SUPPORT_DOCUMENT_A_MALTA_BUNKHOUSE_REROOF_PROJECT_2014s.pdf

PDF 145 KB Posted

Attached to
MALTA BUNKHOUSE REROOFING PROJECT 2014 Federal contract opportunity
Solicitation number
AG-0261-S-14-0099
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

SUPPORT DOCUMENT A

View the file

Other files for this federal contract opportunity

Other files attached to MALTA BUNKHOUSE REROOFING PROJECT 2014, newest first.
File Type Posted
AMEND_1.pdf PDF
AG-0261-S-14-0099_MALTA_BUNKHOUSE_REROOF_PROJECT_2014.pdf PDF
SUPPORT_DOCUMENT_B_DRAWINGS_MALTA_BUNKHOUSE_REROOF_PROJECT_2014s.pdf PDF
SUPPORT_DOCUMENT_C_WORKERS_COMP_FORM_MALTA_BUNKHOUSE_REROOF_PROJECT_2014s.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE - REGION 4 - SAWTOOTH NATIONAL FOREST

SUPPORTING DOCUMENT – A

AG-0261-S-14-0099

MALTA BUNKHOUSE REROOF PROJECT

SPECIFICATIONS

29 Pages (including this header page)

SUMMARY 001100 - 1

MALTA BUNKHOUSE RE-ROOFING PROJECT

SECTION 001100 - SUMMARY

PART 1 - GENERAL

1.1 1.1 SUMMARY

A. A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Use of premises.

3. Work restrictions.

4. Specification formats and conventions.

1.2 1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. A. Project Identification: Malta Work Center Bunkhouse Re-Roofing Project

1. The project is located on the Minidoka Ranger District of the Sawtooth National Forest, Cassia County, Idaho, in Section 12, T 13 S, R 26 E. It is located approximately 35 miles Southeast of Burley, Idaho. The project may be accessed from Interstate Highway 84 and State Highway 81.

B. B. The Work consists of the following:

1. In general the work includes installation of standing seam metal roofing on the sloped portions and modified bitumen roofing membrane on the flat sections of the bunkhouse roof. Work includes the removal of the existing asphalt shingles and underlayment, installation of plywood on top of existing wood planking, installing ice and water shield and roofing felt over the sloped portions of the roof, removal and replacement of roof penetration, rake, and eave flashing and installation of other flashing components (ridge, valley, chimney) for a complete roof installation.

1.3 1.3 USE OF PREMISES

A. Use of Site: Limit use of premises to areas within the construction limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Driveways and Entrances: Provide access to Forest Service Personnel and emergency vehicles at all times.

2. No overnight camping on project site will be allowed.

3. Contractor shall have access to restroom facilities at the office building at the administrative site and power. Potable drinking water and garbage facilities will not be provided.

SUMMARY 001100 - 2

1.4 1.4 WORK RESTRICTIONS

A. A. On-Site Work Hours: Work shall be performed within the project area during normal business working hours of 8:00 a.m. to 6:00 p.m., Monday through Friday, except otherwise indicated.

1. Weekend Hours: No work shall be allowed on the weekend unless approved by the Contracting Officer.

2. Work on Holidays: No work shall be allowed on any federal holiday unless approved by the Contracting Officer.

1.5 1.5 SPECIFICATION FORMATS AND CONVENTIONS

A. A. Specification Format: The Specifications are organized into Divisions and Sections using the CSI division format.

1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections are in numeric sequence; however, the sequence is incomplete because all available Section numbers are not used. Consult the table of contents at the beginning of the Specifications to determine numbers and names of Sections in the Contract Documents.

B. B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

END OF SECTION 01100

SUMMARY 001100 - 3

SECTION 001420 - REFERENCES

PART 1 - GENERAL

1.6 1.1 DEFINITIONS

A. A. "Approved": When used to convey Contracting Officer’s action on Contractor's submittals, applications, and requests, "approved" is limited to Contracting Officer’s duties and responsibilities as stated in the Conditions of the Contract.

B. B. "Contractor": The individual, partnership, firm, corporation, or joint venture, contracting with the Contracting Agency to do prescribed work.

C. C. "Contracting Officer" (C.O.): The individual with the authority to enter into, administer, and/or terminate the contract and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

D. D. "Directed": A command or instruction by Contracting Officer. Other terms including "requested," "authorized," "selected," "approved," "required," and "permitted" have the same meaning as "directed."

E. E. "Drawings": See "Plans".

F. F. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

G. G. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

H. H. "Furnish": Supply and deliver to Project site by Contractor, ready for unloading, unpacking, assembly, installation, and similar operations.

I. I. "Install": Operations at Project site including unloading, temporarily storing, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

J. J. “Plans": The contract plans which show location, character, and dimensions of prescribed work including layouts, profiles, cross-sections, and other details.

K. K. "Provide": Furnish and install, complete and ready for the intended use.

L. L. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

REFERENCES 001420 - 1

M. M. "Specifications": Provisions and requirements for the prescribed work.

N. N. "Work": The provision of all labor, materials, tools, and equipment, and everything needed to successfully complete a project according to the contract.

1.7 1.2 INDUSTRY STANDARDS

A. A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. B. Publication Dates: Comply with standards in effect as of date of the Contract Documents, unless otherwise indicated.

C. C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity.

Copies of applicable standards are not bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

C. Abbreviations and Acronyms for Standards and Regulations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the standards and regulations in the following list.

Names, telephone numbers, and Web-site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

D.

CFR Code of Federal Regulations (888) 293-6498 Available from Government Printing Office (202) 512-1530 www.access.gpo.gov/nara/cfr

1.8 1.3 ABBREVIATIONS AND ACRONYMS

A. A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Gale Research's "Encyclopedia of Associations" or in Columbia Books' "National Trade & Professional Associations of the U.S."

B. B. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web-site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

ASTM ASTM International (202) 293-8020

REFERENCES 001420 - 2

http://www.access.gpo.gov/nara/cfr

(American Society for Testing and Materials International) www.astm.org

UL Underwriters Laboratories (617) 770-3000 www.ul.com

C. C. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, telephone numbers, and Web-site addresses are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

OSHA Occupational Safety & Health Administration (800) 321-6742 www.osha.gov (202) 693-1999

USDA Department of Agriculture (202) 720-2791 www.usda.gov

END OF SECTION 001420

REFERENCES 001420 - 3

http://www.astm.org/ http://www.ul.com/ http://www.osha.gov/ http://www.usda.gov/

SECTION 001430 – CONTRACTOR QUALITY CONTROL

PART 1 - GENERAL

1.9 1.1 DESCRIPTION

A. A. This work shall consist of providing quality control to ensure compliance with the drawings, specifications, and provisions of this contract and to measure the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, and reports necessary to meet the requirements of this specification.

1.10 1.2 SUBMITTALS

A. A. Quality Control Plan:

1. At the time of the pre-work conference, submit for approval a written Quality Control (QC) plan.

2. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.

3. The Government reserves the right to require changes in the plan during the contract period as necessary.

4. No change in the approved plan may be made without written concurrence by the Contracting Officer.

B. B. If the QC plan is not submitted as specified, the Contracting Officer may retain all payments until such time a plan is approved and implemented.

1.11 1.3 QUALITY ASSURANCE

A. A. General:

1. The quality of all work shall be the responsibility of the Contractor.

2. The Contractor shall inspect all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and Drawings.

B. B. Quality Control Staff:

1. The Contractor’s Quality Control plan may be overseen by the Contractor’s onsite representative.

PART 2 - PRODUCTS – NOT APPLICABLE

PART 3 - EXECUTION

CONTRACTOR QUALITY CONTROL 001430 - 1

1.12 3.1 OFF-SITE CONTROL

A. A. Offsite Produced Materials: The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. The Contractor shall certify incidental purchases needed to remedy minor shortages of material.

Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.

1.13 3.2 ON-SITE CONTROL

A. A. Preparatory Phase: Perform before beginning each feature of work.

1. Review all applicable specifications sections and drawings related to the feature of work.

2. Examine the work area to ensure that all preliminary work has been completed.

3. Verify all field dimensions and advise the Contracting Officer of discrepancies with contract documents.

4. Ensure that necessary equipment and materials are at the project site and that they comply with approved submittals.

B. B. Initial Phase:

1. As soon as work begins, inspect a representative portion of a particular feature of work for quality of workmanship.

C. C. Follow-Up Phase: Inspect as work progresses to ensure compliance with contract requirements until completion of work.

D. D. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:

1. Quality of on-going work is unacceptable.

2. Changes occur in the applicable quality control staff, on-site production supervision, or work crew.

3. Work on a particular feature of work is resumed after a substantial period of inactivity.

1.14 3.3 ENFORCEMENT

A. A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the Contracting Officer.

B. END OF SECTION 01430

CONTRACTOR QUALITY CONTROL 001430 - 2

SECTION 001700 - EXECUTION REQUIREMENTS

PART 1 - GENERAL

1.15 1.1 SUMMARY

A. A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:

1. Examination.

2. Preparation.

3. Construction layout.

4. Installation

5. Progress cleaning.

6. Starting and adjusting.

7. Protection of installed construction.

8. Correction of the Work.

B. PART 2 - PRODUCTS – NOT APPLICABLE

PART 3 - EXECUTION

1.16 3.1 EXAMINATION

A. A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.

1. Before construction, verify the location and points of connection of utility services.

1.17 3.3 INSTALLATION

A. A. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

B. B. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Final Completion.

C. C. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

1.18 3.4 PROGRESS CLEANING

EXECUTION REQUIREMENTS 001700 - 1

A. A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.

B. B. Site: Maintain Project site free of waste materials and debris.

C. C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly and inform Contracting Officer.

D. D. Waste Disposal: Burying or burning waste materials on Forest Service Lands will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

E. E. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Final Completion.

1.19 3.5 PROTECTION OF INSTALLED CONSTRUCTION

A. A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Final Completion.

B. B. Comply with manufacturer's written instructions for temperature and relative humidity.

1.20 3.6 CORRECTION OF THE WORK

A. A. Repair or remove and replace defective construction.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

B. B. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

END OF SECTION 001700

EXECUTION REQUIREMENTS 001700 - 2

SECTION 001770 - CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.21 1.1 SUMMARY

A. A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1) Final Completion

2) Project Record Documents

3) Warranties

4) Final Cleaning

1.22 1.2 FINAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Final Completion, complete the following. List items below that are incomplete in request.

A.

1. Submit specific warranties, final certifications, and similar documents.

2. Deliver extra materials to location designated by Contracting Officer.

Label with manufacturer's name and model number where applicable.

3. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

4. Complete final cleaning requirements, including touchup.

B. B. Inspection: Submit a written request for inspection for Final Completion.

On receipt of request, Contracting Officer will either proceed with inspection or notify Contractor of unfulfilled requirements. Contracting Officer will prepare the Certificate of Final Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Contracting Officer that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.23 1.3 WARRANTIES

A. A. Submittal Time: Submit written warranties on request of Contracting Officer for designated portions of the Work where commencement of warranties other than date of Final Completion is indicated.

B. 1.4 FINAL CLEANING

CLOSEOUT PROCEDURES 001770 - 1

C. A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

D. B. Cleaning: Employ experienced workers for final cleaning.

1. Complete the following cleaning operations before requesting inspection for certification of Final Completion for entire Project.

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, of rubbish, waste material, litter, and other foreign substances.

b. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

c. Remove tools, construction equipment, machinery, and surplus material from Project site.

d. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

e. Leave project clean and ready for occupancy and/or use.

E. C. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous that might damage finished surfaces

END OF SECTION 01770

CLOSEOUT PROCEDURES 001770 - 2

SECTION 002135 - WASTE MATERIAL DISPOSAL

PART 1 - GENERAL

1.24 1.1 SUMMARY

A. A. This Section includes the loading, handling, hauling, and placing construction debris.

1.25 1.2 DEFINITIONS

A. A. Construction debris: Removal of garbage, trash, and other refuse generated from construction activities.

PART 2 - PRODUCTS – NOT APPLICABLE

PART 3 - EXECUTION

1.26 3.1 WASTE MATERIALS:

A. A. Construction debris:

1. Debris resulting from construction activities and from removal of existing structures shall be disposed off Government Property at an approved landfill.

a. Contractor shall be responsible for all costs, royalties, arrangements, procurement, cleanup, and work associated the disposal of debris.

b. Government is not responsible for debris upon its departure from the project area.

END OF SECTION 002135

WASTE MATERIAL DISPOSAL 002135 - 1

USDA FOREST SERVICE, R-4

SECTION 061600 - SHEATHING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Roof sheathing.

1.2 SUBMITTALS

A. Product Data: For each type of factory-fabricated product. Indicate component materials and dimensions and include construction and application details.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Stack plywood and other panels flat with spacers between each bundle to provide air circulation. Provide for air circulation around stacks and under coverings.

1.4 MEASUREMENT AND PAYMENT

A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.

PART 2 - PRODUCTS

2.1 WOOD PANEL PRODUCTS, GENERAL

A. Plywood: Either Department of Commerce (DOC) PS 1 or DOC PS 2, unless otherwise indicated.

B. Thickness: As needed to comply with requirements specified, but not less than thickness indicated.

C. Factory mark panels to indicate compliance with applicable standard.

2.2 ROOF SHEATHING

A. Plywood Roof Sheathing: Exterior, Structural I sheathing.

SHEATHING 061600 - 1

1. Span Rating: Not less than 48/24.

2. Nominal Thickness: Not less than 1/2 inch.

2.3 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this Article for material and manufacture.

1. For roof and wall sheathing, provide fasteners with hot-dip zinc coating complying with

ASTM A 153/A 153M.

B. Nails, Brads, and Staples: ASTM F 1667.

C. Power-Driven Fasteners: National Evaluation Service (NES) NER-272.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to use with minimum number of joints or optimum joint arrangement.

B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting construction, unless otherwise indicated.

C. Securely attach to substrate by fastening as indicated, complying with the following:

1. NES NER-272 for power-driven fasteners.

2. Table 2304.9.1, "Fastening Schedule," in ICC's "International Building Code."

D. Use galvanized common wire or deformed shank nails, unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections. Install fasteners without splitting wood.

E. Coordinate roof sheathing installation with flashing and joint-sealant installation so these materials are installed in sequence and manner that prevent exterior moisture from passing through completed assembly.

F. Do not bridge building expansion joints; cut and space edges of panels to match spacing of structural support elements.

G. Coordinate sheathing installation with installation of materials installed over sheathing so sheathing is not exposed to precipitation or left exposed at end of the workday when rain is forecast.

END OF SECTION 061600

APRIL 2014

SHEATHING 061600 - 2

SECTION 074113 – STANDING SEAM METAL ROOF

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Factory-formed and field-assembled, standing-seam metal roof panels, complete with clips, perimeter and penetration flashing, and closures.

1.2 PERFORMANCE REQUIREMENTS

A. Wind-Uplift Resistance: Comply with UL 580, Class 90 for wind-uplift resistance.

B. Structural Performance: Capable of withstanding the effects of gravity loads and the following loads and stresses, based on testing according to ASTM E 1592:

1. Wind Loads: Minimum design wind pressures of 90 mph, acting inward or outward.

2. Roof Snow Loads: 30 lbf/sq. ft.

1.3 SUBMITTALS

A. Product Data: For each type of metal roof panel and accessory indicated.

B. Shop Drawings: Show layouts of metal roof panels, including plans, elevations, sections, details, and attachments to other work.

1. Include details of edge conditions, joints, panel profiles, corners, anchorages, trim, flashings, closures, and accessories.

C. Maintenance data for O & M manual.

D. Color Samples: Submit samples for selection by Contracting Officer (CO).

1.4 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal roof panel assemblies that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

STANDING SEAM METAL ROOF 074113 - 1

a. Structural failures, including rupturing, cracking, or puncturing.

b. Deterioration of metals, metal finishes, and other materials beyond normal weathering.

2. Warranty Period: One year from date of Substantial Completion.

B. Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace metal roof panels that show evidence of deterioration of factory-applied finishes within specified warranty period.

1. Fluoropolymer Finish Warranty Period: 20 years from date of Substantial Completion.

C. Manufacturer's 30 year watertight warranty, including coverage for all trim, flashings, and penetrations associated with the roof area.

1.5 MEASUREMENT AND PAYMENT

A. Measurement will be lump sum for the roof and includes removal of existing shingles, installation of new plywood sheathing, ice and water shield and roofing felt, slip sheet over underlayment, and standing seam metal roofing and associated flashing. Work includes work on the flat section as outlined in specifications.

PART 2 - PRODUCTS

2.1 PANEL MATERIALS

A. Metallic-Coated Steel Sheet Panels Pre-painted with Coil Coating: Steel sheet metallic coated by the hot-dip process and pre-painted by the coil-coating process to comply with ASTM A 755/A 755M.

1. Concealed Finish: White or light-colored acrylic or polyester backer finish.

B. Panel Sealants:

1. Sealant Tape, Joint Sealant, Butyl-Rubber-Based Solvent-Release Sealant: As recommended by the metal roof panel manufacturer.

2.2 UNDERLAYMENT MATERIALS

A. Self-Adhesive Sheet Underlayment (Ice and Water Shield) High-temperature sheet underlayment 30 to 40 mils thick minimum, consisting of slip-resisting polyethylene-film top surface laminated to layer of butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied. Provide primer when recommended by underlayment manufacturer.

STANDING SEAM METAL ROOF 074113 - 2

1. Thermal Stability: Stable after testing at 240 deg F; ASTM D 1970.

2. Low Temperature Flexibility: Passes after testing at minus 20 deg F;

ASTM D 1970.

B. Felt Underlayment and Slip Sheet: Building paper, Type-II (No. 30) asphalt saturated organic felts.

2.3 MISCELLANEOUS METAL FRAMING

A. General: Comply with ASTM C 754 for conditions indicated.

1. Steel Sheet Components: Complying with ASTM C 645 requirements for metal and with manufacturer's standard corrosion-resistant zinc coating.

2.4 MISCELLANEOUS MATERIALS

A. Fasteners: Self-tapping screws, bolts, nuts, self-locking rivets and bolts, end-welded studs, and other suitable fasteners designed to withstand design loads.

B.

1. Unexposed Fasteners: As recommended by roofing manufacturer.

2. Fasteners for Flashing and Trim: Self-drilling screws with hex washer head.

2.5 METAL ROOF PANELS

A. Standing-Seam Metal Roof Panels: Factory-formed, designed to be field assembled.

1. Steel Panel Systems: Comply with ASTM E 1514.

2. Available Manufacturers:

a. AEP-Span.

b. MBCI; Div. of NCI Building Systems.

c. Petersen Aluminum Corporation.

d. An approved equal.

3. Type: 12 to18 inch spacing between seams with 1 ½ to 2 inch seam height.

4. Material: Metallic-coated steel sheet, minimum thickness 24 gauge.

a. Exterior Finish: Two Coat Fluoropolymer, minimum 70% resin.

b. Coating system shall provide nominal 1.0 mil dry film thickness, consisting of primer and color coat

c. Color: To be selected by CO from samples submitted.

5. Clips: Floating to accommodate thermal movement and meet wind resistance rating.

STANDING SEAM METAL ROOF 074113 - 3

a. Material: Metallic-coated-steel sheet.

6. Joint Type: Snap Joint.

7. Uplift Rating: UL 580, class 90.

8. Panel length: Full length without joints, including bends.

2.6 ACCESSORIES

A. Roof Panel Accessories: Provide components required for a complete metal roof panel assembly including trim, ridge, closures, clips, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match material and finish of metal roof panels, unless otherwise indicated.

1. Closures: Provide closures at eaves and ridges, as recommended by metal roof panel manufacturer.

2. Clips: Minimum 16 gage thick, stainless-steel panel clips designed to withstand negative-load requirements.

B. Flashing and Trim: Formed from minimum 24 gauge thick, metallic-coated steel sheet.

Provide flashing and trim as required to seal against weather and to provide finished appearance. Locations include eaves, rakes, corners, framed openings, ridges, chimneys, and fillers. Finish flashing and trim with same finish system as adjacent metal roof panels.

C. Sealant:

1. Concealed Application: Non-curing butyl sealant or equal.

2. Exposed Application: As recommended by manufacturer.

3. Color: As selected.

2.7 FABRICATION

A. General: Fabricate and finish metal roof panels and accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.

B. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.

C. Where indicated, fabricate metal roof panel joints with factory-installed captive gaskets or separator strips that provide a tight seal and prevent metal-to-metal contact, in a manner that will minimize noise from movements within panel assembly.

STANDING SEAM METAL ROOF 074113 - 4

D. Sheet Metal Accessories: Fabricate flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to the design, dimensions, metal, and other characteristics of item indicated.

E. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

PART 3 - EXECUTION

3.1 UNDERLAYMENT INSTALLATION

A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment (ice and water shield), wrinkle free, on roof sheathing under metal roof panels. Comply with temperature restrictions of underlayment manufacturer for installation; use primer rather than nails for installing underlayment at low temperatures. Overlap side edges not less than 3-1/2 inches. Roll laps with roller. Cover underlayment within 14 days.

B. Felt Underlayment – Apply felt over the top of the self-adhering sheet underlayment.

3.2 METAL ROOF PANEL INSTALLATION, GENERAL

A. General: Provide metal roof panels of full length from eave to ridge, unless otherwise indicated or restricted by shipping limitations. Anchor metal roof panels and other components of the Work securely in place, with provisions for thermal and structural movement.

1. Field cutting of metal roof panels by torch is not permitted.

2. Rigidly fasten eave end of metal roof panels and allow ridge end free movement due to thermal expansion and contraction. Pre-drill panels.

3. Provide metal closures at peaks, rake edges, rake walls, and each side of ridge and hip caps.

4. Flash and seal metal roof panels with weather closures at eaves, rakes, and at perimeter of all openings. Fasten with self-tapping screws.

5. Locate panel splices over, but not attached to, structural supports. Stagger panel splices and end laps to avoid a four-panel lap splice condition.

6. Lap metal flashing over metal roof panels to allow moisture to run over and off the material.

B. Fasteners:

1. Steel Roof Panels: Use stainless-steel fasteners for surfaces exposed to the exterior and galvanized steel fasteners for surfaces exposed to the interior.

STANDING SEAM METAL ROOF 074113 - 5

C. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action as recommended by metal roof panel manufacturer.

D. Joint Sealers: Install gaskets, joint fillers, and sealants where indicated and where required for weatherproof performance of metal roof panel assemblies.

1. Seal metal roof panel end laps and seal side joints as recommended by the metal roof panel manufacturer.

3.3 METAL ROOF PANEL INSTALLATION

A. Standing-Seam Metal Roof Panels: Fasten metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended by manufacturer.

1. Install clips to supports with self-tapping fasteners.

2. Snap Joint: Nest standing seams and fasten together by interlocking and completely engaging factory-applied sealant.

3.4 ACCESSORY INSTALLATION

A. General: Install accessories with positive anchorage to building and weathertight mounting and provide for thermal expansion. Coordinate installation with flashings and other components.

1. Install components required for a complete metal roof panel assembly including trim, copings, ridge closures, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items.

2. Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.

3.5 CLEANING AND PROTECTION

A. Remove temporary protective coverings and strippable films, if any, as metal roof panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal roof panel installation, clean finished surfaces as recommended by metal roof panel manufacturer. Maintain in a clean condition during construction.

END OF SECTION 074113

APRIL 2014

STANDING SEAM METAL ROOF 074113 - 6

SECTION 075200 – MODIFIED BITUMINOUS MEMBRANE ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including the Conditions of the Contract and Division 01 Specification Sections apply to this Section.

1.2 SUMMARY

A. Section includes modified bituminous roofing system.

B. Related Work Specified Elsewhere:

1. Standing Seam Metal Roof and Flashing: Section 074113 – Standing Seam Metal Roof.

1.3 REFERENCES

A. American Society for Testing and Materials (ASTM):

1. ASTM D1644 Standard Test Methods for Nonvolatile Content of Varnishes.

2. ASTM D5147 Standard Test Method for Sampling and Testing Modified

Bituminous Sheet Materials.

3. ASTM D6163 Standard Specification for Styrene Butadiene Styrene (SBS)

Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements.

4. ASTM E108 Standard Test Methods for Fire Test of Roof Coverings.

5. ASTM G26 Standard Practice of Operating Light-Exposure Apparatus (Xenon-

Arc Type) with and without Water for Exposure of Non-Metallic Materials.

B. National Roofing Contractors Association (NRCA):

1. Roofing and Waterproofing Manual.

C. Underwriters Laboratories, Inc. (UL):

1. Fire Hazard Classifications.

D. Warnock Hersey (WH):

1. Fire Hazard Classifications.

1.4 SUBMITTALS FOR REVIEW

A. Product Data: Provide manufacturer's technical product data for each type of roofing product specified. Include data substantiating that materials comply with specified requirements.

B. Specimen Warranty: Provide an unexecuted copy of the warranty specified for this Project, identifying the terms and conditions required of the Manufacturer and the Owner.

1.5 SUBMITTALS FOR INFORMATION

A. Manufacturer's Installation Instructions: Submit installation instructions and recommendations indicating special precautions required for installing the membrane.

B. Manufacturer's Certificate: Certify that roof system furnished is approved by Factory Mutual, Underwriters Laboratories, Warnock Hersey or approved third party testing facility in accordance with ASTM E108, Class A for external fire and meets local or nationally recognized building codes.

C. Manufacturer's Certificate: Certify that the roof system is adhered properly to meet or exceed the requirements of FM 1-90.

D. Manufacturer's Certificate: Certify that the roof system furnished is approved or accepted by Factory Mutual Approval Standard 4470.

E. Manufacturer's Certificate: Certify that materials conform to requirements specified herein, are chemically and physically compatible with each other, and are suitable for inclusion within the roof system specified herein.

F. Test Reports: Submit test reports, prepared by an independent testing agency, for all modified bituminous sheet roofing, indicating compliance with ASTM D5147.

G. Written certification from the roofing system manufacturer certifying the applicator is currently authorized for the installation of the specified roof system.

H. Qualification data for firms and individuals identified in Quality Assurance Article below.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: Company specializing in modified bituminous roofing installation with not less than 5 years experience and authorized by roofing system manufacturer as qualified to install manufacturer's roofing materials.

B. Installer's Field Supervision: Maintain a full-time Supervisor/Foreman on job site during all phases of roofing work while roofing work is in progress. Maintain proper supervision of workmen.

C. Maintain a copy of the Contract Documents in the possession of the Supervisor/Foreman and on the roof at all times.

D. Source Limitations: Obtain all components of flat roof system from a single manufacturer. Secondary products that are required shall be recommended and approved in writing by the roofing system Manufacturer.

1.7 DELIVERY, STORAGE AND HANDLING

A. Deliver products to site with seals and labels intact, in manufacturer's original containers, dry and undamaged.

B. Store and handle roofing sheets in a dry, well-ventilated, weather-tight place to prevent moisture exposure. Store rolls of felt and other sheet materials on pallets or other raised surface. Stand all roll materials on end. Cover roll goods with a canvas tarpaulin or other breathable material (not polyethylene).

C. Do not leave unused materials on the roof overnight or when roofing work is not in progress unless protected from weather and other moisture sources.

D. Secure all material and equipment on the job site. If any material or equipment is stored on the roof, assure that the integrity of the deck is not compromised at any time.

Damage to the deck caused by the Contractor's actions will be the sole responsibility of the Contractor, and the deck will be repaired or replaced at his expense.

1.8 MANUFACTURER'S INSPECTIONS

A. Upon completion of installation, and acceptance by the Owner and Architect, the Manufacturer will supply to the Owner the specified 20 year warranty.

B. Installer will submit a two year warranty to the membrane manufacturer with a copy directly to Owner.

C. All materials for flat roof to be supplied by one manufacturer:

1. Report progress and quality of the work as observed.

2. Provide job site inspection at the beginning of the flat roof portion of the work.

3. Report to the Architect in writing any failure or refusal of the Contractor to correct unacceptable practices called to the Contractor's attention.

4. Confirm after completion that manufacturer has observed no application procedures in conflict with the specifications other than those that may have been previously reported and corrected.

1.9 WARRANTY

A. Upon completion of installation, and acceptance by the Owner and Architect, the Manufacturer will supply to the Owner the specified 20 year warranty.

B. Installer will submit a two year warranty to the membrane manufacturer with a copy directly to Owner.

C. All materials for flat roof to be supplied by one manufacturer and installer warranty shall cover entire roof both sloped and flat.

1.10 MEASUREMENT AND PAYMENT

A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.

C.

PART 2 - PRODUCTS

2.1 PRODUCTS, GENERAL

A. Basis of Design: Materials, manufacturer's product designations, and/or manufacturer's names specified herein shall be regarded as the minimum standard of quality required for work of this Section. Comply with all manufacturer and contractor/fabricator quality and performance criteria specified in Part 1.

B. Substitutions: Products proposed as equal to the products specified in this Section shall be submitted in accordance with Bidding Requirements and Division 01 provisions.

2.2 ACCEPTABLE MANUFACTURERS

A. The design is based upon roofing systems engineered and manufactured by The Garland Company or approved equals.

2.3 DESCRIPTION

A. Modified bituminous roofing work including but not limited to:

1. One (1) ply of Garland StressBase 80 base sheet bonded to the prepared substrate with bitumen.

2. Cold Applied Zero VOC Adhesive having the following characteristics:

a. Flash Point 400°F

3. Base Flashing Ply: One (1) ply of 80 mil SBS base flashing ply covered by an additional layer of modified bitumen membrane and set in adhesive.

4. Modified Membrane: VERSIPLY MINERAL; 135 mil SBS (Styrene-Butadiene- Styrene) mineral surfaced, rubber modified roofing membrane with dual fiberglass reinforced scrim.

5. Surfacing: Apply white acrylic coating ASTM G26.

2.4 BITUMINOUS MATERIALS

A. Roofing Mastic: Green-Lock Adhesive or approved equal.

B. Interply Adhesive: Green-Lock Adhesive or approved equal.

2.5 SHEET MATERIALS

A. Base Ply / Base Flashing Ply (StressBase 80 Sheet): Fiberglass scrim with the following minimum performance requirements according to ASTM D5147. Properties (Finished Membrane):

1. Tensile Strength (ASTM D5147)

a. 2 in/min. @ 73.4 ± 3.6°F MD 100 lbf/in CMD 100 lbf/in

b. 50mm/min. @ 23 ± 3°C MD 39 kN/m CMD 39 kN/m

2. Tear Strength (ASTM D5147)

a. 2 in/min. @ 73.4 ± 3.6°F MD 110 lbf CMD 110 lbf

b. 50mm/min. @ 23 ± 3°C MD 1335 N CMD 1335 N

3. Elongation at Maximum Tensile (ASTM D5147)

a. 2 in/min. @ 73.4 ± 3.6°F MD 2.5 % CMD 2.5 %

b. 50mm/min@ 23 ± 3°C MD 2.5 % CMD 2.5 %

B. Modified Flashing Ply:

1. VERSIPLY MINERAL

C. Modified Membrane Properties (Finished Membranes): VERSIPLY MINERAL; ASTM D6163, Type III Grade G:

1. Tensile Strength (ASTM D5147)

a. 2 in/min. @ 73.4 ± 3.6°F MD 220 lbf/in CMD 220 lbf/in

b. 50mm/min. @ 23 ± 3°C MD 39.0 kN/m CMD 39.0 kN/m

2. Tear Strength (ASTM D5147)

a. 2 in/min. @ 73.4 ± 3.6°F MD 300 lbf CMD 300 lbf

b. 50mm/min. @ 23 ± 3°C MD 1335 N CMD 1335 N

3. Elongation at Maximum Tensile (ASTM D5147)

a. 2 in/min. @ 73.4 ± 3.6°F MD 4.5 % CMD 4.5 %

b. 50mm/min@ 23 ± 3°C MD 4.5 % CMD 4.5 %

4. Low Temperature Flexibility (ASTM D5147): Passes -30°F (-34°C)

2.6 SURFACINGS

A. White Elastomeric Roof Coating: Pyramic; Energy Star approved white acrylic roof coating:

1. Weight/Gallon 12 lbs./gal. (1.44 g/cm3)

2. Non-Volatile % (ASTM D 1644) 66 min

3. Reflectance 81%

2.7 RELATED MATERIALS

A. Metal Discs: Flat discs or caps of zinc-coated sheet metal not lighter than twenty eight

(28) gauge and not less than one (1) inch in diameter. Form discs to prevent dishing.

Bell or cup shaped caps are not acceptable.

B. Flashing Boot: Neoprene pipe boot for sealing single or multiple pipe penetrations adhered in approved adhesives as recommended and furnished by the membrane.

C. Plumbing stacks should be 4lb (1.8kg) sheet lead formed and rolled.

PART 3 - EXECUTION

3.1 GENERAL INSTALLATION REQUIREMENTS

A. Cooperate with manufacturer, inspection and test agencies engaged or required to perform services in connection with installing the roof system.

B. Apply adhesive in accordance with manufacturer recommendations.

C. Adhesive Mopping Rate:

1. Interply Mopping: Apply adhesive at the rate of approximately 2-2.5 gallons per roof square.

2. Modified Membrane Mopping: Apply adhesive at the rate of approximately 4-5 gallons per roof square.

D. Substrate Joint Penetrations: Prevent adhesive from penetrating substrate joints, entering building, or damaging roofing system components or adjacent building construction.

E. Apply roofing materials as specified by manufacturer's instructions.

1. Keep roofing materials dry before and during application.

2. Do not permit phased construction.

3. Complete application of roofing plies, modified sheet and flashing in a continuous operation.

4. Begin and apply only as much roofing in one day as can be completed that same day.

F. Cut-Offs (Waterstops): At end of each day's roofing installation, protect exposed edge of incomplete work, including ply sheets and insulation. Provide temporary covering of two (2) plies of #15 organic roofing felt set in full moppings of adhesive with joints and edges sealed.

G. Broadcast minerals into the bleed out of adhesive in accordance with manufacturer recommendations.

3.2 BASE PLY INSTALLATION

A. Install (1) one base sheet in 2 to 2.5 gallons per square of adhesive shingled uniformly to achieve one ply over the entire prepared substrate. Shingle in direction of slope of roof to shed water on each area of roof. Do not step on base rolls until adhesive has set, fish mouths should be cut and patched.

B. Lap ply sheet ends eight (8) inches (203mm). Stagger end laps twelve (12) inches (304mm) minimum.

C. Extend plies two (2) inches (50mm) beyond top edges of cants at wall and roof projections and equipment bases.

D. Install base flashing ply to all perimeter and projection details after membrane application.

3.3 MODIFIED MEMBRANE APPLICATION

A. Solidly bond the modified membrane to the base layers with specified adhesive at the rate of approximately 4to 5 gallons per 100 square feet.

B. The modified membrane roll must push a puddle of adhesive in front of it with adhesive slightly visible at all side laps. Exercise care during application to eliminate air entrapment under the membrane.

C. Apply pressure to all seams to ensure that the laps are solidly bonded to substrate.

D. Install subsequent rolls of modified membrane across the roof as above with a minimum of four (4) inch (101mm) side laps and eight (8) inch (203mm) end laps. Stagger the end laps. Apply the modified membrane in the same direction as the previous layers but stagger the laps so they do not coincide with the laps of the base layers.

E. Apply adhesive no more than five (5) feet (1.5m) ahead of each roll being embedded.

F. Extend membrane two (2) inches (50mm) beyond top edge of all cants in full moppings of the specified adhesive.

3.4 FLASHING MEMBRANE INSTALLATION

A. Metal Edge:

1. Inspect the nailer to assure proper attachment and configuration.

2. Run one ply over the edge. Assure coverage of all wood nailers. Fasten plies with ring shank nails at eight (8) inches o.c.

3. Install continuous cleat and fasten at six (6) inches o.c.

4. Install new metal edge hooked to continuous cleat and set in bed of roof cement.

Fasten flange to wood nailer every three (3) inches o.c. staggered.

5. Prime metal edge at a rate of one hundred (100) square feet per gallon and allow to dry.

6. Strip in flange with base flashing ply covering entire flange in bitumen with six

(6) inches on to the field of roof. Assure ply laps do not coincide with metal laps.

7. Install a second ply of modified flashing ply in bitumen over the base flashing ply, nine (9) inches on to the field of the roof.

3.5 APPLICATION OF SURFACING

A. Reflective Coating:

1. Paint all exposed membrane with manufacturer's Energy Star acrylic coating installed at a rate of one (1) gallon per square per coat in a two coat application.

B. Mineral Surfaced Membrane System: While bleed out from the side and end laps are still hot, hand broadcast minerals into adhesive bleed out for a monolithic appearance.

Apply mineral lap sealant to any areas of improper adherence of minerals and rebroadcast minerals while coating is still wet.

3.6 FINAL INSPECTION

A. At completion of roofing installation and associated work, meet with Contractor, installer, roofing system manufacturer's representative, and other representatives directly concerned with performance of roofing system.

PRODUCT DATA SHEET 1 -

END OF SECTION 074113

July 2014

1. Work covered by the Contract Documents.
2. Use of premises.
3. Work restrictions.
4. Specification formats and conventions.
1. The project is located on the Minidoka Ranger District of the Sawtooth National Forest, Cassia County, Idaho, in Section 12, T 13 S, R 26 E. It is located approximately 35 miles Southeast of Burley, Idaho. The project may be accessed from Interst...
1. In general the work includes installation of standing seam metal roofing on the sloped portions and modified bitumen roofing membrane on the flat sections of the bunkhouse roof. Work includes the removal of the existing asphalt shingles and underl...
A. Use of Site: Limit use of premises to areas within the construction limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Driveways and Entrances: Provide access to Forest Service Personnel and emergency vehicles at all times.
2. No overnight camping on project site will be allowed.
3. Contractor shall have access to restroom facilities at the office building at the administrative site and power. Potable drinking water and garbage facilities will not be provided.
1. Weekend Hours: No work shall be allowed on the weekend unless approved by the Contracting Officer.
2. Work on Holidays: No work shall be allowed on any federal holiday unless approved by the Contracting Officer.
1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections are in numeric sequence; however, the sequence is incomplete because all available Section numbers are not use...