SOW_cooling_tower.docx

DOCX document 15 KB Posted

Attached to
BAC Cooling Tower Parts and Repair
Solicitation number
AG-0202-S-15-0007
Issued by

View the file

Other files

File Type Posted
P4163022.jpg JPG image
ID21.txt TXT text file
SOW_cooling_tower.docx DOCX document
Construction_Clauses.doc DOC document
BAC_Mechanical_Specs.pdf PDF
Construction_Clauses.doc DOC document
ID21.txt TXT text file
BAC_Mechanical_Specs.pdf PDF
P4163022.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 SCOPE OF SERVICE:

The contractor shall provide all professional services necessary for the purchasing, installation, and wiring of a water level control, VFD, and motor on a BAC cooling tower model #VF1-036-22L.

1.1Install a 4-probe universal electric water level control to maintain the proper operating water level with a fourth probe for use as a low water cut-out for the pan heater.
1.2Install a ½” slow closing 120 VAC, normally closed solenoid valve, designed to reduce water hammer.
1.3Install a 20hp premium efficiency inverter duty rated fan motor.
1.4Install power line filters ahead of VFD that will be located on the exterior of the building.
1.5Install a compatible variable frequency drive which shall have an integral 3-contactor maintenance bypass feature along with the following additional features.
1.5.1Rated efficiency of 97% minimum.
1.5.2Motor current overload and other electrical faults, including phase loss, phase imbalance, or phase reversal.
1.5.3Drive failure alarm
1.5.4VFD shall be appropriately matched to the motor.
1.5.5VFD shall have a NEMA rated enclosure suitable for location and outdoor use .
1.6Provide all electrical wiring necessary for the installation of equipment according to local electrical codes.
2.0GENERAL REQUIREMENTS:

The contractor shall be responsible for performing any act or operation which may be necessary to properly install the equipment described above.

2.1It shall be the responsibility of the contractor to complete work in accordance with the manufacturer’s recommendations and Industry Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with applicable codes and recommendations, the contractor shall bring it to the attention of the Contracting Officer for immediate resolution.
2.2Contractor shall provide submittals for products used. O&M manuals shall be provided prior to final payment.
3.0PROJECT SCHEDULE:
3.190 days from notice to proceed.
4.0ATTACHMENTS:
4.1Mechanical Specification Sheet for cooling tower.
4.2Pictures of cooling tower.