AG-024B-S-17-9010_Attach_03-Equipment_02-02-2017.pdf
PDF 366 KB Posted
- Attached to
- National Long-Term Fire Retardant - Full Service Federal contract opportunity
- Solicitation number
- AG-024B-S-17-9010
About this file
Attachment 03 - Equipment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-024B-S-17-9010_Attach_04-Worksheet_02-02-2017.pdf | ||
| AG-024B-S-17-9010_Attach_05-Daily_Record_02-02-2017.pdf | ||
| AG-024B-S-17-9010_Attach_02-Specification_02-02-2017.pdf | ||
| AG-024B-S-17-9010_Attach_08-Fire_Retardant_Characteristics.pdf | ||
| AG-024B-S-17-9010_Attach_07-QPL_Long-term_Fire_Retardant.pdf | ||
| AG-024B-S-17-9010_Solicitation_Retardant_Full_Service_02-02-2017.pdf | ||
| AG-024B-S-17-9010_Attach_06-Summary_02-02-2017.pdf | ||
| AG-024B-S-17-9010_Attach_01-Schedule_02-02-2017.pdf | ||
| AG-024B-S-17-9010_Attach_09-WD_1995-0221_Rev_39_12-30-2016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. AG-024B-S-17-9010 US Forest Service National Long-Term Fire Retardant – Full Service National Office
Exhibit J-1: Facility, Government and Contractor Equipment
J1 - 1
AGENCY CLIN NO. &
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER BASE
NEEDS
BASE
ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
BLM CLIN 01
Billings, MT
None None 3-10,000 gal.
retardant tanks, 1-
5,000 gal.
water-plumbed, and 1-5,000 gal.
water-unplumbed
2 Micro- Motions meters. 3 storage sheds, 2 trailers, 1 for retardant contract office and break area, 1 for pilot rest area.
Numerous types of hose cam locks, 1 fork lift.
Tanker base facility, 5 rooms for office and pilot rest areas.
Fridge, microwave.
2 electric pumps for mixing, 2 variable speed motors that control mix pumps, 1 electric pump for recirculation and offload of tanker trucks. 2 gas pumps. 1 Jordan blender, 1 Canadian blender, 1 hopper mixer for back up. 2 rock traps. All hoses, cam lock connections, manifolds. 14 loading hose dollies.
Stand alone electric panel is
240/208 volt.
This panel supplies mix plant, both pits, several outlets, 2 sheds, and contract trailer.
1 hydrant constant flow into 5,000 gallon water tank.
None 2 2 98,000
FS CLIN 02
Helena, MT
None None 1-20,000 gal.
tank, 2-electrical panels; 1-
Micro motion meter
(DRT/DMS
readout);
office space for contract personnel
Plumbing, fittings for mixing and pumping operations, and off loading.
Agency supplied 2-3 phase 400 amp, 208 volt panels.
Contractor required to supply all electrical components and expertise for the required mixing & loading of retardant from provided panel to the pumps, meters & mixers.
Metered municipal water supplied to site. Contractor responsible for payment for mixing.
Warehouse storage and covered storage available.
2 1 28,000
J1 - 2
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER BASE
NEEDS
BASE
ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
BLM CLIN 03
Grand
Junction, CO
1 Forklift None 1-5,000 gal off-load tank (old, fair condition)
2-Micro Motion meters & printers.
An off load tank is NOT required
Agency supplied 3 phase, 400 amp. Contractor supplies all elec.
components & expertise for the required mixing & loading from provided panel to pumps & mixers.
3 phase electrical pumps required. 2- 3 phase pumps can be operated simultaneously from panel.
Agency supplied water from hydrant off 8" line.
Storage area for dry powder is limited.
2 2 100,000
BLM CLIN 04
Durango, CO
None None 4-10,000 gal retardant tanks;
2- 20,000 gal water tanks;
All 7 years old, good condition;
1-7,500 gal off-load tank
1 Micro Motion meter
3 pumps
Plumbing and fittings to match existing configuration that allow for mixing and other operations.
Sand-oil separator requires yearly clean out.
Agency supplied 3 phase, 227/480 volt, 400 amp. Contractor to provide all wiring panel to mix site. Agency supplied electric meter & phone.
Contractor provide electricity and phone in their name.
Contractor will need to haul water to the base for retardant mixing and wash down.
Limited with room for expansion and uncovered dry storage
2 1 9,000
FS CLIN 05
Rapid City, SD
None 1 Orifice blender in average condition
1-10,000 gal water;
2-15,000 gal retardant;
1-down load 6,000 gal poly tank
2 Micro Motion meters with printers
Gas powered back-up pump, Air compressor, radios
Two Gorman Rupp transfer/circulatio n pumps and mixing valves furnished by contractor
Agency supplied 3 phase, 200 amp. Contractor supplies elec.
components & expertise for the required mixing & loading from provided panel to pumps & mixers.
3 phase electrical pumps required. 2- 3 phase pumps operated simultaneously from panel.
Agency supplied water from
Municipal water.
20 x 40 workshop
8X40 shipping container for dry cold storage.
1 1 68,000
J1 - 3
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 06
Albuquerque, NM
None None None 1-micro motion meter.
Contractor to furnish 3,000 gallon off load tank.
440 amps 7,000 gallon water holding tank for washdown of spills & aircraft is available.
Contractor is responsible for above ground plumbing from on-site water source to supply and mix tanks.
In coordination with airtanker base manager, contractor may use a portion of the agency's 50'
X 100" fenced
2 1 35,200
FS CLIN 07
Prescott, AZ
None None None 1 Micro Motion meter
Washdown hoses & nozzle.
An approved spill containment device is required.
Power (gas, electricity, etc.) for mixing and pumping operations shall be supplied by the Contractor
100 Amp; 220 volt.
Agency supplied from municipal water 4" main.
Office area, storage room
& outside storage shed is available for contractor's use.
2 1 23,050
FS CLIN 08
Winslow, None None 1-5,850 gal water.
1-9,700 gal retardant.
1 Micro Motion meter.
1 manifold
Minimum capacity of
3,000 gal off load tank. 4- 50' loading hoses. 1 loading pump, 400 gpm min
500 gpm max.
1 back-up loading pump.
1 off load pump.
3 phase, 480 volt, 4 wire, 600 amp power panel is located in the plant area. The contractor shall be responsible for all conduit, boxes, panels, switching and wiring not already in this panel, as well as the cost.
Municipal supply through six inch service, flowing at 500 gpm
No indoor over-winter storage available.
Office area and 8x8 storage shed available for contractor use.
3 1 31,278
J1 - 4
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 09
Phoenix-
Mesa Gateway, AZ
1 Forklift (rental), loading hoses, hose skates, valves
None None 2 Micro Motion meters.
Washdown hoses.
20,000 gal Steel offload tank (Tank owned after end of the contract)
3-240/480V hookups 110V outlets both main pits
Municipal, 2- 2 inch supply, flowing at 60 gpm
Yes, SQ footage to be determined
2 2 8,000
FS CLIN 10
Ft.
Huachuca, 1 Micro Motion Meter
(DRT/DMS
readout)
1 Forklift
None None Contractor to furnish 4,000 gallon off load tank w/capability to off load tanker.
Contractor responsible for its plumbing & wiring.
3 April 15 – MRB added for 95 days.
Agency supplied 277/480 volt, 600 amp available.
Agency supplied water from 6" water main flowing at 1400 gpm.
Sufficient for supplies and leftover product.
2 + 1
SEA
T
1 42,770
FS CLIN 11
McCall, ID
None None 4-10,000 gal retardant tanks.
1-13,000 gal water tank, 1-
5,000 gal offload tank.
1-10,000 gal wastewater containment tank
2 – Micro
Meters 3 – Elec.
Panels Manifolds to 2 Pits 2 – Loading
Hoses, 2 – gas pumps, 2 – Electric
Loading pumps 1 –
Elec.
Recirc.
Pump
2 – LC
Blenders 4 – flow valves
1 – Back-up pump
1 – Loading Hose
Electric system is in good condition, but is undersized. It won’t run all pumps at the same time – this is only an issue when operating a batch mixer. Base uses
LC-95A
(Agency does not provide)
Phone Computer Internet Access
1 – 13,000 gal.
Water Tank, Supplied by municipal water, government supplied.
2 2 70,000
J1 - 5
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 12
Boise, ID
None None None 3 - Loading hoses with camlock fittings and dollies.
1-micro motion meter.
Provide retardant storage & off load to meet peak demand.
Contractor shall provide own phone.
Contractor responsible for their plumbing & wiring.
Agency provided 400 amp, 220 volt electrical.
Municipal water supply available from 5” main, flowing at 500 gpm.
1,000 sq ft of covered, paved storage is available.
3 1 134,000
BLM CLIN 13
Twin Falls, ID
N/A 1 Electric motor/pum p for off-loading and recirculatio n; Motor:
Landmark Motor - 20 HP; Volts - 230/460; 3
Phase.
Pump:
Gorman- Rupp -
430 GPM
2-5,000 gal.
off load storage tanks.
1 Micro Motion; 3-loading hoses with camlock fittings, loading hose valves & hose skates; 6-fully configured Mobile Aerial
Retardant Operation
Trailer System
(MAROTS);
950 gallon
LC
capacity.
3-10,000 gallon liquid concentrate tanks; 1- 10,000 gallon auto-fill water tank; wye blender, and associated pipes and lines for recirc/loading;
1-450 GPM
Electric Pump/Motor;
1-250 GPM
gasoline engine/pump;
1-300 GPM
gasoline reload pump.
3 Phase; 400Amp, 480 Volt
Access to 214,000 gallon city storage tanker powered by an electric system; water imported by tenders if power outage occurs.
2-5,000 gallon off load storage tanks for liquid concentrate.
2 1 85,000
J1 - 6
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
BLM CLIN 14
Pocatello, ID
1 forklift. None.
Dry product storage space at mixing pad is very limited
1-10,000 gal water. 2 - 10,000 gal retardant.
Two 20 hp 3-phase loading pumps.
One 15 hp 3-phase back- up loading pump, loading hoses, manifold, valves in system. 2
Micro Motion meters.
5,000 gal off-load tank required.
Recirculation system required.
Agency supplied 3-phase, 225 amp
120/240 volt power at mixing pad
Municipal water supply available from 12” service, flowing at 500 gpm.
Some on-site storage available.
No agency supplied overwinter storage space for dry powder
2 1 62,100
FS CLIN 15
Hill AFB, UT
None None None 2 Micro meters
4,000 gal off-load tank and manifold pipes from mixing area to loading pits required.
Contractors’ personnel are required to obtain ID’s and flightline driver’s licenses.
Agency supplied power
– 3 phase, 200 amp.
Municipal water supply available.
None 2 1 32,000
BLM CLIN 16
Stead, NV meters.
There is an agency-owned sand/oil separator available.
Contacting base management for detailed needs is advisable.
400 amp; 3- phase, 220 v
Municipal, three inch supply, flowing at 200 gpm
Limited space for powder storage & mixing.
Advise contacting base management for storage details.
2 2 150,000
J1 - 7
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
BLM CLIN 17
Battle
Mountain, NV
None None None 1 Micro meter.
Office/worksh op avail. for contractor’s use. Contact base mgmt.
for detailed needs is advised.
Water storage capacity of
20,000 gallons min to be furnished by contractor for a total of 30,000 gals of water storage.
400 amp; 3- phase, 220 v
Agency well, two-inch service, flowing at 300 gpm
Space for dry powder storage & mixing operations is limited.
Contacting base management for storage details is advisable.
2 2 150,000 (last reported – 2006)
BLM CLIN 18
Winnemucca
, NV
None None Two 5,000 gallon poly water tanks provided by
BLM.
[Required steel enclosed, skid mounted retardant tank
(8,000 gal) provided by contractor as well as a
3,000 gal poly off-load tank.
Contractor furnishes portable pump, hoses, valves for off-load tank.
1 micro motion meter
Contractor should be prepared to provide manifold, hoses, valves, hose skates, etc.
Contractor provides all pumps, loading hoses, valves and recirculation system.
Mixing, loading recirculation and bulk off-load pumps may be gasoline powered.
Backup and aircraft off-load pumps may be gas, diesel or a backup generator.
Office, workshop and Wi-Fi available for contractor’s use.
110 volt service currently available at pad.
(220 volt service to be completed prior to 2010 season)
Agency provided water flow rate of 200 gpm.
Contractor
Responsible for all plumbing.
Limited.
Contact base management for storage
1 1 30,000
J1 - 8
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 19
Cedar City, UT
None None 2-10,000 gal water; 3-
10,000 gal retardant; 1-off-load 4,000 gal poly tank
Four pumps;
Contact base manageme nt for
Two Micro meters.
8,000 gal.
water storage tank to fit within existing spill containment berm. Contact base management for additional requirements.
110 V, 220 V, 277/480 V
Municipal, four inch supply, flowing at 400 gpm
None 2 2 35,000
CLIN 20
Reserved
FS CLIN 21
San
Bernardino, CA
1 forklift. None None 4 MicroMotio n meters; 4 printers in Air Ops office;
10,000 gal.
holding tank (undergrou nd); 6,000 gal. clarifier (undergrou nd); tank farm containmen t pad and basin;
workshop and garage.
Contractor to furnish 5,000 gallon off load
Contractor has supplied a supplemental water tank to aid pressure demands.
Approximately 400 feet of steel Victaulic pipe manifold installed 1-3 feet off the ground and approximately 12 feet of retardant hose section valved with skates for vehicle access
Agency furnished 3-phase, 227/480 volt, 600 amp electric panel to mix site. Contractor shall provide all wiring from panel to operation.
Agency provided electric meter and phone.
Contractor to have service for electricity and phone in their name.
Municipal water supply available from 8” service, flowing at 500 gpm.
1600 sq ft of paved, covered storage, is
6 4
200,000
J1 - 9
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 22
Chester, Forklift None 5,000 gal off-load storage tank w/plumbing Underground
4,000 gal sand/ oil separator and 5.000 gal spill holding tank.
100’x100’ containmen t area.
3-Micro- Motion meters.
Enclosure w/ 3 displays.
2 – Westrex Printers (1 in FS & 1 in Contractor office) Office space and use of work shop area.
50,000+ wet storage. Eductor
& transfer pumps w/ 1 gas-powered back-up pump.
Contractor to provide off-load
Pump.
3 phase, 400 amps, 480 volt (capacity for 7 pumps)
Utility District owned from 8” metered main on containment area. Water to be paid by the contractor.
Some covered storage
~40’ x 100’ Uncovered.
3 3 24,281
FS/CDF CLIN 23
Fresno, 1 forklift. None None 2 - Micro meters.
One 4’ x 4’ iron welding table on wheels with heavy-duty vise.
Assorted ATB tools, large pipe wrenches, drill press etc.
Contractor to furnish 6,000 gallon off load tank.
Agency supplied 3-phase, 400 amp, and
440-volt panel.
Contractor to provide electrical service in their name. Existing meter provided by agency.
Provided from 8” city line to a 6” line w/ dual backflow prev.
valves at the retardant mixing pad.
Contractor is resp. for discharge or operating permits for mixing/loading products.
Contractor must provide a Micrometer inline.
Flowmeter MG
104 inst. to water source.
Storage is limited to an area about
16 ft. X 75 ft.
4 4-pit simult.
load 450
GPM
demonstr ated. Must show cap.
to load 4 pits simult. via 2 primary manifolds to any & all comb.
of the 4-pit operation to incl pit’s
1,2,3,4
21,000
J1 - 10
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 24
Redding, meters.
2 wireless modems with 2 printers, micro-motion displays.
2,000 gallon sand/oil separator that is undergroun d.
Office Space, use of repair shop area.
Retardant loading and off-load pumps.
Contractor to supply 8,000 gal. off-load tank, retardant storage tanks, retardant manifolds, loading hoses, loading valves, forklift, tool storage container
(located on pad), phone;
phone bill to be paid in contractor's name
Office Space with rest room facilities
3 phase, 480 volts, 400 amps provided to mixing pad. All electrical lines past main power box on pad to be installed and maintained by contractor. Electric bill to be paid in contractor's name
3" water main, 650 gpm provided to retardant pad.
All water lines past 3" main valve on pad will be installed and maintained by contractor, Water use on retardant pad area will be paid in contractor's name
80' x 120' concrete pad for mixing, wet and dry storage, equipment, (uncovered)
4 2 100,000
FS CLIN 25
Fox Field
(Lancaster), Plumbing from storage tanks
& loading manifolds. All underground plumbing.
1 forklift (needs work).
None 1 – 3000 gallon off load tank.
2– 40,000 gallon retardant storage tanks.
1 – 10,000 gallon water tank.
1 2,000 gallon off-load tank.
1 – 75 hp electric loading pump.
Off. space, garage workshop building.
Five Micromotio n meters.
All plumbing for water supply.
Minimum of three electric loading pumps (60 hp).
Gasoline powered loading pump for emergency back-up.
Loading hose with skates, all fitting attachments and loading valves.
Agency provided 3 phase, 184/92 amp, 230/460 volt, 60hp 3 phase
100/50 amps. Contractor provides all connections from power supply to
Agency provided.
6” main.
4” supply.
Limited covered storage area
Unlimited open area
5 5 130,000+
J1 - 11
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 26
Castle AFB, Mass Flow meters.
2-25K Gallon Steel Tanks w/recirc sys;
350 GPM
Educator Mix
System;
Containment berm; 2-mechanical pumps (400GPM to 2 pits simultaneous;
Office for ICL Crew; forklift 11 Jun 15
MRB added until 30 Sep
400 amp; 220 volt.
supply (Min 350
GPM)
2 2 (VLAT)
100,000
FS CLIN 27
Klamath
Falls, OR
None 5 pumps 1-20,000 gal water. 4-
10,000 gal retardant.
1-5,000 gal off-load.
Hoses, valves, manifold, 2 F-Series
Micro Motion meters.
No equipment currently available for powder mixing.
600 amp service, 3 phase, 277/480 volts.
Municipal, 6”, flowing at 500 gpm. 20,000 gallon storage
40,000 gallons mixed or
4 2 22,000
FS CLIN 28
Redmond, 4 forklifts.
(NW
FireCache)
4 Pumps. 1-20,000 gal water. 4-
10,000 gal retardant. 1- 5,000 gal off-load.
Hoses, valves, manifold, pumps, Off. space, Shop area, 2 Micro- Motion meters
Blending Valves, Back-flow , No equipment for powder mixing.
11 Jun 15 2 New Elec.
Pumps install
600 amp service, 3 phase, 300kva.
600 gpm; city water system, 20,000 gallon storage
No covered dry storage, Limited equipment
3 2 150,000
FS CLIN 29
Medford, 1 forklift. None 2 – 10,000 gal, 20-yr-old
2 pumps.
2 Micro meters
Contractor to supply associated tank plumbing, hoses, valves, pumps, and all mixing equipment.
200 amp service, 3 phase, 220 volts.
Municipal, 6”, flowing at 300 gpm.
20,000 sq ft of covered, paved and/or gravel space.
2 2 100,000
J1 - 12
BASE
AGENCY
OWNED
HANDLING
EQUIPMENT
AGENCY
OWNED
MIXING
EQUIP.
AGENCY
OWNED
STORAGE
TANKS
OTHER
AGENCY
OWNED
SUPPLIES
OTHER
BASE
NEEDS
BASE ELECTRICAL
INFO
BASE WATER
SUPPLY INFO
STORAGE
AVAILABLE
# OF
PITS
# PITS
SIMULT
ANEOUS
LOADS
DAILY
PEAK
DEMAND
(2010)
FS CLIN 30
Moses Lake, WA
None None 4-10,000 gal tanks.
2-20,000 gal water tanks.
1-6,500 gal.
off-load.
Two 50 hp Gorman-
Rupp electric drive cent.
pumps;
2-30 hp Gorman
Rupp centrifugal pumps;
hoses, valves and manifolds.
Two Micro
Motion meters and printers.
Office space only available in existing warehouse.
Contractor would be required to furnish forklift.
400 amp, 3 phase, 277- 480 volt main panel and sub panels for existing electrical equipment at retardant plant site.
Contractor to pay for and supply all electrical components, labor and expertise for required changes to existing mixing/loading equipment or relocation of equipment.
supply, 6” line.
No covered storage area available for contractor tools or spare equip.
No covered storage area available for retardant if dry conc. are used. Plenty of space around the warehouse to store powder on pallets, but area is undeveloped and would require a forklift with balloon tires for operation in dirt.
4 2 15,000
FS CLIN 31
Santa Maria, None None None 3 Micro
Meters, Manifold
Office Trailer at ramp, shared with Contractor
(approx. 160 sq ft)
120 volt 3” main 350- 400 gpm, Contractor pays for water
None 3 3