3-Worklist_AG-0109-S-16-0016.pdf

PDF 87 KB Posted

Attached to
South Prince of Wales Island Bridge Install and Road Repair
Solicitation number
AG-0109-S-16-0016
Issued by

About this file

Attachment 3 - Worklist

View the file

Other files

File Type Posted
AG-0109-S-16-0016_Amendment4.pdf PDF
Amendment3_AG0109S160016.rtf RTF text file
Amendment2_AG0109S160016.pdf PDF
AG-0109-S-16-0016_Amendment1.pdf PDF
2-Project_Specs_AG-0109-S-16-0016.pdf PDF
5-Past_Performance_Worksheet.docx DOCX document
RFP-AG-0109-S-16-0016.pdf PDF
4-WD_AK160006.pdf PDF
1-Project_Drawings_AG-0109-S-16-0016.pdf PDF
SF-1449_AG-0109-S-16-0016.pdf PDF
Drawings_SPOW_Drainage.pdf PDF
FSSS.pdf PDF
SouthPOW_WorkList.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Road # Milepost Description of Work

2100 000

0.65 Remove 18" CMP and replace with 18"x30" CPP

0.78 Reconstruct catch basin and lead-off ditch of 18"

CMP

0.83 Install 18"x30' CPP

0.861 Remove 18" CMP and replace with 18"x30' CPP

0.94 Clean outlet and reconstruct lead-off ditch

1.001 Install 24"x30" CPP

1.13 Install 18"x30' CPP

1.19

50' of ditching across entrance of quarry to direct water to CMP at M.P. 1.2 allow for traffic to cross ditch

1.43 Reconstruct catch basin and clean inlet of 18" CMP

1.63 Remove 18" CMP and replace with 36"x30' CPP

1.73 Remove 18" CMP and replace with 18"x35' CPP

2.18 Remove 18" CMP and replace with 18"x30' CPP

2.26 Remove 24" CMP and replace with 24"x30' CPP

2.46 Remove 18" CMP and replace with 18"x30' CPP

2.51 Remove 18" CMP and replace with 18"x30' CPP

3.89 Remove 24" CMP Replace with 24"x30' CPP

4.36 Remove 18" CMP Replace with 24"x30" CPP

4.4 Remove 18" CMP Replace with 24"x30' CPP

4.65 Remove 18" CMP Replace with 18"x30' CPP

4.81 Remove 18" CMP Replace with 18"x30' CPP

4.91 Remove 18" CMP Replace with 18"x30' CPP

5.96 Remove 18" CMP Replace with 18"x30' CPP

6.31 Remove 24" CMP replace with 24"x30' CPP

6.45 Reconstruct catch basin of 18"CMP

6.48 Remove 18" CMP Replace with 18"x30' CPP

6.5 Furnish and install 40ft slab bridge

6.83 Remove 18"CMP and replace with 18"x30' CPP

7.05 Remove 18"CMP and replace with 24"x30' CPP

7.15 Remove 18" CMP and replace with 24"x30' CPP

7.21 Remove 24" CMP and replace with24"x30' CPP

7.31 Remove 36" CMP and replace with 36"x32' CPP

7.36 Remove 36" CMP and replace with 36"x36' CPP

7.39 Remove 36" CMP replace with 36"x40' CPP

7.45 Remove 18" CMP and replace with 24"x30' CPP

7.5 Remove 24" CMP and replace with 24"x30' CPP

7.53 Remove 24" CMP and replace with 24"x30'

2120000

0.21 Furnish and install 40ft glue laminated slab bridge

Also 10 hours equipment rental medium sized backhoe 5 hours dump truck

File details come from the government source that posted it. Updated .