worklist.pdf
PDF 197 KB Posted
- Attached to
- Acrow Bridge Maintenance and Repair Federal contract opportunity
- Solicitation number
- AG-0116-S-15-0033
About this file
Worklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_002.pdf | ||
| Amendment_001.pdf | ||
| Davis_Bacon_Wages_-_AK_Highway.docx | DOCX document | |
| series_300_steel_Riband_c.pdf | ||
| bridge_wear_surface_typical_dwg_(1).pdf | ||
| AcrowNaukatiMap.pdf | ||
| series_300_steel_Riband_b.pdf | ||
| series_300_steel_Riband_a.pdf | ||
| Existing_Bridge_Photos.docx | DOCX document | |
| sd-900-3_Backwall.pdf | ||
| Solicitation_-_AG-0116-S-15-0033_-_Acrow_Bridge_Repair.pdf | ||
| AcrowThorneBayMap.pdf | ||
| Object_marker_detail.pdf | ||
| AcrowWhalePassMap.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acrow Bridge Repairs Worklist
Road No Milepost Work Description
3060000 0.54 75' Acrow bridge. Remove old wear surface on bridge and replace with new wear surface, full size 3”x12” untreated planks. Wear surface is 75’ long X 16’ wide.
2720000 0.145
55' Acrow bridge. Remove old wear surface on bridge and replace with new wear surface, full size 3”x12” untreated planks. Wear surface is 55’ long X 16’ wide. Remove old wood deck and replace with treated timber deck, full size 4”x12” treated timbers.
Bridge deck is 55’ long X 18’ wide. Remove log backwall and replace with treated timber backwall. Install 4 new objects markers. Install two 5 ft. pieces of Riband with hardware, one on each side of bridge.
Note: The Backwall typical drawing is not specific to the Acrow bridge. The drawing will require field modification to insure that the backwall separates all road fill from the sills and superstructure. Modifications require approval from the COR.
2058000 0.71 77” Acrow bridge. Remove old wear surface and replace with new wear surface, full size 3”X12” untreated planks. Wear surface is 77’ long X 16’ wide. Remove 4 old object markers and replace with new object markers.
3013150 0.63
75'6” Acrow bridge. Remove old wear surface on bridge and replace with new wear surface, full size 3”x12” untreated planks. Wear surface is 75’6”’ long X 16’ wide.
Remove old wood deck and replace with treated timber deck, full size 4”x12” treated timbers. Bridge deck is 75’6” long X 18’ wide. Remove log backwall and replace with treated timber backwall. Install 4 new objects markers. Install 16 ft. of Riband with hardware on the right side of bridge and 6 ft. of Riband on the left side of bridge.
Note: The Backwall typical drawing is not specific to the Acrow bridge. The drawing will require field modification to insure that the backwall separates all road fill from the sills and superstructure. Modifications require approval from the COR.
File details come from the government source that posted it. Updated .