West_Salzer_Map.pdf
PDF 3 MB Posted
- Solicitation number
- AG-02NV-S-13-0044
About this file
West Salzer Map
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03.doc | DOC document | |
| West_Salzer_Appendix_A_080913.doc | DOC document | |
| Appendix_B__C_Tree_measurement_Mandatory_080913.doc | DOC document | |
| West_Salzer_Timber_Removal_Aug_2nd_2013.pdf | ||
| West_Salzer_Service_Items_Aug_2nd_2013.pdf | ||
| Amendment_02.doc | DOC document | |
| Amendment_01.doc | DOC document | |
| West_Salzer_Maps_Amendment_01.pdf | ||
| West_Salzer_Appendix_A_Amendment_01.doc | DOC document | |
| Appendix_B__C_Tree_measurement_Mandatory.doc | DOC document | |
| West_Salzer_Appendix_A.doc | DOC document | |
| Solicitation_0044.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
+R
+R
+R+R
+R +R
+R +R
+R
+R
35 36 31
26 25 2930
60091
60088
1-D
88- A 60087
60091-F
1-C
60202
60092
60088-B
60208
U2
1A
U252002A
U252107A
U252001C
U252002C
U252001B
91-
E U252
E
7-B
U252104A
U262130A U262025A
U252002F U262132B
U2
4J
60233-A
U12-1 U2
5A
U252002D U262
B
U2
9A
U252104L
U2
4D
U262131C
U2
4C
U262132A
U252002B U252106A
U252104H
Stewardship Name: West Salzer National Forest: Salmon-Challis Ranger District: North Fork
Sale Area Boundary, BT.1
Payment Unit Boundary, BT.1
Primary Haul Route, KT-FT.1.2#
Unit Number
33S 33T
Road Number, KT-FT.3.1#
T / S Tractor OR Skyline Specified, BT.1 and
GT.4.2
Notes:
1) Cutting Unit Boundaries are Marked with two Horizontal Orange Paint Bands.
2) Cut trees are marked with Blue Paint.
3) Map Contour interval is 40 feet.
4) Contract Area Boundary for Timber Removal covers approximately 1,942 acres.
5) Roads 60085, 60088 & 60091 shall be kept open, BT.1.
Payment Units, BT.1
60128-A
Cutting Unit Number, BT.1, K-CT.3.5.7#, KT-CT.3.0.1#
1 Payment Unit Number, BT.1
0 10.5 Miles
West Salzer Stewardship Contract Area Map Timber Removal, Page 1 of 1
Map Prepared By: Glenwood A Brittain Date: June 6th 2013
Unit 32,33T,55 = Payment Unit 1 Unit 31,33S,34 = Payment Unit 2 Unit 36,39,76 = Payment Unit 3 Unit 38,41,43 = Payment Unit 4
Unit 40,42 = Pay ment Unit 5 Unit 52,53 = Payment Unit 6
Contour (40')
Existing Transportation System Road, KT-FT.1.2# X
CTM
Hauling Prohibited, KT-FT.1.2#
Cut Tree Mark, K-CT.3.5.7#
Type of Slash Disposal
(KT-GT.7#)
1) {Clean System Roads}
3) {Yard Limbs and Tops}
4) {Lopping Damaged Residual and Tops and Limbs}
5 {Fell Damaged Residual} 6 {Scatter Logging Slash allowed to stay in units}
7 {Landing Cleanup}
ACRES
ã Remove/Install Earthen Barriers, KT-FT.3.1#
KO Keep Road Open, BT.1
KO
KO
60030
60036
60071
60091
60079
60078
60092
60035
60449
60088 6131
60164
60080
60086
60037
NORTH FORK, ID
CONTRACT AREA
VICINITY MAP
T
CTM
T
CTM
T
CTM T
CTM
T
CTM
T
CTM
T
Ida ho
Mont anaMont ana
KO
KO
KO
KO
Gate, BT.1, KT-FT.3.1#
Idah o
CTM
US
X X
T.25.0N. Township/Range Description, BT.1, AT
Section Number, BT.1, AT36KO
SALMON RIVER
Harvest Method Skyline Tractor Skyline Tractor Skyline Tractor Tractor Tractor Skyline Tractor Skyline Tractor Skyline Skyline Tractor Tractor
Private Land
CTM
S
CTM
S
CTM
T
CTM
T
CTM 2
Unit Boundary, CT.3, KT-CT.3.0.1#
X
S
S
CTM
CTM
S
CTM
S
S
S T
T
CTM
CTM
X
X ã ã ã ã ã ã
Streamcourse Protection, III.44 Stream Coarse Protection
KO
KO
T.25.0N., R.21.0E, 08
T.25.0N., R.20.0E, 08
T.26.0N., R.20.0E, 08
File details come from the government source that posted it. Updated .