Attachment4WashingtonCreekWorklist.docx

DOCX document 97 KB Posted

Attached to
Nez Perce-Clearwater NFs - Washington Creek Road Obliteration
Solicitation number
AG-02RC-S-17-0144
Issued by

About this file

Attachment 4 - Work Lists, 44 pages

View the file

Other files

File Type Posted
Amend1_Page1.doc DOC document
Amendment1Pg2.docx DOCX document
Attachment7_52.212-3.docx DOCX document
Attachment2Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

WASHINGTON CREEK ROAD OBLITERATION

ESTIMATED WORK LIST

ROAD NO. 6069

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS

0+00

Begin Project Road 6069 Begin Item 21103A, Roadway Obliteration Method I (2.8 Miles).

Begin Seeding (14.0 Acres).

Project road 6069 begins at junction left with Rd. 6004 at approximately 0.5 miles from junction of Rd. 246

7+45
Cross-Drain Channel (CDC)
Existing 36” cmp, 18’ wide by 60’ long through fill, 8’ to 15’ deep.
9+26
CDC
Seep 30’ long
10+95
Drainage Excavation
Existing CMP 3’ to 12’ deep..
20+87
CDC
Small pond above road. Water ponding in ditch above pulled cmp.
23+90
Drainage Excavation
cmp pulled, may still be some log culverts.
25+75
Notice
Large rock in the road, will take large excavator or dozer to move rock in order to get past. End of pick up access.
31+90
Notice
Beginning of shoulder break off
32+95
Notice
End of shoulder break off.
35+00
Notice
Beginning of rock slide in road.
40+00
Notice
End of rock slide in road. Beginning of saturated road surface.
40+40
CDC

40+80

End of saturated road surface.

42+50
Notice
Beginning of rock slide in road, large excavator or dozer needed in order to provided access past..
43+40
Notice
End of rock slide.
44+97
Notice
cmp pulled- dry.
50+13
CDC
cmp pulled – wet..
51+40
Notice
40’ long slide in road.
52+15
CDC
Wet area in the road.
53+21
CDC
cmp pulled.
58+59
CDC
cmp pulled.
61+96
Notice
Road shoulder failure 12’ wide road prism.
69+30
Stream-Grade Channel (SGC)
Existing cmp pulled.
74+00 – 74+75
CDC
Existing cmp pulled, wet area along the road and the road is outsloped.
80+50
SGC
Existing cmp pulled, Stream greade Crossing needs drainage structure per drawings and specifications.
90+00
SGC
Existing cmp pulled, Stream greade Crossing needs drainage structure per drawings and specifications.
90+90
Notice
Slide in the road, estimated 30 cy, will need to move to get past.
98+95
Notice
Existing constructed stream grade crossing, take care in crossing to cause as little disturbance as possible.
101+14-102+38
Notice
Rock and material slide, road only 6’ wide, will need excavator to widen the road to get past.
110+29
CDC
Existing cmp pulled
116+77
CDC
Existing cmp pulled
122+72
CDC
Existing cmp pulled
131+70
CDC
Existing cmp pulled
138+34
CDC
Existing cmp pulled
141+72
CDC
Existing cmp pulled
148+25
End of Project Work on Road 6069
End Roadway Obliteration Method I, End Seeding, Road ends at dead end.

WASHINGTON CREEK ROAD OBLITERATION

ESTIMATED WORK LIST

ROAD NO. 74249

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74249

Begin Item 21103A, Roadway Obliteration Method I (0.3 Miles).

Begin Seeding (1.5 Acres).

Project road 74249 begins at junction right (west) with Rd. 74248. From USFS Road 5301 take junction left with USFS Road 724, travel approx. 1.0 miles to junction right with USFS road 74248, travel approximately 0.3 miles to junction right with USFS Road 74249 start of project.

3+75
Cross-Drain Channel (CDC)
Existing cmp pulled.
16+00
Remove existing 55 gallon steel drum buried in landing
16+00
End of Project Work on Road 74249
End roadway obliteration method I, End seeding. Project end at old log landing.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74227

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74227

Begin Item 21103A, Roadway Obliteration Method I (0.40 Miles).

Begin Seeding (2.10 Acres).

Project road 74227 begins at junction with Rd. 722 at sta. 1+00. From USFS Road 246 take jct right on USFS Road 5301. Travel approx. 0.43 miles then take junction right onto USFS Road 722, travel approx. 100’ take junction right with USFS Road 74227, beginning of Project.

0+15
Stream-Grade Channel (SGC)
Live stream failed pipe.
1+56 – 2+21
Notice
Cut slope slumping and road shoulder failing. Road narrows and will take some excavator work to get past.
2+76
Notice
20’ long crack in road shoulder.
4+00-5+61
Notice
Road narrows to a 7’ road width and will take some excavator work to get past.
5+60
Notice
Junction left T1 road.
6+00
Notice
40’ long shoulder slump.
6+27
Cross-Drain Channel (CDC)
Saturated road bed and road shoulder failure.
6+83
Notice
20’ fill crack.
11+58
Notice

Cut bank failure and road shoulder failure, will take some excavator work to get past.

12+82
Notice
Road narrows to an 11’ road width and will take some excavator work to get past.
13+34
CDC
Dry Swale with a slumpy road shoulder.
14+29
CDC
Dry draw
20+37
Notice
Junction road right T2
21+99
End of Project Work on Road 74227
End roadway obliteration method I, end seeding. Road ends at dead end.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74227-T2

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION.
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74227-T2

Begin Item 21103A, Roadway Obliteration Method I (0.20 Miles).

Begin Seeding (1.10 Acres).

Project road 74227-T2 begins at junction right with road 74227. From USFS Road 246 take junction right on USFS Road 5301. Travel approx. 0.43 miles then take junction right onto USFS Road 722, travel approx. 100’ take junction right with USFS Road 74227, travel approx. 0.4 miles, take junction right on the 74227-T2 road beginning of project.

1+23
Notice
Road narrows, will take some excavator work to get by.
2+01
Notice
Junction right skid road
2+37
Notice
Road narrows, will take some excavator work to get by.
3+21
Cross-Drain Channel (CDC)
Dry draw
5+11
Notice
Road slumping.
5+73
CDC
Wet draw
6+30
CDC
Existing channel down fill slope.
8+08
CDC
Dry Swale
8+31
Notice
Junction left T3 road
11+40
Steam-Grade Channel (SGC)
Live stream 3’ wide bankfull.
11+47
End of Project Work on Road 74227-T2
End roadway obliteration method I, end seeding. Road end at deadend and junction with a skid trail.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74227-T3

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION.
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74227-T3

Begin Item 21103A, Roadway Obliteration Method I (0.20 Miles).

Begin Seeding (1.0 Acres).

Project road 74227-T3 begins at junction right with road 74227-T2. From USFS Road 246 take junction right on USFS Road 5301. Travel approx. 0.43 miles then take junction right onto USFS Road 722, travel approx. 100’ take junction right with USFS Road 74227, travel approx. 0.4 miles, take junction right on the 74227-T2, travel approx. 0.16 mile to junction left with road 74227-T3 beginning of project..

0+82
Notice
Road narrows to 7’ width, will take some excavator work to get by.
2+42
Stream-Grade Channel (SGC)
Live water and a failed log culvert..
3+43
Notice
Junction left skid trail.
6+35
Notice
Junction right road T4.
7+13
SGC
Live water flowing down road, revert back to original channel.
8+50
End project Work on Road 74227-T3.

End of roadway obliteration method I, End of seeding. Road end at deadend.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 6004E

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION.
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Road 6004E

Begin Item 21103A, Roadway Obliteration Method I (0.50 Miles).

Begin Seeding (2.50 Acres).

Notice: Access cut off on USFS Road 6004B by 3’to 8’ high cut bank, excavator will have to construct access.

Project road 6004E begins at junction right on Road 6004B. From USFS Road 246 turn right onto USFS Road 5301, travel for approx. 0.40 mile to the junction left with USFS Road 6069. Turn left onto road 6069 and travel 700’ to the junction right with USFS Road 6004. Turn right onto road 6004 then travel approx. 2.67 miles to left junction with USFS Road 6004B. Turn Left onto road 6004B and travel approx. 0.3 miles to junction right with USFS Road 6004E the beginning of project.

3+20
Cross-Drain Channel (CDC)
Seep.
3+54
CDC
Existing cmp removed.
14+60
CDC
Seep.
15+01
CDC
Cannot find existing pipe in pond.
14+60
CDC
Seep and saturated road, stream adjacent
15+99
CDC, start of wet area
Saturated road.
16+46
CDC
Saturated road and ponding.
16+80
CDC
Saturated road and ponding.
17+95
Notice
End of wet area
22+25
Notice
Road narrows to 8’ to 10’ wide, will take some excavator work to get to the end.
25+25
End project work on Road 6004E.

End roadway obliteration method I., End seeding. Road ends at dead end.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 6004D

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION.

ACTIVITY DESCRIPTION

REMARKS

0+00
Begin Project Road 6004D.

Begin Item 21103A, Roadway Obliteration Method I (0.90 Miles).

Begin Seeding (4.50 Acres). Large washout at the intersection, will take some excavator work to gain access.

Project road 6004D begins at junction right on Road 6004C. From USFS Road 246 turn right onto USFS Road 5301, travel for approx. 0.40 mile to the junction left with USFS Road 6069. Turn left onto road 6069 and travel 700’ to the junction right with USFS Road 6004. Turn right onto road 6004 then travel approx. 2.40 miles to right junction with USFS Road 6004C. Turn right onto road 6004C and travel approx. 0.3 miles to junction left with USFS Road 6004D the beginning of project.

5+40
Cross-Drain Channel (CDC)
Existing cmp pulled. However, not all the fill was removed and there are still drainage issues at this site.
12+00
CDC
Existing cmp pulled
13+10 – 13+52
CDC
Seep and saturated area, existing cmp removed.
17+67 – 18+24
CDC
Seep in this area and the road is outsloped for a short stretch.
26+26
CDC
Existing cmp pulled, saturated wallow area, with several holes in the roads.
31+53 – 31+70
Notice
Crack in road shoulder fill 6’-8’ wide, 3’ deep.
34+20 – 34+60
Notice
Crack in road shoulder fill 3’- 6’ wide.
35+20 – 35+82
Notice
Crack in road shoulder fill.
37+15
Notice
Shoulder fill cracking 4’ wide, 40’ long.
39+20
Skip 100’ of roadway obliteration to protect 100’ of system trail.
Forest system trail jons road for approximately 100’ at a ridge top saddle, skip roadway obliteration in this areas to protect system trail.
40+50 – 41+00
Notice
Road shoulder fill crack 4’ wide.
45+00
End Project Work on Road 6004D.

End roadway obliteration method I, End seeding, ends at dry ridge with 10” to 12” trees.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 6004C

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

0+00
Begin Project Road 6004C.

Begin Item 21103B, Roadway Obliteration Method I (0.70 Miles).

Begin Seeding (3.50 Acres).

Large water bar at the intersection with the 6004 road will take some work with an excavator to reconstruct access.

Project road 6004C begins at junction right on Road 6004. From USFS Road 246 turn right onto USFS Road 5301, travel for approx. 0.40 mile to the junction left with USFS Road 6069. Turn left onto road 6069 and travel 700’ to the junction right with USFS Road 6004. Turn right onto road 6004 then travel approx. 2.40 miles to right junction with USFS Road 6004C, the beginning of project.

3+54 – 4+50
Cross-Drain Channel (CDC)
Wet area in the road.
5+04 – 5+88
CDC
Wet area in the road.
8+45
CDC
Existing cmp pulled, little work needed here.
10+90
CDC
Existing cmp pulled, little work needed here.
14+24
Notice
Junction left with USFS Road 6004D
17+50 – 18+34
2 CDCs
Wet areas here, the road widens to 50’. Some logs will need to be moved and 2 CDCs may be required in this area.
18+65
CDC
Existing cmp pulled, little work needed here.
18+66 - 19+79
CDC
Wet area in the road.
20+88 – 21+30
CDC
2 wet waterbars road is outsloped.
38+00
End project work on Road 6004C.

End roadway obliteration method I, End seeding. Road ends at dead end on a dry hill side.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 5301A

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

0+00
Begin Project Road 5301A.

Begin Item 21103A, Roadway Obliteration Method I (2.10 Miles).

Begin Seeding (10.50 Acres).

Project road 5301A begins at junction left with Rd. 5301. Starting at USFS road 246 turn right onto USFS Road 5301, travel approx. 1.9 miles to junction left with road 5301A, beginning of project.

0+65
Cross-Drain Channel (CDC)
Seep and standing water against the cut bank..
1+80
Notice
Junction left skid road.
1+85
Stream-Grade Channel
Live water. Failed log culvert, water running across the road.
2+83
Notice
Rock source
4+34 - 4+50
CDC
Road bed saturated and wate running across the road from a seep.
4+90 – 5+40
Notice
Saturated road bed water running down the road.
5+40
Stream-Grade Channel (SGC)
Live Stream, failed log culvert.
6+00
Notice
Road way widens in this aread.
8+00 – 9+00
Notice
Saturated
9+00
CDC
Seep
9+40 – 10+11
Notice
Saturated road bed
10+60
CDC
Seep
10+80
CDC
Seep
11+50
Notice
Rock source
15+90
SGC
Failed log culvert, saturated road, stream goes subsurface to station 15+40
17+30
SGC
Live stream functioning log culvert.
21+00
Notice
Ridge Point
23+50
Notice
Ridge Point and old log landing.
25+00
Notice
Junction left T5 road.
26+00
SGC
Live stream failed plugged log culvert.
28+40 – 29+50
Notice
Road shoulder fill failure, road narrows to 12’ wide.
29+74
SGC
Live water, plugged log culvert.
31+34
Notice
Road narrows to 9’-12’
31+96 – 33+45
Notice
Road shoulder fill failure, road narrows to 12’-14’ wide
35+15 - 35+88
Notice
Road shoulder slumping
40+00
Notice
Ridge point
43+60
Notice
Junction left road T 10
48+30
Notice
Ridge point
53+45
Notice
Ridge point
55+00
CDC
Swale and junction left, skid road.
58+90
Notice
Ridge point, landing.
60+75
Notice
Junction left, T15 road.
61+15
SGC
Live water, functioning log culvert, 22’ deep by 40’ long through fill.
62+95 – 63+45
Notice
Saturated road bed and water running down the road.
63+42
CDC
Swale
63+65
Drainage Excavation
Remove existing 10” cmp.
65+90
CDC
Swale
66+22
SGC
12” channel running off cut bank over the road and down the fill slope.
67+00
Notice
Ridge point
70+00
CDC
Swale
71+40
CDC
Seep
72+25
SGC
Live water and an existing cmp
77+30
Notice
Ridge point, saddle and through cut
77+75
Notice
Junction right, T 20 road, loops to T25 road ahead.
78+05
Notice
Junction right, T25 road loops to T20
80+55
Notice
Junction left, T30 road.
83+14
Notice
Ridge point
83+75
CDC
Swale
84+30-84+73
Notice
Road shoulder fill failure, road width between 7’ to 8’
85+50
SGC
Water over the road, existing culvert plugged.
87+20-87+30
Notice
Road shoulder fill failure, rod width 10’
90+44 – 90+50
SGC
Water over the road, stream braided over the road, and road is saturated.
90+93
CDC
Seep
92+92
Notice
Rock in cut bank non-rippable
94+70
CDC
Swale, ponding above cut bank.
98+50
Notice
Ridge Point
10+263
SGC
Draw with a partially plugged culvert
10+317 – 10+386
CDC
Large trickle of water on the road.
10+428
Notice
Junction left, T35 road
10+535
Notice
Ridge point
11+007
CDC
Dry Draw
111+05
End project work on Road 5301A.

End roadway obliteration method I. End seeding, road end 100’ before a creek at the edge of a cut unit.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 726A

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 726A

Begin Item 21103A, Roadway Obliteration Method I (0.50 Miles).

Begin Seeding (2.50 Acres).

Project road 726A begins at the junction with Road 726 at approx. milepost 1.32. From USFS Road 246 turn right onto USFS road 5301. Travel for approx. 1.0 miles then take a hard left onto USFS Road 724. Travel along USFS road 724 for approx. 1.6 miles. to the junction with USFS road 726. Turn left onto USFS road 726 and travel approximately 1.32 miles to the junction left with USFS road 726A, beginning of the project.

4+40 – 5+15
Stream-Grade Channel (CDC)
Saturated road, existing culvert has been pulled but most of the fill still remains.
8+75 – 9+45
SGC
Live water, 2’ bankfull width, partial pulled, failed log culvert. Stream running own cut slope then going sub surface.
9+85
Notice
Ridge point and old log landing/
11+20 – 11+45
Notice
Heavily saturated road.
11+45
SGC
Partially pulled log culvert, water running over the road.
12+20
Cross-Drain Channel (CDC)
Saturated road.
14+00
Notice
Road narrows to 10’ wide.
16+00 – 18+55
Notice
Heavy wet vegetation in the roadway.
18+55
SGC
Live water, pulled culvert but stream channel only partially restored.
20+30
Notice
Ridge point.
22+51 – 22+95
CDC
Draw with a saturated ditch.
23+55
CDC
Pulled cmp, seep goes subsurface 20’ before the road.
24+00
Notice
Road narrows to 10’ wide.
24+48
End of Project work on Road 726A
End roadway obliteration method I. End seeding. Road ends at the junction with the 6004C

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 724C

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 724C

Begin Item 21103A, Roadway Obliteration Method I (0.80 Miles).

Begin Seeding (4.0 Acres).

Project road 724C begins at junction left with Rd. 724 at approx. milepost 0.35. From USFS Road 246 turn right onto USFS road 5301 and travel approx. 1.o miles to the junction with USFS Road 724. Take a hard left onto USFS road 724 and travel approx.0.35 miles to the junction with USFS road 724C, beginning of the project.

2+04
Notice
Beginning of saturated road.
2+40
Cross-Drain Channel (CDC)
Remove existing culvert and install a cross-drain channel.
3+89
Notice
End of saturated road.
11+40
CDC
Remove existing culvert in a deep fill, junction with 724C-1 spur road to the right.
16+80 – 17+36
CDC
Seep, saturated road
19+18
Notice
30’ wide complete road fill failure, will take some excavator and/or bull dozer work to get past.
42+50
End Project Work on Road 724C.

End roadway obliteration method I. End seeding. Road ends at the junction with USFS Road 6004.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 724C-T1

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 724C-T1

Begin Item 21103A, Roadway Obliteration Method I (0.10Miles).

Begin Seeding (0.50 Acres).

Project road 724C-T1 begins at junction right with Rd. 724C at station 11+40. From USFS Road 246 turn right onto USFS road 5301 and travel approx. 1.o miles to the junction with USFS Road 724. Take a hard left onto USFS road 724 and travel approx.0.35 miles to the junction with USFS road 724C. Turn left onto USFS road 724C and travel 1140 feet to the junction right with 724C-T1, beginning of the project.

0+00 – 0+75
Notice
Road Saturated in this area.
3+25
End Project Work on Road 724C-T1.

End roadway obliteration method I. End seeding. Road end at the edge of a creek

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74360

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74360

Begin Item 21103A, Roadway Obliteration Method I (0.70 Miles).

Begin Seeding (3.50 Acres).

Project road 74360 begins at junction right with Rd. 246. Travel approx. 0.85 miles on USFS road 246 past the 246/5301 junction. The junction with the 74360 is on the right, beginning of project.

0+84
Notice
Very tall Kelly Hump, nearly 6’ tall. Will take excavator and/or dozer work to get past.
2+26
Notice
Shoulder fill failure, 20’ long, 4’ wide.
3+05
Notice
Cut slope slide failure,, 8’ road width.
6+23
Cross-Drain Channel
Dry Swale, existing cmp pulled, CDC partially restored.
8+07
Notice
20’ long crack in the road shoulder fill.
10+01
CDC
Dry Swale, CDC partially restored.
11+34
Notice
(2) small sink holes and a 10’ long road shoulder fill failure.
13+79
Notice
Reference - Bare slumpy granite
14+40
Notice
Cut slope slide, 6’ road width. 10’ long fill slope failure 2’ wide.
15+94
CDC
Dry Swale
20+97
CDC
Dry swale, road shoulder fill crack 20’ long.
21+72
Notice
Cut slope and fill sloe failing, 8’ road width, road very out sloped.
23+44 – 24+20
Notice
60% of the roadway failing, road very slumpy.
24+69
Notice
Failing road shoulder.
25+84
Notice
Sink hole and failing cut slope.
29+47
Notice
25’ long road shoulder fill failure, shoulder sliding.
29+80
CDC
Dry swale, existing cmp pulled.
31+47
CDC
Dry swale, wet vegetation in the roadway.
32+35
Notice
Reference – bare slumpy cut slope
34+80
End Project Work on Road 74360.

End roadway obliteration method I. End seeding. Road dead end and day lights at a natural grade.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 246 – T3

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 246 – T3

Begin Item 21103A, Roadway Obliteration Method I (0.90 Miles).

Begin Seeding (4.50 Acres).

Project road 246 – T3 begins at junction right with Rd. 246. Travel approx. 0.35 miles on USFS road 246 past the 246/5301 junction. The junction with the 246 – T3 is on the left, beginning of project.

0+00 – 1+35
Notice
Through fill, 9’ road width, roadway raised 6’
2+25
Notice
Large landing area 150’ long x 30’ wide.
2+97
Notice
Junction left, T1 road.
3+88
Notice
Out sloped 8’ road width.
5+84
Cross-Drain Channel (CDC)
Dry swale.
6+01
Notice
Reference - 14’ bare granite.
8+61
CDC
Dry swale, road way very slumpy.
10+10
Notice
Junction left, skid road.
13+78
CDC
Dry Swale, large patially reached water bar.
15+67 – 16+13
Notice
Thru cut 12’ road width.
18+09
CDC
Dry swale.
24+45
CDC
Dry swale, CDC mostly restored little to no work required.
32+71
Notice
Junctions left (2) skid roads.
34+98 – 35+85
CDC
Dry draw without slope, 6’ road width.
37+31
Notice
Cut sloe slide, some large boulders in the roadway
38+13
CDC
Cut slope seep, saturated road bed.
41+33
Notice
Large boulder in the cut slope, 8’ roadway.
46+51
End Project Work on Road 246 – T3.

End roaway obliteration method I. End seeding. Road ends in a draw.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74205

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS

0+00

Project road 74205 begins at the intersection of USFS road 670 and USFS Road 74205. From USFS road 246 take a right onto USFS Road 670 at approx. milepost 13.2. Travel on 670 for approx. 0.25 miles to junction left with USFS road 74205.

1+75
Notice
Wet area 200’ long through a through cut.
12+50
Notice
Junction right 74205T-1
13+50
Begin Item 21103A, Roadway Obliteration Method I (1.70 Miles). Continue Seeding (8.40 Acres).
Junction left road 74224.
26+40
Notice
Wet area 80’ long, bridge for Lodge Creek trail is 15’ to the left.
30+35
Notice
Motor cycle trail crosses the road, preserve crossing.
32+15
Stream-Grade Channel
Running water and an existing log bridge.
39+68
Notice
Junction right, T2 road.
46+50
Notice
Road narrows to 10’ wide, very steep to the creek.
48+90
CDC
40’ long wet area, existing bridge-puncheon
53+20
Notice
Wet area
54+44
Notice
Junction right, T3 road. Beginning of a large mud hole in a flat area.
56+75
Notice
End of large mud hole in flat area.
58+32 – 59+50
CDC
Seep and a mud hole.
61+75
Notice
Junction right, 74206 road.
101+96
End Project Work on Road 74205.

End roadway obliteration method I. End seeding. Project work end at the Junction with USFS Road 5213B.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74205-T1

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74205-T1

Begin Item 21103A, Roadway Obliteration Method I (0.10 Miles).

Begin Seeding (.50 Acres).

Project road 74205-T1 begins at the intersection of USFS road 74205 and road 74205T-1. From USFS road 246 take a right onto USFS Road 670 at approx. milepost 13.2. Travel on 670 for approx. 0.25 miles to junction left with USFS road 74205. Turn left onto USFS road 74205 and travel for approx. 1250’to the intersection of USFS roads 74205-T1 (right), beginning of project.

2+98
End Project Work on Road 74205-T1.

End roadway obliteration method I. End seeding. Road end at an old log landing.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74205-T2

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74205-T2

Begin Item 21103A, Roadway Obliteration Method I (0.10 Miles).

Begin Seeding (0.50 Acres).

Project road 74205-T2 begins at the intersection of USFS road 74205 and road 74205-T2. From USFS road 246 take a right onto USFS Road 670 at approx. milepost 13.2. Travel on 670 for approx. 0.25 miles to junction left with USFS road 74205. Turn left onto USFS road 74205 and travel for approx. 5318’to the intersection of USFS roads 74205-T2 (right), beginning of project.

2+00
End Project Work on Road 74205-T2.

End roadway obliteration method I. End seeding. Road dead ends.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74205-T3

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74205-T3

Begin Item 21103A, Roadway Obliteration Method I (0.10 Miles).

Begin Seeding (0.50Acres).

Project road 74205-T3 begins at the intersection of USFS road 74205 and road 74205-T2. From USFS road 246 take a right onto USFS Road 670 at approx. milepost 13.2. Travel on 670 for approx. 0.25 miles to junction left with USFS road 74205. Turn left onto USFS road 74205 and travel for approx. 6794’to the intersection of USFS roads 74205-T3 (right), beginning of project.

5+28
End Project Work on Road 74205-T3.

End roadway obliteration method I. End seeding. Road ends at a dead end.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74206

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74206

Begin Item 21103A, Roadway Obliteration Method I (0.40 Miles).

Begin Seeding (2.0 Acres).

Project road 74206 begins at the intersection of USFS road 74205 and road 74206. From USFS road 246 take a right onto USFS Road 670 at approx. milepost 13.2. Travel on 670 for approx. 0.25 miles to junction left with USFS road 74205. Turn left onto USFS road 74205 and travel for approx. 7465’to the intersection of USFS roads 74206 (right), beginning of project.

0+82
Stream-Grade Channel (SGC)
Existing log culvert, 10’ wide stream.
18+84
End Project Work on Road 74206.
End roadway obliteration method I. End seeding. Road ends at the intersection with USFS Road 670.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 6004B

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing. Segments of this road have gradients at approx. 30%.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 6004B

Begin Item 21103B, Roadway Obliteration Method II (0.7 Miles).

Begin Seeding (3.50 Acres).

From USFS road 246 turn right onto USFS road 5301 and travel 0.4 mile to the junction with USFS road 6004. Turn left onto USFS road 6004 and travel approx. 14,800’ to the junction left with USFS road 6004B, beginning of project.

2+26
Cross-Drain Channel (CDC)
Live water draining down from the 6004 road.
2+58
Notice
Partial Road Fill Failure 5’ wide.
3+12
Notice
Wet veg. in the road..
5+30 – 6+00
Notice
Road width narrow to 7’ – 8’
6+50 – 10+50
Notice
Alder growing in the road bed. Heavy wet veg in the road bed and road bed very slumpy.
9+07
Stream-Grade Channel (SGC)
Live water draining across the road. 9’ bankfull many sink holes in the road.
12+83
Notice
Cut slope failure 10’ wide slump in the road.
12+95
CDC
Saturated road with two channels flowing down the road then off the road down the fill slope. Place CDC in location to capture both flows.
15+00 – 17+25
Notice
Bare cut slope.
20+20
Notice
Saddle
25+02 – 26+00
Notice
2’ wide x 2’ deep shoulder slump
25+70
Notice
Junction left skid road, goes approx. 200’ around the ridge.
27+75 – 28+80
Notice
Road width narrows to 8’
28+80 – 31+00
Notice
Road width narrow to 5’
29+81
Notice
Junction left with road 6004B-T1
30+00 – 35+72
Notice
Alder growing in the roadway and slump road bed.
32+02
Notice
Ridge point.
33+15
CDC
Dry swale
34+06 – 34+80
CDC
Saturated road and a seep in the cut slope.
34+32
End Roadway Obliteration Method II. Begin Roadway Obliteration Method I (6.0 miles). Begin Seeding (3.0 Acres)
34+80-35+55
CDC
Saturated road and a seep in the cut slope.
35+30
Notice
Road width narrows to 9’
35+92
Notice
3’ wide x 6” deep depression across the road.
36+70 – 38+30
Notice
22’ bare cut slope.
39+34
Notice
Junction left skid road and landing.
39+80
CDC
Dry swale
41+33
Notice
Ridge point
42+10 – 42+55
Notice
Slumpy road shoulder.
43+50
CDC
Dry draw
44+70
Notice
Ridge point
47+72 – 53+10
Notice
This particular stretch is particularly wet/saturated and unstable.
47+72 – 47+61
CDC
Seep in cut slope, road bed saturated.
48+30
Notice
2’ wide x 18” deep depression across the road.
48+74 – 51+69
Notice
Road bed 100% saturated, pools and very swampy.
49+94
SGC
Live water, failed rotting log culverts. There is a 6’ wide by 7’ deep sink hole across the road. Heavy Alder and brush growing in the road.
51+69
SGC
Live water no cmp.
53+80 – 54+30
Notice
2’ wide x 2’ deep shoulder slump.
55+37
Notice
Ridge point
56+00 – 56+90
Notice
4’ wide by 2’ deep shoulder slump
56+98
SGC
Live water, 12” bankfull, failed log culvert.
58+29
Notice
Road width narrows to 7’
65+40
Notice
Ridge point
67+40 – 67+80
CDC
Saturated road, water run off going subsurface.
69+15
CDC
Dry Swale
70+25
End Project Work on Road 6004B
End roadway obliteration method I. End seeding. Road end on natural slope.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 6004A

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 6004A

Begin Item 21103B, Roadway Obliteration Method II (0.3 Miles).

Begin Seeding (1.5 Acres).

From USFS road 246 turn right onto USFS road 5301 and travel 0.4 mile to the junction with USFS road 6004. Turn left onto USFS road 6004 and travel approx. 8,755’ to the junction left with USFS road 6004A, beginning of project.

4+22
Cross-Drain Channel (CDC)
Seep in cut slope, existing cmp partially uncovered.
11+41
Stream-Grade Channel (SGC)
Live water, existing cmp partially uncovered.
13+20
End Roadway Obliteration Method II. Begin Roadway Obliteration Method I (0.5 miles). Begin Seeding (2.5 Acres).
15+15
CDC
Existing cmp partially uncovered.
18+87
CDC
Existing cmp partially uncovered.
21+90
CDC
Existing cmp partially uncovered.
22+87
SGC
Live water, existing cmp partially uncovered.
26+16
CDC
Existing cmp partially uncovered.
27+22
CDC
Existing cmp partially uncovered.
33+48
Notice
Saturated area, large puddle in the road.
35+52
CDC
Existing cmp partially uncovered.
40+69
End Project Work on Road 6004A.

End roadway obliteration method I. End seeding

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 726

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 726

Begin Item 21103B, Roadway Obliteration Method II (2.2 Miles).

Begin Seeding (11.0 Acres).

From USFS road 246 turn right onto USFS road 5301 and travel approx. 0.9 miles to the intersection with USFS road 724. Take a sharp left onto USFS road 724 and travel 8,350 to the junction left with USFS road 726, beginning of project.

1+60 – 3+65
Notice
Heavy Alder cover on the road bed.
2+10
Notice
Junction right 726-T1 road.
3+65
Stream-Grade Channel (SGC)
Live water, 24” bankfull width
6+50
Notice
Ridge point
8+07
Notice
Ridge point
10+87
Notice
Ridge point
13+20
Notice
Junction left, skid road
14+70
Notice
16’ road width, near ridge point/saddle
16+00 – 16+70
Cross-Drain Channel (CDC)
Dry draw, wet veg in road ditch.
19+50
Notice
Junction left, 726 – T5 road.
20+10 – 21+50
Notice
Alder growing in the road bed, ridge point at 21+50
23+70
Notice
Road width narrow to 10’
24+30
CDC
Dry swale
29+57
CDC
Dry draw
32+50 – 34+20
CDC
Shallow dry draw
36+17
Notice
15’ Road width
37+13
CDC
Seep in cut slope.
38+64 – 54+72
Notice
Road width narrows to 9’.
43+40
Notice
Ridge point
46+08
Notice
Cut slope failure, 20’ wide slump in road.
46+60
CDC
Dry swale
49+02
CDC
Dry swale, slumpy road shoulders
51+80
SGC
Live water, 18” bankfull.
54+72 – 56+38
CDC
14’m road width, dry swale
56+38 – 65+00
Notice
Road width narrows to 9’, goes back to 11’ after station 65+00
58+20 – 63+08
Notice
Draw with wet veg, fill slumping in the road.
62+50
SGC
Live water, bankfull 40”
63+20
CDC
Live water from ditch
63+20 – 64+62
CDC
Live water in ditch, exists at and existing 18” cmp.
67+50
CDC
Swale, slumpy road shoulders, heavy alder
68+04 – 68+50
CDC
Water in road ditch, puddle in road, road bed saturated.
68+70
SGC
Live water, 2 small stream channels converge at the inlet of an existing 24” cmp. One stream bankfull is 18” the other is 2’. Numerous sink holes in the road.
69+60
Notice
Junction left 726A road.
70+00
Notice
Ridge point
72+80
CDC
Dry draw
72+80 – 74+75
Notice
Road surface covered alder.
78+60 – 79+20
Notice
Draw.
78+90
SGC
Live water, 20” bankfull, 24” cmp
81+30
Notice
Ridge point
82+80
SGC
Live water, 24” bankfull, 18” cmp
82+80 – 83+50
Notice
6” of water in saturated ditch.
84+00 – 84+70
Notice
Road covered with alder.
85+50
Notice
Road width narrows to 11’.
88+30
Notice
Junction left, 726-T10 road
89+80
Notice
Saddle with a 30’ x 30’ landing
89+80
Notice
Heavy alder on road to the end of the road at station 114+46
90+25
Notice
Kelly hump
90+75
Notice
Kelly hump
92+00
Notice
Kelly hump, junction left skid road
93+75 – 95+80
Notice
Water bars on this section road
99+70 – 100+90
Notice
Road width narrow to 7’
100+91
CDC
Dry draw, junction left up draw
102+28
Notice
10’ road width
103+50
Notice
Ridge point
108+18
CDC
Dry draw, sink holes in the road with wet veg., junction left with Y intersection to two skid roads.
111+24
CDC
Swale to the left
114+46
End Project Work on Road 726.

End roadway obliteration method II. End seeding. Road ends mid-slope on natural grade.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74247

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74247

Begin Item 21103B, Roadway Obliteration Method II (1.4 Miles).

Begin Seeding (7.0 Acres).

From USFS road 246 turn right onto USFS road 5301 and travel approx. 0.9 miles to the intersection with USFS road 724. Take a sharp left onto USFS road 724 and travel 7,746 to the junction left with USFS road 74247, beginning of project.

5+94
Drainage excavation
Remove existing cmp.
16+83
Cross-Drain Channel (CDC)
Seep in draw.
29+08
CDC
Seep
29+75
CDC
Seep
31+24
CDC
Swale
34+14
CDC
Swale
38+00
CDC
Seep
39+44
Stream-Grade Channel (SGC)
Live water, Remove existing cmp.
41+00
CDC
Swale
43+17
CDC
Draw with a seep.
58+95
Stream-Grade Channel (SGC)
Live water, Remove existing cmp.
62+82
CDC
Draw
70+92 – 71+50
CDC
Draw
72+40 – 72+88
CDC
Draw with seep.
72+90
Notice
Road starts to transition into a skid trail
73+85
End Project Work on Road 74247.

End roadway obliteration method II. End seeding. Road end by turning into a skid trail.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74248

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74248

Begin Item 21103B, Roadway Obliteration Method II (0.6 Miles).

Begin Seeding (3.0 Acres).

From USFS road 246 turn right onto USFS road 5301 and travel approx. 0.9 miles to the intersection with USFS road 724. Take a sharp left onto USFS road 724 and travel 1.35 miles to the junction right with USFS road 74248, beginning of project.

0+34
Notice
Large Tank Trap approx. 6’
2+05
Notice
Ridge point with erosion channel in the road
2+46
Notice
Junction left skid road.
4+70
Notice
Ridge point and 20’ x 20’ landing
4+85 – 5+20
Notice
Saturated ditch line
5+60
Cross-Drain Channel (CDC)
Dry draw
6+00
Notice
Road width narrows to 10’
6+80
CDC
Dry draw/swale.
9+50
Notice
Ridge point w/ bare soil and a small landing
13+44
CDC
Draw draw, existing cmp was pulled but most of the culvert fill remains.
16+14-17+10
Notice
Ridge point, road width narrows to 9’, bare soil on cut slope.
18+08
CDC
Dry swale
18+50
Stream-Grade Channel (SGC)
Live water, very small flow, existing cmp pulled, but most of the culvert fill still remains.
19+80 – 20+01
Notice
Small gully in the road.
20+35 – 20+90
CDC
Channel above the road that crosses the road. Road widens and is saturated with one large pool and several smaller ones.
21+00
Notice
2’ wide by 30’ long shoulder fill failure.
23+20
SGC
Live water, existing cmp was pulled but most of the culvert fill still remains.
23+20-24+10
CDC
Swale with a trickle of water going sub-surface, the road is 100% saturated.
25+83
CDC
Dry Swale
26+80
Notice
Ridge point
28+70
Notice
Junction right 74250
30+20
Notice
Junction right 74249
30+20
End Roadway Obliteration Method II. Begin Roadway Obliteration Method I (0.6 miles). Begin Seeding (3.0 Acres).
Begin roadway obliteration method I just past the intersection with the 74249 road.
31+60
CDC
Dray swale, road width narrow to 10’
32+70
Notice
Ridge point
33+55
SGC
Live water, small seep, existing cmp pulled, but culvert fill still remains.
35+63
CDC
Dry draw
36+20
Notice
Ridge point
36+70 – 37+10
Notice
Draw
36+94
SGC
Live water, small flow, existing cmp has been pulled, but most of the culvert fill still remains.
40+05
Notice
Ridge point with a small landing.
42+50 – 43+79
Notice
Large fill failure, 130 long, 25-30’ wide, 30’-40 deep.
43+80 – 44+10
Notice
Saturated slumpy road, road width narrows to 9’
44+50
Notice
3’ wide x 15’ long road shoulder fill failure
45+40
Notice
Ridge point
46+25
CDC
Dry draw/swale
48+20
Notice
Junction right 74248 T-1
53+26
SGC
Live water, existing cmp pulled, but most of culvert fill still remains.
54+00 – 54+35
Notice
Slumpy granitic cut slope
55+50
Notice
Ridge point
56+60
CDC
Dry swale
58+00
Notice
Ridge point
60+20
CDC
Dry draw
64+05
End Project Work on Road 74248.

End roadway obliteration method I. End seeding. Road ends in a draw near a water crossing.

WASHINGTON CREEK ROAD OBLITERATION

ROAD NO. 74250

*CMP: corrugated metal pipe, CDC: cross-drain channel, SGC: stream-grade channel. Notice: Segments of this road have cut and fill failures that will require rehabilitating prior to crossing.

STATION
ACTIVITY DESCRIPTION
REMARKS
0+00
Begin Project Road 74250

Begin Item 21103B, Roadway Obliteration Method II (0.2 Miles).

Begin Seeding (1.0 Acres). *This road has not been surveyed, information is from LIDAR only From USFS road 246 turn right onto USFS road 5301 and travel approx. 0.9 miles to the intersection with USFS road 724. Take a sharp left onto USFS road 724 and travel 1.35 miles to the junction right with USFS road 74248. Turn right onto USFS road 74248 and travel approx. 0.6 miles to junction right with USFS road 74250, beginning of project.

2+11
Notice
20’ long road prism failure. 75% of road prism gone.
7+39
Notice
Large landing on the right.
10+56
End Project Work on Road 74250.

End roadway obliteration method II. End seeding. Road ends in a draw near a water crossing.