Amend 02.doc

DOC document 82 KB Posted

Attached to
Indian Creek Bridges Federal contract opportunity
Solicitation number
AG-02NV-S-08-0021
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Amendment 02

View the file

Other files for this federal contract opportunity

Other files attached to Indian Creek Bridges, newest first.
File Type Posted
Amend 01.doc DOC document
Indian_Bridge 2.pdf PDF
specs.doc DOC document
Indian_bridge 1.pdf PDF
Solicitation.doc DOC document
Indian_bridge 3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
5 44
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
02
05/19/2008
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

IDAWY Acquisition Service Center 1405 Hollipark Drive

Idaho Falls, ID 83401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
Prospective Offerors
FORMCHECKBOX

AG-02NV-S-08-0021

9B. DATED (SEE ITEM 11)

04/22/2008

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Solicitation No. AG-02NV-S-08-0021, Indian Creek Bridges, North Fork Ranger District, Salmon-Challis National Forest is amended as follows:

See following pages.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 02 A site visit was held May 8, 2008 at 9:30 a.m. at the site. The following questions and answers were discussed at the site visit.

Attendees:

Name

Organization

Phone Number Pete Schuldt

Salmon NF Engineering

208-756-5121 Jeff Parker

Salmon NF Engineering

208-756-5161

Judy Martin

IDAWY Acq. Service Center

208-557-5841 Brad Bauer

IDAWY Acq. Service Center

208-557-5768

Earl Pogge

Pogges Excavation

208-684-3403

Rulon Wellard

Wellard Construction

208-756-7117 Katherine Kirk

Spring Creek Contractors

208-429-1781

Barry Roark

Idaho Stage

208-926-4668

Jason Hussey

Getly Excavating

208-879-5550

Dan & Lynn Cook

Cook & Sons Const.

208-839-2383

Skyler Neibaur

Rain for Rent

208-521-6500

Nate Hoggan

H & N Construction

208-221-6563

Mitch Barreras

Turning Point Surveying

208-756-1494

Brad Watkins

Rieber Construction

406-360-8600

Allen Ledbetter

Ledbetter Construction

208-756-4571

Allan Probst

Allan Probst

208-756-2194 In the meeting room:

Pay close attention to contractor requirements listed in Sections C, H, L, and M. Because of the sensitive nature of the stream as bull trout habitat, the stream quality will be monitored during the spawning season. The method and maintenance of the de-watering system for the in-stream work will be very important to the submitted proposal. Fish in the work area will be removed before the de-watering system is in place. The erosion control and the de-watering plans may be separate or combined into one plan.

The solicitation is in the $100,000 to $250,000 range. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP03 applies to this project with supplemental specifications inserted into the contract. The specifications may be downloaded at www.wfl.fhwa.dot.gov or purchased from the Government Printing Office at www.bookstore.gpo.gov. Heavy Highway Davis-Bacon wages apply to this project.

Material Source Q: Asphalt is required?

A: Asphalt is an Additive Item, and may or may not be awarded based on available funding at time of award Q: Is the asphalt a hot or cold mix?

A: Asphalt is a hot mix and there is a company in Salmon that can provide asphalt.

Q: Will the material source be the riprap source?

A: Yes.

Q: Is there an estimated quantity of riprap?

A: Yes, the quantity is stated in the solicitation.

Q: What if the material source does not contain enough material?

A: If the material source does not contain enough suitable material, the Government will provide another source.

Bridge Storage Location Q: Are the bridges all the same?

A: The bridges are the same length; however, abutement heights and skews are different.

Q: What is the weight of each bridge?

A: Approximately 45-50 lbs./cubic foot.

Q: Where is the hardware for the bridges currently?

A: Bridge hardware is currently being stored at the Indianola Guard Station.

Q: How much does each panel weight?

A: Approximately 5600 lbs. per panel.

Q: How will we know if all the parts are here?

A: At the time the contractor takes possession of the bridges, the Government and Contractor will inventory the bridges and hardware and complete a property transfer form for each bridge to ensure all parts are present and accounted for.

Q: Are bridges the same design?

A: The bridges are basically the same design but heights and skews are designed for each installation site.

Q: Are the holes pre-drilled in the bridges?

A; Stiffeners will not be pre-drilled, so some holes will need to be field drilled and treated on site.

Q: Is there a problem with drilling over live water?

A: If drilling over live water is necessary, the contractor must provide a method for catching any of the treatment product to prevent spillage into live water

Q: Are there load limits on the road?

A: Load limits that are currently on the bridges are tied to the bridges that are there currently. Bridge #1 currently has a 5 ton limit and Bridges #5 and #6 are condemned so you will not be able to haul over them.

Bridge #1

Q: Where are the control pins?

A: The Government will re-establish the control points & centerline of abutements prior to work starting.

Q: What about the telephone line that is lying on the bridge?

A: Rural Telephone has been contacted and will move the lines prior to construction. The Contractor may have to coordinate their de-watering and general construction site to assure continued phone service to the residence.

Q: Will the contractor be expected to provide conduit for the phone line?

A: Rural Telephone Company is resposible for providing a conduit for their line.

Q: Do you have August flow records?

A: Specification 157 Soil Erosion Control shows the mean flow, but not the peak flows.

Q: Where does the by pass road tie back into Indian Cr. Road?

A: Just past bridge #1. The by pass road runs directly through the Indianola Guard Station which will have crews stationed there, so minimize the use. The Forest Service road crew will establish the road, and the contractor will need to scarify & seed the road after bridge #1 is complete.

Q: Are there residences that are on the Indian Cr. Road?

A: Yes, there are several residences and a guest ranch. For that reason, the road needs to be kept open to traffic with only minor delays.

Bridge #5 Q: Where does the private land end?

A: The Forest Service boundary is just before Bridge #5.

Q: Where can we close the road at?

A: Indian Creek Road may be closed at the Forest Service boundary, or the contractor may negotiate with the private land owner to close it prior to the Forest Service boundary.

Q: Are the elevations spelled out in the solicitation?

A: There will be no construction staking, just centerline of the road and abutements and control points. Contractor is responsible for off-sets.

Q: What is our latitude for storage of materials & equipment?

A: This is a riparian area, so retain as much vegetation as possible. There is a wider location that may be used approximately 100 yards farther up the Indian Creek Road.

Q: Is most of the dirt work here?

A: Yes, bridge #5 requires the deck being raised approximately 4 feet so embankment needs to be brought in from the other bridge sites and the material source.

Q: Are compaction tests required?

A: Yes, contractor is responsible for testing each lift of the structural backfill behind the abutments.

Bridge #6 Q: Is a licensed surveyor required?

A: No

Q: What about removal and disposal of existing bridges?

A: Contractor is responsible for the removal and disposal of existing bridges off of Forest property.

Q: Why the October 17th completion date?

A: Because of the temperature issues for the asphalt and the opening of hunting season, the Government needs the bridges complete by October 17th.

Q: Can concrete be substituted for asphalt?

A: No