Cascade Trail Bridge Amend 01.pdf

PDF 600 KB Posted

Attached to
Casecade Trail Bridges Federal contract opportunity
Solicitation number
AG-0261-S-09-0058
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

AMENDMENT 01

View the file

Other files for this federal contract opportunity

Other files attached to Casecade Trail Bridges, newest first.
File Type Posted
Dollar Creek Trail Bridge Final Sheets.pdf PDF
Lodgepole Creek Trail Bridge Final Sheets.pdf PDF
CascadeTrailBridge Specifications.pdf PDF
Bear Creek Final Sheet Package.pdf PDF
AG-0261-S-09-0058 Casecade Trail Bridge.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

Amendment No. 1 07/22/09

6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:

USDA Forest Service SW Idaho/Nevada Acquisition Center 1249 South Vinnell Way, Suite 200 Boise, ID 83709-1663

8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER

[X] AG-0261-S-09-0058

9B. DATED (see item 11)

07/16/09

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE ORDER IS PURSUANT TO: FAR 52.243-5 Changes and Changed Conditions The changes set forth in Item 14 are made in the Contract Order Number in Item 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[ ] D. OTHER (specify type of modification and authority)

E. Contractor [ ] is, [X ] is not required to sign this document and return _____ ___ copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

1. Add attached cover pages to maps.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print) DANIEL A. BULLOCK, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

__________________________ BY:________________________

(Signature of authorized person to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

BOISE NATIONAL FOREST

CASCADE RANGER DISTRICT

VALLEY COUNTY

IDAHO

Lodgepole Creek Trail Bridge 255A-5.2

PROJECT DESCRIPTION

W arm

L ake H wy

A

W arm

L ake H ighway

.1

.2

A

3.

422A

35 4 3 252 11 4

32 4 6 13 545 3 2 1 6

4 3

4 6

1 34

35 4

5 2

6 3

2 1

1 3

11 11

10 12

17 14

36 36

22 21

24 23

17 15

31 31

3235 31 3331 34

161713

131415

181617

2930 28 27

26 30

26 25

18 13

30 29 28

25 30

B ig

C re ek

N o rth F o rk P a yette R ive r

D ea dw oo d R iv er

So ut h F or k

S a lm on

R iv er

CASCADE RESERVOIR

WARM LAKE

T 13 N

R 5 E

T 15 N

R 3 E

T 13 N

R 6 E

T 15 N

R 5 E

T 14 N

R 4 E

T 15 N

R 4 E

T 14 N

R 3 E

T 14 N

R 5 E

T 15 N

R 6 E

T 14 N

R 6 E

T 13 N

R 4 E

T 13 N

R 3 E

T 13 N

R 7 E

T 15 N

R 7 E

T 14 N

R 7 E

T 12 N

R 6 E

T 12 N

R 5 E

T 12 N

R 4 E

T 12 N

R 7 E

T 12 N

R 3 E

T 16 N

R 3 E

T 16 N

R 4 E

T 16 N

R 5 E

T 16 N

R 6 E

T 16 N

R 7 E

T 14 N

R 2 E

T 15 N

R 2 E

T 13 N

R 2 E

T 12 N

R 2 E

T 16 N

R 2 E

Cascade

This project consists of construction of a trail bridge on the

Lodgepole Cr. Trail near Cascade, Idaho. The site is located where NFSR 473 crosses Lodgepole Creek. Major items of work include: structure excavation and backfill; design

,furnish and install one steel prefabricated trail bridge with precast concrete footings; furnish and place riprap.

SPECIFICATION:

Standard Specifications for Construction of

Roads and Bridges on Federal Highway

Projects, FP-03, U.S. Customary Units www.wfl.fha.dot.gov/design/specs/fp03.htm

Burley

Pocatello

Twin Falls

Boise

Coeur d'Alene

Bonners Ferry

Lewiston

McCall

Cascade

Emmett

Challis St Anthony

���84 tu93 tu95 tu12 tu20 tu26 tu2 tu191 tu20 tu93 tu26 tu26 tu95

Utah

M ontana

Idaho

Nevada

O re g o n

W y o m in g

W a s h in g to n

���84

���86

���15

���90

���15

IDAHO MAP

PLANS FOR

DISTRICT RANGER

APPROVED:

DATE:

FOREST ENGINEER

APPROVED:

DATE:

BOISE

NATIONAL

FOREST

Idaho City

Lowman

Mountain Home

Cascade

Emmett

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 4

Lodgepole Creek Trail Bridge

Project Site

Sheet Name Sheet

Title Sheet 1

Vicinity Map 2

Typical Sections & Construction Notes 3

Footing and Bearing Details 4

Plan and Profile View 5

INDEX TO SHEETS

gsmolik Text Box /s/ Carol McCoy-Brown gsmolik Text Box 6/30/2009 gsmolik Text Box /s/ Jeff Alexander gsmolik Text Box 6/26/2009

BOISE NATIONAL FOREST

CASCADE RANGER DISTRICT

VALLEY COUNTY

IDAHO

North Fork Dollar Creek Trail Bridge 114-0.1

PROJECT DESCRIPTION

W arm

L ake H wy

W arm

L ake H ighway

498 4

.1

.2

A

3.

422A

35 4 3 252 11 4

32 4 6 13 545 3 2 1 6

25 54 61 34 35 46 3

5 534

79 7

23 1 5 4

1 56 4

1111 11

10 12

20 23

10 12

17 14

33 34

17 14

36 36

17 15

31 31

24 1923

24 2221202322212024 1923 19

222120

2423 19

2019 24

B ig

C re ek

N o rth F o rk P a yett e R i v er

So ut h F o rk

S a lm o n

R iv er

Gold Fork R iver

W i llo w C re ek

B o u ld er

C re ekL a k e

F o rk

CASCADE RESERVOIR

WARM LAKE

T 15 N

R 3 E

T 15 N

R 5 E

T 16 N

R 3 E

T 16 N

R 4 E

T 14 N

R 4 E

T 15 N

R 4 E

T 14 N

R 3 E

T 14 N

R 5 E

T 15 N

R 6 E

T 14 N

R 6 E

T 16 N

R 5 E

T 16 N

R 6 E

T 15 N

R 7 E

T 16 N

R 7 E

T 14 N

R 7 E

T 13 N

R 6 E

T 13 N

R 5 E

T 13 N

R 4 E

T 13 N

R 7 E T 13 N

R 3 E

T 14 N

R 2 E

T 15 N

R 2 E

T 16 N

R 2 E

T 13 N

R 2 E

Cascade

This project consists of construction of a trail bridge on the

Noth Fk. Dollar Cr. Trail near Cascade, Idaho. The site is located where NFSR #495 crosses the North Fk. of Dollar

Creek. Major items of work include: structure excavation and backfill; design ,furnish and install one steel prefabricated trail bridge with precast concrete footings;

furnish and place riprap.

SPECIFICATION:

Standard Specifications for Construction of

Roads and Bridges on Federal Highway

Projects, FP-03, U.S. Customary Units www.wfl.fha.dot.gov/design/specs/fp03.htm

Burley

Pocatello

Twin Falls

Boise

Coeur d'Alene

Bonners Ferry

Lewiston

McCall

Cascade

Emmett

Challis St Anthony

���84 tu93 tu95 tu12 tu20 tu26 tu2 tu191 tu20 tu93 tu26 tu26 tu95

Utah

M ontana

Idaho

Nevada

O re g o n

W y o m in g

W a s h in g to n

���84

���86

���15

���90

���15

IDAHO MAP

PLANS FOR

DISTRICT RANGER

APPROVED:

DATE:

FOREST ENGINEER

APPROVED:

DATE:

BOISE

NATIONAL

FOREST

Idaho City

Lowman

Mountain Home

Cascade

Emmett

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION 4

North Fk. Dollar Creek Trail Bridge

Project Site Sheet Name Sheet

Title Sheet 1

Vicinity Map 2

Typical Sections & Construction Notes 3

Footing and Bearing Details 4

Plan and Profile View 5

INDEX TO SHEETS

gsmolik Text Box /s/ Carol McCoy-Brown gsmolik Text Box /s/ Jeff Alexander gsmolik Text Box 6/30/2009 gsmolik Text Box 6/26/2009

File details come from the government source that posted it. Updated .