amendment_2_keno_creek.doc
DOC document 66 KB Posted
- Solicitation number
- AG-02RC-S-10-0011
About this file
Amendment - 2 - Augments provision L.2 Instructions to Offerors in full.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_1_keno_creek.doc | DOC document | |
| Attachment_3_keno_fp-03_sup_proj_specs.doc | DOC document | |
| Attachment_2_keno_plan_sheets.pdf | ||
| Attachment_1_keno_wage_rates.docx | DOCX document | |
| attachment_4_Idaho_wrk_comp_cert_.doc | DOC document | |
| complete_sol_ag-02rc-s-10-0011.doc | DOC document | |
| return_offer_forms_ag-02rc-s-10-0011.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 2 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| TWO (2) |
| 06-30-2010 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA-Forest Service Idaho Montana Acquisition Zone
3835 Schreiber Way
Couer d’Alene, ID 83815 Same as block 6
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-02RC-S-10-0011 Keno Ck. Bridge
9B. DATED (SEE ITEM 11)
06-11-2010
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This amendment replaces in its entirety the provision L.2 AGAR 452.215-71 Instructions For The Preparation Of Technical And Business Proposals (SEP 1999) Solicitation is NOT extended.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| William Standley |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 2 – AG-02RC-S-10-0011 Keno Creek Bridge Replacment
L.2 AGAR 452.215-71 Instructions For The Preparation Of Technical And Business Proposals (SEP 1999)
Proposals submitted in response to this solicitation shall include the following:
· 1 copy - Completed SF-1442 Request for Proposal form, signed and dated by offeror.
· Properly executed bid bond per I.4 FAR 52.228-1 Bid Guarantee (SEP 1996)
· Acknowledgement of any and all amendments that were issued on FBO.
· 1 copy - Schedule of Items (Section B). All items must be priced and signature box filled in.
· 1 copy information required from Section K Representations and Certifications.
· For: Past Performance Evaluation Criteria - 1 copy – (no bound material) A listing of your firms past experience for the Past Performance Evaluation Criteria including:
Name of the project with description of the work involved, contract number(s), dollar amount, dates of operation for the project, who or what entity public or private the project was for, and a name and contact number of person the project was for. Describe any challenges or problems encountered and how you with resolved them.
· For: Key Personnel Evaluation Criteria – 1 copy (no bound material) The Key Personnel Clause is included in this contract and applies to the Construction Superintendent. H.5 AGAR 452.237-74. Other personnel may be described.
· Superintendent qualifications.
· Site management experience working in structures construction.
· Skills, experience or other credentials within the firm to accomplish the work.
· Project Contractor Quality Control (CQC) responsibilities and credentials.
· For: Technical Approach Evaluation Criteria - 1 copy – (no bound material) of your technical approach to this project including.
· Describe your general plan of operations for this project, particularly stream protection.
· Describe your approach to quality control.
· Describe the equipment available. Include any sub-contractors roles.
(This is not a request for an extremeley detailed construction plan.)
The Government may use past performance information provided by the offeror, information provided by references on previous efforts undertaken by the offeror, and information available from other sources, such as but not limited to Government past performance databases.
File details come from the government source that posted it. Updated .