SF30Amend3.doc

DOC document 55 KB Posted

Attached to
IDAHO PANHANDLE NATIONAL FORESTS-FOREST SERVICE GATES AND REPLACEMENT PARTS
Solicitation number
AG-0281-S-09-0062
Issued by

About this file

Fabricator allowance 2 Clarification of Misprints Information about where holes should be drilled and placement of Bolts

View the file

Other files

File Type Posted
Section 708a.pdf PDF
RFQ.doc DOC document
Gate Page 1.pdf PDF
Amend_7a.doc DOC document
Gate Page 2.pdf PDF
amend_6.doc DOC document
SF30Amend2.doc DOC document
Heavy_gate-Layout1.pdf PDF
SF30Amend.doc DOC document
FAR 52.212-4-Contract Terms and Conditions.doc DOC document
FAR 52.212-3-Offeror Representations and Certifications.doc DOC document
Heavy_gate-Layout2.pdf PDF
R E Q U E S T F O R QUOTATION.docm DOCM document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE OF PAGES

AMENDMENT OF SOLICITATION OF CONTRACT

1
1
2. AMENDMENT NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
3 (Three)
9/02/2009
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service Idaho Panhandle National Forests 3815 Schreiber Way Coeur d'Alene ID 83815-8363 Contracting Officer Idaho Panhandle National Forests 3815 Schreiber Way Coeur d'Alene ID 83815-8363

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

AG-0281-S-09-0062

9B. DATED (SEE ITEM 11)

August 28, 2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

XX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt offers __ is extended, _X_is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b)By acknowledging the receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

E. IMPORTANT: Contractor

is not,
X
is required to sign this document and return
1
copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

AG-0281-S-09-0062 IDAHO PANHANDLE NATIONAL FORESTS – FOREST SERVICE GATES AND REPLACEMENT PARTS

(1) Fabricators are allowed to use square tubing that is pre drilled in place of the steel tube that is identified for the LOCK OPEN BOX only, provided that the wall thickness is the same and the outside diameter is the same. (2) In the LOCK OPEN BOX AND POST DETAIL the 3/16” is a misprint for the wall thickness of the lockbox. The wall thickness is identical for both the LOCK CLOSED BOX and the LOCK OPEN BOX. (3)There is a misprint along the GATE DETAIL, the 4”O.D. SQ STRUCTURAL TUBING should be a 3/16” wall thickness not 3/6” wall thickness. (4) For the OBJECT MARKERS, the holes should be drilled so that the bolts can fit cleanly through the tubing and the OBJECT MARKERS can be attached on both sides. This is for the LOCK CLOSED POST, and the HINGE ARM. The holes in the SLIDE BAR will be field drilled during installation and does not need to be drilled during fabrication of the gates. (5) The TYPE 2 OBJECT MARKER on the 6” O.D. SQ. STRUCTURAL TUBING will have Bolts welded in place to accept the OBJECT MARKER and held in place with the same thread of NUT and WASHERS to hold the OBJECT MARKER in place.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Charles C. Stuart, Jr. Contract Specialist

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-10

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA

FAR (48 CFR) 53.24

File details come from the government source that posted it. Updated .