worklist.pdf

PDF 197 KB Posted

Attached to
Acrow Bridge Maintenance and Repair Federal contract opportunity
Solicitation number
AG-0116-S-15-0033
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Worklist

View the file

Other files for this federal contract opportunity

Other files attached to Acrow Bridge Maintenance and Repair, newest first.
File Type Posted
Amendment_002.pdf PDF
Amendment_001.pdf PDF
Davis_Bacon_Wages_-_AK_Highway.docx DOCX document
series_300_steel_Riband_c.pdf PDF
bridge_wear_surface_typical_dwg_(1).pdf PDF
AcrowNaukatiMap.pdf PDF
series_300_steel_Riband_b.pdf PDF
series_300_steel_Riband_a.pdf PDF
Existing_Bridge_Photos.docx DOCX document
sd-900-3_Backwall.pdf PDF
Solicitation_-_AG-0116-S-15-0033_-_Acrow_Bridge_Repair.pdf PDF
AcrowThorneBayMap.pdf PDF
Object_marker_detail.pdf PDF
AcrowWhalePassMap.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acrow Bridge Repairs Worklist

Road No Milepost Work Description

3060000 0.54 75' Acrow bridge. Remove old wear surface on bridge and replace with new wear surface, full size 3”x12” untreated planks. Wear surface is 75’ long X 16’ wide.

2720000 0.145

55' Acrow bridge. Remove old wear surface on bridge and replace with new wear surface, full size 3”x12” untreated planks. Wear surface is 55’ long X 16’ wide. Remove old wood deck and replace with treated timber deck, full size 4”x12” treated timbers.

Bridge deck is 55’ long X 18’ wide. Remove log backwall and replace with treated timber backwall. Install 4 new objects markers. Install two 5 ft. pieces of Riband with hardware, one on each side of bridge.

Note: The Backwall typical drawing is not specific to the Acrow bridge. The drawing will require field modification to insure that the backwall separates all road fill from the sills and superstructure. Modifications require approval from the COR.

2058000 0.71 77” Acrow bridge. Remove old wear surface and replace with new wear surface, full size 3”X12” untreated planks. Wear surface is 77’ long X 16’ wide. Remove 4 old object markers and replace with new object markers.

3013150 0.63

75'6” Acrow bridge. Remove old wear surface on bridge and replace with new wear surface, full size 3”x12” untreated planks. Wear surface is 75’6”’ long X 16’ wide.

Remove old wood deck and replace with treated timber deck, full size 4”x12” treated timbers. Bridge deck is 75’6” long X 18’ wide. Remove log backwall and replace with treated timber backwall. Install 4 new objects markers. Install 16 ft. of Riband with hardware on the right side of bridge and 6 ft. of Riband on the left side of bridge.

Note: The Backwall typical drawing is not specific to the Acrow bridge. The drawing will require field modification to insure that the backwall separates all road fill from the sills and superstructure. Modifications require approval from the COR.

File details come from the government source that posted it. Updated .