Attachment 02 - FP-03 Document (supplemental Specifications)

View the file

Other files

File Type Posted
AG02RCP120134_00002.pdf PDF
AG02RCS120134_00001.pdf PDF
Attch02_Amend01_FSSS.docx DOCX document
Attch01_SHEET 6.pdf PDF
Attch01_SHEET 5.pdf PDF
Attch01_SHEET 1.pdf PDF
AG-02RC-S-12-0134.rtf RTF text file
Attch01_SHEET 8.pdf PDF
Attch01_SHEET 4.pdf PDF
Attch01_SHEET 2.pdf PDF
Attch05_SF 25A.pdf PDF
Attch04_FOOD_STORAGE-2.pdf PDF
Attch01_SHEET 3.pdf PDF
Attch03_WD_MT120001.docx DOCX document
Attch01_SHEET 7.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

Table of Contents1
Preface3
101 - Terms, Format, and Definitions4
101.01 Meaning of Terms4
101.03 Abbreviations.4
101.04 Definitions.4
102 - Bid, Award, and Execution of Contract7
102 Bid, Award, and Execution of Contract7
103 - Scope of Work8
Deletions8
104 - Control of Work9
Deletions9
104.06 Use of Roads by Contractor9
105 - Control of Material10
105.02 Material Sources.10
105.02(a) Government-provided sources.10
105.05 Use of Material Found in the Work.10
106 - Acceptance of Work11
106.07 Delete11
107 - Legal Relations and Responsibility to the Public12
107.05 Responsibility for Damage Claims.12
107.06 Contractor’s Responsibility for Work.12
107.09 Legal Relationship of the Parties.12
107.10 Environmental Protection.12
108 - Prosecution and Progress14
108 Delete.14
109 - Measurement and Payment15
109 Deletions15
109.02 Measurement Terms and Definitions.15
109.02 Measurement Terms and Definitions.15
151 - Mobilization17
151.01 Description17
151.02 Measurement18
155 - Schedules for Construction Contracts19
155 Delete.19
404 - Minor Hot Asphalt Concrete20
404.04 Weather Limitations.20
404.07 Compacting (a).20
404.09 Acceptance.21
Table 404-1. Sampling and Testing Requirements.21
409 - Asphalt Surface Treatment22
409.06 Weather.22
409.08 Asphalt Application.22
409.10 Fog Seal.22
409.11 Single Course Surface Treatments.22
Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment23
409.13 Acceptance.24
Table 409-4 Sampling and Testing Requirements.24
634 - Permanent Pavement Marking25
634.03 General.25
634.04 Conventional Traffic Paint (Type A).25
635 - Temporary Traffic Control26
635.03 General.26
718 - Traffic Signing and Marking Material27
718.05 Aluminum Panels27

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

109.02_0114_us_06_09_2008

109.02 Measurement Terms and Definitions.

Add the following definition:

(q) Actual quantity. (AQ) These quantities are determined from measurements of completed work.

151 - Mobilization 151.01_0114_us_08_04_2005

151.01 Description

Add the following:

This work consists of washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands.

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 24 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the C.O.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

151.02 Measurement

Add the following:

Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment under this item will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Delete.

Delete Section 155 in its entirety.

404 - Minor Hot Asphalt Concrete 404.04_nat_us_03_02_2005

404.04 Weather Limitations.

Change 35o F to 45o F:

404.07_nat_us_03_02_2005

404.07 Compacting (a).

Delete and replace with the following:

(a) Roadway paving. Thoroughly and uniformly compact the surface a minimum of three passes with rollers that meet one of the following requirements:

(1) Steel-wheeled rollers, other than vibratory type, capable of exerting a force of not less than 1.5 ton/feet of width of the compression roll or rolls.

(2) Vibratory steel-wheel rollers with a minimum mass of 5 ton, equipped with amplitude and frequency controls, and designed to compact asphalt concrete.

(3) Pneumatic-tire rollers with smooth tread tires of equal size that provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 lbf/in2.

Perform initial compaction while the mixture is above 250 °F. Perform finish rolling with steel-wheel rollers and continue until no roller tracks remain.

404.09_nat_us_03_02_2005

404.09 Acceptance.

Add the following to the second paragraph:

See Table 404-1 for sampling and testing requirements.

Table 404-1. Delete and replace with the following:

Table 404-1. Sampling and Testing Requirements.

Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Sampling Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Asphalt Mixture (404.09)
-
-
-
AASHTO T 168
Three minimum per project and at least one per 500 Cubic yards
Roadway prior to compaction
yes
As soon as sampled

409 - Asphalt Surface Treatment 409.06_nat_us_05_12_2004

409.06 Weather.

Delete the first paragraph and replace with the following:

Apply surface treatments with aggregate only when ambient air and surface temperatures are above 60 °F and rising in the shade, when the weather is not foggy or rainy, and when rain is not forecast for at least 24 hours after application.

409.08 Asphalt Application.

Add the following to the 3rd paragraph:

Ensure the length of spread is no more than what can be covered with aggregate within 1 minute of the asphalt application.

409.10 Fog Seal.

Add the following to the first paragraph:

Dilute by adding an equal amount of water to the emulsified asphalt. Do not cut the emulsified asphalt more than once.

409.11 Single Course Surface Treatments.

Add the following:

Do not permit traffic to travel over any Asphalt Surface Treatment until completion of rolling.

409.10_nat_us_08_12_2004 Delete Table 409-1 and substitute the following:

Delete Table 409-1 and substitute the following:

Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment

Table 409-1 Approximate Quantities of Material for Single-Course Surface Treatment

Designation
Nominal Maximum Size of Aggregate
Aggregate Gradation (1)
Estimated Quantity of Aggregate (2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of Asphalt Binder (3) gallons/yd2
1A
3/4 inch
B
40 – 49
0.40 – 0.55
0.27 – 0.38
1B
1/2 inch
C
26 – 29
0.31 – 0.44
0.20 – 0.31
1C
3/8 inch
D
24 – 28
0.44 – 0.48
0.13 – 0.24
1D
No. 4
E
15 – 20
0.15 – 0.22
0.11 – 0.18
1E
Sand
F
9 – 15
0.11 – 0.18
0.09 – 0.15

(1) See Table 703-7 for aggregate gradations.

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.

(3) Adjust the asphalt content for the condition of the road. For Region One use only 3/8 inch aggregate unless approved by Regional office.

409.13_nat_us_05_13_2004

409.13 Acceptance.

Delete the 2nd paragraph and replace with the following:

Aggregate gradation for asphalt surface treatment will be evaluated under Subsection 106.04.

Table 409-4 Sampling and Testing Requirements.

Delete the last cell (4th) under Sampling Frequency and replace with the following:

1 per tanker truck and 1 per trailer Delete the 2nd and 3rd cell under Type of Acceptance and replace with the following:

Measured and tested for conformance (106.04)

634 - Permanent Pavement Marking 634.00_01_us_10_12_2006

634.03 General.

Add the following:

On single lane roads, apply pavement markings according to the manufacturer’s recommendations and in a direction consistent with safe application.

634.04 Conventional Traffic Paint (Type A).

Delete subsection and replace with the following:

Apply paint when the pavement and air temperatures are above 40 °F. Spray paint at 25-mil minimum wet film thickness (before glass beads) or at a rate of 65 square feet per gallon. Immediately apply type 1 glass beads on the paint at a minimum rate of 6 pounds per gallon of paint.

635 - Temporary Traffic Control 635.03_nat_us_05_13_2004

635.03 General.

Add the following:

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

image1.png