SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-0116-11-0146

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

August 17, 2011

PAGE OF PAGES

1 30

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

537430

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

Tongass National Forest, Contracting 123 Scow Bay Loop Rd PO Box 309 Petersburg, AK 99833

Same as Block 7

9. FOR INFORMATION

CALL:

A. NAME

Kim Toland

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(907) 772-5804

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

White Sulfur Springs Cabin Replacement Project

NOTES:

1. Facsimile (907-772-5894) or email (kimtoland@fs.fed .us) offers for this solicitation are acceptable but, the bid guarantees must be original.

2. This is Hub Zone set-aside procurement.

11. The Contractor shall begin performance within 10 calendar days and complete it within 180 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.2.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO (See notes 1 and 2 above)

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 10:00 am (hour) local time September 15, 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required. (See notes 1 and 2 above)

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 0112 27. PAYMENT WILL BE MADE BY

Tongass National Forest PO Box 309

Petersburg, AK 99833

Tongass National Forest Attn: Contracting Office Invoices 648 Mission Street Ketchikan, AK 99901

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract.

The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

Kim B. Toland

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

White Sulfur Springs Cabin Replacement Project; Solicitation: AG-0116-S-11-0146; Contract:

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES SCHEDULE OF ITEMS

Schedule of Items

Sitka Ranger District, Tongass National Forest

Item

No.

Description Qty Unit Unit

Price

Total

Base Item

Cabin w/deck, woodshed, and pit toilet

1 Lump

Sum

Optional Item One

Cabin furnishings

1 Lump

Sum

Total Price:

Offerors must provide an offer on all items.

Additional Vendor Information

Contact Name:

Phone No:

TIN No.:

DUNS No:

Email:

Electronic Funds Transfer Banking Information

Bank

Last Four Numbers of Account

SECTION C-DESCRIPTION/SPECIFICATIONS

C.1 PROJECT DESCRIPTION AND LOCATION

(a) Description: The Base Bid of this contract is for the construction of a 15’x17’ cabin with a front and side deck, a pit toilet, and a woodshed. Option Item #1 is for the fabrication and installation of cabin furnishings.

The use of primitive tools is required for all work on this project on National Forest lands.

(b) Location and Facilities: The project site is about 65 air miles northwest of Stika, Alaska on Chichagof

Island within the West Chichagof/Yakobi Is. Wilderness Area. A trail leads from the small protected bight at the northwest corner of the West Arm or Mirror Harbor at approx.

57°47'52.14"N, 136°19'56.92"W. Access is by boat or limited small plane access. There are no utilities onsite. The nearest community is Pelican, Alaska, located 15 air miles northeast.

(c) Price Range: Between $100,000 and $250,000.

(d) Pre-bid Tour: none.

(e) Period of Performance: See Part I, Section F, Clause 52.212-3.

C.2 TECHNICAL SPECIFICATIONS

(a) The technical specifications included in Section J are hereby made part of this solicitation and any resultant contract.

(b) The following specifications (including Region 10 Specifications and Special Project Specifications) are hereby made a part of this solicitation and any resultant contract:

FOREST SERVICE STANDARD SPECIFICATIONS FOR THE CONSTRUCTION AND

MAINTENANCE OF TRAILS, em-7720-103, (1996).

Copies of the Forest Service Specifications can be purchased from:

Government Books Store, 905 Second Ave. Seattle, WA 98714, (206) 553-4270.

C.3 Special Project Specifications Included In Full Text In Section J Are As Follows:

Section 01110 — Summary of Work

Section 013300 — Submittals

Section 024000 — Demolition

Section 061000 — Rough Carpentry

Section 133400 — Fabricated Engineered Structures

Section 13350 — Miscellaneous Work

Section 951 — Mobilization

USDA FOREST SERVICE

White Sulphur Springs Cabin Replacement Project

SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01110

SUMMARY OF WORK

PART 1 - GENERAL

1.01 DESCRIPTION

A. Furnish and install one cabin w/ deck including foundation and furnishings, woodstove and all materials necessary to assemble a finished cabin.

B. Furnish materials and construct a pit toilet and woodshed.

C. Furnish materials and fabricate cabin furnishings including bunks, a table with four benches, counters, and shelves and other items as shown on the drawings.

PART 2 - PRODUCTS

2.01 DEFINITIONS

A."Material" includes all lumber, windows, doors, hardware, fasteners, millwork, roofing, flooring, concrete, etc.

PART 3 - EXECUTION

3.01 PRIMITIVE TOOLS

A. Only non-mechanized transport and non-motorized tools, equipment or devices may be used, with the exception of fixed-wing aircraft and motorboats for access. Mechanical transport and mechanized equipment are defined as follows:

Mechanical Transport. Any contrivance for moving people or material in or over land, water, or air, having moving parts, that provides a mechanical advantage to the user, and that is powered by a living or nonliving power source. This includes, but is not limited to, hang gliders, parachutes, bicycles, game carriers, carts, and wagons. It does not include wheelchairs when used as necessary medical appliances. It also does not include skis, snowshoes, rafts, canoes, sleds, travois, or similar primitive devices without moving parts.

Motorized Equipment. Machines that use a motor, engine, or other nonliving power sources. This includes, but is not limited to, such machines as chain saws, generators, and motor vehicles. It does not include small battery or gas powered hand-carried devices such as shavers, wristwatches, flashlights, cameras, stoves, or other similar small equipment.

3.02 FIELD STAKING

A. Provide two week notice prior to the beginning of construction for the Government to stake the locations and elevations of all proposed developments. The new cabin will be located approximately 30 feet away from the existing cabin. The pit toilet and woodshed will be located in the vicinity of the cabin.

3.03 CABIN DECK

A. Provide cabin deck on gable measuring approximately 18’ wide by 10’ deep plus a 36‖ wide side deck extending along side of cabin to back end. Install ADA standard ramp where staked and 4-feet wide stair where staked. Deck and ramp to have 4x4 bullrail on blocks w/chamfers as approved. Provide structural design and submittals to meet requirements in Section 133400.

SECTION 013300

SUBMITTALS

A. Cabin and deck design and materials submittals:

Provide shop drawings, construction details, and other submittals to illustrate all aspects of the proposed cabin and deck design and assembly procedure. Provide these submittals prior to commencing fabrication of the cabin. Base the submittals upon the attached drawings for a standard

Forest Service cabin, with modifications made where necessary to accommodate design requirements peculiar to the Contractor's methods of construction. All suggested modifications to the standard

Forest Service cabin plans are subject to review and approval by the Government. The design will comply with all applicable building codes.

Submittals are required under this contract for the purpose of establishing the final specifications for:

(1) quality assurance; (2) design configurations; (3) performance standards; (4) color, texture, finish;

and/or (5) other features necessary for a complete description of the Work to be performed.

Submittals shall be approved by the Contracting Officer. The Contractor shall not purchase, order, ship, install, or otherwise incur costs for a product or other work subject to submittal approval until after approval is granted by the Contracting Officer; the government shall not be responsible for payment for any work, product, design, etc., not approved.

Rejection of any submittal by the Contracting Officer constitutes notice that a resubmittal is required for the same purpose; rejections shall be explained.

1.02 Quality Assurance

A. "Or Equal":

Where the phrase "or equal" occurs in the contract documents, do not assume that the materials, equipment, or methods will be approved as equal unless the item has been so specifically approved by the

Contracting Officer.

2.01 CABIN AND DECK REQUIRED SUBMITTALS

A. Within thirty (30) calendar days of receipt of Notice of Award, the Contractor shall submit to the

Contracting Officer two copies of shop drawings and other instructions for review. These submissions shall clearly illustrate, at minimum, the following:

1). scaled drawings showing the elevation views of each side of the cabin and a plan view of the deck with foundation and bullrail details.

2). a scaled drawing showing the floor plan

3). a scaled drawing showing the foundation and floor framing plan

4). a complete list of materials to be supplied by the contractor

5). manufacturers specification sheets for the proposed windows, doors, roofing and insulation.

6). assembly instruction and construction detail drawings for all cabin elements

7). proposed method of shipment and delivery date.

8). snow load and wind load values used in structural design.

B. The contractor's proposed shop drawings shall conform substantially with the design drawings provided for bid by the Government, however, the contractor's proposed interior wall dimensions may be increased slightly to conform with kit requirements. Proposed variations shall be highlighted in the proposed shop drawing submittal.

All proposed variations shall conform with applicable building codes.

C. Shop drawings shall bear the stamp of a registered Architect or Professional Engineer.

D. The Government shall review the submittal and within 21 days provide a written response to the contractor outlining any corrections to the proposed working drawings. The Contractor shall then have 7 days to submit the corrected shop drawings to the Contracting Officer for approval. Approval of the shop drawings will constitute the Contractor's Notice to Proceed.

PART 3 - NOT USED

SECTION 024000

DEMOLITION

A. This section covers demolition of the existing woodshed, pit toilet structure, and existing cabin, and rehabilitation of abandoned building sites.

Not Used

2.01 WOODSHED DEMOLITION

A. Demolish woodshed and remove all metal hardware and dispose offsite. Cut wood that is suitable for firewood into 16‖ pieces suitable for firewood and stack neatly in new woodshed cabin.

2.03 PIT TOILET DEMOLITION

A. Burn existing pit toilet structure completely and remove all non-burnables from project and dispose offsite.

Fill pit hole with soil to elevation 4‖ above surrounding ground to allow for settlement.

2.04 CABIN DEMOLITION

A. Demolish the cabin wood members and remove all materials not suitable for firewood and dispose offsite.

Reserve wall timbers from cabin that are suitable for bathhouse repair as marked and stow under new cabin for later reuse. Cut remaining firewood-suitable materials into 16‖ pieces suitable for firewood and stack neatly in woodshed at cabin.

2.05 ABANDONED SITE REHABILITATION

A. Regrade abandoned building sites to natural-appearing ground profile and install transplanted moss and native vegetation collected from surrounding area as directed. Install logs or stones where marked to prevent use of the sites as campsites.

SECTION 061000

ROUGH CARPENTRY

A. This section covers constructing the cabin, woodshed, and pit toilet including all carpentry work.

2.01 HANDLING

A. Handle lumber that will appear in the final work in a manner that will ensure a clean and undamaged appearance.

2.02 METAL FASTENERS AND ACCESSORIES

A. Where fastener size is not indicated provide sizes and quantities as required by Code.

B. Unless indicated otherwise, all fasteners, anchors, hangers and other connectors including washers, nuts and other accessories to be Stainless Steel.

3.01 CARPENTRY FIT AND FINISH

A. Carefully lay out and erect items. Install all work to true lines as detailed, plumb and level unless otherwise indicated.

B. Accurately cut and fit lumber so that joints will have a close fit over entire contact surface. No shimming will be permitted in making joints; open joints not acceptable.

3.02 ROOFING

Install full sheet from ridge to wall, lap over walls. Install wiggle molding under lap. Predrill all screw holes.

Screw attach roofing at each wiggle mold intersection (do not skip intersections). Begin placing roofing from upland end of the building so laps open to upland side. Otherwise install per manufacturers recommendations.

Install wood end closure and wiggle molding.

SECTION 133400

FABRICATED ENGINEERED STRUCTURES

Work in this section consists of supplying a cabin and deck in accordance with the drawings and specifications. The project includes, but is not limited to, foundation; flooring; wall and roof framing; loft framing; windows; doors; roofing; insulation; trim; hardware and sealing.

1.02 RELATED WORK

A. Section 1300, Submittal

1.03 QUALITY ASSURANCE

A. Softwood lumber shall be graded in accordance with the latest edition of "Grading Rules for Western

Lumber", WWPA. Furnish lumber bearing a recognized grading bureau mark; or a "Certificate of Grade" may be substituted.

B. Plywood shall be graded in accordance with PS-1, APA. Furnish panels identifiable by a grade trademark of a recognized grading association.

1.04 SUBMITTAL

A. Comply with section 01300, Submittal. 2.02 CABIN DESCRIPTION

This section describes the cabin elements that are included in this contract. See also drawings.

B. Cabin Configuration

1. Cabin Kit Style (select one)

T&G Timbers, Alaska Yellow Cedar ___x___

Peeled round logs w/ notched corners ______

2. Forest Service Cabin Design Number ___15’x17’_______(from standard design drawings)

3. Floor Plan Option Number _4__(for determining locations and sizes of windows and doors)

4. (select one ) No Loft___x__ Half Loft _____ Full Loft_______

C. Structural Design Values

3.02 – CABIN REQUIREMENTS

A. Structural Design Values

1. Ground Snow Load, p_g = 50 PSF

2. Design Wind Condition, 120 MPH (3-sec), Exposure Category C

3. Foundation Bearing Capacity = 2000 psf

4. Seismic Base Shear Coefficient, C_s = 0.15

D. Cabin First Floor Material

1. Cabin flooring, first floor (select one)

Olympic Panel Products SkidGuard High Density Overlay (HDO) Plywood __ __

2x6 T&G SPF (Spruce, Pine or Fir, or Alaska Yellow Cedar) ____x____

E. Windows and Doors

1. Window frame type (select one) Wood __x__ Vinyl___ __

2. Door material (select one) Wood__x___ Fiberglass w/ wood texture_____

Door style (select one) Standard ___x___ Dutch ______

Window on top of door? Yes__x____ No_____ (except where shown as ―required‖ on elevation view drawings)

3. Number of skylights to be provided __2___(in addition to the skylights shown as ―required‖ on the elevation view drawings)

F. Roof Color

1. Roof color (select one) Forest Green ______Brown __x___

G. Insulation

1. Floor insulation Yes__x__ If yes, give R-value _10__

Supply Blue foam insulation

2. Ceiling insulation Yes____ If yes, give R-value ______

No_x____

2.01 TIMBERS, LUMBER AND MILLWORK

A. If the T&G Timber Cedar type of cabin kit is selected, the walls shall be 3"x6" minimum size, tongue and groove, solid Alaska Yellow Cedar.

B. Exterior window trim, exterior door trim, rake trim and fascia shall be Alaska Yellow Cedar, grade #1 or btr. Provide rake trim in full lengths. Provide window and door trim as lengths to be cut for installation

C. Provide solid wood millwork to trim the interior floor/wall junction, wall/roof junction, windows, and doors.

D. Roof and loft decking shall be Spruce, Pine or Fir (light in color) or Alaska Yellow Cedar, T&G. The roof and loft decking shall present a V Joint pattern on the bottom side. The loft decking shall present a tight joint on the top side. If T&G floor decking is selected for the first floor, the top side shall present a tight joint.

E. Supply sufficient quantities of all required items, including an amount to allow for trim waste. "Short" items shall be promptly delivered FOB destinations, at Contractor's expense.

F. Deck, bullrail, ramp, and stair materials to be Alaska Yellow Cedar. Below-deck materials to be CCA treated materials.

2.02 FOUNDATION AND FLOORING

Foundation beams, ground floor joists and plywood subflooring shall be preservative treated with CCA in accordance with American Wood Preservers Association (AWPA) C2 standards. Foundation posts shall be treated to AWPA C4 standards.

2.04 ROOFING

A. Roofing shall be metal, 26 ga. min. with matching ridge, eve and gable flashing and fasteners.

B. Provide roofing in precut lengths.

C. Provide 30 lb. asphalt saturated felt as underlayment for metal roofing.

2.05 WINDOWS

A. Wood window frames shall be Western Red Cedar or Alaska Yellow Cedar, with a clear finish.

B. Vinyl window frames shall be cream in color interior and exterior.

C. Provide screens for each operable window.

D. Precut window and door openings. Provide framing materials needed for window installation.

E. If design wind loading is more than 80 mph, provide window meeting design standards for high wind locations.

2.06 SKYLIGHTS

A. Furnish 30 ½" by 39" skylights by Velux, model FSF, fixed skylight with a ventilation flap, or approved equal.

B. Furnish metal roof flashing, hardware, curbing, caulk, and any other materials necessary for skylight installation.

2.07 DOORS

A. Doors shall be pre-hung, exterior grade, 3'-0" x 6'-8" clear opening width, with 1 ½ pair heavy hinges.

Locksets shall be commercial grade, lever type passage locksets, If windows in the doors are required they shall be true-divided light or glue applied muntins, removeable muntin grilles are not acceptable.

If wood doors are required they shall be unfinished solid Fir or Cedar. If fiberglass doors are required, they shall have simulated wood grain and be suitable for the application of stain type finishes.

2.08 HARDWARE

A. Furnish all required hardware to completely erect the cabin, including nails, spikes screws, closure strips, joist hangers, post bases, brackets, etc.. All hardware shall be hot-dip galvanized, stainless steel, brass or equivalent.

2.09 INSULATION

A. Furnish sufficient insulation strips for installation around doors and windows.

B. Provide, if applicable, a rigid type of insulation such as polystyrene, that is resistant to attack from decay and rodents. Fiberglass bat type of insulation is unacceptable. Provide all insulation mounting hardware and fasteners. Provide insulation installation details, including an air space under the roofing to disperse condensation.

2.10 STAIRWAY, GUARDRAIL AND HANDRAIL

A. Provide, if applicable, all materials for framing and finish of staircase, ballustrades, handrails and guardrails:

1. Staircase and landing

Provide closed riser type of staircase using ledgers or stair angle brackets. Provide code-compliant ballustrade with cap rail. Provide 1-1/2" diameter, round section, handrails and hardware for mounting on the wall along the staircase.

2. Guardrail

Provide code-compliant guardrails for all loft openings.

3.01 - WORKMANSHIP

A. Materials as furnished or fabricated shall result in a strong, tight, well finished structure.

B. All materials shall be cut or fabricated accurately to correct measurements, including mortises, chamfers, notches, miters, etc.

SECTION 13350

MISCELLANEOUS WORK

PART 1- GENERAL

1.01 This work consists of the wood stove installation.

PART 2- PRODUCTS

2.01 WOOD STOVE

A. Provide Blaze King Royal Guardian wood stove

B. Spark Protection Mat: Ceramic tile covering the floor surface recommended by the manufacturer’s installation instruction for floor protection

C. Insulated chimney flue and all required items for complete stove installation.

D. Roof Flashing: Prepainted sheet metal, configured to fit tightly to chimney riser and seal to metal roofing system.

PART 3- EXECUTION

3.01 WOOD STOVE

A. Install stove per manufacturer’s directions and UL requirements.

B. Secure chimney in opening framing with appropriate fasteners.

C. Maximum variation of chimney from plumb: 1/2 inch.

Section 951

Mobilization

Description

951.01 Work. This work consists of moving personnel, equipment, material and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the costs associated with obtaining permits, insurance, and bonds. Mobilization is not intended to pay for the costs of materials before they are used on the project site.

Payment

951.02 Basis. Pay for the accepted work at the contract unit price for the PAY ITEM SHOWN IN THE

SCHEDULE OF ITEMS.

Make progress payments for mobilization as follows:

(a) Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.

(b) When 5 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.

(c) When 10 percent or more of the original contract amount is earned from other PAY ITEMS, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.

(d) Pay any unpaid amount for mobilization upon final acceptance of all work items.

Make payment under:

PAY ITEM PAY UNIT

951(01) Mobilization .............................................................. LS

SECTION D--PACKAGING AND MARKING

Project Labeling For Official Correspondence

The Government singularly identifies each project with a contract number at time of Award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

Federal Acquisition Regulation (48 Cfr Chapter 1) Clauses

52.246-12 Inspection of Construction (AUG 1996) http://www.arnet.gov/far/

SECTION F--DELIVERIES OR PERFORMANCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

Federal Acquisition Regulation (48 Cfr Chapter 1) Clauses

52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

Contracting Officer’s Representative

The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer’s

Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the

Government. The COR will be designated in writing and a copy of the designation will be furnished to the

Contractor before or at the pre-work conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term ―Contracting

Officer‖ as used throughout the contract shall be interpreted to include the Contracting Officer’s designated representative(s) acting within the limits of their delegation of authority.

Contractor’s Representative

Any representative of the Contractor shall be designated in writing. The designation shall clearly indicate the name and limitations of authority, if any, of the representative.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 Order of Precedence – Requirements, Specifications & Drawings

Any inconsistency in the specifications of this solicitation and any resultant contract shall be resolved by giving precedence in the following order:

a). Section H – Special Contract Requirements b). Contract Drawings (Section J)

1). Drawings, figured dimensions over scaled dimensions

2). Drawings, large scale drawings over small scale drawings

3). Schedules on drawings over notations on drawings c). Section C – Specifications

1). Special Project Specifications

2). Reconstruction Log

3). Standard Specifications d). Staking on the ground e). Forest Service Standard Specifications for Construction and Maintenance of Trails, September 1996

H.2 Landscape Preservation a). Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams and rivers.

Pollutants such as raw sewage and other harmful materials shall not be discharged into or near streams and rivers or into natural or manmade channels leading thereto.

Waste motor oil, fuel, lubricant, bitumen and similar hydrocarbons shall be collected and returned to the supplier.

They shall not be wasted on the ground or buried.

b). During construction clover the clover patch in front of the existing cabin with tarpos or rope off to prevent weed seeds or contaminated soil from being transported. Dispose of Dandelion and Foxglove plants to prevent seed production.

H.3 Use of Premises a). The existing White Sulphur cabin will be closed to public use and provided for the contractor’s use during the period July 1, 2012 through July 30, 2012. Complete all onsite work during this period only. The bathhouse and related trails will remain open during this period; provide signs and barriers as needed to guide public use and locate material storage and work areas and other items to not interfere with the safe use of the bathhouse and natural soaking pool by the public.

b). Before any camp, storage area, or access is opened or operated on National Forest land, written permission shall be obtained through the Contracting Officer. A camp includes the campsite of any employee working for the Contractor. Such permission, if granted, will be without charge to the Contractor. The Contractor will follow all rules and regulations specific to the use of the National Forest and other requirements pertaining to Wilderness

Areas.

c). The area may be frequented by brown bears, which may become habituated to humans and may be attracted by activity and food. In the campsite, store food in a bear-proof container or hang at least 12 feet above ground.

Avoid leaving any food scraps at any time in camp or on the trail.

d). Sanitation Facilities: Unless provided otherwise, the Contractor shall provide and maintain the following facilities:

1. Potable water supplies for drinking, washing, and cooking shall meet the State of Alaska drinking water regulations 18 AAC 80. Drinking water may not be available at the camp location.

2. Domestic sewerage shall meet the State of Alaska wastewater disposal regulations 18 AAC 72.

3. Solid waste shall be removed and disposed of in Sitka or other approved location.

4. Fuel storage shall meet the requirements of 40 CFR 112 (Oil Pollution Prevention).

e). Provide a plan for camp development, occupation and clean-up prior and obtain approval prior to any camp development activities. The plan should contain the following information:

1. Layout and location of the proposed camp.

2. Number of users and dates of occupancy.

3. Sewage and waste disposal systems.

4. Layout of cooking, sleeping and common areas.

5. Camp trails layout.

6. Equipment and fuel storage area and Spill Prevention Control and Countermeasure (SPCC) plan.

7. Fire prevention and control plan.

8. Site Restoration plan.

9. Mobilization and boating plan.

The Government shall review the Contractor's plan as submitted for completeness and applicability. Proposed modifications of Contractor's plans will be discussed with the Contractor prior to approval.

g). There are no known eagle nest trees in the vicinity of the project area, but if such trees are discovered no disturbance will be allowed within 330 feet of the trees and additional mitigation measures may be applied.

h). Do not use new pit toilet or deposit waste in the pit toilet hole.

i). At completion of all work, leave woodshed full of suitable firewood.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

Federal Acquisition Regulation (48 CFR Chapter 1) Clauses

52.202-1 Definitions (JUL 2004)

52.203-3 Gratuities (APR 1984)

52.203-5 Covenant Against Contingent Fees (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)

52.203-7 Anti-Kickback Procedures (OCT 2010)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)

52.204-4 Printed or Copied Double-Sided on Recycled Paper (AUG 2000)

52.204-7 Central Contractor Registration (APR 2008)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2010)

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment (Dec 2010)

52.211-18 Variation in Estimated Quantity (APR 1984)

52.215-2 Audit and Records -- Negotiation (OCT 2010)

52.215-8 Order of Precedence--Uniform Contract Format (OCT 1997)

52.219-3 Notice of Total HUBZone Set-Aside (JAN 2011)

52.219-8 Utilization of Small Business Concerns (JAN 2011)

52.219-14 Limitations on Subcontracting (DEC 1996)

52.219-28 Post-Award Small Business Program Rerepresentation (APR 2009)

52.222-3 Convict Labor (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)

52.222-6 Davis-Bacon Act (JUL 2005)

52.222-7 Withholding of Funds (FEB 1988)

52.222-8 Payrolls and Basic Records (June 2010)

52.222-9 Apprentices and Trainees (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements (FEB 1988)

52.222-11 Subcontracts (Labor Standards) (JUL 2005)

52.222-12 Contract Termination - Debarment (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)

52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (FEB 1988)

52.222-21 Prohibition of Segregated Facilities (FEB 1999)

52.222-26 Equal Opportunity (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)

52.222-36 Affirmative Action for Workers with Disabilities (Oct 2010)

52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible

Veterans (SEP 2010)

52.222-37 Employment Reports Veterans (SEP 2010)

52.222-50 Combating Trafficking in Persons (FEB 2009)

52.222-54 Employment Eligibility Verification (JAN 2009) http://www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html https://www.acquisition.gov/far/current/html/52_217_221.html#wp1139913

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007)

52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997)

52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-14 Toxic Chemical Release Reporting (Aug 2003)

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (May 2008)

52.223-18 Contractor Policy to Ban Text Messaging While Driving (SEP 2010)

52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.228-1 Bid Guarantee (SEP 1996) The amount of the bid guarantee is 20% or $3,000,000, which ever is less.

52.228-2 Additional Bond Security (Oct 1997)

52.228-11 Pledges of Assets (SEP 2009)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.228-15 Performance and Payment Bonds – Construction (NOV 2006)

52.229-3 Federal, State, and Local Taxes (APR 2003)

52.232-1 Payments (APR 84)

52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)

52.232-9 Limitation on Withholding of Payments (APR 1984)

52.232-11 Extras (APR 1984)

52.232-17 Interest (OCT 2010)

52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)

52.233-1 Disputes (JULY 2002)

52.233-3 Protest After Award (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship (APR 1984)

52.236-6 Superintendence by The Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention (NOV 1991)

52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-16 Quantity Surveys (APR 1984)

Alternate I (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.236-21Specifications and Drawings for Construction (FEB 1997)

52.236-26 Preconstruction Conference (FEB 1995)

52.237-2 Protection of Government Buildings, Equipment, and Vegetation (APR 1984)

52.242-13 Bankruptcy (JUL 1995)

52.242-14 Suspension of Work (Apr 1984)

52.243-1 Changes--Fixed-Price (AUG 1987)--Alternate I (APR 1984)

52.243-5 Changes and Changed Conditions (Apr 1984)

52.244-6 Subcontracts for Commercial Items (Dec 2010)

52.245-1 Property Records (JUN 2007)

52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007)

52.246-21 Warranty of Construction (MAR 1994) https://www.acquisition.gov/far/current/html/52_223_226.html#wp1188603

52.246-25 Limitation of Liability—Services (FEB 1997)

52.248-1 Value Engineering (OCT 2010)

52.249-2 Termination for Convenience of the Government (Fixed-Price) (MAY 2004)

52.249-10 Default (Fixed-Price Construction) (APR 1984)

52.253-1 Computer Generated Forms (JAN 1991)

Agriculture Acquisition Regulation (48 CFR Chapter 4) Clauses

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-73 Archeological or Historic Sites (FEB 1988)

452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

452.237-70 Loss, Damage, Destruction or Repair (FEB 1988)

452.237-75 Restrictions Against Disclosure (FEB 1988)

52.217-7 Option for Increased Quantity—Separately Priced Line Item (Mar 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor before March 2012. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

52.225-9 Buy American Act—Construction Materials (Sep 2010)

(a) Definitions. As used in this clause—

―Commercially available off-the-shelf (COTS) item‖—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.

―Component‖ means an article, material, or supply incorporated directly into a construction material.

―Construction material‖ means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

―Cost of components‖ means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

―Domestic construction material‖ means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if— https://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

―Foreign construction material‖ means a construction material other than a domestic construction material.

―United States‖ means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting

Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

http://uscode.house.gov/ http://uscode.house.gov/ https://www.acquisition.gov/far/current/html/Subpart%2012_5.html#wp1077123

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)*

Item 1:

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

Item 2: _______ _______ _______

Foreign construction material _______ _______ _______

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

AGAR 452.228-70 Alternative Forms of Security (NOV 1996)

If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to:

USDA Forest Service.

Order of Precedence--Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J. LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract.

Category Pages

Experience And Capability Questionnaire, OMB Clearance Number 9000-0142 2

Wage Determination: 12

Project Drawings: 10

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF BIDDERS

NOTE: Offerors should address questions concerning VETS-100 reporting and reporting requirements to the

Office of Veterans Employment and Training Services offices at the following address:

U. S. Department of Labor

VETS-100 Reporting

4200 Forbes Blvd., Suite 202

Lanham, MD 20703

Telephone: (301) 306-6752

Website: www.vets100.cudenver.edu

Reporting Questions: HelpDesk@vets100.com

Reporting Verification: Verify@vets100.com

AGAR 452.219-70 Size Standard And Naics Code Information (January 2005)

The North American Industrial classification System Code(s) and business size standard(s) describing the products and/or services to be acquired under this solicitation are listed below:

Contract line item(s): ALL

--NAICS Code 237990

--Size Standard $33.5 Million

The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is

500 employees.

52.204-8 Annual Representations and Certifications (Jan 2011)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990 .

(2) The small business size standard is $33.5 Million .

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is

500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual…