AG-024B-S-17-9010_Attach_03-Equipment_02-02-2017.pdf

PDF 366 KB Posted

Attached to
National Long-Term Fire Retardant - Full Service Federal contract opportunity
Solicitation number
AG-024B-S-17-9010
Issued by
Department of Agriculture Forest Service Fire and Aviation Management National Interagency Fire Center

About this file

Attachment 03 - Equipment

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-024B-S-17-9010 US Forest Service National Long-Term Fire Retardant – Full Service National Office

Exhibit J-1: Facility, Government and Contractor Equipment

J1 - 1

AGENCY CLIN NO. &

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER BASE

NEEDS

BASE

ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

BLM CLIN 01

Billings, MT

None None 3-10,000 gal.

retardant tanks, 1-

5,000 gal.

water-plumbed, and 1-5,000 gal.

water-unplumbed

2 Micro- Motions meters. 3 storage sheds, 2 trailers, 1 for retardant contract office and break area, 1 for pilot rest area.

Numerous types of hose cam locks, 1 fork lift.

Tanker base facility, 5 rooms for office and pilot rest areas.

Fridge, microwave.

2 electric pumps for mixing, 2 variable speed motors that control mix pumps, 1 electric pump for recirculation and offload of tanker trucks. 2 gas pumps. 1 Jordan blender, 1 Canadian blender, 1 hopper mixer for back up. 2 rock traps. All hoses, cam lock connections, manifolds. 14 loading hose dollies.

Stand alone electric panel is

240/208 volt.

This panel supplies mix plant, both pits, several outlets, 2 sheds, and contract trailer.

1 hydrant constant flow into 5,000 gallon water tank.

None 2 2 98,000

FS CLIN 02

Helena, MT

None None 1-20,000 gal.

tank, 2-electrical panels; 1-

Micro motion meter

(DRT/DMS

readout);

office space for contract personnel

Plumbing, fittings for mixing and pumping operations, and off loading.

Agency supplied 2-3 phase 400 amp, 208 volt panels.

Contractor required to supply all electrical components and expertise for the required mixing & loading of retardant from provided panel to the pumps, meters & mixers.

Metered municipal water supplied to site. Contractor responsible for payment for mixing.

Warehouse storage and covered storage available.

2 1 28,000

J1 - 2

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER BASE

NEEDS

BASE

ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

BLM CLIN 03

Grand

Junction, CO

1 Forklift None 1-5,000 gal off-load tank (old, fair condition)

2-Micro Motion meters & printers.

An off load tank is NOT required

Agency supplied 3 phase, 400 amp. Contractor supplies all elec.

components & expertise for the required mixing & loading from provided panel to pumps & mixers.

3 phase electrical pumps required. 2- 3 phase pumps can be operated simultaneously from panel.

Agency supplied water from hydrant off 8" line.

Storage area for dry powder is limited.

2 2 100,000

BLM CLIN 04

Durango, CO

None None 4-10,000 gal retardant tanks;

2- 20,000 gal water tanks;

All 7 years old, good condition;

1-7,500 gal off-load tank

1 Micro Motion meter

3 pumps

Plumbing and fittings to match existing configuration that allow for mixing and other operations.

Sand-oil separator requires yearly clean out.

Agency supplied 3 phase, 227/480 volt, 400 amp. Contractor to provide all wiring panel to mix site. Agency supplied electric meter & phone.

Contractor provide electricity and phone in their name.

Contractor will need to haul water to the base for retardant mixing and wash down.

Limited with room for expansion and uncovered dry storage

2 1 9,000

FS CLIN 05

Rapid City, SD

None 1 Orifice blender in average condition

1-10,000 gal water;

2-15,000 gal retardant;

1-down load 6,000 gal poly tank

2 Micro Motion meters with printers

Gas powered back-up pump, Air compressor, radios

Two Gorman Rupp transfer/circulatio n pumps and mixing valves furnished by contractor

Agency supplied 3 phase, 200 amp. Contractor supplies elec.

components & expertise for the required mixing & loading from provided panel to pumps & mixers.

3 phase electrical pumps required. 2- 3 phase pumps operated simultaneously from panel.

Agency supplied water from

Municipal water.

20 x 40 workshop

8X40 shipping container for dry cold storage.

1 1 68,000

J1 - 3

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 06

Albuquerque, NM

None None None 1-micro motion meter.

Contractor to furnish 3,000 gallon off load tank.

440 amps 7,000 gallon water holding tank for washdown of spills & aircraft is available.

Contractor is responsible for above ground plumbing from on-site water source to supply and mix tanks.

In coordination with airtanker base manager, contractor may use a portion of the agency's 50'

X 100" fenced

2 1 35,200

FS CLIN 07

Prescott, AZ

None None None 1 Micro Motion meter

Washdown hoses & nozzle.

An approved spill containment device is required.

Power (gas, electricity, etc.) for mixing and pumping operations shall be supplied by the Contractor

100 Amp; 220 volt.

Agency supplied from municipal water 4" main.

Office area, storage room

& outside storage shed is available for contractor's use.

2 1 23,050

FS CLIN 08

Winslow, None None 1-5,850 gal water.

1-9,700 gal retardant.

1 Micro Motion meter.

1 manifold

Minimum capacity of

3,000 gal off load tank. 4- 50' loading hoses. 1 loading pump, 400 gpm min

500 gpm max.

1 back-up loading pump.

1 off load pump.

3 phase, 480 volt, 4 wire, 600 amp power panel is located in the plant area. The contractor shall be responsible for all conduit, boxes, panels, switching and wiring not already in this panel, as well as the cost.

Municipal supply through six inch service, flowing at 500 gpm

No indoor over-winter storage available.

Office area and 8x8 storage shed available for contractor use.

3 1 31,278

J1 - 4

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 09

Phoenix-

Mesa Gateway, AZ

1 Forklift (rental), loading hoses, hose skates, valves

None None 2 Micro Motion meters.

Washdown hoses.

20,000 gal Steel offload tank (Tank owned after end of the contract)

3-240/480V hookups 110V outlets both main pits

Municipal, 2- 2 inch supply, flowing at 60 gpm

Yes, SQ footage to be determined

2 2 8,000

FS CLIN 10

Ft.

Huachuca, 1 Micro Motion Meter

(DRT/DMS

readout)

1 Forklift

None None Contractor to furnish 4,000 gallon off load tank w/capability to off load tanker.

Contractor responsible for its plumbing & wiring.

3 April 15 – MRB added for 95 days.

Agency supplied 277/480 volt, 600 amp available.

Agency supplied water from 6" water main flowing at 1400 gpm.

Sufficient for supplies and leftover product.

2 + 1

SEA

T

1 42,770

FS CLIN 11

McCall, ID

None None 4-10,000 gal retardant tanks.

1-13,000 gal water tank, 1-

5,000 gal offload tank.

1-10,000 gal wastewater containment tank

2 – Micro

Meters 3 – Elec.

Panels Manifolds to 2 Pits 2 – Loading

Hoses, 2 – gas pumps, 2 – Electric

Loading pumps 1 –

Elec.

Recirc.

Pump

2 – LC

Blenders 4 – flow valves

1 – Back-up pump

1 – Loading Hose

Electric system is in good condition, but is undersized. It won’t run all pumps at the same time – this is only an issue when operating a batch mixer. Base uses

LC-95A

(Agency does not provide)

Phone Computer Internet Access

1 – 13,000 gal.

Water Tank, Supplied by municipal water, government supplied.

2 2 70,000

J1 - 5

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 12

Boise, ID

None None None 3 - Loading hoses with camlock fittings and dollies.

1-micro motion meter.

Provide retardant storage & off load to meet peak demand.

Contractor shall provide own phone.

Contractor responsible for their plumbing & wiring.

Agency provided 400 amp, 220 volt electrical.

Municipal water supply available from 5” main, flowing at 500 gpm.

1,000 sq ft of covered, paved storage is available.

3 1 134,000

BLM CLIN 13

Twin Falls, ID

N/A 1 Electric motor/pum p for off-loading and recirculatio n; Motor:

Landmark Motor - 20 HP; Volts - 230/460; 3

Phase.

Pump:

Gorman- Rupp -

430 GPM

2-5,000 gal.

off load storage tanks.

1 Micro Motion; 3-loading hoses with camlock fittings, loading hose valves & hose skates; 6-fully configured Mobile Aerial

Retardant Operation

Trailer System

(MAROTS);

950 gallon

LC

capacity.

3-10,000 gallon liquid concentrate tanks; 1- 10,000 gallon auto-fill water tank; wye blender, and associated pipes and lines for recirc/loading;

1-450 GPM

Electric Pump/Motor;

1-250 GPM

gasoline engine/pump;

1-300 GPM

gasoline reload pump.

3 Phase; 400Amp, 480 Volt

Access to 214,000 gallon city storage tanker powered by an electric system; water imported by tenders if power outage occurs.

2-5,000 gallon off load storage tanks for liquid concentrate.

2 1 85,000

J1 - 6

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

BLM CLIN 14

Pocatello, ID

1 forklift. None.

Dry product storage space at mixing pad is very limited

1-10,000 gal water. 2 - 10,000 gal retardant.

Two 20 hp 3-phase loading pumps.

One 15 hp 3-phase back- up loading pump, loading hoses, manifold, valves in system. 2

Micro Motion meters.

5,000 gal off-load tank required.

Recirculation system required.

Agency supplied 3-phase, 225 amp

120/240 volt power at mixing pad

Municipal water supply available from 12” service, flowing at 500 gpm.

Some on-site storage available.

No agency supplied overwinter storage space for dry powder

2 1 62,100

FS CLIN 15

Hill AFB, UT

None None None 2 Micro meters

4,000 gal off-load tank and manifold pipes from mixing area to loading pits required.

Contractors’ personnel are required to obtain ID’s and flightline driver’s licenses.

Agency supplied power

– 3 phase, 200 amp.

Municipal water supply available.

None 2 1 32,000

BLM CLIN 16

Stead, NV meters.

There is an agency-owned sand/oil separator available.

Contacting base management for detailed needs is advisable.

400 amp; 3- phase, 220 v

Municipal, three inch supply, flowing at 200 gpm

Limited space for powder storage & mixing.

Advise contacting base management for storage details.

2 2 150,000

J1 - 7

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

BLM CLIN 17

Battle

Mountain, NV

None None None 1 Micro meter.

Office/worksh op avail. for contractor’s use. Contact base mgmt.

for detailed needs is advised.

Water storage capacity of

20,000 gallons min to be furnished by contractor for a total of 30,000 gals of water storage.

400 amp; 3- phase, 220 v

Agency well, two-inch service, flowing at 300 gpm

Space for dry powder storage & mixing operations is limited.

Contacting base management for storage details is advisable.

2 2 150,000 (last reported – 2006)

BLM CLIN 18

Winnemucca

, NV

None None Two 5,000 gallon poly water tanks provided by

BLM.

[Required steel enclosed, skid mounted retardant tank

(8,000 gal) provided by contractor as well as a

3,000 gal poly off-load tank.

Contractor furnishes portable pump, hoses, valves for off-load tank.

1 micro motion meter

Contractor should be prepared to provide manifold, hoses, valves, hose skates, etc.

Contractor provides all pumps, loading hoses, valves and recirculation system.

Mixing, loading recirculation and bulk off-load pumps may be gasoline powered.

Backup and aircraft off-load pumps may be gas, diesel or a backup generator.

Office, workshop and Wi-Fi available for contractor’s use.

110 volt service currently available at pad.

(220 volt service to be completed prior to 2010 season)

Agency provided water flow rate of 200 gpm.

Contractor

Responsible for all plumbing.

Limited.

Contact base management for storage

1 1 30,000

J1 - 8

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 19

Cedar City, UT

None None 2-10,000 gal water; 3-

10,000 gal retardant; 1-off-load 4,000 gal poly tank

Four pumps;

Contact base manageme nt for

Two Micro meters.

8,000 gal.

water storage tank to fit within existing spill containment berm. Contact base management for additional requirements.

110 V, 220 V, 277/480 V

Municipal, four inch supply, flowing at 400 gpm

None 2 2 35,000

CLIN 20

Reserved

FS CLIN 21

San

Bernardino, CA

1 forklift. None None 4 MicroMotio n meters; 4 printers in Air Ops office;

10,000 gal.

holding tank (undergrou nd); 6,000 gal. clarifier (undergrou nd); tank farm containmen t pad and basin;

workshop and garage.

Contractor to furnish 5,000 gallon off load

Contractor has supplied a supplemental water tank to aid pressure demands.

Approximately 400 feet of steel Victaulic pipe manifold installed 1-3 feet off the ground and approximately 12 feet of retardant hose section valved with skates for vehicle access

Agency furnished 3-phase, 227/480 volt, 600 amp electric panel to mix site. Contractor shall provide all wiring from panel to operation.

Agency provided electric meter and phone.

Contractor to have service for electricity and phone in their name.

Municipal water supply available from 8” service, flowing at 500 gpm.

1600 sq ft of paved, covered storage, is

6 4

200,000

J1 - 9

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 22

Chester, Forklift None 5,000 gal off-load storage tank w/plumbing Underground

4,000 gal sand/ oil separator and 5.000 gal spill holding tank.

100’x100’ containmen t area.

3-Micro- Motion meters.

Enclosure w/ 3 displays.

2 – Westrex Printers (1 in FS & 1 in Contractor office) Office space and use of work shop area.

50,000+ wet storage. Eductor

& transfer pumps w/ 1 gas-powered back-up pump.

Contractor to provide off-load

Pump.

3 phase, 400 amps, 480 volt (capacity for 7 pumps)

Utility District owned from 8” metered main on containment area. Water to be paid by the contractor.

Some covered storage

~40’ x 100’ Uncovered.

3 3 24,281

FS/CDF CLIN 23

Fresno, 1 forklift. None None 2 - Micro meters.

One 4’ x 4’ iron welding table on wheels with heavy-duty vise.

Assorted ATB tools, large pipe wrenches, drill press etc.

Contractor to furnish 6,000 gallon off load tank.

Agency supplied 3-phase, 400 amp, and

440-volt panel.

Contractor to provide electrical service in their name. Existing meter provided by agency.

Provided from 8” city line to a 6” line w/ dual backflow prev.

valves at the retardant mixing pad.

Contractor is resp. for discharge or operating permits for mixing/loading products.

Contractor must provide a Micrometer inline.

Flowmeter MG

104 inst. to water source.

Storage is limited to an area about

16 ft. X 75 ft.

4 4-pit simult.

load 450

GPM

demonstr ated. Must show cap.

to load 4 pits simult. via 2 primary manifolds to any & all comb.

of the 4-pit operation to incl pit’s

1,2,3,4

21,000

J1 - 10

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 24

Redding, meters.

2 wireless modems with 2 printers, micro-motion displays.

2,000 gallon sand/oil separator that is undergroun d.

Office Space, use of repair shop area.

Retardant loading and off-load pumps.

Contractor to supply 8,000 gal. off-load tank, retardant storage tanks, retardant manifolds, loading hoses, loading valves, forklift, tool storage container

(located on pad), phone;

phone bill to be paid in contractor's name

Office Space with rest room facilities

3 phase, 480 volts, 400 amps provided to mixing pad. All electrical lines past main power box on pad to be installed and maintained by contractor. Electric bill to be paid in contractor's name

3" water main, 650 gpm provided to retardant pad.

All water lines past 3" main valve on pad will be installed and maintained by contractor, Water use on retardant pad area will be paid in contractor's name

80' x 120' concrete pad for mixing, wet and dry storage, equipment, (uncovered)

4 2 100,000

FS CLIN 25

Fox Field

(Lancaster), Plumbing from storage tanks

& loading manifolds. All underground plumbing.

1 forklift (needs work).

None 1 – 3000 gallon off load tank.

2– 40,000 gallon retardant storage tanks.

1 – 10,000 gallon water tank.

1 2,000 gallon off-load tank.

1 – 75 hp electric loading pump.

Off. space, garage workshop building.

Five Micromotio n meters.

All plumbing for water supply.

Minimum of three electric loading pumps (60 hp).

Gasoline powered loading pump for emergency back-up.

Loading hose with skates, all fitting attachments and loading valves.

Agency provided 3 phase, 184/92 amp, 230/460 volt, 60hp 3 phase

100/50 amps. Contractor provides all connections from power supply to

Agency provided.

6” main.

4” supply.

Limited covered storage area

Unlimited open area

5 5 130,000+

J1 - 11

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 26

Castle AFB, Mass Flow meters.

2-25K Gallon Steel Tanks w/recirc sys;

350 GPM

Educator Mix

System;

Containment berm; 2-mechanical pumps (400GPM to 2 pits simultaneous;

Office for ICL Crew; forklift 11 Jun 15

MRB added until 30 Sep

400 amp; 220 volt.

supply (Min 350

GPM)

2 2 (VLAT)

100,000

FS CLIN 27

Klamath

Falls, OR

None 5 pumps 1-20,000 gal water. 4-

10,000 gal retardant.

1-5,000 gal off-load.

Hoses, valves, manifold, 2 F-Series

Micro Motion meters.

No equipment currently available for powder mixing.

600 amp service, 3 phase, 277/480 volts.

Municipal, 6”, flowing at 500 gpm. 20,000 gallon storage

40,000 gallons mixed or

4 2 22,000

FS CLIN 28

Redmond, 4 forklifts.

(NW

FireCache)

4 Pumps. 1-20,000 gal water. 4-

10,000 gal retardant. 1- 5,000 gal off-load.

Hoses, valves, manifold, pumps, Off. space, Shop area, 2 Micro- Motion meters

Blending Valves, Back-flow , No equipment for powder mixing.

11 Jun 15 2 New Elec.

Pumps install

600 amp service, 3 phase, 300kva.

600 gpm; city water system, 20,000 gallon storage

No covered dry storage, Limited equipment

3 2 150,000

FS CLIN 29

Medford, 1 forklift. None 2 – 10,000 gal, 20-yr-old

2 pumps.

2 Micro meters

Contractor to supply associated tank plumbing, hoses, valves, pumps, and all mixing equipment.

200 amp service, 3 phase, 220 volts.

Municipal, 6”, flowing at 300 gpm.

20,000 sq ft of covered, paved and/or gravel space.

2 2 100,000

J1 - 12

BASE

AGENCY

OWNED

HANDLING

EQUIPMENT

AGENCY

OWNED

MIXING

EQUIP.

AGENCY

OWNED

STORAGE

TANKS

OTHER

AGENCY

OWNED

SUPPLIES

OTHER

BASE

NEEDS

BASE ELECTRICAL

INFO

BASE WATER

SUPPLY INFO

STORAGE

AVAILABLE

# OF

PITS

# PITS

SIMULT

ANEOUS

LOADS

DAILY

PEAK

DEMAND

(2010)

FS CLIN 30

Moses Lake, WA

None None 4-10,000 gal tanks.

2-20,000 gal water tanks.

1-6,500 gal.

off-load.

Two 50 hp Gorman-

Rupp electric drive cent.

pumps;

2-30 hp Gorman

Rupp centrifugal pumps;

hoses, valves and manifolds.

Two Micro

Motion meters and printers.

Office space only available in existing warehouse.

Contractor would be required to furnish forklift.

400 amp, 3 phase, 277- 480 volt main panel and sub panels for existing electrical equipment at retardant plant site.

Contractor to pay for and supply all electrical components, labor and expertise for required changes to existing mixing/loading equipment or relocation of equipment.

supply, 6” line.

No covered storage area available for contractor tools or spare equip.

No covered storage area available for retardant if dry conc. are used. Plenty of space around the warehouse to store powder on pallets, but area is undeveloped and would require a forklift with balloon tires for operation in dirt.

4 2 15,000

FS CLIN 31

Santa Maria, None None None 3 Micro

Meters, Manifold

Office Trailer at ramp, shared with Contractor

(approx. 160 sq ft)

120 volt 3” main 350- 400 gpm, Contractor pays for water

None 3 3

File details come from the government source that posted it. Updated .