AMENDMENT 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGN IN SHEET.pdf | ||
| FULL SOLICITATION FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE
CONTRACTING OFFICER, USDA, USFS
SPRING MTN. NATIONAL REC. AREA
4701 N. TORREY PINES DRIVE
LAS VEGAS, NV 89130
SAME
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and Zip Code)
ALL OFFERORS
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
CODE:
FACILITY CODE:
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered, solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers, FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If Required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO., AS DESCRIBED IN ITEM 14
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43,103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is NOT is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
STEVEN R. ROEHR
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE
SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous Edition Unusable Prescribed by GSA FAR (48 CFR) 53.243 sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text One sroehr Typewritten Text 06/11/2010 sroehr Typewritten Text
AG-0261-S-10-0039
sroehr Typewritten Text 05/19/2010 sroehr Typewritten Text sroehr Typewritten Text X sroehr Typewritten Text X sroehr Typewritten Text Amended Due Date June 25, 2010 @ 3:00 PM Local sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text See page 2 and any subsequent pages for changes to solicitation. The due date is hereby extended to 3:00 PM Local on June 25, 2010.
sroehr Typewritten Text All other terms and conditions remain the same.
sroehr Typewritten Text
ES// STEVEN R. ROEHR // ES
sroehr Typewritten Text June 11, 2010
SF – 30 PAGE 2
AMENDMENT 1 – HUMBOLDT-TOIYABE NATIONAL FOREST MASTICATION IDIQ CONTRACT.
As discussed in the pre-bid meeting, here are the Fuel Types per area. Since this is an IDIQ contract, and not a single job, it is the best we are able to describe.
Fuel Types per Area
The following fuel types are typical of the areas below. There are areas on the forest that do have small pockets of fuels not listed such as White Pine and Aspen, but the majority of areas to be treated are fairly represented by the descriptions below.
Area 1 (Carson and Bridgeport): Jeffrey Pine/conifer mix, the area does have sites with plantation from the 50’s and 60’s. The area also has a shrub component of Green Leaf Manzanita, Mountain Mahogany, sagebrush, ceanothus and bitterbrush. In the east ends of area one there is a Juniper/Pinyon Pine.
Area 2 (Ely, Austin/Tonopah/NRA): The NRA consists of a Jeffrey Pine fules type with a mixed understory of brush (Green Leaf Manzanita, Mountain Mahogany, sagebrush, ceanothus and bitterbrush). Also in the NRA there is a large component of Juniper/Pinyon Pine with a brush understory. The rest of Area 2 is mainly a Juniper/Pinyon Pine fuel type with a brush understory which may consist of Mountain Mahogany, sagebrush, ceanothus and bitterbrush.
Area 3 (Santa Rosa/Elko area): This area consists of a Juniper/Pinyon Pine with a brush understory which my consist of Mountain Mahogany, sagebrush, ceanothus and bitterbrush.
Work will most likely occur between June and December of Any given year. This does not effect the
Government’s right to request a task outside of these months when necessary.
AMENDMENT 1 – HUMBOLDT-TOIYABE NATIONAL FOREST MASTICATION IDIQ CONTRACT.
Other Items
Replace Current Coversheet SF 1449 with attached replacement SF 1449
Replace current pages 3 – 17 (Price Schedule) (SCHEDULE B) with attached Price Schedule B
Replace Page 18 with Replacement page 18 – Changes to C.1.4
Replace Page 23 with Replacement Page 23. Removes E.2.1
Replace Page 33 with Replacement Page 33. Removes Parag. 2 of Instruction for………..
Changes (4a), & (4b)
Replace Pages 35 – 37 with replacement pages 35 – 37. Various clarifications and deletions.
Replace Page 54 with Replacement Page 54. Clarifies Minimum and Maximum thresholds.
Insert Map
SF 30 PAGE 3
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
93D5
LAS VEGAS NV 89130
4701 NORTH TORREY PINES DRIVE
SPRING MOUNTAINS NATL REC AREA
USDA FS HUMBOLDTTOIYABE NF
CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00% FOR:SET ASIDE:UNRESTRICTED OR
93D5
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
06/18/2010 1500 PT
05/19/2010
702-839-5575STEVE ROEHR
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
AG-0261-S-10-0039
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEM 1. REQUISITION NUMBER PAGE OF
1 2OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
15. DELIVER TO
LAS VEGAS NV 89130
4701 NORTH TORREY PINES DRIVE
SPRING MOUNTAINS NATL REC AREA
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$17.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS
HUBZONE SMALL
BUSINESS
EMERGING SMALL
BUSINESS
8(A)
USDA FS HUMBOLDTTOIYABE NF
Sole Source
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
HUMBOLDT TOIYABE MASTICATION IDIQ
Period of Performance: 07/01/2010 to 06/30/2015
001 Humboldt-Toiyabe National Forest Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Mastication in three areas of the H-T Forest. 1.
(Reno/Carson/Bridgeport area) 2. (Southern Nevada including the Spring Mountains Las Vegas to the south and as far as Tonopah to the North and Ely to the east. 3. Rest of H-T (remainder of State of Nevada)
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
STEVE ROEHR
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDEND
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 3/2005)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
Working Copy
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT REF.
sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text
SAME AS BLOCK 9
sroehr sroehr Typewritten Text sroehr Typewritten Text
DUNS:
sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text vid sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text USDA National Finance Center sroehr Typewritten Text sroehr Typewritten Text x sroehr Typewritten Text sroehr Typewritten Text E-Mail Address for POC______________________________ sroehr
TAX ID Number:
CONTRACT BASE YEAR - RENO/CARSON CITY/BRIDGEPORT AREA AREA 1
ITEM NUMBER
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 1 of 35Page 3 of 37
CONTRACT BASE YEAR - SOUTHERN NEVADA (SPRING MTN.S/ELY ETC.) AREA 2
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 1 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 1 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 2 of 35Page 4 of 37
CONTRACT BASE YEAR - REMAINDER OF FOREST AREA 3
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 3 of 35Page 5 of 37
CONTRACT OPTION YEAR 1 - RENO/CARSON CITY/BRIDGEPORT AREA AREA 1
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 4 of 35Page 6 of 37
CONTRACT OPTION YEAR 1 - AREA TWO - SO. NEVADA AREA 2
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 1 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 1 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 5 of 35Page 7 of 37
OPTION YEAR 1 - REMAINDER OF FOREST AREA 3
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 6 of 35Page 8 of 37
CONTRACT OPTION YEAR 2 - RENO/CARSON CITY/BRIDGEPORT AREA AREA 1
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 7 of 35Page 9 of 37
CONTRACT OPTION YEAR 2 - AREA TWO - SO. NEVADA AREA 2
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 1 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 1 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 8 of 35Page 10 of 37
OPTION YEAR 2 - REMAINDER OF FOREST AREA 3
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 9 of 35Page 11 of 37
OPTION YEAR 3 - RENO/CARSON CITY/BRIDGEPORT AREA AREA 1
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 10 of 35Page 12 of 37
OPTION YEAR 3 - AREA TWO - SO. NEVADA AREA 2
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 1 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 1 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 11 of 35Page 13 of 37
OPTION YEAR 3 - REMAINDER OF FOREST AREA 3
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 12 of 35Page 14 of 37
OPTION YEAR 4 (FINAL) - RENO/CARSON CITY/BRIDGEPORT AREA AREA 1
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 13 of 35Page 15 of 37
OPTION YEAR 4 (FINAL) - AREA TWO - SO. NEVADA AREA 2
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 1 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 1 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Page 14 of 35Page 16 of 37
OPTION YEAR 4 (FINAL) - REMAINDER OF FOREST AREA 3
ITEM DESCRIPTION/LEVEL OF EFFORT PER
SPECIFICATIONS UNIT
ALL INCLUSIVE PRICE
PER UNIT
Item 0030AA Level I - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is under 30%.
Acre
Item 0030AB Level II - Crown closure of material to be severed is estimated to be between 0 and 30 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AC Level III - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is under 30%.
Acre
Item 0030AD Level IV - Crown closure of material to be severed is estimated to be between 31 and 60 percent total cover. Slope is from 30 to 45%.
Acre
Item 0030AE Level V - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is under 30%.
Acre
Item 0030AF Level VI - Crown closure of material to be severed is estimated to be greater than 60% percent total cover.
Slope is from 31 to 45%.
Acre
Item MOB (a) FLAT FEE - Single Masticator From Area 2 Fee
Item MOB (b) FLAT FEE - Two Masticators or More From Area 2 Fee
Item MOB (c) FLAT FEE - Single Masticator From Area 3 Fee
Item MOB (d) FLAT FEE - Two Masticators or More From Area 3 Fee
Inclusive price per acre includes all costs associated with mastication of 1 acre per the specifications for the level of effort and area of the forest indicated. This includes all labor, supervision, equipment, tools, expertise, overhead, profit, and any other costs associated with this contract, EXCEPT mobilization fee per task order which is broken out as a separate price.
Page 15 of 35Page 17 of 37
Contract:
The government anticipates awarding a 5-year indefinite-delivery, indefinite-quality contract for the services specified. Offers shall be submitted for the difficulty levels listed below.
SECTION C – SPECIFICATIONS/STATEMENT(S) OF WORK
C.1.1 Introduction
The government is acquiring fuels management services by use of mechanical equipment to treat vegetation to reduce the risk of wildland fires, enhance ecosystems and improve wildlife habitat.
C.1.2 Background
The purpose of this contract is to secure mechanical treatment services to create and maintain fuelbreaks, and to be used for forest health activities on the Humboldt-Toiyabe National Forest. Vegetation types and terrain differ from around the forest which may include reforestation areas, natural and managed stands of timber of all ages, size and species, and shrub fields. Vegetation to be treated will require cutting, chipping, shredding and mulching. The treatment will reduce ladder fuels and rearrange natural vegetation to a state that will burn with reduced fire intensity during a wildfire event.
Firefighter safety will be improved as well as a reduced threat to the public and private property. The work shall be done in a manner that does not damage vegetation not specified to be treated.
C.1.3 Scope of Contract
C.1.3.1 The services in this contract are designed to provide for wildfire hazard reduction, ecosystem enhancement and improve wildlife habitat. Mastication treatments can take place at any point during the year as long as weather, ground conditions and fire conditions allow for.
C.1.3.2 Other fuels reduction activities not priced on the schedule of items are suject to negotiation.
C.1.4 Location of Project Areas: The work will be performed on U.S. Forest Service Lands administered by the Humboldt-Toyiabe National Forest within California and Nevada on 9 Ranger Districts (Bridgeport, Carson, Austin, Tonopah, Ely, Ruby Mountains, Jarbidge, Mountain City, and Santa Rosa Ranger Districts).
C.1.5 Boundaries of Project Areas: The project areas are generally identifiable by changes in vegetation, roads, or flagging. Boundaries will also be noted on project maps.
C.1.6 Access to Project Areas: Access to units will vary, but are typically accessible by dirt roads. Roads may be impassable for several days after rains, and or snow. The Government assumes no liability to perform special road maintenance to keep roads open to the project area. Vehicles must stay on designated roads. All specified roads shown on contract maps shall be left in the original condition existing prior to the commencement of work on this contract. Any water bars in skid trails disturbed by the Contractor's operations shall be restored to the condition prior to damage at the Contractor's expense. Excessive slash cannot be left in the roadways after end of each workday. All cut vegetation shall be kept within unit boundaries. If slash is broadcasted onto the roadways, it must be removed by the end of each workday.
Warning signs (at least two) shall be posted on roads. These shall be located 200’ from the intersection of the road and unit boundary at each edge of the unit. Signs shall be posted whenever working to alert oncoming traffic of the safety hazards associated with the operation. Signs shall include phrases similar to “Caution, flying debris stay back 300 feet” and be no less than 3’X3’ in size.
C.1.7 Unique Features of Project Areas: Standing timber, wildlife trees and snags may be present within the project sites. Research plots, cultural sites, and other areas of concern may exist within the project sites as well. Known areas of concern will be flagged and avoided (Contractor will be notified of flagging color prior to working in the site). Any cultural sites identified by the contractor will require immediate notification to the COR and the area will be avoided. Meadows and wet areas will be avoided. This includes any areas with wet soils or vegetation indicating the presence of wet soils. The COR shall designate these areas on the ground. Survey monuments and bearing trees shall be protected and not damaged in any way.
C.2.0 Definitions:
Aggregation – A pocket of densely packed trees distinct from adjacent areas within a project unit. It is characteristic for trees within aggregations to have a higher percent of phenotypic defects (see definition) due to competition for resources sroehr Typewritten Text sroehr Typewritten Text , Also the Spring Mountains sroehr
National Recreation Area near Las Vegas, NV.
INSPECTION AND ACCEPTANCE
E.1. N/A
E. 2. CONTRACTOR QUALITY CONTROL
E.2.1. Quality Control Plan. The Contractor shall provide a general Quality Control Plan (QCP) with the technical proposal.
The general Quality Control Plan must demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. The Plan shall describe how quality will be monitored to assure the performance standards are met, the supervision of crew and work, and personnel that will be performing the quality control. Quality control shall include monitoring quality while planting is in progress, tree care, and other associated tasks, and an unbiased sample of planting, and artificial shade and ADC installation for determining actual quality percentage.
E.2.2 Inspection of plots – Each plot will be randomly selected, given equal weight and inspected for the following listed below. A final percentage will be determined from the plot results for 1) Crop Tree Selection and 2) Mastication and Slash Treatment.
E.2.2.1-Upon inspection of all plots, the quality of thinning shall be calculated as follows:
# of passing plots ---------------------- X 100 = Quality % # of total plots
E.2.3 Mastication and Slash Treatment for all Items
E.2.3.1 – The location of mastication and slash treatment plots will be nested inside the crop tree selection plots. A visual inspection will be made for the following. Item A and Item B will be averagved together for % quality:
A- At each plot location, mastication and slash treatment will be examined to see if it has been treated according to the specifications in Section C8.2.1. If any of the specifications are not met within the plot, the plot will fail.
B-If more than five Brush sprouts are left greater than 6 inches above the average ground level, the plot will fail.
E.2.32 - Upon inspection of all plots for a unit, the quality of mastication and slash treatment shall be calculated as follows:
# of passing plots for A + # of passing plots for B -------------------------------------------------------------- X 100 = Quality % # of total plots taken of A + B
E.2.4 Quality % After finding a percent for Crop or Cut Tree Selection and Mastication and Slash Treatment, the two treatments will be added together and averaged for a final inspection percentage. For example, a 95% for tree selection and an 86% for mastication and slash treatment will yield an overall inspection percentage of 91%.
( % tree selection + % mastication & slash treatment) / 2 = overall inspection percentage
E.3 Acceptance Level
Work on this contract will be deemed acceptable when the quality percentage is least 90 percent for acceptance for full payment. Where inspection determines quality is 80 percent and above, but below 90 percent, the work will be accepted at a rate reduction of 2 percent for each 1 percent the quality of work is below 90 percent. If the percentage falls below 80 percent due to inadequate treatment, the area may be reworked to bring the percentage up or no payment will be made for the work. The contractor shall pay for reinspection costs of reworked areas. A maximum of 2 reworks will be allowed on any sub item and only one may be allowed if two reworks are common.
Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
ADDENDA TO 52.212-1 INSTRUCTIONS TO OFFERORS
452.204-70 INQUIRIES (FEB 1988)
Inquiries and all correspondence concerning this solicitation should be submitted in writing to the Contracting Officer.
Offerors should contact only the Contracting Officer issuing the solicitation about any aspect of this requirement prior to contract award.
(End of provision)
452.211-3 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications.
(End of Clause) This is an IDIQ Contract, and the Statement of work will vary in specifics from task order to task order.
452.211-4 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in the solicitation are hereby made part of this solicitation and any resultant contract.
(End of Clause) As well as any resulting Task Orders.
452.215-71 INSTRUCTIONS FOR THE PREPARATION OF TECHNICAL AND PRICE PROPOSALS (NOV 1996)
(a) General Instructions. Proposals submitted in response to this solicitation shall be furnished in the following format with the numbers of copies as specified below.
(1) The proposal must include a technical proposal, (5 copies), and price/cost proposal (1 signed original). Each of the parts shall be separate and complete so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal must not contain reference to cost; however, resource information (such as data concerning labor hours and categories, materials, subcontracts, etc.) must be contained in the technical proposal so that the contractor's understanding of the statement of work may be evaluated.
(2) Offerors may, at their discretion, submit alternate proposals or proposals which deviate from the requirement;
provided, that an offeror also submit a proposal for performance of the work as specified in the statement of work. Any "alternate" proposal may be considered if overall performance would be improved or not compromised, and if it is in the best interest of the Government, in the sole opinion of the Government. Alternate proposals, or deviations from any requirement of this RFP, must be clearly identified as such in the proposal submission.
(3) The Government will evaluate proposals in accordance with the evaluation criteria set forth in the EVALUATION FACTORS portion of this RFP.
(4) Offerors shall submit their proposal(s) in the following format and the quantities specified:
(4a) 1 original of the completed, signed offer (All sections of the RFP, INCLUDING the Price Proposal, or at a minimum, a originally signed Price Proposal including the schedule of pricing)
(4b) 5 copies of the technical proposal only.
If you are selected as the awardee, then an electronic copy of the technical proposal only will be required. This may be submitted via E-mail, on a USB thumb drive, a CD or DVD Rom. The file format should be Microsoft Word or and Adobe PDF File.
(b) Technical Proposal Instructions. The technical proposal will be used to make an evaluation and arrive at a determination as to whether the proposal will meet the requirements of the Government. Therefore, the technical proposal must present sufficient information to reflect a thorough understanding of the requirements and a detailed, description of the techniques, procedures and program for achieving the objectives of the specifications/statement of work. Proposals sroehr Typewritten Text
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
sroehr Typewritten Text XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX sroehr Typewritten Text
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
sroehr Typewritten Text
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
sroehr Typewritten Text
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
sroehr Typewritten Text sroehr Typewritten Text
REMOVED - N/A
sroehr Typewritten Text sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 4 Additional copies of the Technical proposal (No pricing pages) sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr xxxxxxxxxxxxxxx
52.212-2 Evaluation—Commercial Items. (JAN 1999)
(a) Award Statement Award will be made to the offeror(s) whose proposal represents the best value to the
Government, technical and price factors considered. Evalution factors other than cost or price, when combined, are approximately equal to cost or price in the award decision. The critical factor in making any price/technical trade-offs is not the spread between the technical ratings, but rather the significance of that difference. The significance of the difference in ratings will be determined on the bais of what that difference is and what it would cost the government to take advantage of it. Award may not necessarily be made for technical capabilities that would appear to exceed those needed for fulfilling the requirements of this contract. The Government reserves the right to make price/technical trade-offs that are in the best interest and advantageous to the Government.
The Government intends to evaluate proposals and award a contract without dicussions with Offerors. Proposals should be submitted initially on the most favorable terms, from a price and technical standpoint, which the Offeror can submit to the Government. However, the Government may, at it’s sole discretion, after initial evaluation of proposals, conduct further oral or written discussions of as deemed appropriate, with any or all offerors whose proposals are within a competitive range.
(1) Past Performance.
The Government will evaluate the Offeror’s past performance on same or similar work and will consider information submitted by the Offeror, obtained from references or obtained by the Government from other sources that is relevant to the following elements: (a) Quality of Service; (b) Timeliness of Performance; (c) Customer Satisfaction/Working Relationships, and (d) management skill. In evaluating past performance, the Government will consider the currency and relevancy of the information provided or obtained, the context of the data and the general trends of Offeror’s performance. Offeror’s that have no record of past performance will receive a neutral rating. Offeror shall demonstrate satisfactory performance of same or similar work on previous contracts. Offeror shall provide information relevant to Offeror’s quality of service, timeliness of performance, customer satisfaction/working relationships, and management skill. Offeror shall submit a list of customers during the past 3 years, including names and phone numbers of contacts that the Government may use to verify that satisfactory performance was provided to customer.
(2) Experience.
The Government will evaluate the Offeror’s experience and qualifications, including (a) the quantity of Offeror’s experience, and (b) the relevance of Offeror’s experience. Offeror shall identify the quantity of experience that they have in same or similar work. Offeror shall demonstrate relevance of past experience to the work contemplated by this contract.
(3) Capacity / Workforce / Proposed Production Rate. Offeror shall provide the Government with:
(a) information regarding quantity and skill of the Offeror’s workforce that would be available for work on task orders under this contract, including a list of key personnel (See H.1.);
(b) the proposed production rates that will be inserted in Paragraph F.3.2.1 and F.3.2.2 of the contract, and that will be used by the CO to determine contract time for Task Orders issued under the contract;
(c) the proposed minimum crew size (See F.3.2.3.);
(d) the proposed minimum number of crews (See F.3.2.3);
(4) Safety. Offeror shall provide the Government with information demonstrating their safety record and explaining the Offeror’s safety program and/or policies.
(5) Quality Control. Offeror shall submit a general quality control plan.
Typewritten Text
XXXXXXXX
sroehr Typewritten Text
XXXXXXXXXXXXXXXXXXXXXX
sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text
XXXXXXXXX
sroehr Typewritten Text sroehr Typewritten Text
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
sroehr Typewritten Text sroehr
*(relevant experience i.e. Mastication, in the past 3 years).
(b) Business Proposal
Price Schedule - The Government will evaluate Offeror’s prices submitted on the Schedule of Items found in Secition B.
Offeror shall provide this information by completing Section B of this solicitation. Offeror shall complete the entire Schedule of Items.
For the purposes of price evaluation the Government will utilize the estimated quantities identified in B.1. Schedule of Items. This does not preclude the Government from considering prices offered for items with no identified estimated quantities
Technical and past performance, when combined, are, approximately equal when compared to price.
(b) Options (IF ANY). The Government will evaluate offers for award purposes by calculating each option level separately from the base contract, and with other offers containing pricing for the same options. We do not anticipate a multiple award, but we do reserve the right to do so if it makes sound business sense. It is intended, that we will award to offeror providing the best value to the Government. We will not necessarily award to the lowest priced vendor, because they may not offer the best technical ability, and we will not necessarily award to the highest rated technical offeror if their price can not be judged reasonable within the field of competition and against the US Government estimate. The Government may determine that an offer is unacceptable if the option prices (IF APPLICABLE) are significantly unbalanced. Evaluation of options (IF ANY) shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award, or in the instance where the Government may be considering award of more than one contract to the offeror.
(End of provision)
Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text sroehr Typewritten Text unit pricing given in Schedule B, sroehr Typewritten Text xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text xxxxxxxxxx sroehr Typewritten Text xxxxx sroehr Typewritten Text xxx sroehr Typewritten Text xx sroehr Typewritten Text xx sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text sroehr Typewritten Text sxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx sroehr Typewritten Text s sroehr Typewritten Text s sroehr Typewritten Text sroehr Typewritten Text s sroehr Typewritten Text We may process multiple awards under a sroehr a variety of scenarios, and the number of awards, and reasons for them are solely at the discretion of the Government.
IF YOU ARE REGISTERED AND COMPLETE ANNUAL REPS AND CERTS IN ORCA, SKIP TO THE REPS AND CERTS ADDENDA CLAUSE, 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS, AND IGNORE 52.212-
3. OTHERWISE, PLEASE FILL OUT AND RETURN 52.212-3 WITH YOUR PROPOSAL.
52.212-3 Offeror Representations and Certifications—Commercial Items. (AUG 2009) An offeror shall complete only paragraph (b) of this provision if the offeror has completed the annual representations and certifications electronically at http://orca.bpn.gov. If an offeror has not completed the annual representations and certifications electronically at the ORCA website, the offeror shall complete only paragraphs (c) through (m) of this provision.