0116S150026POWKioskAttachments.pdf

PDF 2 MB Posted

Attached to
Prince of Wales Island Interpretive Kiosks
Solicitation number
AG-0116-S-15-0026
Issued by

About this file

attachments

View the file

Other files

File Type Posted
0116S150026_A0001.pdf PDF
0116S150026POWKiosk_050615.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE

Forest Service Special Project Specifications

Prince of Wales Island Interpretive Kiosks

USDA Forest Service

5/7/2015

SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01110

SUMMARY OF WORK

PART 1 - GENERAL

1.01 DESCRIPTION

A. Description: This contract is for the construction and installation of five similar interpretive sign kiosks at five sites on Prince of Wales Island. It includes site improvement work. Work that is illustrated but excluded from the contract includes the artwork panel carving and installation on each kiosk and the fabrication and installation of the final interpretive panels on each kiosk.

PART 2 – PRODUCTS

2.01 DEFINITIONS

A. "Material" includes all lumber, hardware, fasteners, millwork, roofing, concrete, crushed rock, etc.

PART 3 - EXECUTION

3.01 ACCESS

A. Access to the sites is available via the road system on Prince of Wales Island. All sites are adjacent to the road or parking areas.

3.02 COMMUNICATIONS

A. Maintain a form of communication such as internet, wireless or satellite phone that carries data or voice communications to facilitate communication with the Government.

Schedule teleconferences every three days.

3.03 FABRICATION

A. Fabrication and pre-finishing of kiosk components may occur at a work site remote from the installation sites.

END OF SECTION

SECTION 01111

MOBILIZATION

A. PART 1 - GENERAL

1.1 DESCRIPTION

A. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.

1.2 PAYMENT

A. Pay for the accepted work at the contract unit price for the PAY ITEM shown in THE SCHEDULE

OF ITEMS.

B. Make progress payments for mobilization as follows:

1. Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.

2. When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.

3. When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.

4. Pay any unpaid amount for mobilization upon final acceptance of all work items.

SECTION 01330

SUBMITTALS

1.01 SUBMITTAL PROCEDURES

A. Provide submittals in timely manner to ensure sufficient time to complete all required reviews prior to required construction window. Allow 10 workdays for review. If a submittal is rejected, a resubmittal is required, and the time for review is restarted.

B. Submit all design submittals in electronic PDF format to the COR.

A. Provide a sample of the finished wood adze treatment on red cedar, minimum face size 12” wide x 24” long, for COR’s approval.

PART 3 – EXECUTION

3.1 MATERIAL SUBMITTALS

A. Provide manufacturer supplied cut sheets and installation submittals for all commercial items to include the items below as described above and in the following sections:

• Copper roofing

• Wood adze treatment

• Wood stain

• Rock aggregate grade D1

• Typical boulders

SECTION 01331

CONSTRUCTION LAYOUT

PART 1 – GENERAL

1.01 SUMMARY

A. Section includes the layout of the project for construction.

None

3.01 Project Layout

A. Provide all survey work necessary to lay out the work according to the plans and specifications.

Provide vertical control for all work based on the grading plan or as staked by the Government.

B. The COR will stake the area of construction and location of key elements prior to Contractor starting work.

C. After clearing, grubbing and rough grading of the roadway, parking areas and pads, field stake the corners and grades of the kiosk structure and footing, and other features. Obtain approval of staking before proceeding with work. The Government may make changes to the layout and site grading at this time to better fit the site. If adjustments are made, provide survey and staking of the revised plan to ensure its full implementation.

D. The COR will field stake the locations and types of boulders “A, B & C” as well as the boulder retaining wall locations.

SECTION 02230

CLEARING AND GRUBBING

Part 1 - GENERAL

1.1 Summary

A. This section specifies clearing, grubbing, removing, and disposing of all vegetation and debris within the clearing limits except objects designated to remain.

B. Clearing Limits.

1. Clearing limits for brush, and for trees 8” in diameter and under, are 4’ from the edge of all NEW OR TO BE IMPROVED pads, trails, and pathways as shown in drawings. Retain all trees within this area over 8” in diameter unless marked for removal.

Part 2 - PRODUCTS (not used)

Part 3 - EXECUTION

3.1 Surface Preparation

A. Clearing.

1. Clear all trees, brush and other objects not designated to remain.

B. Grubbing.

1. Grub stumps, shrubs, brush, and roots within the excavation limits.

3.2 Debris Disposal

A. Haul all cleared and grubbed material, and thinned material located within 5’ of roads, paths and pads or within 100’ of a water body and not designated for use as firewood, to an approved debris disposal site.

B. An approved disposal site will be provided at each location for disposal of cleared plant materials.

C. Haul other removed materials off site.

3.3 Clearing

A. Do not remove any trees or other vegetative material outside the grading limit lines without approval of the COR.

SECTION 02410

DEMOLITION

PART 1 – GENERAL

1.01 SUMMARY

A. Section includes removal of identified signs, wheel stops and surfacing materials. It includes the salvage and reuse of garbage and recycling containers, surfacing materials and miscellaneous items.

A. None

3.01 REMOVAL AND REUSE OF REMOVED MATERIALS

A. Garbage and Recycling Containers, Signs and Signposts: Protect from damage to items and paint finishes. Relocate on project site.

B. Remove other demolished materials and dispose off-site at a suitable facility.

SECTION 03300

CAST-IN-PLACE CONCRETE

PART 1- GENERAL

A. This section of the specifications covers the requirements for furnishing and installing cast-in-place concrete footings, in conjunction with notes as shown on Drawings.

1.2 REFERENCE SPECIFICATION

A. ACI 301-05 - Standard Specifications for Structural Concrete.

B. International Building Code (IBC) - Chapter 19.

C. American Society for Testing and Materials (ASTM).

PART 2 - MATERIALS

2.1 CONCRETE MIXTURES

A. Provide Type I or Type II concrete. Conform to Table 938-2.

Table 938-2 Property Specification

Cement content 611 pounds per cubic yard minimum Water/cement ratio 0.49 maximum Slump 5 inches maximum Air content 4 % minimum Size of coarse aggregate AASHTO M 43 with 100% passing the 1.5 inch sieve 28-day compressive strength 3,000 pounds per square inch minimum

Do not use calcium chloride or admixtures containing chloride from sources other than impurities in admixture ingredients.

3.1 FOOTINGS

Obtain government approval of subgrade before pouring footings.

Remove and dispose of existing organic and/or unsuitable material below bottom of proposed footings. Excavate to competent bearing material.

Remove exposed tree roots on or in the proposed footing location that are greater than 1/8" in diameter. Fill holes caused by rock and root removal with suitable material and compact to form a smooth subgrade.

Place and compact D1 aggregate at a minimum 6 inch thickness below bottom of footing.

Compact by hand over the full area of each layer until visual displacement ceases. Following compaction, correct any irregularities or depressions that develop by adding or removing material until the surface is smooth and uniform.

After completing footing work and allowing for concrete to cure, backfill with compacted Grade

D1 aggregate

3.2 CONCRETE PLACEMENT

Clear subgrade of excess moisture and ponding.

Place concrete to avoid segregation of materials. Do not exceed 30 minutes between delivery of batch for a single pour.

Finish surface to a medium broom texture free of large aggregates or voids.

Cure concrete a minimum of 7 days. Protect curing concrete from rain or weather for a minimum of 2 days by covering with a water-impermeable barrier.

END SECTION

SECTION 06100

CARPENTRY

A. This section of the specifications covers the requirements for the wood kiosks.

1.2 RELATED SECTIONS

A. NOT INCLUDED

1.3 REFERENCES

A. Provide lumber graded in accordance with official grading rules of The Western Wood Products Association (WWPA) Western Lumber Grading Rules, West Coast Lumber Inspection Bureau (WCLIB), or National Lumber Grades Authority (NLGA).

B. International Building Code, current edition, Chapter 23 – WOOD.

C. American Society for Testing and Materials (ASTM).

1.4 HANDLING

A. Ship and store lumber to protect from exposure to moisture, store in dry location until incorporated into the work.

B. Handle lumber with rope slings. No cant dogs, peaveys, hooks or pike poles shall be used. Use slings or other devices to protect corners of heavy construction timbers and banded packages of heavy construction timber.

1.5 INSPECTION

A. Provide #1 red cedar wood posts and beams. COR to inspect and approve prior to start of fabrication.

2.2 TIMBER, LUMBER AND BOARDS

A. Lumber for Site Improvements

1. Kiosk: Western Red Cedar, No. 1.

2. Moisture Content

i. Dimensional lumber less than 2”: kiln or air dried to a maximum moisture content of 19%.

ii. Dimensional lumber greater than 2”: unseasoned; air dried to ambient air moisture content.

2.3 METAL FASTENERS AND ACCESSORIES

A. Provide all necessary nails, screws, and bolts for proper installation of rough carpentry;

sizes and quantities as indicated. Unless otherwise noted, fasteners shall be of a size and type to suit application. Accessories shall include bolts with necessary nuts and washers, timber connectors, drift pins, dowels, nails, screws, straps and other metal fasteners.

B. Bolts shall be provided with washers under nut and head. Washers shall be provided under lag screw heads.

C. Common nails shall be round wire of standard form.

D. All bolts, screws, nuts, dowels, washers, nails, drift pins and all other fastening hardware shall be galvanized in accordance with ASTM A153.

2.4 ROOFING

A. Roofing shall be COPPER metal, 26 gage minimum, structural standing seam snap lock system roofing with matching flashing and fasteners. Provide roofing in precut lengths ready for installation. Color: Copper. Submit sample to COR approval.

B. Roofing felt shall be 30 lb roofing felt, F.S. HH-R-595, Type 30A, Style A, (30-lbs/sq.) or ASTM D226, Type II.

C. Roofing fasteners shall be copper as recommended by the roofing manufacturer.

2.5 KIOSK TEMPORARY SIGN

A. Install temporary wood boards in locations of future interpretive panels. COR to supply a temporary laminated sign to be secured to the wood boards. Contractor to provide shop drawings of temporary panel installation to COR for approval prior to installation.

3.1 GENERAL

A. Construct all items in locations and to elevations indicated on the plans, in conformance with details. Prepare subgrades, footings and foundations in accordance with applicable sections of these Specifications. Coordinate the work of all trades.

3.2 FASTENING

A. Nailing per IBC Table 2304.9.1 – Fastening Schedule unless indicated otherwise on Drawings. Use sufficient nails, drift pins, screws, and bolts to insure rigidity and permanence. Use framing anchors as shown on the drawings or where specified nailing is not possible. Make tight connection between members. Install fasteners without splitting wood; pre-drill as required.

B. Pre-drill for all lag screws using two diameters, one for the shank and one for the threads.

The lead hole for the shank is to be 1/16” diameter larger than the shank diameter and is to be bored to the depth of penetration of the shank. The lead hole for the threaded portion is to be 70% of the screw diameter as shown on the drawings and is to be bored at least to the length of the threads. Do not drive lag screws with a hammer.

C. Drill holes for bolts 1/16” larger than bolt diameter. Cut and peen all bolts after the nuts have been fully tightened, maximum 3/16”, touch up with galvanized paint.

D. Pre-drill holes for nails and spikes 75% of nail/spike diameter.

E. Bolts and screws shall be effectively tightened when installed and shall be re-tightened before final acceptance.

3.3 FRAMING

A. Carefully lay out and erect items. Install all work to required levels and lines, with members plumb, true to line, cut, and fitted.

B. Construct members of continuous pieces.

C. Fit to other construction; scribe and cope as needed for accurate fit.

D. Accurately cut and frame lumber in such manner that joints will have a close fit over the entire contact surfaces, except as noted otherwise in the drawings. No shimming will be permitted in making joints. Open joints not acceptable.

E. Align bolts and screws horizontally and vertically, countersink and plug where indicated.

Plug to be flush with adjacent surface.

3.4 SURFACE TREATMENT BEFORE FINISH

A. Prior to the application of finishes, treat wood members as follows:

1. Provide adze finish on all exposed wood posts, beams and roof joists except as follows:

a. Provide smooth sanded finish to area beneath artwork panel location.

SECTION 09930

STAINS AND TRANSPARENT FINISHES

1.1 SUMMARY

A. Section includes exterior wood finish

1.2 SUBMITTALS

A. Submittal procedures to comply with Section 013300.

1.3 DELIVERY, STORAGE & HANDLING

A. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.

PART 2 - PRODUCTS

1.1 WOOD FINISH

A. Provide Sikkens Cetol Log and Siding finish; COLOR: Natural, for all exposed wood surfaces.

3.1 APPLICATION

A. Exterior wood finish: Apply three coats, for all exposed wood surfaces including posts, beams, rafters, blocking, etc. Apply in accordance with manufacturer’s directions.

Thoroughly saturate end grain of all finished members.

SECTION 31230

EXCAVATION AND FILL

A. This work shall consist of excavation and shaping of gravel in locations noted on the plans.

Work includes excavation of unsuitable material, embankment construction, and disposal of excavated material necessary for the completion of construction.

2.1 EMBANKMENT MATERIAL

A. Provide material in accordance with FP-03.

1.1 CLEARING AND GRUBBING

A. Clearing and grubbing shall be accomplished before excavation or embankment placement begins.

3.2 EXCAVATION

A. Excavate as required to accommodate the new construction. Establish subgrade to an elevation below the finished grade to accommodate embankment and surfacing as specified and detailed on the plans.

B. Make excavations for posts and concrete footings to dimensions shown on the drawings.

Take care not to disturb bottom of excavations.

3.3 UTILIZATION OF EXCAVATED MATERIALS

A. Approved excavated material shall be used in the construction of embankment, subgrade, bedding, and backfill for the structure.

B. Unsuitable material shall be excavated. Excavated areas shall be backfilled with embankment material when necessary to complete the work. Frozen material shall not be placed in embankments.

C. Stockpile all excavated soil as approved and stockpile for use as planting soil.

3.4 OVERBUILDING AND LANDSCAPE PROTECTION

B. Confine excavation and embankment material to within the clearing limits to protect the native landscape.

3.5 GRADING

A. Uniformly grade areas within all work areas and establish natural transitions to adjacent undisturbed surfaces as approved. Finish surfaces free from irregularities and abrupt changes in grade.

B. Grade surface under concrete slab smooth and even, free of voids, compacted as specified and to required elevation. Grade areas adjacent to concrete slab to drain away from kiosk and to prevent ponding. Slope grade away from kiosk 2.5 inches in 10 feet.

SECTION 32150

AGGREGATE AND STONE

A. Work covered under this section shall consist of furnishing, hauling and placing commercially produced gravel and stone boulders for trails, pathways, and pads.

1.2 REFERENCE SPECIFICATION

A. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03

1.3 RELATED WORK

A. Section 312300, Excavation and Fill

2.1 BASE COURSE

A. Not used at this time.

2.2 AGGREGATE SURFACE COURSE

A. Where "surface course" refers to an aggregate surface, use “Surface Course Aggregate”

Grade D1.

2.3 STONE BOULDERS

A. Install stone boulders (Stone Boulders are defined as Rock ‘A’, ‘B’, ‘C’ on the drawings) in rock cluster configuration and sizes as staked.

B. Stone boulders to be from local sources. Stone boulders will be government provided at the El Cap site. The boulder site is located on the 1500000 road, approximately 0.5 miles Southeast of El Cap cave.

3.1 PREPARATION OF SUBGRADES

A. Establish subgrade as required and in conformance with Section 312300.

B. Prior to placement of any materials specified under this section, the subgrade shall be prepared by dressing, shaping, wetting or drying and compacting. Compacted subgrades require approval of the COR prior to final surfacing. Scarify, moisture condition, and recompact as required to achieve compaction.

C. Any ruts or soft yielding spots that may appear shall be corrected by loosening and removing unsatisfactory material and adding approved material as required, reshaping and recompacting the affected areas to the lines and grades indicated on the plans.

3.2 COMPACTION

A. Moistened or dry aggregate to uniform moisture content suitable for compaction.

B. Compact all gravel by mechanical vibratory over the full area of each layer until visual displacement ceases but no fewer than three complete passes.

3.3 THICKNESS REQUIREMENTS

A. The thickness of the compacted aggregate shall not vary more than ½ inch. The compacted thickness shall not be consistently above or below the specified thickness.

3.4 AGGREGATE FINISHING FOR WHEELCHAIR ACCESSIBLE SURFACE

A. All aggregate surfacing is wheelchair accessible surface.

General Decision Number: AK150001 04/10/2015 AK1

Superseded General Decision Number: AK20140001

State: Alaska

Construction Types: Building and Heavy

Counties: Alaska Statewide.

BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015 1 01/09/2015 2 01/23/2015 3 02/06/2015 4 02/20/2015 5 03/27/2015 6 04/03/2015 7 04/10/2015

ASBE0097-001 09/02/2013

Rates Fringes

Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 34.88 18.67

ASBE0097-002 09/02/2013

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 34.88 18.67

BOIL0502-002 01/01/2013

Rates Fringes

BOILERMAKER......................$ 42.97 26.60

BRAK0001-002 07/01/2014

Rates Fringes

Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 39.03 18.95 Tile & Terrazzo Finisher.........$ 33.27 18.95

* CARP1501-001 09/01/2014

Rates Fringes

MILLWRIGHT.......................$ 35.74 21.29

* CARP2520-003 09/01/2014

Rates Fringes

Diver Stand-by....................$ 41.65 23.34 Tender......................$ 40.65 23.34 Working.....................$ 81.45 23.34 Piledriver Carpenter...................$ 37.34 23.34 Piledriver; Skiff Operator and Rigger..................$ 37.34 23.34 Sheet Stabber...............$ 36.59 22.59 Welder......................$ 42.90 23.34

DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:

50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot

ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:

5-50 FEET $1.00 PER FOOT/DAY

51-100 FEET $2.00 PER FOOT/DAY

101 FEET AND ABOVE $3.00 PER FOOT/DAY

SATURATION DIVING:

The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

* CARP4059-001 09/01/2014

Rates Fringes

CARPENTER

Carpenter...................$ 37.34 23.34 Lather/Drywall Applicator...$ 36.59 22.59

ELEC1547-004 04/01/2015

Rates Fringes

CABLE SPLICER....................$ 39.82 3%+23.96

ELECTRICIAN......................$ 39.47 3%+24.21

ELEC1547-005 04/01/2015

Line Construction

Rates Fringes

CABLE SPLICER....................$ 52.27 3%+28.33

Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+28.33 Powderman........................$ 48.52 3%+28.33

TREE TRIMMER.....................$ 35.34 3%+21.51

ELEV0019-002 01/01/2015

Rates Fringes

ELEVATOR MECHANIC................$ 51.34 28.38+a+b

FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:

New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving and Christmas Day

ENGI0302-002 01/01/2015

Rates Fringes

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 40.03 21.10

GROUP 1A....................$ 41.79 21.10

GROUP 2.....................$ 39.26 21.10

GROUP 3.....................$ 38.54 21.10

GROUP 4.....................$ 32.33 21.10

TUNNEL WORK

GROUP 1....................$ 44.03 21.10

GROUP 1A...................$ 45.97 21.10

GROUP 2....................$ 43.19 21.10

GROUP 3....................$ 42.39 21.10

GROUP 4....................$ 35.56 21.10

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;

Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;

Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:

Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler

GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),

(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.

and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;

Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;

GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;

Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;

Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.

GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;

Bombardier (tack or tow rig); Boring Machine; Brooms-power;

Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor

GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.

FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.

IRON0751-003 08/01/2013

Rates Fringes

Ironworkers:

BRIDGE, STRUCTURAL,

ORNAMENTAL, REINFORCING

MACHINERY MOVER, RIGGER,

SHEETER, STAGE RIGGER,

BENDER OPERATOR.............$ 33.55 25.53

FENCE, BARRIER AND

GUARDRAIL INSTALLERS........$ 30.05 25.53

GUARDRAIL LAYOUT MAN........$ 30.79 25.53

HELICOPTER, TOWER...........$ 34.55 25.53

LABO0341-005 09/01/2014

Rates Fringes

Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees

GROUP 1.....................$ 29.24 23.43

GROUP 2.....................$ 30.24 23.43

GROUP 3.....................$ 31.14 23.43

GROUP 3A....................$ 34.42 23.43

GROUP 3B....................$ 35.25 23.43

GROUP 4.....................$ 18.81 23.43

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 32.16 23.43

GROUP 2....................$ 33.26 23.43

GROUP 3....................$ 34.25 23.43

GROUP 3A...................$ 37.86 23.43

GROUP 3B...................$ 38.78 23.43

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber

Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

LABO0942-001 09/01/2014

Rates Fringes

Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees

GROUP 1.....................$ 29.24 23.43

GROUP 2.....................$ 30.24 23.43

GROUP 3.....................$ 31.14 23.43

GROUP 3A....................$ 34.42 23.43

GROUP 3B....................$ 35.25 23.43

GROUP 4.....................$ 18.81 23.43

TUNNELS, SHAFTS, AND RAISES

GROUP 1....................$ 32.16 23.43

GROUP 2....................$ 33.26 23.43

GROUP 3....................$ 34.25 23.43

GROUP 3A...................$ 37.86 23.43

GROUP 3B...................$ 38.78 23.43

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;

Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;

Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;

Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;

Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner

GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);

Culvert Pipe Laborer; Cured in place Pipelayer;

Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman

GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;

Multiplate; Slurry Seal Squeegee Man

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

GROUP 4: Final Building Cleanup

TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS

GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;

Tunnel Track Laborer

GROUP 2: Burning and Cutting Torch; Concrete Laborers;

Jackhammers; Nozzleman, Pumpcrete or Shotcrete.

GROUP 3: Miner; Retimberman

GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);

Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.

GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)

Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.

PAIN1959-001 04/01/2014

NORTH OF THE 63RD PARALLEL

Rates Fringes

PAINTER

BRUSH/ROLLER PAINT OR WALL

COVERER.....................$ 31.10 19.48

TAPING, TEXTURING,

STRUCTURAL PAINTING,

SANDBLASTING, POT TENDER,

FINISH METAL, SPRAY,

BUFFER OPERATOR, RADON

MITIGATION, LEAD BASED

PAINT ABATEMENT, HAZARDOUS

MATERIAL HANDLER............$ 31.62 19.48

PAIN1959-002 04/01/2014

SOUTH OF THE 63RD PARALLEL

Rates Fringes

Painters:

Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 29.34 19.23 Machine Taper/Drywall.......$ 30.59 19.23 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 30.69 19.23

PAIN1959-003 01/01/2015

NORTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 37.52 19.70

PAIN1959-004 07/01/2012

Rates Fringes

FLOOR LAYER: Carpet.............$ 30.09 13.02

PAIN1959-006 01/01/2015

SOUTH OF THE 63RD PARALLEL

Rates Fringes

GLAZIER..........................$ 37.52 18.98

PLAS0867-001 02/01/2015

Rates Fringes

PLASTERER

North of the 63rd parallel..$ 36.94 20.22 South of the 63rd parallel..$ 36.69 20.22

PLAS0867-004 02/01/2015

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

North of the 63rd parallel..$ 36.69 20.22 South of the 63rd parallel..$ 36.44 20.22

PLUM0262-002 07/01/2013

East of the 141st Meridian

Rates Fringes

Plumber; Steamfitter.............$ 36.02 25.62

PLUM0367-002 07/01/2013

South of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 38.46 20.74

PLUM0375-002 07/01/2014

North of the 63rd Parallel

Rates Fringes

Plumber; Steamfitter.............$ 40.96 21.25

PLUM0669-002 07/01/2013

Rates Fringes

SPRINKLER FITTER.................$ 42.05 21.67

SHEE0023-003 07/01/2014

South of the 63rd Parallel

Rates Fringes

Sheet Metal Worker...............$ 40.49 20.40

SHEE0023-004 07/01/2014

North of the 63rd Parallel

Rates Fringes

SHEET METAL WORKER...............$ 45.68 20.31

TEAM0959-003 09/01/2014

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 39.09 20.02

GROUP 1A....................$ 40.36 20.02

GROUP 2.....................$ 37.83 20.02

GROUP 3.....................$ 37.01 20.02

GROUP 4.....................$ 36.43 20.02

GROUP 5.....................$ 35.67 20.02

GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler

GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)

GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;

Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;

Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;

Stringing Truck

GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician

GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;

Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;

Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;

Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;

GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;

Gear/Supply Truck; Bus Operator, Up to 30 Passengers;

Rigger/Swamper

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

EXPERIENCE AND CAPABILITY QUESTIONNAIRE -- OMB Clearance Number 9000-0142 Instructions: See Box 10, REMARKS, if extra space is needed to answer any items below. Mark "X" in the appropriate boxes. Please list NA for inapplicable items. Offerer should copy if extra space needed or in another format provide identical information.

1. Contractor's Name, Address & Telephone Number 2. Type of Business

____ Company

____ Corporation

____ Non-profit Organization

____ Co-partner

____ Individual

3. How many years of experience do you have in this line of work? ___________________

4. How many years of experience as a prime contractor? _________ subcontractor? ________

5. List the projects your business has completed in the last 3 years.

Contract

Amount

Type of Project Date

Completed

Name and Telephone Number to Contact

For Information

6. List all of your firm's current contract commitments.

Contract

Number

Contract

Amount

Type of Project Est. Date of

Completion

Name and Telephone Number to

Contact For Information

7a. Have you ever failed to complete any work awarded to you? ____ yes ____ no

7b. Has work ever been completed by performance bond? ____ yes ____ no

7c. If "yes" to either Question 7a. or 7b., please specify location(s) and reason(s):

EXPERIENCE AND CAPABILITY QUESTIONNAIRE -- OMB Clearance Number 9000-0142

8. Organization that will be available for this project:

a. Minimum No. of employees: _______________ Maximum No. of employees:

b. Are employees regularly on your payroll? ____ yes ____ no

c. If applicable, specify equipment available for this contract:

d. If applicable, estimate rate of progress (such as 2.0 acres per day):

Minimum progress rate: __________________________ Maximum progress rate:

9. List the experience of the principal individuals of your business.

Individual's Name Present Position Years Experience Type of Work

10. Remarks:

CERTIFICATION: I certify that all of the statements made above are complete and correct to the best of my knowledge and that ny persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.

Signature Title Date

END OF SECTION
SECTION 01111 MOBILIZATION
1.1 DESCRIPTION
1.2 PAYMENT
SECTION 01330 SUBMITTALS
1.01 SUBMITTAL PROCEDURES
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.1 MATERIAL SUBMITTALS
END OF SECTION
1.01 SUMMARY
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.01 Project Layout
END OF SECTION
1.1 Summary
Part 2 - PRODUCTS (not used)
3.1 Surface Preparation
3.2 Debris Disposal
3.3 Clearing
END OF SECTION
PART 2 – PRODUCTS
PART 3 – EXECUTION
3.01 REMOVAL AND REUSE OF REMOVED MATERIALS
END OF SECTION
1.1 DESCRIPTION
1.2 REFERENCE SPECIFICATION
2.1 CONCRETE MIXTURES
PART 3 - EXECUTION
1.1 DESCRIPTION
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 HANDLING
PART 2 - MATERIALS
2.2 TIMBER, LUMBER AND BOARDS
2.3 METAL FASTENERS AND ACCESSORIES
2.4 ROOFING
2.5 KIOSK TEMPORARY SIGN
PART 3 - EXECUTION
3.1 GENERAL
3.2 FASTENING
3.3 FRAMING
END SECTION
1.1 SUMMARY
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE & HANDLING
PART 2 - PRODUCTS
1.1 WOOD FINISH
PART 3 - EXECUTION
3.1 APPLICATION
END SECTION
1.1 DESCRIPTION
PART 2 - MATERIALS
2.1 EMBANKMENT MATERIAL
PART 3 - EXECUTION
1.1 CLEARING AND GRUBBING
3.2 EXCAVATION
3.3 UTILIZATION OF EXCAVATED MATERIALS
3.4 OVERBUILDING AND LANDSCAPE PROTECTION
3.5 GRADING
END SECTION
SECTION 32150
AGGREGATE AND STONE
1.2 REFERENCE SPECIFICATION
1.3 RELATED WORK
PART 2 - MATERIALS
2.1 BASE COURSE
2.2 AGGREGATE SURFACE COURSE
2.3 STONE BOULDERS
PART 3 - EXECUTION
3.1 PREPARATION OF SUBGRADES
3.2 COMPACTION
3.3 THICKNESS REQUIREMENTS
3.4 AGGREGATE FINISHING FOR WHEELCHAIR ACCESSIBLE SURFACE