Amendment 01 - 05/02/2011 Contractors are required to sign and return this document with their response.

View the file

Other files

File Type Posted
J4_JeruLindsey_Drawings.pdf PDF
Construction_RFQ_AG02RCS110051_JeruLindsey.doc DOC document
J1_Wage_Determination_ID100012.pdf PDF
J3_FSSS_Complete_II.pdf PDF
J-5_Idaho_WCI.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION OF CONTRACT 1 1

2. AMENDMENT NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0001 05/02/2011

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service

Idaho Panhandle National Forests

3815 Schreiber Way

Coeur d'Alene ID 83815-8363

Contracting Officer

Idaho Panhandle National Forests

3815 Schreiber Way

Coeur d'Alene ID 83815-8363

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-02RC-S-11-0051

9B. DATED (SEE ITEM 11)

04/22/2011

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

XX The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt offers X is extended, _is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b)By acknowledging the receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(�) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, XX is required to sign this document and return 01 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Sol. AG-02RC-S-11-0051, Jeru-Lindsey Decommissioning is hereby amended as follows:

1. See attached Section B - Schedule of Items with revisions to add the Method of Measure column to match the table at Sheet 2 of the Drawings (Attachment J-4 to the solicitation) (1 page)

2. See attached Question & Answer sheet addressing the following topics: Accessibility to the project site, Specifications, Bonding requirements etc. (2 pages)

The due date for quotations per Block 10 of the solicitation remains unchanged. Return one copy of this Amendment with your quotation/response.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-10 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.24

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

Jeru Lindsey Decommissioning

Idaho Panhandle National Forests, Sandpoint Ranger Station, Bonner County, Idaho

B- 1 Schedule of Items

ITEM

NO.

DESCRIPTION

M E

T H

O D

O

F

M E

A S

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization LSQ LS 1.00 $ $

15707 Straw/Hay Bales AQ EA 30.00 $ $

15713 Soil Erosion and Pollution Control LSQ LS 1.00 $ $

20201 Selective Clearing CQ MI 0.58 $ $

20301A Remove and Dispose Existing Gate AQ EA 1.00 $ $

20301B Remove/Dispose Concrete Jersey Barrier AQ EA 1.00 $ $

21120 Stream Channel Restoration Category 1 AQ EA 3.00 $ $

21121 Stream Channel Restoration Category 2 AQ EA 3.00 $ $

21129 Full Recontour of Road CQ LF 600.0 $ $

21130 Waterbars AQ EA 57.00 $ $

21131 Ditch Relief Culvert Removal AQ EA 45.00 $ $

21132 Gradient Control Structures AQ EA 25.00 $ $

21133 Scarification of Roadbed CQ MI 4.71 $ $

62201A Equipment Rental – Excavator AQ HR 24.00 $ $

62201B Equipment Rental – Dump Truck AQ HR 16.00 $ $

62201C Equipment Rental – Dozer AQ HR 16.00 $ $

62503 Seeding and Mulching, Dry Method LSQ LS 1.00 $ $

TOTAL (ALL ITEMS): $

* Designated Method of Measurement: LF – Lineal Foot, MI – Mile, EA – Each, LS - Lump Sum, AQ - Actual Quantity, LSQ – Lump Sum Quantity, CQ – Contract Quantity

B- 2 Quote on all items. Only quotes to the nearest cent will be accepted.

B- 3 Payment for Bond Premiums Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization. (See Section I, I-6 FAR 52.228-13 Alternative Payment Protections (JULY 2000) for additional details).

B- 4 Written Acceptance Any contract resulting from this solicitation will require written acceptance within 10 days of receipt by the Contractor.

Amendment 01 – 05/02/2011

AG-02RC-S-11-0051 - JERU-LINDSEY DECOMMISSIONING AMD 01 (05/02/11): Question and Answers

Q1: Is the project site accessible now?

A1: No, still snow at the bottom with more snow falling as verified by Sandpoint Ranger District personnel. Also, due to wildlife restrictions the areas are behind locked gates. Questions should be addressed to Josh Nelson, 208-265-6610.

Q2a: Sediment and Erosion Control - Can Straw Bales be used?

Q2b: Also the contract spec mentioned Diversions, but none shown?

A2a: The Supplemental Specification 157.03 states that the Contractor is to submit an Erosion Control Plan that details permanent and temporary control measures. Therefore, Straw Bales can be used for the temporary control measure, but the project would also need additional permanent control measures in place such as the silt fence or similar structure and both structures listed in the plan.

The bales would have to be Certified Weed Free. The plan would be submitted at least 7 days prior to operation for approval.

A2b: Supplemental Specification 157.09 lists for Diversions when shown on the drawings. Jeru- Lindsey Decommissioning does not have any Diversions shown in the drawings so at this point is not planned for any Stream Diversions. Sheet 11, Note 5 of the drawings states to utilize the existing culvert for flow during excavation for as long as possible prior to removal to minimize sedimentation into the water.

Q3: Gradiant Control Structures: The contract lists the total quantity of the control structures. In other previous contracts it was identified how many per category of stream crossing.

A3: The contract is set up for AQ of 25 Gradient Control Structures. So we would have the Hydrologist determine how many we would want per crossing with a total of 25 because of the uniqueness of some of the crossings.

Q4: What is the typical CFS of the streams?

A4: It ranges from approximately 10 CFS during the construction window on the major Lindsey Creek Stream Crossings. The other stream crossings are typically smaller flows than Lindsey Creek but precise data is not available.

Q5: The contract talked about Access to the project through Josh Nelson. How is that set up?

A5: The project is behind a gate, and a key is required, so the project is walk in only until the project is awarded. After award, the coordination for access would be through Josh Nelson.

Q6: Is bonding required for this project?

A6: Performance and payment bonds are required for this project. See the clauses referenced or in full text at Section I of the solicitation (52.228-2 Additional Bond Security, (OCT 1997), 52.228-11 Pledges of Assets. (SEP 2009), 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995), 52.228-14 Irrevocable Letter of Credit. (DEC 1999).

Q7: Do they have to use a dump truck to do the work, or can it be done with a dozer?

A7: In the Schedule of Items there are three pay items for equipment rental, a dump truck, a dozer, and an excavator.

Q8: Is there a lot of brush on the roads?

A8: The two areas where there is brushing is listed as the Selective Clearing Pay Item which will have minimal clearing as shown on Sheet 12 to pass equipment safely. Otherwise, the roads are drivable.

AG-02RC-S-11-0051 - JERU-LINDSEY DECOMMISSIONING AMD 01 (05/02/11): Question and Answers

Q9: Is there a way to have the start date earlier?

A9: The areas are near bear units and the start date listed is the earliest possible date considering these wildlife restrictions.

Q10: What are some of the depth of the culverts?

A10: On sheet 9 of the drawings, the main crossings, the table shows the depths on the Stream Channel Restoration Areas (SCRs).

The remaining SCRs not on the table that are categorized are similar to these. If the culverts are not categorized they were listed as Ditch Relief Culverts.

Q11: Is seeding done on the entire road?

A11: Sheet 11 notes state that the seeding and fertilizing will be on all disturbed areas, and Mulch will be within the SCRs.

Q12: Are the Structures logs or rocks? What is the purpose of those?

A12: Yes, they are logs and rocks and they help reduce velocity/energy of the water to reduce possible erosion.

Q13: Is this deep ripping because it listed only 6" or less otherwise bedrock? (For Jeru-Lindsey Decomm?

A13: This will be scarification and not full recontour the whole road. The deep ripping will be as shown on Sheet 12 for the SCR areas.