SF30Amend_1.doc

DOC document 188 KB Posted

Attached to
Facility Maintenance Services and Light Construction
Solicitation number
AG-0281-S-09-0013
Issued by

About this file

Amendment 1 Replace Schedule of Items with attached Schedule of Items page 5-7 changed line item V Profit Rate to V.1 Profit Rate Subcontract and V.2 Profit Rate Materials Offer must sign and return ONE copy this amendment

View the file

Other files

File Type Posted
Heavy_ID12_dvb.htm HTM file
ipnf_sol_facilities_maint.doc DOC document
Buidling_ID1_dvb.htm HTM file
Highway_ID15_dvb.htm HTM file
Resident_ID5_dvb.htm HTM file
FBOpreSolnotice.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-0281-S-09-0013, Facility Maintenance Services and Light Construction

1. CONTRACT ID CODE
PAGE OF PAGES

AMENDMENT OF SOLICITATION OF CONTRACT

1
1
2. AMENDMENT NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
ONE (1)
2/19/09
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service Idaho Panhandle National Forests 3815 Schreiber Way Coeur d'Alene ID 83815-8363 Contracting Officer Idaho Panhandle National Forests 3815 Schreiber Way Coeur d'Alene ID 83815-8363

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

AG-0281-S-09-0013

9B. DATED (SEE ITEM 11)

2/6/09

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt offers __ is extended, __X is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b)By acknowledging the receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Facility Maintenance Services and Light Construction, Idaho Panhandle National Forests, is hereby amended as follows:

Replace Schedule of Items with attached Schedule of Items, page 5-7, changed line item V Profit Rate to V.1 Profit Rate Subcontract and V.2 Profit Rate Materials Offer must sign and return ONE copy this amendment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

RITA J. LOPER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

30-10

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA

FAR (48 CFR) 53.24

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

Facility Maintenance Services and Light Construction

Idaho Panhandle National Forest Facilities

B- 1 Schedule of Items

Miscellaneous facilities maintenance services and light construction for the Idaho Panhandle National Forest at Forest Service maintained facilities. Labor Rates shall include ALL overhead, supervision, tools, incidental supplies, insurance, quality control, and profit needed to perform the services. Task Orders will be negotiated using the rates below, location of work, cost of materials, and delivery schedule.

NORTH ZONE: Bonners Ferry, Priest Lake and Sandpoint Ranger Districts, Bonner, Boundary and Kootenai Counties, Idaho

ITEM NO. 1
SUPPLIES/SERVICES
UNIT
BASE

PERIOD

OPTION YEAR 1
OPTION YEAR 2
OPTION YEAR 3
OPTION YEAR 4
(a)
(b)
(c)
(d)
(d)
(d)
(d)
(d)
A
Carpenter
Per Hour
$_________
$_________
$________
$________
$________
B
Carpenter Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
C
Roofer
Per Hour
$_________
$_________
$_________
$_________
$_________
D
Roofer Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
E
Laborer
Per Hour
$_________
$_________
$_________
$_________
$_________
F
Laborer Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
G
Flooring Installation (Carpet/Vinyl)
Per Hour
$_________
$_________
$_________
$_________
$_________
H
Flooring Installation (Carpet/Vinyl) Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
I
Concrete, Masonry, Tile Trades
Per Hour
$_________
$_________
$_________
$_________
$_________
J
Concrete, Masonry, Tile Trades Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
K
Electrician
Per Hour
$_________
$_________
$_________
$_________
$_________
L
Electrician Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
M
Plumber
Per Hour
$_________
$_________
$_________
$_________
$_________
N
Plumber Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
O
Painter
Per Hour
$_________
$_________
$_________
$_________
$_________
P
Painter Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
Q
Mechanical/HVAC
Per Hour
$________
$_________
$_________
$_________
$_________
R
Mechanical/HVAC Apprentice
Per Hour
S
Equipment (backhoe, trackhoe, small excavator with operator) Example is 55 HP and ½ CY bucket
Per Hour
$_________
$_________
$_________
$_________
$_________
T
Overhead Rate (Includes all Overhead, and General Administration Costs)
%
_________
_________
_________
_________
_________
U
Profit Rate
%
_________
_________
_________
________
_________
V.1
Profit Rate Subcontract
%
_________
_________
_________
_________
_________
V.2
Profit Rate Materials
%
_________
_________
_________
_________
_________
W
Mobilization (including Bonding if required)
LS
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order

B- 1 Schedule of Items continued

CENTRAL ZONE: Coeur d Alene River Ranger District (Silver Valley and Fernan), Shoshone and Kooteani Counties, Idaho

ITEM NO. 2
SUPPLIES/SERVICES
UNIT
BASE

PERIOD

OPTION YEAR 1
OPTION YEAR 2
OPTION YEAR 3
OPTION YEAR 4
(a)
(b)
(c)
(d)
(d)
(d)
(d)
(d)
A
Carpenter
Per Hour
$_________
$_________
$________
$________
$________
B
Carpenter Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
C
Roofer
Per Hour
$_________
$_________
$_________
$_________
$_________
D
Roofer Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
E
Laborer
Per Hour
$_________
$_________
$_________
$_________
$_________
F
Laborer Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
G
Flooring Installation (Carpet/Vinyl)
Per Hour
$_________
$_________
$_________
$_________
$_________
H
Flooring Installation (Carpet/Vinyl) Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
I
Concrete, Masonry, Tile Trades
Per Hour
$_________
$_________
$_________
$_________
$_________
J
Concrete, Masonry, Tile Trades Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
K
Electrician
Per Hour
$_________
$_________
$_________
$_________
$_________
L
Electrician Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
M
Plumber
Per Hour
$_________
$_________
$_________
$_________
$_________
N
Plumber Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
O
Painter
Per Hour
$_________
$_________
$_________
$_________
$_________
P
Painter Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
Q
Mechanical/HVAC
Per Hour
$________
$_________
$_________
$_________
$_________
R
Mechanical/HVAC Apprentice
Per Hour
S
Equipment (backhoe, trackhoe, small excavator with operator) Example is 55 HP and ½ CY bucket
Per Hour
$_________
$_________
$_________
$_________
$_________
T
Overhead Rate (Includes all Overhead, and General Administration Costs)
%
_________
_________
_________
_________
_________
U
Profit Rate
%
_________
_________
_________
________
_________
V.1
Profit Rate Subcontract
%
_________
_________
_________
_________
_________
V.2
Profit Rate Materials
%
_________
_________
_________
_________
_________
W
Mobilization (including Bonding if required)
LS
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order

B- 1 Schedule of Items-continued

SOUTH ZONE: St Joe Ranger District, (St Maries and Avery), Benewah, Shoshone and Latah Counties, Idaho

ITEM NO. 3
SUPPLIES/SERVICES
UNIT
BASE

PERIOD

OPTION YEAR 1
OPTION YEAR 2
OPTION YEAR 3
OPTION YEAR 4
(a)
(b)
(c)
(d)
(d)
(d)
(d)
(d)
A
Carpenter
Per Hour
$_________
$_________
$________
$________
$________
B
Carpenter Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
C
Roofer
Per Hour
$_________
$_________
$_________
$_________
$_________
D
Roofer Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
E
Laborer
Per Hour
$_________
$_________
$_________
$_________
$_________
F
Laborer Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
G
Flooring Installation (Carpet/Vinyl)
Per Hour
$_________
$_________
$_________
$_________
$_________
H
Flooring Installation (Carpet/Vinyl) Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
I
Concrete, Masonry, Tile Trades
Per Hour
$_________
$_________
$_________
$_________
$_________
J
Concrete, Masonry, Tile Trades Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
K
Electrician
Per Hour
$_________
$_________
$_________
$_________
$_________
L
Electrician Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
M
Plumber
Per Hour
$_________
$_________
$_________
$_________
$_________
N
Plumber Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
O
Painter
Per Hour
$_________
$_________
$_________
$_________
$_________
P
Painter Apprentice
Per Hour
$_________
$_________
$_________
$_________
$_________
Q
Mechanical/HVAC
Per Hour
$________
$_________
$_________
$_________
$_________
R
Mechanical/HVAC Apprentice
Per Hour
S
Equipment (backhoe, trackhoe, small excavator with operator) Example is 55 HP and ½ CY bucket
Per Hour
$_________
$_________
$_________
$_________
$_________
T
Overhead Rate (Includes all Overhead, and General Administration Costs)
%
_________
_________
_________
_________
_________
U
Profit Rate
%
_________
_________
_________
________
_________
V.1
Profit Rate Subcontract
%
_________
_________
_________
_________
_________
V.2
Profit Rate Materials
%
_________
_________
_________
_________
_________
W
Mobilization (including Bonding if required)
LS
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order
Negotiated at time of order

Amendment No. 1, dated 2/19/09

Amendment No. 1, dated 2/19/09

File details come from the government source that posted it. Updated .