SF30_AG-0116-S-12-0122_073012.pdf
PDF 85 KB Posted
- Attached to
- Alder Neck Rare Plant Survey
- Solicitation number
- AG-0116-S-12-0122
About this file
Amendement to solicitation. This amendment discloses the amount of funding available for this project. Offerors should adjust their proposals to fit to the funding constraints. See attached amendment for details.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-0116-S-12-0122
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
KETCHIKAN AK 99901
648 MISSION STREET
TONGASS NF KETCHIKAN AREA FED BLDG
USDA FOREST SERVICE
59347707/16/2012
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/16/2012
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Alder Neck Rare Plant Survey
This amendment makes changes to solicitation provision 452.215-71(b)(3) Instructions for the Preparation of Technical and Business Proposals. This provision is found on page 25 of the solicitation.
Technical Approach instructions are changed from:
3. Technical Approach: A narrative describing the general technical approach to accomplishing the work addressing, at a minimum
(i) Planned method of completing the project
(ii) Logistical issues that have been considered
(iii) Comprehensive work plan and schedule for completion of all aspects of the contract
(iv) Description of survey method to be used
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CATHERINE R. POWELL
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-0116-S-12-0122
(v) Identification of general areas to be surveyed in accordance with Section C.2, paragraph (c).
Changed to read:
3. Technical Approach: A narrative describing the general technical approach to accomplishing the work addressing, at a minimum
(i) Planned method of completing the project
(ii) Logistical issues that have been considered
(iii) Comprehensive work plan and schedule for completion of all aspects of the contract
(iv) Description of survey method to be used
(v) Identification of general areas to be surveyed in accordance with Section C.2, paragraph (c).
(vi) Description of the amount of work that will be provided the government given financial constraints of no more than $100,000 available to commit for the award.
001 Alder Neck Lake Rare Plant Survey Product/Service Code: B510 Product/Service Description: SPECIAL
STUDIES/ANALYSIS- ENVIRONMENTAL ASSESSMENTS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Untitled
File details come from the government source that posted it. Updated .