AG-0112-S-14-0015TbrdElectricDistroPh1.pdf
PDF 272 KB Posted
- Solicitation number
- AG-0112-S-14-0015
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0112-S-14-0015Amd1.pdf | ||
| TbrdElectricDistroPh1Specs140529.pdf | ||
| OrigDrawings.pdf | ||
| Phose1Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0112-S-14-0015
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
30May2014
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
690275
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
U.S. Forest Service, Alaska Region, Contracting 123 Scow Bay Loop Rd, P.O. Box 309 Petersburg, AK 99833
U.S. Forest Service, Alaska Region, Contracting 123 Scow Bay Loop Rd, P.O. Box 309 Petersburg, AK 99833 Email: kimtoland@fs.fed.us, FAX: (907) 772-5894
R INFORMATION
CALL:
A. NAME
Kim Toland
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(907) 772-5804
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Thorne Bay Ranger District (TBRD) Compound Electrical Distribution Repair and Upgrade Phase 1
Thorne Bay Ranger District, Tongass National Forest
(a) In strict compliance with the contract, specifications, and drawings.
(b) This is Total Small Business set-aside procurement
(c) Price Range: Between $100,000 and $250,000
(d) Proposals can be faxed or emailed, but the bid bond must be original.
(e) A hosted site visit is not planned, but prospective bidders are expected to visit the work site at their convenience;
see FAR 52.236-27.
(f) Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction
Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
(g) Send inquiries about this solicitation to the contracting officer by email to: kimtoland@fs.fed.us.
(h) Offerors complete the following information:
(1) Contact Name: ____________________________________________________
(2) DUNS No: ________________________________________________________
(3) Email:____________________________________________________________
11. The Contractor shall begin performance within 10 calendar days and complete it within (See Section F. Deliveries or Performance) calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 11AM local time
30June2104. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
An offer guarantee is, is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e) mailto:kimtoland@fs.fed.us
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
MOUNTS
. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
MENDMENT NO.
ATE
NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
B. SIGNATURE
C. OFFER DATE
AWARD (To be completed by Government)
ITEMS ACCEPTED:
AMOUNT
ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
ADMINISTERED BY CODE PAYMENT WILL BE MADE BY
U.S. Forest Service Alaska Region, Contracting 123 Scow Bay Loop Rd, P.O. Box 309 Petersburg, AK 99833
Invoice Processing Platform (IPP), all invoices must be submitted electronically through IPP at www.ipp.gov
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO
SIGN (Type or print)
A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
Thorne Bay Ranger District (TBRD) Compound Electrical Distribution Repair and Upgrade Phase 1 AG-0112-S-14-0015 Contract:
PART I—THE SCHEDULE
SECTION B. SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
B.1 Base Items Item Description Method of
Measurement Qty. Pay Unit Price
A Generator Removal and Generator Room Refurbishment
Lump Sum 1 Lump Sum
B Electric Concrete Manhole Extension and Repair
Each 2 Lump Sum
C Site Lighting Conductor Replacement and Conduit Bonding
Lump Sum 1 Lump Sum
D Mobile Home Service Pedestal Removal Each 3 Lump Sum
E Duplex Service Replacement for:
Duplex A (DUM 1) Duplex B (DUM 2) Duplex C (DUM 3)
Each 3 Lump Sum
Note: DUM = Duplex Meter as shown on the drawings Total Base Items:
B.2 Optional Item One F Duplex Service Replacement for:
Duplex D (DUM 4) Duplex E (DUM 5)
Each 2 Lump Sum
B.3 Optional Item Two G Install High Voltage Service 4-Inch
Service Riser Lump Sum 1 Lump Sum
B.4 Optional Items Three H 50 KVA single phase pad mounted transformer (supply only) Each 1 Lump Sum
I 30 KVA three phase pad mounted transformer (supply only) Each 1 Lump Sum
J 25 KVA single phase pad mounted transformer (supply only) Each 1 Lump Sum
K 25 KVA single phase pad mounted transformer (supply only) Each 1 Lump Sum
L 25 KVA single phase pad mounted transformer (supply only) Each 1 Lump Sum
M 15 KVA single phase pad mounted transformer (supply only) Each 1 Lump Sum
Note: DUM = Duplex Meter as shown on the drawings
Total Optional Items Three:
Grand Total of Base and Optional Items
SECTION C. DESCRIPTION/SPECIFICATIONS
C.1 Description:
(a) This project provides for a portion of a larger project to repair or replace the entire electrical distribution system on the Thorne Bay Ranger District administrative compound in Thorne Bay Alaska. The purpose of the overall project is to bring this system into compliance with AP&T electric utility standards with the objective of eventual transference of the system to AP&T.
(b) The intent of this contract is to provide for the execution of the project described in the contract. Work includes all supervision, labor, materials, equipment, transportation, and supplies, required to complete the project in accordance with drawings, specifications, and provisions of the contract. All appurtenances, fasteners, hardware, and connections to make a complete final product are considered incidental to the work.
(c) Project Location:
Thorne Bay Ranger District 1312 Federal Way Thorne Bay, AK 99819
C.2 Special Conditions
(a) The TBRD Administrative Site consists of an office, warehouse, bunkhouse, 5 duplexes, and a 12-plex apartment building, including connecting roadways and paths. The site was constructed between the years of 1982 and 1986.
(b) Work will be ongoing on a Forest Service Administrative Site, mostly in residential areas. Traffic control and site safety are of utmost importance.
(c) The Office and Warehouse have normal business hours of 0700 to 1630, Monday through Friday excluding federal holidays. Residential buildings are occupied by families working for the Thorne Bay Ranger District.
(d) Work will be ongoing around high voltage conductors. Contractor’s project approach shall accommodate the hazards posed by these working conditions, optimizing safety for contractor personnel and site occupants.
(e) All scheduled power outages required for the work shall be approved by the CO 72 hours in advance of the outage. Power outages in residential buildings shall be scheduled between 0800 to 1630 on normal business days, unless otherwise approved.
C.3 General Conditions and Requirements
(a) Work Hours: 0800 to 1800 Monday through Friday, unless otherwise approved by the CO. Exceptions to these hours are expected for the purposes of minimizing impacts of outages.
(b) Work Schedule: Within 14 calendar days after the Notice to Proceed, Contractor shall submit a written work schedule showing beginning and completion dates for salient work items to the CO for approval. Schedule to also include dates and times of outages and any other significant impacts to the operations of the Site.
Contractor shall maintain the schedule up to date, and shall provide it to the CO upon request.
(c) Vehicle and Pedestrian Control Plan: Within 14 calendar days after the Notice to Proceed, Contractor shall submit a written Traffic and Pedestrian Control Plan to the CO for approval. Plan shall indicate methods of providing for safety for site occupants and workers during times when manholes are open or when other activities might pose a hazard to vehicles or pedestrians.
(d) Safety: Contractor shall submit a written safety plan within 14 calendar days after the Notice to Proceed, but prior to any on-site activities. Plan shall address safety of occupant and contractor personnel, and protection of improvements. Plan shall comply with and reference all applicable OSHA Construction and Workplace requirements.
(e) Permits: Permits are not required as these are federally owned facilities. However, contractor is required to coordinate with Alaska Power and Telephone for service disconnect and reconnect services as required.
Contractor is responsible for all fees for incidental Utility services required by the work.
(f) Applicable Codes:
(1) NFPA 70 – National Electric Code (NEC), 2014 edition
(2) ANSI C2, National Electric Safety Code (NESC)
(3) The current family of ICC codes
(4) IAPMO Uniform Plumbing Code as adopted by the State of Alaska Department of Labor
(5) Licensure for Trades: Electrical work shall be performed under an administrator’s license in the State of Alaska.
(g) Staging Area: Contractor shall be allowed to stage materials and equipment in a location on site as approved by the CO.
(h) Building Access: Contractor shall coordinate with the CO for access to buildings and facilities.
(i) Material Storage and Handling: All material shall be delivered, stored, handled, and installed per manufacturer’s specifications and recommendations.
(j) Daily Cleanup: Contractor shall maintain the site clean, removing construction debris daily.
(k) Contractor’s Use of On-Site Facilities: Contractor will have access to electric power, potable water, and restroom facilities (in the warehouse during normal business hours) while working on site. Contractor’s use of restroom facilities shall not impose additional cleaning requirements.
(l) Protection of Existing Improvements and Vegetation: Contractor shall inspect and document existing improvements and vegetation from damage for the duration of the contract, and shall be responsible for the correction of damage caused by contractor’s work. Contractor shall submit a written plan for the protection of the building from the elements during roofing removal and installation.
(m) Finishes: All work shall be finished to match existing facility colors and materials.
C.4 WORK ITEMS
(a) General – The work listed in the Schedule and described below is a portion of a larger project described by the specifications and the original drawings. The drawings have been modified to show portions of work that are specifically included in this contract as “Phase I”. The drawings, completed in 2010, have also been modified to reflect as-built conditions, reflecting changes that have occurred since 2010.
(b) Base Item A – Generator Removal and Generator Room Refurbishment:
(1) Generator Removal: Remove existing generator, day tank, fuel lines, transfer switch, exhaust, air intake, and concrete pad. All removed materials to be properly disposed of by the contractor.
(2) Generator Room Refurbishment: Repair wall and floor finishes damaged or missing after generator removal. Finishes to match adjacent existing finishes for a complete professional end product.
(c) Base Item B – Electric Concrete Manhole Extension and Repair:
(1) Electric Concrete Manhole Extension: Extend two existing buried concrete electric manholes to grade. Replace lid on one manhole and reinstall existing lid on one manhole. Manhole size and exact extension distance to be verified by the contractor, and extension distance to be approved by the CO. Extension distance estimated to be 12 inches or less. Manholes to be extended are shown on the drawings.
(2) Electric Concrete Manhole Repair: Repair spalling of interior walls of 14 buried electric manholes.
Manholes to be repaired are shown on the drawings.
(d) Base Item C – Site Lighting Conductor Replacement and Conduit Bonding
(1) Remove all existing conductors from existing buried conduit between electric manholes. Pull all new conductors and terminate.
(2) Bond conduits in accordance with the NEC and the drawings.
(e) Base Item D – Mobile Home Service Pedestal Removal
(1) Remove 3 existing unused mobile home service pedestals.
(2) Completely remove conductors back to transformer pad from 2 pedestals and abandon conduit 6 inches below grade.
(3) On the third pedestal, pedestal will be removed, and a junction box installed in that location to provide continued service to the adjacent existing mobile home.
(f) Base Item E - Duplex Service Replacement
(1) Replace 3-gang meter stack on each of Duplex Buildings identified on the drawings as follows:
(2) Duplex A (DUM 1)
(3) Duplex B (DUM 2)
(4) Duplex C (DUM 3)
(g) Optional Item One - Duplex Service Replacement
(1) Replace 3-gang meter stack on each of Duplex Buildings identified on the drawings as follows:
(2) Duplex D (DUM 4)
(3) Duplex E (DUM 5)
(h) Optional Item Two – Install High Voltage Service 4-Inch Service Riser
Install new buried 4-inch conduit from the existing utility pole to manhole 2 as shown on the drawings.
(i) Optional Item Three: Provide following transformer as identified on the drawings and described in the specifications to be stored in an on-site location approved by the CO.
(1) 50 KVA Single Phase Pad Mounted Transformer (Supply Only)
(2) 30 KVA Three Phase Pad Mounted Transformer (Supply Only)
(3) 25 KVA Single Phase Pad Mounted Transformer (Supply Only)
(4) 25 KVA Single Phase Pad Mounted Transformer (Supply Only)
(5) 25 KVA Single Phase Pad Mounted Transformer (Supply Only)
(6) 15 KVA Single Phase Pad Mounted Transformer (Supply Only)
SECTION D. PACKAGING AND MARKING
D.1 Project Labeling for Official Correspondence: The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E. INSPECTION AND ACCEPTANCE
E.1 Federal Acquisition Regulation (48 CFR Chapter 1) Clauses 52.246-12 Inspection of Construction (AUG 1996)
SECTION F. DELIVERIES OR PERFORMANCE
F.1 Federal Acquisition Regulation (48 CFR Chapter 1) Clauses 52.242-14 Suspension of Work (APR 1984) 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.
SECTION G. CONTRACT ADMINISTRATION DATA
G.1 Agriculture Acquisition Regulation (48 CFR Chapter 4) Clauses 52.211-10Post Award Conference (NOV 1996)
A post award or pre-work conference with the successful offeror is required. It will be scheduled and held within a reasonable time after award and prior to the issuing of a Notice to Proceed.
G.2 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)
(a) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform (IPP).
(b) "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov
(c) The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.
(d) Final Payment. The final invoice must be accompanied by a release of claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically https://www.ipp.gov/ mailto:IPPCustomerSupport@fms.treas.gov accepted from the operation of the release. Final payment will not be approved without a properly executed Contract Release, Form 6300-16.
(e) In addition, when submitting the invoice, the Contractor shall submit payrolls, subcontractor payment information and a spreadsheet detailing the payment breakdown in accordance with the Pay Items in the Schedule of Items, Section B.1 (either electronically in IPP, hard copy, or via fax) to the Contracting Officer (see FAR 52.232-5 Payments Under Fixed Price Construction Contracts).
G.3 Designation of Contracting Officer's Representative
(a) The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
(b) The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
(c) On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.4 Contractor’s Designated Representative
It is required that the Contractor have a designated representative available on the project during the entire project and that the representative be able to speak and understand English. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the Contracting Officer. Such designation shall clearly indicate the name and limitations (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting, the representative is strongly encouraged to attend that meeting.
G.5 Email and Telephone Communications
For the life of this contract, the contractor shall monitor the email address and telephone number provided to the government. The government requires response to email or telephone inquiries within three days. Not responding within three days is an un-satisfactory business practice and will reflect unfavorably on the performance evaluation and subsequent source selections. Email sent by the government to the contractor shall be considered received the same day they are sent.
SECTION H. SPECIAL CONTRACT REQUIREMENTS
H.1 Landscape Preservation
(a) Confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Unless otherwise agreed to by the CO, retrieve material which falls outside of these limits and either incorporate the material in the work or dispose of the material as directed by the CO.
(b) Schedule and conduct operations to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.). Install silt fencing around areas immediately next to streams and ponds to mitigate suspended sediments when designated on the drawings.
(c) Do not discharge pollutants such as raw sewage, and other harmful materials into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Do not allow wash water or waste water from concrete or aggregate operations to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(d) Collect and return waste motor oils, fuels, lubricants, bitumens and similar hydrocarbons to the supplier.
Comply with the requirements of 40 CFR 279, Standards for the Management of Used Oil. Do not discharge hydrocarbon products on the ground, use them for road oiling, or bury them in a landfill.
(e) Do not operate mechanized equipment in live streams without written approval of the Contracting Officer.
H.2 Contractor's Use And Maintenance Of Existing Roads
(a) The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. Such roads are those which are necessary for direct access to designated borrow sites, quarries, stockpile sites, waste areas, campsites, equipment unloading ramps, and other approved work areas. The roads authorized for use will be subject to the following general conditions:
(b) Federal Regulations contained in 36 CFR 261.12; except vehicle weight will not exceed that of AASHTO HS20-44 and/or U80 Loading. Submit written requests to the CO for approval to use L90 and U102 overload Loadings on roads authorized for use. Regulations prohibit damaging a road or blocking a road open to use by others, except as otherwise provided in the Special Project Specifications.
(c) The Government will not snowplow roads for the Contractor's use. The Contractor may snowplow any road designated for his use. A permit defining snowplowing requirements is required and will be issued by the District Ranger, upon request by the Contractor. Repair any damage to the road structure caused by snow removal operations. Vehicles, other than conventional over-the-snow vehicles (snowmobiles), will not be permitted to use roads when there is an average of more than 4 inches of snow unless the road has been snowplowed.
(d) The Contractor is responsible for and will perform road maintenance on Forest Service roads in the construction area commensurate with his use. Perform road maintenance at such intervals that prevent deterioration of the roadway, or as directed by the Contracting Officer.
H.3 Emergency Control
(a) Immediately extinguish without expense to the Government all fires on or in the vicinity of the project which are caused by the Contractor's employees, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor's employees or resulting from construction operations.
(b) Contractor's Responsibility for Controlling Other Emergencies - When requested by the Contracting Officer, allow the Forest Service to temporarily use employees and equipment for emergency control work.
Payment will be made at not less than the current area rate established by the Forest Service.
H.4 Product Substitution
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
PART II--CONTRACT CLAUSES
SECTION I. CONTRACT CLAUSES
I.1 Federal Acquisition Regulation (48 CFR Chapter 1) Clauses 52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (APR 1984) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (OCT 2010) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of
Whistleblower Rights (SEP 2013) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2013) 52.204-13 System for Award Management Maintenance (JUL 2013) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.217-7 Option for Increased Quantity – Separately Price Line Item (Mar 1989)
Fill-in: 90-days .
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (JAN 2011) 52.219-14 Limitations on Subcontracting (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (JUN 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988)
52.222.17 Nondisplacement of Qualified Workers (JAN 2013)
52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-34 Project Labor Agreement (MAY 2010) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and other Eligible Veterans (SEP 2010) 52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) 52.222-37 Employment Reports on Veterans (SEP 2010) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.222-54 Employment Eligibility Verification (AUG 2013) 52.223-3 Hazardous Material and Material Safety Data (JAN 1997) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction
Contracts (MAY 2008)
52.223-18 Contractor Policy to Ban Text Messaging While Driving (AUG 2011) 52.223-19 Compliance with Environmental Management Systems (MAY 2011) 52.225-9 Buy American Act-Construction Materials (SEP 2010)
(a) Definitions. As used in this clause—
(1) “Commercially available off-the-shelf (COTS) item”-
(i) Means any item of supply (including construction material) that is-
(A) A commercial item(as defined in paragraph (1) of the definition at FAR 2.101);
(B) Sold in substantial quantities in the commercial marketplace; and
(C) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(D) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C.
App. 1702), such as agricultural products and petroleum products.
(2) "Component" means an article, material, or supply incorporated directly into a construction material.
(3) "Construction material" means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
(4) "Cost of components" means—
(i) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(ii) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
(5) "Domestic construction material" means—
(i) An unmanufactured construction material mined or produced in the United States;
(A) A construction material manufactured in the United States, if –
(B) the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(C) The construction material is a COTS item.
(6) "Foreign construction material" means a construction material other than a domestic construction material.
(7) "United States" means the 50 States, the District of Columbia, and outlying areas.
(i) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(b) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: none
(c) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(1) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(2) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(3) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(d) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(1) A description of the foreign and domestic construction materials;
(2) Unit of measure;
(3) Quantity;
(4) Price;
(5) Time of delivery or availability;
(6) Location of the construction project;
(7) Name and address of the proposed supplier; and
(8) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(e) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(f) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(g) Any Contractor request for a determination submitted after contract award shall explain why the
Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(h) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(i) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(j) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
(k) Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material
(l) [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.228-15 Performance and Payment Bonds – Construction (OCT 2010) 52.229-3 Federal, State, and Local Taxes (APR 2003) 52.232-5 Payments under Fixed-Price Construction Contracts (SEP 2002) 52.229-7 Taxes - Fixed-Price Contracts with Foreign Governments (FEB 2013) 52.232-17 Interest (OCT 2010)
52.232-23 Assignment of Claims (JAN 1986)
52.232.27 Prompt Payment for Construction Contracts (JUL 2013) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JULY 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(Apr 1984) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.237-11 Accepting and Dispensing of $1 Coin (AUG 2007) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Items (DEC 2013) 52.245-1 Government Property (APR 2012) 52.245-2 Government Property Installation Operation Services (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering -- Construction (OCT 2010) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012);
Alternates I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
(End of Clause) 52.253-1 Computer Generated Forms (JAN 1991) http://www.acquisition.gov/far/ http://www.usda.gov/procurement/policy/agar.html
I.2 Agriculture Acquisition Regulation (48 CFR Chapter 4) Clauses 252.209-71 Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants Alternate 1 (Feb 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No.
112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it-
(1) does not have a tax delinquency, meaning that is it not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal Law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
(End of Clause) 452.228-70 Alternative Forms of Security (NOV 1996) If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to:
USDA Forest Service.
(End of Clause) 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J. LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 The following attachments are made a part of this solicitation and any resultant contract.
Title Pages Davis Bacon Wage Determination AK140006 01/03/2014 AK6 13 Thorne Bay Ranger District (TBRD) Compound Electrical Distribution Repair and Upgrade Phase 1, Project Specifications
Original Stamped Design Drawings:
The complete Original Stamped Design Drawings, sheets 1-24 are provided for reference
Sheet Description 0 Cover 1 1 General Legend, Design Criteria, Project Narrative, and Abbreviations 1 2 Site Plan Survey 1 3 Site Plan Survey 1 4 Warehouse Generator Room Demolition Plan and Elevations 1 5 Warehouse/Generator Room Photos 1 6 Warehouse/Generator Room Plan and Elevations Repair 1 7 Dormitory Electrical Panel Locations 1st Floor 1 8 Dormitory Electrical Panel Locations 2nd Floor 1 9 Legend, Key Plan, and Equipment List 1 10 Demolition Site Plan North 1 11 Demolition Site Plan South 1 12 Demolition One Line Diagram #1 1 13 Demolition One Line Diagram #2 1 14 Demolition One Line Diagram #3 1 15 Demolition One Line Diagram #4 1 16 Miscellaneous Photos 1 17 Manhole Photos 1 18 Transformer and Meter Base Photos 1 19 New Construction Site Plan North 1 20 New Construction Site Plan South 1 21 New Construction One Line Diagram #1 1 22 New Construction One Line Diagram #2 1 23 New Construction One Line Diagram #3 1 24 New Construction One Line Diagram #4 1
Phase I Contract Drawings Only a portion of the work shown on the Original Stamped Design Drawings is required under this contract; the required work (as well as as-built conditions that have changed since the Original Stamped Design Drawings were completed) is depicted in the Phase I Contract Drawings and outlined in Section C.
Original drawing sheets that were not edited are not provided.
Sheet Title 0 Cover 1 2 Site Plan Survey 1 4 Warehouse Generator Room Demolition Plan and Elevations 1 6 Warehouse/Generator Room Plan and Elevations Repair 1 10 Demolition Site Plan North 1 11 Demolition Site Plan South 1 12 Demolition One Line Diagram #1 1 13 Demolition One Line Diagram #2 1 14 Demolition One Line Diagram #3 1 15 Demolition One Line Diagram #4 1 19 New Construction Site Plan North 1 21 New Construction One Line Diagram #1 1 22 New Construction One Line Diagram #2 1 23 New Construction One Line Diagram #3 1 24 New Construction One Line Diagram #4 1 Experience And Capability Questionnaire - OMB Clearance Number 9000-0142 (solicitation only) 2
J.2 In compliance with the paper reduction act, sections K, L, and M, which apply only to the solicitation phase, are not duplicated after contract award. However, section K will be incorporated by reference into the resulting contract.
J.3 "The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, DC 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.”
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF BIDDERS
K.1 Federal Acquisition Regulation (48 CFR Chapter 1) Provisions 52.203-11 Certifications and Disclosure Regarding Payments to Influence Certain Federal Transactions
(SEP 2005)
52.204-8 Annual Representations and Certifications (JAN 2014) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.
(2) The small business size standard is $14,000,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless-
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisitions threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, or 2010.
(vi) 52.209-5, (APR 2010) Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.214-4, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .