. Ensure that each bag is stamped to show the latest date on which it may be used. Use mortar that consists of a cementitious system made up of:
(a) Natural aggregate, 3/8” maximum size, that meets the requirements specified in ASTM C 33 except for grading. Accomplish grading by blending sieve sizes to obtain the optimum density.
(b) Metallic aggregate free from nonferrous material, soluble alkaline compounds, and visible rust.
(c) Water reducers, workability agents, air-entraining agents, and catalysts.
Blend the materials to minimize bleeding, increase workability, resist exposure to freeze-thaw cycles and deicing salts, and prevent shrinkage within and at the perimeter of the patch, keyway, or other area to be filled.
Ensure that the minimum compressive strength of the mortar, as tested by ASTM C 109 for a 3” slump, is:
· 24-hour..........................................................................................35MPa (5000 psi)
· 7-day.............................................................................................60 MPa (8500 psi)
· 28-day........................................................................................70 MPa (10,000 psi)
Ensure that the durability of the products when tested at 300 cycles, ASTM C 666, procedure A is:
Submerged in: DF (%)
Water 98
5% CaCl2 solution 95
5% NaCL solution 85
Ensure that the scaling resistance has a rating of 3, Moderate Scaling, after 50 cycles when tested in accordance with ASTM C 672.
Provide certification from the manufacturer that the product is compatible for work that is 1” or more in depth and more than 1” in width; and where the mixing, placing, and curing temperatures may range from 5O C to 30O C (40O F to 85O F).
Submit products proposed for use to the CO for approval, and accompany them with the manufacturer’s submittals substantiating all requirements in this section, including (1) graphs or charts showing the time, temperature, humidity, and curing requirements to achieve mortar strengths equal to the adjacent concrete; and (2) complete recommendations for storage, mixing, application, and curing procedures.
As specified as mortar on the contract plans, the following products meet the above requirements.
1. EMACO T425 or T430, manufactured by Chemrex.
2. RAPID SET DOT REPAIR MIX manufactured by CTS Cement Manufacturing Co.
3. SURE-GRIP HIGH PERFORMANCE GROUT (when extended with pea gravel) manufactured by Dayton Superior .