AG-0116-S-12-0093 Twelve Mile Road Storage.pdf

PDF 2 MB Posted

Attached to
Twelve Mile Road Storage
Solicitation number
AG-0116-S-12-0093
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
S-12-0093 Amd 2.pdf PDF
S-12-0093 Amd 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ X IS IS NOT A SMALL BUSINESS SET- ASIDE 1 40

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

AG-0116-S-12-0093 June 16, 2012 590544

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date)

Tongass National Forest, 123 Scow Bay Loop Road, PO Box 309, Petersburg, AK 99833, FAX (907)772-5894, Email kimtoland@fs.fed.us

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION

NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

Kim Toland (907) 772-5804 a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5a. This request does not commit the Government to pay any costs incurred in the preparation of the

July 15, 2012 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(a) (b) (c) (d) (e) (f)

Twelve Mile Road Storage

In accordance with the attached specifications, terms and conditions.

Enter Prices on

Schedule of Items

Responses to this solicitation can be mailed or hand carried, faxed or emailed to address listed in Item 5a above.

Prospective contractors shall complete electronic annual representations and certifications at http://orca.bpn.gov in conjunction with required registration in the Central Contractor Registration

(CCR) database.

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR

DAYS (%)

c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

Twelve Mile Road Storage, Solicitation: AG-0116-S-12-0093; Purchase Order:

PART I—THE SCHEDULE

SECTION B. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SCHEDULE OF ITEMS

This is a Total Small Business Set-Aside

Item

Number

Description Unit Estimated

Quantity

Unit Price Total

1.1 557(01) Furnish and Install 50’ Log Trail

Bridge, MP 0.455 Road 2122000

Lump

Sum

1 $ $

1.2 802(03) Road Storage Mile

7.11 $ $

1.3 807(03) Medium Excavator Hour

32 $ $

1.4 151(01) Mobilization Lump

Sum

1 $ $

Total $

Additional Vendor Information

Contact Name:

Phone No:

TIN No.:

DUNS No:

Email:

Electronic Funds Transfer Banking Information

Bank

Last Four Numbers of Account

B.1 Site visit is not planned, but offerors should visit the work site at their own convenience.

B.2 Inquiries regarding this acquisition must be directed to the contracting officer. Questions regarding this solicitation are invited on or before July 8, 2012, so the contracting officer can make any needed clarifications or amendments.

SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Scope of Contract

The intent of the contract is to perform road maintenance activities. Work includes installing waterbars, excavate and sidecast road fill material, clearing existing roadway of live trees, blown down trees, and mossy vegetation, remove culverts and log structures, construct fords through streams, repair washed out road surfaces, construct log trail bridge, and seeding and fertilizing exposed organic soils on and along roadsides on approximately 7 miles of National Forest System Roads on the Craig Ranger District. The removed culverts and hardware become the property of the contractor and must be removed from the National Forest. The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and perform all work required to maintain the facilities in accordance with the attached typical drawings, supplemental specifications and parent specifications.

Road storage work in this contract involves stabilizing roads regarding drainage. Work will include a combination of drainage structure removal, ford and waterbar construction, clearing the roadway of brush for project access and proper drainage, and seeding and fertilizing bare organic soils. Work also includes shaping rough sections of roadway caused by stream flows diverted onto the roadway. Shaping the roadway includes using existing roadbed rock borrow to establish a uniform crowned road surface without irregularities.

Road storage work is payable on a per mile basis, regardless of the number of drainage structures removed or constructed for each mile, the number of fords or waterbars constructed, and the amount of seeding and fertilizing required. Refer to the drawings and worklist in Section J for details on each project road.

Finished slopes into excavated structure sites will follow the lines shown on the attached drawings.

The structures listed in the worklog represent known locations of drainage structures needing work.

Additional structures may be located during the project that will require maintenance or removal, any work within the scope of the project associated with additional structures or additional required work to stabilize the roads is considered incidental to the rest of the project work. Interested bidders are encouraged to visit the work sites to view road conditions.

In-stream timing restrictions are included in the contract for work in streams with fish populations. Refer to

Section H for times and locations where this will affect work scheduling.

The Contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.

C.2 Description and Location

The project is located on Prince of Wales Island in southeast Alaska. Hydaburg and Hollis are the nearest communities to the work sites. The roads are passable with 4 wheel drive OHV type vehicles on approximately

¼ of the roads. Some log bridges and many culverts have previously been removed. Road shoulders are lined with brush. Some road segments are heavily brushy even for OHVs, while some segments offer a 20’ wide clear zone of brush. It is the intention to leave as much existing brush as possible in place, however, where brush must be removed it may not be placed in streams, and shall be windrowed below the road with minimal damage to vegetation left in place.

C.3 Project Timing

Other contracts currently underway will be using and blocking some project roads in 2012. Work under this contract on roads 2122000, 2100205, 2100210 and 2100200 will not be allowed during calendar year 2012 due to these projects.

C.4 Signing and Safety

(a) A reflectorized SLOW MOVING VEHICLE emblem shall be attached to any equipment not designed to maintain a safe travel rate or that will be moving at a slow rate while performing maintenance.

(b) It shall be the Contractor’s responsibility to furnish black and orange reflectorized maintenance warning signs to alert motorists of maintenance operations. All signs shall conform to the standards for Temporary

Traffic Control in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). A minimum of one (1) sign at each end of road sections under construction shall be kept in place at all times and shall be moved as work progresses in accordance with the MUTCD.

C.5 Activity Report

The Contractor shall maintain and furnish a Daily Activity Report reporting maintenance activity performed.

Reports shall be furnished to Contracting Officer on a weekly basis. A sample form to be used is included in

Section J.

C.6 Technical Specifications

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL

HIGHWAY PROJECTS, FP-03, U.S. Customary Units

The specifications are included by reference only. The requirements contained in these Standard

Specifications are hereby made a part of this solicitation and any resulting work.

These specifications can be ordered from FHWA. For information on how to order books, go to the FHWA’s website, http://www.wrl.fha.dot.gov/design/specs/fp03.htm. The following supplemental specifications are included:

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest

System Roads. 101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work.

In a timber sale contract, the contractor is the ―purchaser‖.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--―Equitable adjustment,‖ as used in the Federal Acquisition Regulations, or

―construction cost adjustment,‖ as used in the Timber Sale Contract, as applicable.

Change--―Change‖ means ―change order‖ as used in the Federal Acquisition Regulations, or ―design change‖ as used in the Timber Sale Contract.

Design Quantity--―Design quantity‖ is a Forest Service method of measurement from the FS-96 Forest Service

Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term ―Contract Quantities‖.

http://www.wrl.fha.dot.gov/design/specs/fp03.htm http://www.nist.gov/

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of

Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Stream—A channel that is at least one foot wide that has evidence of routine periodic or constant flow, may be dry during extended periods of dry weather. Mossy seeps and small springs in the cutbanks are generally not considered streams.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section

625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

―except as provided in Subsection 106.07‖.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill.

Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

―(b) Cubic yard‖ to ―(c) Cubic yard‖.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic

156.00_nat_us_04_17_2007

Delete Section 156 in its entirety and replace with the following:

Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Construction sign panels 633

Retro-reflective sheeting 718.01

Temporary concrete barrier 618

Temporary plastic fence 710.11

Temporary traffic control devices 718.22

156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 15 minutes at any one time followed by an open period of no less than 15 minutes.

Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with

MUTCD. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the

National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown.

Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1

Temporary Road Closures

Road

Number

From

Terminus

To Terminus Maximum

Consecutive

Days of

Closure

Minimum

Consecutive

Days Open

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.

201 - Clearing and Grubbing

201.01_nat_us_02_18_2005

201.01 Description

Replace with the following

This work consists of clearing alder and conifer trees and other brush on roadways and road shoulders for equipment access along older single lane logging roads. Clearing widths will be kept as narrow as needed for moving equipment. All slash and debris resulting from clearing operations will be removed from ditches to not impede drainage patterns.

203 - Removal of Structures and Obstructions

203.01_nat_us_02_25_2005

203.01 Description.

Delete and replace with the following:

This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, bridges, utilities, curbs, sidewalks, and other obstructions.

204 - Excavation and Embankment

204.00_nat_us_03_26_2009

Replace Section 204 in its entirety with the following:

204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by

Subsections 204.05, 204.06(b), and 204.06(c).

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(1) Preparing foundation for embankment;

(2) Constructing roadway embankments;

(3) Benching for side-hill embankments;

(4) Constructing dikes, ramps, mounds, and berms; and

(5) Backfilling subexcavated areas, holes, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

Material

204.03 Conform to the following Subsections:

Backfill material 704.03

Select borrow 704.07

Select topping 704.08

Topping 704.05

Unclassified borrow 704.06

Water 725.01

Construction Requirements

204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.

204.05 Reserved.

204.06 Roadway Excavation. Excavate as follows:

(a) General. Do not disturb material and vegetation outside the construction limits.

Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material according to

Subsection 204.14.

At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section.

Eliminate all ruts and low spots that could hold water.

Retrieve material deposited outside of the clearing limits as directed by the CO. Place unsuitable material in designated areas.

(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11

(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.

(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.

Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.

204.07 Subexcavation. Excavate material to the limits designated by the CO. Take cross-sections according to

Section 152. Prevent unsuitable material from becoming mixed with the backfill. Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping, or other suitable material. Compact the material according to Subsection 204.11.

204.08 Borrow Excavation. Use all suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the appropriate borrow excavation quantity.

Obtain borrow source acceptance according to Subsection 105.02. Develop and restore borrow sources according to Subsection 105.03. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.

204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:

(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.

(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement.

Reduce all particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.

(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.

(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench.

204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment.

When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:

(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.

During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.

Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.

Where placing embankment on one side of abutments, wing walls, piers, or culvert headwalls, compact the material using methods that prevent excessive pressure against the structure.

Where placing embankment material on both sides of a concrete wall or box structure, conduct operations so compacted embankment material is at the same elevation on both sides of the structure.

Where structural pilings are placed in embankment locations, limit the maximum particle size to 4 inches.

(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding

12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch layers by reducing them in size or placing them individually as required by (c) below. Compact each layer according to

Subsection 204.11 before placing the next layer.

Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing them individually according to (c) below. Place sufficient earth and smaller rocks to fill the voids. Compact each layer according to Subsection 204.11 before placing the next layer.

(c) Individual rock fragments and boulders. Place individual rock fragments and boulders greater than 24 inches in diameter as follows:

(1) Reduce rock to less than 48 inches in the largest dimension.

(2) Distribute rock within the embankment to prevent nesting.

(3) Place layers of embankment material around each rock to a depth not greater than that permitted by

(b) above. Fill all the voids between rocks.

(4) Compact each layer according to Subsection 204.11 before placing the next layer.

(d) Embankment outside of roadway prism. Where placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer according to Subsection 204.11.

204.11 Compaction. Compact the embankment using one of the following methods as specified:

(a) Compaction A. Use AASHTO T 27 to determine the amount of material retained on a Number 4 sieve. If there is more than 80 percent retained on the No. 4 sieve use procedure (1). If there is 50 to 80 percent retained on the No. 4 sieve use procedure (2). If there is less than 50 percent retained on the No. 4 sieve use procedure (3).

(1) Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.

(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

(b) Eight roller passes of a 20-ton compression-type roller.

(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.

Increase the compactive effort for layers deeper than 12 inches as follows:

For each additional 6 inches or fraction thereof, increase the number of roller passes in (a) above by four passes.

For each additional 6 inches or fraction thereof, increase the number of roller passes in (b) and (c) above, by eight passes.

(2) Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a

No. 4 sieve. Multiply this number by the percentage of material passing a No. 4 sieve, and add 2 percent to determine the optimum moisture content of the material. Adjust the moisture content of material classified

A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.

Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width according to (1) above.

(3) Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 180, method D. For other material classifications, determine the optimum moisture content and maximum density according to AASHTO T 99, method C.

Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.

Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to

AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.

(b) Compaction B. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller ―walks out‖ of the layer. Make at least three complete passes.

(c) Compaction C. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.

204.12 Ditches. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or similar matter.

Maintain all ditches in an open condition and free from leaves, sticks, and other debris.

Form furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place all excavated material on the downhill side so the bottom of the ditch is approximately 18 inches below the crest of the loose material. Clean the ditch using a hand shovel, ditcher, or other suitable method. Shape to provide drainage without overflow.

204.13 Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows:

(a) Sloping. Leave all earth slopes with uniform roughened surfaces, except as described in (b) below, with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of all slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale all rock slopes. Slope rounding is not required on tolerance class D though M roads.

If a slide or slipout occurs on a cut or embankment slope, remove or replace the material, and repair or restore all damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition.

(b) Stepped slopes. Where required by the contract, construct steps on slopes of 1⅓V:1H to 1V:2H. Construct the steps approximately 18 inches high. Blend the steps into natural ground at the end of the cut. If the slope contains nonrippable rock outcrops, blend steps into the rock. Remove loose material found in transitional area.

Except for removing large rocks that may fall, scaling stepped slopes is not required.

(c) Shaping. Shape the subgrade to a smooth surface and to the cross-section required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.

(d) Finishing. Finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections.

Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.Ensure that the subgrade is visibly moist during shaping and dressing.

Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.

For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed.

For unsurfaced roads, use one of the following methods to finish the roadbed:

(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.

(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until there is no visible evidence of further consolidation.

(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.

204.14 Disposal of Unsuitable or Excess Material. Dispose of unsuitable or excess material at designated sites or legally off of the project.

When there is a pay item for waste, shape and compact the waste material in its final location. Do not mix clearing or other material not subject to payment with the waste material.

204.15 Acceptance. See Table 204-1 for sampling and testing requirements.

Material for embankment and conserved topsoil will be evaluated under Subsections 106.02 and 106.04.

Excavation and embankment construction will be evaluated under Subsections 106.02 and 106.04.

Clearing and removal of obstructions will be evaluated under Sections 201 and 203.

Measurement

204.16 Measure the Section 204 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

(a) Roadway excavation. Measure roadway excavation in its original position as follows:

(1) Include the following volumes in roadway excavation:

(a) Roadway prism excavation;

(b) Rock material excavated and removed from below subgrade in cut sections;

(c) Unsuitable material below subgrade and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule;

(d) Ditches, except furrow ditches measured under a separate bid item;

(eTopsoil;

(f) Borrow material used in the work when a pay item for borrow is not shown in the bid schedule;

(g) Loose scattered rocks removed and placed as required within the roadway;

(h) Conserved material taken from stockpiles and used in Section 204 work; and

(i) Slide and slipout material not attributable to the Contractor's method of operation.

(2) Do not include the following in roadway excavation:

(a) Overburden and other spoil material from borrow sources;

(b) Overbreakage from the backslope in rock excavation;

(c) Water or other liquid material;

(d) Material used for purposes other than required;

(e) Roadbed material scarified in place and not removed;

(f) Material excavated when stepping cut slopes;

(g) Material excavated when rounding cut slopes;

(h) Preparing foundations for embankment construction;

(i) Material excavated when benching for embankments;

(j) Slide or slipout material attributable to the Contractor's method of operation;

(k) Conserved material taken from stockpiles constructed at the option of the Contractor; and

(l) Material excavated outside the established slope limits.

(3) When both roadway excavation and embankment construction pay items are shown in the bid schedule, measure the following as roadway excavation only:

(a) Unsuitable material below subgrade in cuts and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule;

(b) Slide and slipout material not attributable to the Contractor’s method of operations; and

(c) Drainage ditches, channel changes, and diversion ditches.

(b) Unclassified borrow, select borrow, and select topping. When measuring by the cubic yard measure in its original position. If borrow excavation is measured by the cubic yard in place, take initial cross-sections of the ground surface after stripping overburden. Upon completion of excavation and after the borrow source waste material is returned to the source, retake cross-sections before replacing the overburden.

Do not measure borrow excavation used in place of excess roadway excavation.

(c) Embankment construction. Measure embankment construction in its final position. Do not make deductions from the embankment construction quantity for the volume of minor structures.

(1) Include the following volumes in embankment construction:

(a) Roadway embankments;

(b) Material used to backfill subexcavated areas, holes, pits, and other depressions;

(c) Material used to restore obliterated roadbeds to original contours; and

(d) Material used for dikes, ramps, mounds, and berms.

(2) Do not include the following in embankment construction:

(a) Preparing foundations for embankment construction;

(b) Adjustments for subsidence or settlement of the embankment or of the foundation on which the embankment is placed; and

(c) Material used to round fill slopes.

(d) Rounding cut slopes. Measure rounding cut slopes horizontally along the centerline of the roadway if a pay item for slope rounding is included in the bid schedule. If a pay item for slope rounding is not included in the bid schedule slope rounding will be considered subsidiary to excavation.

(e) Waste. Measure waste by the cubic yard in its final position. Take initial cross-sections of the ground surface after stripping over burden. Upon completion of the waste placement, retake cross-sections before replacing overburden.

(f) Slope scaling. Measure slope scaling by the cubic yard in the hauling vehicle.

Payment

204.17 The accepted quantities will be paid at the contract price per unit of measurement for the Section 204 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See

Subsection 109.05.

T a b le

-1

S m p li n g a n d

T es ti n g R eq u ir em en ts

R ep o rt in g im e

B ef o re u si n g i n w rk ef p la ci ex t la y er n g i ef ci t la

(1

M in im u m o f p o in ts p er p ro ct o r

S p li t m le

Y es w h q u es te d w u es

P in t o f

S a m p li ro ce ss ed m at er ia l b ef co rp o ra ti n g i n w

In -p ce ce er ia l b ef co rp o ra ti n g i n w

-p m p li

F q u cy er s o il t y p e p er s o il t y p e b u t n o t le ss t an

,0 y er y b t n o t le ss t er l ay er s o il t y p e b u t n o t le ss t f o r ea ch d ay o f p ro d u ct io p er s o il t y p e b u t n o t le ss t

,0 y er y t n o t le ss t er l ay t M et h o d s

S p ec if ic a ti o n s

A A

S H

T O

M

A

S H

T m et h

D

) o r

T m et h o d C

(1

A A

S H

T O

T r o th ap ro v ce d u re s

A A

S H

T

S H

T O

T

S H

T O

T

S H

T m et h

) o r

T m et h o d C

(1

A A

S H

T O

T o ap ro ce d u re s

C a te g o

C a ra ct er is ti c

C la ss if ic at i is tu re d en ty m p ac ti ss if ic at i

G ra d at

L iq id it is tu re d en m p ac ti p e o f

A cc ep ta

(S b se c ti o n

M ea su re d a st ed f o r co n fo rm

.0

M ea su re d a ed f o r co n fo rm

.0

M a te r ia l o r

P ro d ct p p

(7

.0 cl as si fi rr

.0

S el ec t b o rr

.0 el ec t to p p

.0 b le

-1 co n ti n u ed

S a m p li n g a n d

T es ti n g R eq u ir em ts ep o rt im e o re u si ef ci n g n ex t la ci n g n ex t la

M in im u m o f p o in ts p er p ro ct r.

m w u es in t o f

S a m p li u rc e er ia l

In -p

-p m p li q u cy er s o il t y p e p er s o il t y p e b u t n t h an

,0 y er y d b u t n t h an er y t M et h o d s

S p ec if ic a ti o n s

A A

S H

T O

M

S H

T O

T et h o d D

(1 ) o m et h o d C

(1

A A

S H

T O

T er a p p ro ce d u re s

A A

S H

T O

T er a p p ro ce d u re s

C a te g o a ra ct er is ti c

C la ss if ic at is tu re d en m p ac ti m p ac ti p e cc ep ta

(S b se c ti o n

M ea su re d a fo co n fo rm

.0

M ea su re d a fo co n fo rm

.0

M a te r ia l o r

P ro d ct

E ar em an k m en t

(2

.1

C o m p ac ti o n

A

T o p o f su b g ra d e

(2

.1 m p ac ti o n b le

-2 n st ru ct io n T o le ra n ce s

T o le ra n ce

C la ss (a

.0

(c

(c

(a

M ax im u m a ll o w ab le d ev ia ti o n f ro m c o n st ru ct io n s ta k es a n d d ra w in s.

(b

M ax im u m a ll o w ab le d ev ia ti o n f ro m s ta k ed s lo p e m ea su re d f ro m s lo p e st ak es o r h in g e p o in ts

(c

U n le ss o th er w is e sh o w n t h e ce n te rl in e al ig n m en t an d s u b g ra d e el ev at io n as b u il t, h av e n o h o ri zo n ta l cu rv es w it h a r ad iu s o f le ss t h an f ee t, n o v er ti ca l cu rv es w it h a c u rv e le n g th o f le ss t h an f ee t w h en t h e al g eb ra ic d if fe re n ce i n t h e g ra d e ch an g e is l es s th an p er ce n t, o r a cu rv e le n g th o f le ss t h an f ee t w h en t h e al g eb ra ic d if fe re n ce o f th e g ra d e ch an g e is g re at er t h an o r eq u al t o p er ce n t.

T h e ce n te rl in e g ra d e is n o to ed p er ce n t in f ee t o f le n g

L

K

J

I

H

.5

G

E

.2

.1 ad b ed w id

(f t) b g ra d e el ev at te rl in e al ig n m en t lo p es ex ca v at io n em an k m s lo p e(b

718 - Traffic Signing and Marking Material

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

802 Road Storage

802.01

Service Required

Remove and dispose or stockpile culverts and bridges, construct fords and waterbars, place excavated material on roadway according to drawings to allow OHV passage on roads identified as OHV trails, clear roadway of brush for project access, repair rough road surfaces with locally available rock borrow, and seed and fertilize bare organic soils in accordance with the applicable specifications and drawings.

Bridge removal may include bucking stringer logs to facilitate handling with smaller excavators. Bridge stringer logs may not be left in streams, but may be partially suspended over streams when anchored to stream banks as directed by the engineer.

802.02

Performance Standards

A road is stored when the designated drainage structures are removed or constructed, the ditches are operating free of blockages, and all bare organic soils have been treated with seed and fertilizer.

802.03

Location of Work

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the

Contracting Officer.

802.04

Measurement

Measurement under this Section will be made by the total number of units for each item listed in the

SCHEDULE OF ITEMS completed and accepted.

Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

802.05

Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 802 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

807 Equipment Rental

807.01 Service Required. Furnishing and operating equipment.

807.02 Performance Standard. Make equipment available for inspection and approval before use. Furnish the equipment specified in the table below:

Description

Max

Age

Min

HP

Min

Reach

Min

Weight Capacity Attachments Remarks

Small Sized

Crawler

Excavator 2000 50 15’ 15,000#

Opposable thumb Similar to Cat 307D

Medium Sized

Crawler

Excavator 2000 100 28’ 35,000# 0.6 CY

Opposable thumb

Similar to Hitachi

Grader 1990 135 29,000# Ripper teeth

Moldboard at least

12 feet long

Crawler

Tractor 1990

Similar in weight and HP to Cat D6

Dump Truck

10 Cubic

Yard

Capable of towing lowboy trailer

Vibratory

Roller 1990

Minimum weight

19,000#

Minimum 84‖ wide drum

Lowboy Trailer

Capable of hauling excavator or tractor or roller

807.03 Location of Work. As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

807.04 Acceptable Quality Levels.

A. Keep equipment well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.

B. Equipment shall be operated by a fully trained, qualified, and competent operator at all times.

807.05 Measurement

A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.

B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.

C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.

D. Payment will only be made for the actual time the equipment is working on the assigned project.

807.06 Payment. The accepted quantities will be paid at the contract price per unit of measurement for the Section

807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this

Section.

PAY ITEM PAY UNIT

807(1) Equipment, Type ________ Hour

807(2) Small Excavator Hour

807(3) Medium Excavator Hour

807(4) Grader Hour

807(5) Crawler Tractor Hour

807(6) Dump Truck Hour

807(7) Brush Cutter Hour

807(8) Drilling Rig Hour

807(9) Vibratory Roller Hour

807(10) Lowboy Trailer Hour

833 Drainage Structure Removal, Installation or Replacement

833.01

Service Required

Furnish and install or remove drainage structures including culverts, water-bars, and cross ditches.

833.02

Performance Standard

Drainage structure installation, replacement or removal is complete when designated culverts, water-bars, or cross ditches have been installed to the lines and grades specified, and removed culverts have been properly disposed. Non-drivable waterbars will intersect existing ditches and drain ditch flows to the low side of the road.