AG-02RC-S-15-0091.docx

DOCX document 83 KB Posted

Attached to
Helwick Road Work, Kootenai National Forest, Cabinet Ranger Distirict - IMAT
Solicitation number
AG-02RC-S-15-0091
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Attch01_Drawings.pdf PDF
Attch06_ExpQuest.rtf RTF text file
Attch05_SF25A_PaymentBond.pdf PDF
Attch03_WD.docx DOCX document
Attch02_3FSSS.doc DOC document
Attch04_FOOD_STORAGE-2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-02RC-S-15-0091

Helwick Road Reconstruction

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

RFP AG-02RC-S-15-0091

2. TYPE OF SOLICITATION

|_| SEALED BID (IFB)

|_| NEGOTIATED (RFP)

3. DATE ISSUED

6/15/2015

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BYCODE
8. ADDRESS OFFER TO

USDA, Forest Service Idaho Montana Acquisition Team Idaho Panhandle National Forests 3815 N. Schreiber Way Coeur d’Alene ID 83815 USDA, Forest Service Idaho Montana Acquisition Team Idaho Panhandle National Forests ATTN: Michael J. Allred 3815 N. Schreiber Way Coeur d’Alene ID 83815 Coeur d’Alene ID 83815

9. FOR INFORMATION
CALL:
a. NAME

MICHAEL ALLRED

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(208) 765-7456

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

1. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

HELWICK ROAD RECONSTRUCTION

CABINET RANGER DISTRICT

KOOTENAI NATIONAL FOREST

SANDERS COUNTY, MONTANA

*100% - HUBZone Set-aside **FAXED OFFERS ARE NOT ACCEPTABLE. ORIGINAL BID BONDS ARE REQUIRED FOR OFFERS THAT EXCEED $150,000. OFFERS MUST BE MAILED OR HAND-CARRIED AND RECEIVED BY Wednesday, 07/15/2015 AT 4:00 PM LOCAL TIME.

**PRICE RANGE: the Government’s estimate for this project is between $25,000 and $100,000.

11. The Contractor shall begin performance within 10 days of receipt of the notice to proceed, and complete project in accordance with deadlines stated in FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I. This performance period is |X| mandatory, |_| negotiable. (See Section F, Deliveries and Performance.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12b.)

|_| YES|_| NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a.Sealed offers in original to perform the work required are due at the place specified in Item 8 by 4:00 pm local time Wednesday, 07/15/2015. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
b.An offer guarantee|_| is,|X| is not required. (See FAR 52.228-1 - Bid Guarantee, Section I) (Bid bond required if total offer value exceeds $150,000.)
c.All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-32121442-101STANDARD FORM 1442 (REV. 4-85)
Computer GeneratedPrescribed by GSA
FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

Duns No. ______________________________________

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

PLEASE COMPLETE THIS BLOCK

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

1. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
|_| 10 U.S.C. 2304(c)( )|_| 41 U.S.C. 253(c)( )
26. ADMINISTERED BYCODE
27. PAYMENT WILL BE MADE BY

USDA – Forest Service Idaho Montana Acquisition Team Idaho Panhandle National Forests 3815 N. Schreiber Way Coeur d’Alene ID 83815

All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

|_|28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
|_|29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

MICHAEL ALLRED

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

B – SECTION B – Schedule of Items

HELWICK ROAD RECONSTRUCTION

KOOENTAI NATIONAL FOREST

Cabinet Ranger District Sanders County, MT

ITEM NO
FP-03 NO.
DESCRIPTION
METH. OF

MEAS.

PAY

UNIT

EST.

QTY

UNIT

PRICE

TOTAL

PRICE

Item 1 - Beaver Creek (Road – 152)

1.1
151(01)
MOBILIZATION
LSQ
LS
1
$___________
$_____________
1.2
204(19)
Ditch Construction
CQ
LF
3855
$___________
$_____________
1.3
230(50)
Brushing (LIGHT)
AQ
MI
.86
$___________
$_____________
1.4
251(01)III
Place Riprap, Class III (Gov’t Furnished)
AQ
CY
3
$___________
$_____________
1.5
303(01)
Road Reconditioning
AQ
MI
.86
$___________
$_____________
1.6
602(50)18
18” Corrugated Metal Pipe
AQ
LF
108
$___________
$_____________
1.7
622(01)G
Equipment Rental, Grader
AQ
HR
16
$___________
$_____________
1.8
625(01)
Seeding, Dry Method
DQ
AC
.10
$___________
$_____________
Sub Total Item 1
$_____________

Item 2 – Little Beaver (Road – 301)

2.1
151(01)
Mobilization
LSQ
LS
1
$___________
$_____________
2.2
203(01)
Removal of Culvert, disposal Method A
AQ
EA
5
$___________
$_____________
2.3
204(04)
Unclassified Borrow
CQ
CY
50
$___________
$_____________
2.4
204(18)
Ditch reconstruction
CQ
LF
25300
$___________
$_____________
2.5
204(20)C
Construct Drain Dips
AQ
EA
5
$___________
$_____________
2.6
204(20)R
Reconstruct Drain Dips
AQ
EA
11
$___________
$_____________
2.7
230(50)
Brushing (light)
AQ
MI
1.28
$___________
$_____________
2.8
251(01)III
Place Riprap, Class III (Government-Furnished)
AQ
CY
17
$___________
$_____________
2.9
251(01)IV
Place Riprap, Class VI
AQ
CY
30
$___________
$_____________
2.10
303(01)
Road Reconditioning
AQ
MI
5.15
$___________
$_____________
2.11
602(50)18
18” Corrugated Metal Pipe
AQ
LF
388
$___________
$_____________
2.12
602(50048
48” Corrugated Metal Pipe
AQ
LF
90
$___________
$_____________
2.13
607(10)
Recondition Drainage Structures
AQ
EA
1
$___________
$_____________
2.14
622(01)D
Equipment Rental, Dump Truck
AQ
HR
8
$___________
$_____________
2.15
622(01)E
Equipment Rental, Excavator
AQ
HR
10
$___________
$_____________
2.16
625(01)
Seeding, Dry Method
DQ
AC
5
$___________
$_____________
Item 2 Sub-Total
$_____________

Item 3 – Emma Creek (Road – 2262)

3.1
151(01)
Mobilization
LSQ
LS
1
$___________
$_____________
3.2
157(10)
Sediment Retention Barrier
AQ
EA
2
$___________
$_____________
3.3
204(04)
Unclassified Borrow
CQ
CY
85
$___________
$_____________
3.4
204(18)
Ditch Reconstruction
CQ
LF
1058
$___________
$_____________
3.5
204(20)C
Construct Drain Dip
AQ
EA
4
$___________
$_____________
3.6
204(20) R
Reconstruct Drain Dip
AQ
EA
32
$___________
$_____________
3.7
230(50)
Brushing (Medium)
AQ
MI
4.96
$___________
$_____________
3.8
251(01)III
Placed Riprap, Class III (Gov’t Furnished)
AQ
CY
7
$___________
$_____________
3.9
303(01)
Road Reconditioning
AQ
MI
4.96
$___________
$_____________
3.10
602(50)18
18” Corrugated Metal Pipe
AQ
LF
60
$___________
$_____________
3.11
602(50)36
36” Corrugated Metal Pipe
AQ
LF
38
$___________
$_____________
3.12
622(01)D
Equipment Rental, Dump Truck
AQ
HR
8
$___________
$_____________
3.13
622(01)E
Equipment Rental, Excavator
AQ
HR
8
$___________
$_____________
3.14
625(01)
Seeding, Dry Method
DQ
AC
3
$___________
$_____________

Item 3 Sub-Total

Item 4 – Haines Point (Road – 2265)

4.1
151(01)
Mobilization
LSQ
LS
1
$___________
$_____________
4.2
203(01)
Removal of Culvert, Disposal Method A
AQ
EA
8
$___________
$_____________
4.3
204(18)
Ditch Reconstruction
CQ
LF
2600
$___________
$_____________
4.4
204(20)C
Construct Drain Dip
AQ
EA
11
$___________
$_____________
4.5
204(20)R
Reconstruct Drain Dip
AQ
EA
15
$___________
$_____________
4.6
230(50)
Brushing (Heavy)
AQ
MI
6.4
$___________
$_____________
4.7
251(01)III
Placed Riprap, Class III (Government-Furnished)
AQ
CY
8
$___________
$_____________
4.8
303(01)
Road Reconditioning
AQ
MI
6.4
$___________
$_____________
4.9
602(50)18
18” Corrugated Metal Pipe
AQ
LF
40
$___________
$_____________
4.10
607(10)
Recondition Drainage Structures
AQ
EA
1
$___________
$_____________
4.11
622(01)D
Equipment Rental, Dump Truck
AQ
HR
8
$___________
$_____________
4.12
622(01)E
Equipment Rental, Excavator
AQ
HR
8
$___________
$_____________
4.13
625(01)
Seeding, Dry Method
DQ
AC
5
$___________
$_____________
Item 4 Sub-Total
$_____________

Item 5 - Anderson Gulch (Road – 2720)

5.1
151(01)
Mobilization
LSQ
LS
1
$___________
$_____________
5.2
204(20)R
Reconstruct Drain Dips
AQ
EA
1
$___________
$_____________
5.3
303(01)
Road Reconditioning
AQ
MI
.64
$___________
$_____________
5.4
622(01)E
Equipment Rental, Excavator
AQ
HR
2
$___________
$_____________

Item 5 Sub-Total

Total All Items
$________________

Prices Submitted By:

Signature:
Phone:
Printed Name:
Fax:
Business Name:
DUNS #:
Address:
TIN #:

Email:

B-2 PRICE QUOTE INSTRUCTIONS: Unit prices and total item amounts must be submitted for all items. Do not round the extended item amounts and provide prices to the nearest cent. In addition, the Contractor shall give a price per hour under Items 62201 Hydraulic Excavator and Large Dump Truck for additional work above the estimated quantities that may be encountered during the contract performance. The Government does not guarantee that any hourly work shall be ordered and reserves the right to reduce or eliminate entirely the work under these items with no adjustment in contract unit price.

B-3 BOND PREMIUMS: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151(01) Mobilization. The above pay items are contract quantities unless noted.

B-4 OFFER SUBMITTAL: As your offer, submit a completed and signed Standard Form 1442, a completed Schedule of Items (Section B), a Technical Package, and a completed Section K. Technical package and price quotes are required for evaluation of offers. See Section L for proposal instructions and Section M for evaluation/award information.

Electronic or facsimile proposals are NOT acceptable.

C - SECTION C - Description/Specifications/Statement of Work

C-1 – PROJECT DESCRIPTION AND LOCATION

(a) Description of Work. This project consists of Roadside Brushing, road reconstruction, culvert replacements, ditch reconstruction, and drainage dip construction.

(b) Project Location. This project is located south of Trout Creek off Hwy 200 at MP 40, Beaver Creek Road 152. Project Begins about 4.3miles on Beaver Creek Road 152 and continues up to Junction with Road 301 and road 2262,2265, and 2720 are off of Road 301.

(c) Bid Conference and Tour. A pre-bid conference or tour will not be conducted, but it is recommended any interested offeror’s view the project site before submitting a quote

(d) Start Work. It is estimated that work will begin around July 20, 2015.

(e) Period of performance. All work on Road 152 and Road 301 up to Junction with road 2262 and Road 2262, 2265, and 2720 must be completed by Oct 15, 2015.

(f) Price Range. Between $25,000 and $100,000

C-2 - STANDARD SPECIFICATIONS

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. Copies of these Specifications are available on the internet at www.wfl.fha.dot.gov/design/specs/fp03.htm

C-3 - FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

Forest Service supplementary specifications incorporated into this solicitation and any resultant contract are included as a separate APPENDIX of this solicitation. The supplementary specifications applicable to this project are listed in Appendix A.

NOTE THAT THE SUPPLEMENTAL SPECIFICATION ATTACHED INCLUDES THE MAJOR SPECIFICATIONS APPLICABLE TO THIS PROJECT. OTHER SPECIFICATIONS REFERRED TO WITHIN THESE SPECIFICATIONS (EVEN THOUGH NOT SPECIFICALLY LISTED HEREIN) ARE ALSO FULLY APPLICABLE TO THIS REQUEST FOR PROPOSALS AND ANY RESULTANT CONTRACT.

Clauses 452.211-72 Statement of Work/Specifications. (FEB 1988) 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) E - SECTION E - Inspection and Acceptance Clauses 52.246-1 Contractor Inspection Requirements. (APR 1984) 52.246-12 Inspection of Construction. (APR 1996) F - SECTION F - Deliveries or Performance Clauses 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 10/15/2015. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 08/01/2015. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause) 52.242-14 Suspension of Work. (APR 1984) G - SECTION G - Contract Administration Data Clauses 452.215-73 Postaward Conference. (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: Cabinet Ranger Station.

(End of Clause) H - SECTION H - Special Contract Requirements H- 1 Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from firefighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved hand tool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Power saws. For each power saw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a power saw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; power saw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. NONE.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with hand pump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer. Not Applicable.

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Obtain a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H- 2 Incidental Payment Items

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

H- 3 Conformity with Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

H- 4 Local Material Sources

(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.

The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.

When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.

Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.

(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.

H- 5 Samples, Tests, Cited Specifications

Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.

H- 6 Barricades, Warning Signs, and Other Devices

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.

Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

H- 7 Weed-Free Equipment

In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.

The following is considered proof of weed-free equipment:

The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.

Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.

H- 8 Landscape Preservation

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumen, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

H- 9 Environmental Management System (EMS)

Definition. An EMS provides a systematic approach for continually improving environmental performance and identifies the major environmental aspects and associated impacts that occur on a National Forest or Grassland. There are controls in place to manage these impacts, such as NEPA analysis, best management practices (BMPs), and resource monitoring. The EMS simply documents and ensures that these controls are in place and working as intended. EMS is an ongoing process that formalizes the Forest Service’s commitment to adaptive management and continual improvement of the environment.

Environmental Objectives:

1. Invasive Weeds – Reduce invasive weed introduction or spread through improved and more effective control and management.

2. Vegetation Management – 1) Restore or maintain vegetation health including the improvement or maintenance of resilient, native wildlife habitat and 2) Reduce fuels in a pattern and location to decrease fire intensity in the proximity of Wildland Urban Interface (WUI) or Community Wildfire Protection Plan areas.

3. Travel Management – 1) Reduce the existing road systems’ contributed sediment and impairment of water quality and aquatic habitats and 2) Improve security for grizzly bears or elk through the designation of roads, trails, and areas for motor vehicle use.

4. Reduction of Petroleum Consumption – Reduce fuel consumption by 2% annually through the following operational controls: a) Use the most fuel efficient vehicle for the job, b) Use car-pooling and ride-sharing, c) Maintain vehicles for fuel efficiency.

H- 11 Food Storage on Worksite

The Kootenai National Forest has implemented a mandatory Food Storage and Sanitation Special Order; contractors are required to comply with the food and refuse storage guidelines under this Order. The purpose of the Order is to minimize adverse interactions between humans, bears and other wildlife, and to provide for Forest visitor safety. A complete copy of the Order is provided as an attachment to this solicitation and is listed (under Section J-4). The Order will be incorporated into any resultant contract.

Clauses 52.236-4 Physical Data. (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual inspection.

(b) Weather conditions Local weather conditions.

(c) Transportation facilities Work site access is avaliable for all equipment necessary to complete the work..

(d) None.

(End of clause)

452.237-74 KEY PERSONNEL (FEB 1988)

1.1. The Contractor shall assign to this contract the key personnel identified in their technical proposal and that list may include the following:

1. CREW FOREMAN/SITE SUPERVISOR -

1. INSPECTOR -

1.2. The Contractor shall make no substitutions of key personnel without notifying the Contracting Officer within a reasonable timeframe and in advance, and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. Proposed substitutes should have comparable qualifications to those of the persons being replaced.

1.3. The Contractor shall make no diversion of key personnel without the written consent of the Contracting Officer.

1.4. The contract will be modified to reflect any approved changes of key personnel.

I - SECTION I - Contract Clauses Clauses 52.204-7 System for Award Management. (JUL 2013) 52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011) 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013) 52.211-18 Variation in Estimated Quantity. (APR 1984) 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award. (NOV 2011) 52.222-3 Convict Labor. (JUN 2003) 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision) 52.222-6 Construction Wage Rate Requirements. (MAY 2014) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (MAY 2014) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-11 Subcontracts (Labor Standards). (MAY 2014) 52.222-12 Contract Termination - Debarment. (MAY 2014) 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000. (MAY 2014) 52.222-21 Prohibition of segregated facilities. (APR 2015) 52.222-26 Equal Opportunity. (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007) 52.224-1 Privacy Act Notification. (APR 1984) 52.224-2 Privacy Act. (APR 1984) 52.225-9 Buy American - Construction Materials. (MAY 2014)

(a) Definitions. As used in this clause- Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of Quantity Price measure (dollars)* Item 1:

Foreign construction material ________ ________ ________ Domestic construction material ________ ________ ________ Item 2:

Foreign construction material ________ ________ ________ Domestic construction material ________ ________ ________

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause) 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-11 Pledges of Assets. (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) 52.228-13 Alternative Payment Protections. (JUL 2000)

(a) The Contractor shall submit one of the following payment protections: []

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within [] days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause) 52.228-14 Irrevocable Letter of Credit. (NOV 2014) 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) 52.232-18 Availability of Funds. (APR 1984) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt payment for construction contracts. (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013) 52.233-1 Disputes. (MAY 2014) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-14 Availability and Use of Utility Services. (APR 1984) 52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-16 Quantity Surveys. (APR 1984) 52.236-17 Layout of Work. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.236-26 Preconstruction Conference. (FEB 1995) 52.243-5 Changes and Changed Conditions. (APR 1984) 52.244-6 Subcontracts for Commercial Items. (APR 2015)

(a) Definitions. As used in this clause- Commercial item has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.

Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.

(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509), if the subcontract exceeds $5,000,000 and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.

(iii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(v) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).

(vi) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212(a));

(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

(viii) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).

(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.

(x)(A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).

(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xi) 52.222-55, Establishing a Minimum Wage for Contractors (E.O. 13658) (DEC 2014).

(xii) 52.225-26, Contractors Performing Private Security Functions Outside the United States JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xiii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.

(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.

(End of clause) 52.246-21 Warranty of Construction. (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

This is the start of the file's text. The full file is on GovTribe.