3-Worklist_AG-0109-S-16-0016.pdf
PDF 87 KB Posted
- Solicitation number
- AG-0109-S-16-0016
About this file
Attachment 3 - Worklist
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0109-S-16-0016_Amendment4.pdf | ||
| Amendment3_AG0109S160016.rtf | RTF text file | |
| Amendment2_AG0109S160016.pdf | ||
| AG-0109-S-16-0016_Amendment1.pdf | ||
| 2-Project_Specs_AG-0109-S-16-0016.pdf | ||
| 5-Past_Performance_Worksheet.docx | DOCX document | |
| RFP-AG-0109-S-16-0016.pdf | ||
| 4-WD_AK160006.pdf | ||
| 1-Project_Drawings_AG-0109-S-16-0016.pdf | ||
| SF-1449_AG-0109-S-16-0016.pdf | ||
| Drawings_SPOW_Drainage.pdf | ||
| FSSS.pdf | ||
| SouthPOW_WorkList.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Road # Milepost Description of Work
2100 000
0.65 Remove 18" CMP and replace with 18"x30" CPP
0.78 Reconstruct catch basin and lead-off ditch of 18"
CMP
0.83 Install 18"x30' CPP
0.861 Remove 18" CMP and replace with 18"x30' CPP
0.94 Clean outlet and reconstruct lead-off ditch
1.001 Install 24"x30" CPP
1.13 Install 18"x30' CPP
1.19
50' of ditching across entrance of quarry to direct water to CMP at M.P. 1.2 allow for traffic to cross ditch
1.43 Reconstruct catch basin and clean inlet of 18" CMP
1.63 Remove 18" CMP and replace with 36"x30' CPP
1.73 Remove 18" CMP and replace with 18"x35' CPP
2.18 Remove 18" CMP and replace with 18"x30' CPP
2.26 Remove 24" CMP and replace with 24"x30' CPP
2.46 Remove 18" CMP and replace with 18"x30' CPP
2.51 Remove 18" CMP and replace with 18"x30' CPP
3.89 Remove 24" CMP Replace with 24"x30' CPP
4.36 Remove 18" CMP Replace with 24"x30" CPP
4.4 Remove 18" CMP Replace with 24"x30' CPP
4.65 Remove 18" CMP Replace with 18"x30' CPP
4.81 Remove 18" CMP Replace with 18"x30' CPP
4.91 Remove 18" CMP Replace with 18"x30' CPP
5.96 Remove 18" CMP Replace with 18"x30' CPP
6.31 Remove 24" CMP replace with 24"x30' CPP
6.45 Reconstruct catch basin of 18"CMP
6.48 Remove 18" CMP Replace with 18"x30' CPP
6.5 Furnish and install 40ft slab bridge
6.83 Remove 18"CMP and replace with 18"x30' CPP
7.05 Remove 18"CMP and replace with 24"x30' CPP
7.15 Remove 18" CMP and replace with 24"x30' CPP
7.21 Remove 24" CMP and replace with24"x30' CPP
7.31 Remove 36" CMP and replace with 36"x32' CPP
7.36 Remove 36" CMP and replace with 36"x36' CPP
7.39 Remove 36" CMP replace with 36"x40' CPP
7.45 Remove 18" CMP and replace with 24"x30' CPP
7.5 Remove 24" CMP and replace with 24"x30' CPP
7.53 Remove 24" CMP and replace with 24"x30'
2120000
0.21 Furnish and install 40ft glue laminated slab bridge
Also 10 hours equipment rental medium sized backhoe 5 hours dump truck