SHRIMP_LTF_BRDG.pdf
PDF 1 MB Posted
- Attached to
- Shrimp Bay Log Transfer Facility (LTF) and Bridge Federal contract opportunity
- Solicitation number
- AG-0109-S-15-0010
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment_04.doc | DOC document | |
| amendment_03.doc | DOC document | |
| amendment_02.doc | DOC document | |
| amendment_01.doc | DOC document | |
| Amended_solicitation_AG-0109-S-15-0010.doc | DOC document | |
| AG-0109-S-15-0010.doc | DOC document | |
| LTF_BRIDGE_FSSS_15-06-04.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
132°136°138°140°142° 134°
JUNEAU
Craig
132°
KEY MAP
GULF OF ALASKA
56°
58° Sitka
138°
60°
Yakutat
ALAS
KA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
SHRIMP BAY LTF AND BRIDGE
INDEX TO SHEETS
NO. DESCRIPTION
SHRIMP BAY BRIDGE DRAWINGS
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE COVER SHEET
KETCHIKAN - MISTY FJORDS
MRC 15/05/30
MRC 15/05/30
acad.DWG 1 14
EROSION CONTROL PLAN
03-07
COVER SHEET
08-12
SHRIMP BAY LTF DRAWINGS
SCALE IN FEET
1 0 1 2
SCALE IN MILES
QUARRY DEVELOPMENT PLAN
GENERAL NOTES AND MAP
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE GENERAL NOTES AND MAP
KETCHIKAN - MISTY FJORDS
MRC 15/05/30
MRC 15/05/30
ACAD.DWG
2 14
ROAD 8000900 MP 2.988:
CULVERT TO BE REPLACED
BY BRIDGE
ROAD 8000900 MP 3.045:
DESIGNATED ROCK PIT
GENERAL NOTES:
1. GOVERNMENT DOES NOT CERTIFY ACCURACY OF APPROXIMATED QUANTITIES.
2. CUBIC YARD QUANTITES ARE MEASURED IN PLACE.
SHRIMP BAY LTF
3. DESIGNATED ROCK PIT FOR WASTE DISPOSAL AND ROCK STOCKPILE LOCATED AT ROAD
8000900 MILE POST 0.074, LOCATED APPROXIMATELY 1/2 MILE AWAY FROM LTF. MILE POSTS
DECREASE IN DIRECTION OF TRAVEL AWAY FROM LTF.
SHRIMP BAY BRIDGE:
4. 8 FT DIA PIPE OR ARCH-PIPE TO BE REPLACED BY BRIDGE IS LOCATED AT ROAD 8000800 MILE
POST 2.988. MILE POSTS INCREASE IN DIRECTION OF TRAVEL AWAY FROM LTF. REMOVED PIPE
TO BECOME PROPERTY OF THE CONTRACTOR AND APPROPRIATELY DISPOSED OFF NATIONAL
FOREST LAND.
5. DESIGNATED ROCK PIT FOR WASTE DISPOSAL AND AGGREGATE PRODUCTION LOCATED AT ROAD
8000800 MILE POST 3.045.
6. GLULAM BRIDGE TYPICAL DRAWINGS ON SHEETS 11 AND 12.
7. BRIDGE INSTALLATION INCLUDES 4 HOURS BACKHOE TIME AS DIRECTED BY CONTRACTING
OFFICER REPRESENTATIVE TO DRESS BRIDGE INSTALLATION.
8. IN STREAM ACTIVITY DURING EXCAVATION AND RIP RAP PLACEMENT MUST BE APPROVED IN
ADVANCE BY THE CONTRACTING OFFICER AND MUST OCCUR BETWEEN JUNE 25 THROUGH
SEPTEMBER 1.
9. EQUIPMENT CROSSINGS MUST BE APPROVED IN WRITING BY THE CONTRACTING OFFICER. SUBMIT
A STREAM CROSSING PLAN AT LEAST 14 CALENDAR DAYS PRIOR TO PLANNED CROSSING. NO
EQUIPMENT CROSSING WILL BE PERMITTED IF THERE ARE FISH EGGS OR ADULT FISH IN THE
STREAM.
ROAD 8000800 MP 0.074:
DESIGNATED ROCK PIT
SHRIMP BAY LTF APPROXIMATE QUANTITIES
DESCRIPTION UNIT QUANTITY
RAMP EXCAVATION CUBIC YARDS 3100
MECHANICALLY PLACED RIP RAP CUBIC YARDS 500
SHOT ROCK BERM CUBIC YARDS 60
SETTLING BASIN PIPE LINEAR FEET 150
SETTLING BASIN EXCAVATION CUBIC YARDS 50
SHRIMP BAY BRIDGE CONTRACT QUANTITIES
ITEM DESCRIPTION UNIT METHOD OF MEASUREMENT QUANTITY
2A REMOVE PIPE LUMP SUM CONTRACT QUANTITY 1
2B GLULAM BRIDGE AND
ACCESSORIES, FURNISHED
TO SITE AND INSTALLED
LUMP SUM CONTRACT QUANTITY 1
2C UNCLASSIFIED BORROW CUBIC YARDS CONTRACT QUANTITY 950
MECHANICALLY PLACED RIP
RAP (INCIDENTAL TO BRIDGE)
CUBIC YARDS CONTRACT QUANTITY 65
-6
-5
-4
-3
-2
-1
SCALE IN FEET
70 0 70 140
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE EXISTING GROUND
KETCHIKAN - MISTY FJORDS
MRC 15/05/30
MRC 15/05/30
ACAD.DWG
3 14
MON 3
MON 2
MON 1
M
HH
W : 1
5.
FT
M
LL
W : 0
F T
RO
AD
C M
P
CMP
CMP
EXISTING EQUIPMENT RAMP
BEACH ACCESS HERE
EXISTING
DRAINAGE
SHRIMP BAY LTF EXISTING GROUND
OIL
SEPARATER
ROCK
SOURCE
BP: 0+00.00
PC: 0+42.10
PT: 0+50.76
PC: 0+96.19
PT: 1+30.29
EP: 1+83.27
-2
-1
0+00
1+00
1+83
N9° 53' 38"E 52.98'
N42° 27' 29"E 45.42'
N34° 11' 20"E 42.10'
L=34.10' =32.56
R=60'
L=8.66' =8.27 R=60'
S63° 25' 35"E 68.35'
N18° 34' 36"W 187.56'
0+25 0+50 0+75 1+25 1+50 1+750+00 1+00
-14.25%
-2.03%
GRADE BREAK STA = 0+00.00
ELEV = 30.450
G R A D
E B R
EA
K S
TA
.0
EL
EV
.0
G R A D
E B R
EA
K S
TA
.8
EL
.3
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE NEW RAMP
KETCHIKAN - MISTY FJORDS
MRC 15/05/30
MRC 15/05/30
ACAD.DWG
4 14
SCALE IN FEET
40 0 40 80
RAMP ENDS AT DAYLIGHT
FROM EXISTING LTF
MON 3
MON 2
TO MON 1
SHRIMP BAY LTF PROPOSED 40' WIDTH RAMP
SHRIMP BAY RAMP PROFILE
RAMP ENDS AT DAYLIGHT
FROM EXISTING LTF
NOTES:
1. SEE SHEET 6 FOR TYPICAL RAMP SECTION DETAIL.
2. MAY ENCOUNTER BEDROCK DURING EXCAVATION OF RAMP.
3. SEPARATE WASTE MATERIAL FROM CLEAN ROCK GENERATED BY EXCAVATION. WASTE MATERIAL
TO BE DISPOSED AT ROCK PIT LOCATED AT ROAD 8000900 MILE POST 0.074.
4. EXCESS CLEAN ROCK GENERATED BY EXCAVATION MAY BE REUSED WITHIN THIS PROJECT.
FURTHER EXCESS CLEAN ROCK TO BE STOCKPILED AT ROCK PITLOCATED AT ROAD 8000900
MILE POST 0.074, SEPARATE FROM WASTE MATERIAL.
5. CONTRACTING OFFICER REPRESENTATIVE WILL DESIGNATE LOCATION FOR WASTE AND STOCKPILE
WITHIN ROCK PIT.
EXISTING GROUND
NEW RAMP
RAMP 2
RAMP 1
RAMP 3
RAMP 4
PROPOSED RAMP POINTS LIST
DESCRIPTION NORTHING EASTING ELEVATION
RAMP 1 9900.73 9931.03 30.45
RAMP 2 9939.15 9957.13 23.83
RAMP 3 9988.79 10002.55 14.26
RAMP 4 10058.25 10014.67 0.00
-10
-20
SCALE IN FEET
40 0 40 80
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE FINISHED GROUND
KETCHIKAN - MISTY FJORDS
MRC 15/05/30
MRC 15/05/30
ACAD.DWG
5 14
RAMP ENDS AT DAYLIGHT
FROM EXISTING LTF
NEW SETTLING BASIN AND DRAIN PIPE.
BOTTOM ELEVATION APPROX 25'.
PIPE LENGTH APPROX 144'. REFER TO
SHEET 6 AND 7 FOR DETAIL.
EXISTING RIP RAP WALL
TO REMAIN. REPAIR IF
DAMAGED DURING
CONSTRUCTION.
CONSTRUCT NEW
MECHANICALLY PLACED
RIP RAP WALL, CLASS 8
RIP RAP
RIP RAP WALL AT END OF RAMP, CLASS 8 RIP
RAP. MAINTAIN SMOOTH AND FLAT SURFACE
OF RAMP SUITABLE FOR BARGE USAGE.
CLEAR ALL BRUSH FROM LTF
SURFACE AND REMOVE APPROX
40 CY WASTE
CONSTRUCT ROCK BERM.
APPROX 160' LENGTH.
SEE SHEET 6 FOR DETAIL.
ROCK SOURCE
SHRIMP BAY LTF FINISHED GROUND AND ADDITIONAL WORK
NOTES:
1. WASTE MATERIAL TO BE DISPOSED AT ROCK PIT LOCATED ON ROAD 8000900 MILE POST 0.074.
2. GOVERNMENT DOES NOT CERTIFY ACCURACY OF APPROXIMATE QUANTITIES.
3. CONTOUR LTF FINISHED GROUND SURFACE TO DRAIN AWAY FROM OCEAN AND TOWARDS DITCH AND SETTLING BASIN.
CLEAR ALL BRUSH FROM
LTF SURFACE.
CLEAN EXISTING DRAINAGE
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE LTF DETAILS
KETCHIKAN - MISTY FJORDS
MRC 15/05/30
MRC 15/05/30
ACAD.DWG
6 14
SHRIMP BAY DETAILS, NO SCALE
NOTES:
1. ALL CUT AND FILL SLOPES ARE 1.25:1 UNLESS OTHERWISE NOTED.
2. COMPACTION METHOD B DESCRIBED BY FP-03 SPECIFICATION 204.11 (a) (1).
UNCLASSIFIED BORROW NO
MATERIAL LARGER THAN 6".
2 FT
5 FT
LTF SURFACE DRAINS TOWARDS
DITCH AND SETTLING BASIN.
UNCLASSIFIED BORROW
NO MATERIAL LARGER
THAN 6" WITHIN TOP 6".
COMPACT METHOD B.
40 FT RAMP WIDTH
2% CROWN
1.25:1 SLOPE 1.25:1 SLOPE
1 FT DEEP DRAINAGE UNCLASSIFIED BORROW
LTF MATERIAL. COMPACT
METHOD B.
APPROX. 3 FT
SETTLING BASIN
ROCK BERM
RAMP TYPICAL SECTION
LTF SURFACE
TO OCEAN
EXISTING RIP RAP
NEW MECHANICALLY
PLACED RIP RAP, CLASS 8
PIPE GRADE APPROX 2%
REFER TO SHEET 7 FOR PIPE DETAIL
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE SETTLING BASIN OUTLET PIPE DETAIL
KMRD
K. ELMORE 10/12/07
K. ELMORE 10/15/07
M. PETERSON 10/29/07
5/22/14 TONGASS LTF RECON MRC
ACAD.DWG
7 14
1/4 1/4
12" Ø, 1/4" WALL THICKNESS STEEL PIPE, HOT DIP GALVANIZED
TYPICAL FLANGE CONNECTION BOLTED TOGETHER
39'-0", TYPICAL PIPE LENGTH BETWEEN FLANGE PLATES
12" Ø, 1/4" WALL
THICKNESS
3/8" THICK, 1'-6" FLANGE PLATES,
MATE FLANGE PLATES TOGETHER AND BOLT
PLATES TOGETHER WITH SIX - 1/2" Ø, 2" LONG
A-307 BOLTS AND NUTS PER CONNECTION
12" Ø, 1/4" WALL THICKNESS STEEL PIPE, HOT DIP GALVANIZED
3/8" THICK, 1'-6" Ø FLANGE PLATES,
TYP.; SEE DETAIL THIS SHEET
STEEL PIPE, TYP.
TYP.; SEE DETAIL THIS SHEET
12" Ø, 1/4" WALL THICKNESS STEEL PIPE, TYP. NO FLANGE PLATE
ON PIPE OUTLET
3'-1 1/8"
PIPE OUTLET
INSTALL 12" Ø "TEE"
AND RISER PIPE AT
INLET; SEE DETAIL
THIS SHEET
NO SCALE
NO SCALE
NO SCALE
NO SCALE
3/8" THICK, 1'-6" OUTSIDE
DIAMETER STEEL PLATE, TYP.
1'-0" INSIDE DIAMETER HOLE
IN FLANGE PLATES
5/8" DIAMETER HOLES FOR
1/2" DIAMETER BOLTS, TYP.
6 PLACES PER PLATE
1 1/2", TYP.
7 1/2"
NO SCALE
3/8" THICK, 1'-6" OUTSIDE
DIAMETER STEEL PLATE, TYP.
5/8" DIAMETER HOLES FOR
1/2" DIAMETER BOLTS, TYP.
6 PLACES PER PLATE
1 1/2", TYP.
7 1/2"
60°, TYP.
60°, TYP.
12" INSIDE DIAMETER, TYP.
12" DIAMETER "TEE"
1'-0"
3'-0" 3/8"
2"
3/4"
2 - 3/8" THICK, 1'-6"
OUTSIDE DIAMETER
FLANGE PLATES, TYP.
12" Ø RISER PIPE, 1'-6" LONG
1/4
1/41/4
3/8" THICK, 1'-6"
OUTSIDE DIAMETER
FLANGE PLATE AND
CAP PLATE, SEE
3/4" 6"
2"
6"
2"
CUT 2 ROWS OF 6" LONG, 1/2" WIDE
SLITS IN RISER PIPE, SPACED ON 3"
CENTERS AROUND CIRCUMFERENCE
(SIMILAR TO STANDARD WINDOW SCREEN
OF PIPE; COVER SLITS AND TOP OF
PIPE WITH WIRE MESH SCREEN MEETING
REQUIREMENTS FOR 1.18 mm (No. 16)
STANDARD SOIL TEST SIEVE WIRE CLOTH.
WITH 16 OPENINGS PER INCH); ATTACH
SCREEN OVER RISER PIPE WITH 1 3/4"
WIDE, 1/8" THICK METAL BAND,
SEE DETAIL THIS SHEET
NO SCALE
R
TY
P.
1 3/4" 7/8"
1"1"
1/8" THICK, 1 3/4"
WIDE STRAP PLATE
R
1/2" Ø, 1 1/2"
LONG ASTM
A-307 BOLT
AND NUT, TYP.
5/8" Ø HOLES,
TYP.
DETAILS ON THIS
SHEET
1. PIPE SHALL MEET REQUIREMENTS OF ASTM
A-53, TYPE F IN ACCODANCE WITH SECTION 717.
2. STEEL PLATES AND SHAPES SHALL BE ASTM A-36.
ADJUST PIPE SEGMENT LENGTH AS NECESSARY
8 9
99989796
99 98
0+00
1+00 2+00
3+00 3+57
0+50 1+00 1+50 2+00 2+50 3+00
8.00%
-8.00%
1.50%
G R A D
E B R
EA
K S
TA
.4
EL
.3
GRADE BREAK STA = 1+46.50
ELEV = 104.325
G R A D
E B R
EA
K S
TA
.7
EL
.8
GRADE BREAK STA = 2+36.50
ELEV = 105.675
SCALE IN FEET
30 0 30 60
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE SHRIMP BRIDGE SITE
KMRD
MRC 15/06/03
MRC 15/06/03
ACAD.DWG
8 14
RP 1
SITE ALIGNMENT PROFILE
GRAVEL BAR
40' BRIDGE AND 25'
APPROACH REGIONS
SURVEY ENDS. FEATHER FILL
INTO EXISTING ROAD AT END
OF PROPOSED GRADE.
EXISTING CULVERT
FILLED WITH SLIDE
MATERIAL.
CREEK BOTTOM
ELEVATION
APPROX. 95-96'
SURVEY ENDS. FEATHER FILL
INTO EXISTING ROAD AT END
OF PROPOSED GRADE.
TOP OF BANK
END BRIDGE
RP 2
REFERENCE POINT DESCRIPTION
RP 1 IS NAIL WITH FLAGGING AT BASE OF 30" SPRUCE WEST OF ROAD.
HUB WITH FLAGGING IS NAILED TO TREE.
RP 2 IS MAGNAIL AT BASE OF 20" SPRUCE EAST OF ROAD. HUB WITH
FLAGGING POINTS TO MAGNAIL.
HUBS ARE 0.5" X 1.0" X 18".
START BRIDGE
END FILL
START FILL
POINTS LIST
DESCRIPTION NORTHING EASTING ELEVATION
RP1 4955.96 9951.68 101.80
RP2 4996.60 10054.90 96.08
START BRIDGE 5017.40 9992.70 104.70
END BRIDGE 4977.57 9996.41 105.30
START FILL 5167.26 9984.79 94.31
END FILL 4854.89 10006.54 97.819
SITE PLAN
NEW ROAD PRISM TO ELEVATE ROAD SURFACE
(SEE SHEET 10 FOR TYPICAL SECTION)
FLO
W
1.25
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE SHRIMP BRIDGE
KMRD
MRC 15/06/04
MRC 15/06/04
ACAD.DWG
9 14
NOTES:
1. DRAWINGS ON THIS SHEET NOT TO SCALE.
2. WORK INCLUDE 4 HOURS BACKHOE WORK
DIRECTED BY COR TO DRESS BRIDGE
INSTALLATION.
3. SEE SHEETS 11 AND 12 FOR GLULAM
BRIDGE DETAIL.
TOE OF FILL
STREAM THALWEG
TAPER RIPRAP TO
DESIGNED FILL
EDGE OF ROAD
BACK WALL WIDE ENOUGH TO
CONTAIN APPROACH FILL AT
BACKWALL ELEVATION.
MECHANICALLY PLACED
EMBANKMENT
SLAB BRIDGE
100 YR FLOOD
40 FT GLULAM SLAB BRIDGE
APPROX. 98 FT
20 FT CREEK CHANNEL
2' THICK MECHANICALLY
PLACED RIPRAP CLASS 6
6" THICK LEVELING
COURSE, 2" MINUS
WEARING SURFACE
1.5% BRIDGE GRADE
APPROXIMATE ELEVATION
OF EXISTING ROAD
5.3 FT
6 FT
EXTEND LEVELING COURSE
TO RIP RAP. AT LEAST 1 FT
BETWEEN SILL AND RIP RAP.
MATERIAL IS INCIDENTAL TO
RAISING ROAD SURFACE.
BRIDGE SILL
BRIDGE PROFILE
BRIDGE PLAN
1.25
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
SHRIMP BAY LTF AND BRIDGE ROAD TYPICAL SECTION
KMRD
MRC 15/06/04
MRC 15/06/04
ACAD.DWG
10 14
NOTES:
1. EXISTING ROAD IS 14' WIDE. CONSTRUCT NEW ROAD PRISM TO ELEVATE
EXISTING ROAD SURFACE.
2. ALL FILL SLOPE ARE 1.25:1 UNLESS OTHERWISE NOTED.
3. CROWN ROAD SURFACE FROM CENTERLINE TO EDGE OF ROAD AT 4-6%.
4. NO MATERIAL LARGER THAN 6" IN TOP 6" OF NEW ROAD PRISM.
5. SUITABLE MATERIAL FROM CULVERT EXCAVATION AND LTF RAMP EXCAVATION
MAY BE USED IN CONSTRUCTING NEW ROAD PRISM. CONTRACTOR MAY
PRODUCE AND USE AGGREGATE FROM DESIGNATED ROCK PIT AT MP 3.45 ON
ROAD 8000800.
6. PLACE AND COMPACT MATERIAL PER FP-03 204.10 AND 204.11 (a) (1)
COMPACTION METHOD B, VIBRATORY ROLLER.
NEW ROAD PRISM FILL
MATERIAL: UNCLASSIFIED
BORROW.
GROUND
EXISTING ROAD PRISM
14 FT WIDE
VARIES CROWNED 4-6%
NO MATERIAL LARGER
THAN 6" IN TOP 6".
STEEL GUARDRAILWOOD CURBBACKWALL PLANK, TYP.
GLU-LAM FOOTING, TYP.
CURB BLOCK @ EQUAL SPACING NOT TO EXCEED 6'-0"
BRIDGE LENGTH VARIES - SEE TABLE 'A' FOR STIFFENER SPACING
STIFFENER BEAM, TYPICAL
STEEL POST, SEE DETAILS SH. SD-320-3
3 X 12 WEARING SURFACE, TYP.
STEEL GUARDRAIL SEE
DETAIL SH. SD-320-3
G
LU
L A M
-D
EC
K
PA
N
EL
S
'-0
'-5
/8
/4
" 4 '-6
/4
" 4 '-6
/4
'-5
/8
BEVEL
CURB
ENDS
4" @ 45°
WOOD CURB
STEEL
GUARD RAIL
BACKWALL
PLANKS, TYP.
CURB BLOCK GLU-LAM
FOOTING, TYP.
STEEL ANGLE,
SEE SH. SD-320-3
FOR STEEL POST
CONNECTIONS
STIFFENER BEAM
C10X20, 16' LONG TYP.
M
IN
WEARING SURFACE, TYPICAL
LAG SCREW
SEE SH. SD-320-3
FOR SPACING & DETAILS
16'
1.5
SEE CURB CONNECTION
DETAIL 'B' SH. SD-320-2
10 X 12 GLU-LAM OR
SAWN TIMBER CURB
W/OUT SPLICES
8 X 12 X 36" CURB BLOCK
6 X SAWN
BACKWALL
4" X 24" X 20' GLU-LAM
FOOTINGSTIFFENER BEAM, SEE SH. SD-320-2
ALIGN 3 X 12 WEARING SURFACE JOINTS
W/ DECK PANEL JOINTS, FIELD-RIP IF NEEDED
COVER 14" GAPS
LAG SCREW, TYP.
BRIDGE PANEL STIFFENER BEAMS
LENGTH THICKNESS QUANTITY SPACING
40 FT 16 1/4" 4 7'-10"
30 FT 14 1/4" 4 6'-6"
25 FT 12 1/4" 3
20 FT 2
6'-6" 6'-6"12 1/4"
TABLE 'A'
NOTES:
1. DECK PANELS DESIGNED IN ACCORDANCE W/ THE 1994 ASHTO LRFD
SPECIFICATIONS,FIRST EDITION.
2. PANELS ARE GLU-LAMINATED COASTAL DOUGLAS FIR, COMB. 5 OR BETTER,
Fby = 6100 psi Fvy = 245 psi
3. CURBS ARE COMB. 20FV3 OR NO. 1 COASTAL DOUGLAS FIR.
4. FOOTINGS ARE COMBINATION SYMBOL 1
5. BACKWALL PLANKS SHALL BE NO. 2 HEM FIR OR BETTER.
6. TIMBER IS TREATED IN ACCORDANCE W. AWPA C28 OR BETTER AFTER
FABRICATION W/ PENTACHLOROPHENOL OR COPPER NAPTHANATE.
7. WEARING SURFACE SHALL BE UNTREATED NO. 2 HEM FIR, ALASKA HEMLOCK,
ALASKA SPRUCE OR ALASKA YELLOW CEDAR.
8. ALL HARDWARE SHALL BE HOT-DIP GALVANIZED.
9. SHOP DRAWINGS SHALL BE SUBMITTED IN ACCORDANCE WITH SPECIFICATION
SECTION 574.
PLAN VIEW
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
STANDARD GLU-LAM BRIDGE SD-320-1 PLAN/PROFILE/SECTIONS
KMRD
SJC 2/2005
D.VOGAN 11/2005
11/2005 edit text dwv tnf_stnd_glulam_bridge1.dwg 11 14
PROFILE VIEW
SECTION @ MIDSPAN SECTION @ ABUTMENT
TYPICAL SECTIONS - WOOD CURB
SEE SH. SD-320-2,
CURB CONNECTION DETAIL 'B'
A
A
1" Ø BOLT W/ M.I. WASHER TOP & BOTTOM
ON 8" O.C. PRE-DRILL 1-1/8" Ø
10 X 12 GLU-LAM OR SAWN TIMBER
CURB
8 X 12 X 36" CURB BLOCK
WEARING SURFACE
(BEYOND)
GLU-LAM DECK PANEL
SPLICE AT MID SPAN
FOR LONGER SPANS
18" OVERLAP
RECESS ALL CURB BOLTS
FLUSH WITH BOTTOM OF
DECK PANEL
1.5
FASTEN WEARING SURFACE TO DECK W/ 38" Ø X 8" RING SHANKS, 2 @ PLANK ENDS, STAGGER @ 3' SPACING THROUGHOUT LENGTH PRE-DRILL DECK AND PLANK 14" Ø, TYPICAL, FIELD TREAT DECK LEAD HOLE; RECESS NAIL HEAD
8"
1" Ø LAG SCREWS W/ ACCESS HOLES THRU WEARING SURFACE, PRE-DRILL DECK PANEL 1
16" Ø
8" Ø BOLT W/ M.I. WASHER @ DECK,
& CUT WASHER AT STIFFENER BEAM
PRE-DRILL DECK PANEL 11
16" Ø
STIFFENER BEAM,
C10X20 X16'
UNTREATED 3 X 12
WEARING SURFACE,
BEVEL END OF PLANKS
2" @ 45°, TYPICAL
6 X BACKWALL PLANKS,
ATTACH TO DECK/FOOTING
W/ MIN. NUMBER OF
SPIKES NEEDED TO
HOLD IN PLACE PRIOR
TO BACKFILLING
4" X 24" GLU-LAM
FOOTING
6" DEPTH 2" MINUS MATERIAL
3'-0" OR AS DESIGNED
(OR AS DESIGNED)
PRE-DRILL SILL 58" Ø
FOR PERMANENT BRIDGE INSTALLATION
COUNTERSINK BOTTOM OF RUNNING PLANKS
FOR TEMPORARY BRIDGE INSTALLATION
CUT ACCESS HOLES THRU RUNNING PLANKS
8 1/8"
8 3/8"
8 3/8"
8 3/8" 1'-7 1/8" 11"
11"
11"
C10X20
SLOTTED HOLE
4" X 11
4", TYPICAL
1'-9 1/4" 11" 11" 11" 1'-7 1/8"
8 3/8"
8 3/8"
8 3/8"
8 1/8"
16'
1'
8 1/8"
8 3/8"
8 3/8"
8 3/8"
8 3/8"
1/4"
10 1/2"
11" 11" 11"
10 1/2"
1/4"
10 1/2"
11" 11" 11"
10 1/2"
1/4"
8 3/8"
8 3/8"
8 3/8"
8 3/8"
8 1/8"
1'
DECK END PANEL
(VARIES X 535
8" X (VARIES)
DECK CENTER PANEL
(VARIES X 54" X (VARIES)
PRE-DRILLED HOLE 11
16" Ø, TYPICAL
GAP BETWEEN PANELS, 1
4" TYPICAL
℄ CHANNEL
VARIES
CHANNEL
GRADE POINT
VARIES
BANK REINFORCEMENT,
CLASS AND THICKNESS
AS DESIGNED
12" (MIN.) NATIVE
STREAM BED MATERIAL
OVER RIPRAP
*1'-0"
*1'-0" MINIMUM WITH
RIPRAP, 3'-0" MINIMUM
WITHOUT RIPRAP
CURB CONNECTION DETAIL 'B'
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
STANDARD GLU-LAM BRIDGE SD-320-2 TYPICAL DETAILS
KMRD
SJC 2/2005
D. VOGAN 11/2005
11/2005 curb detail/abutment dim. dwv tnf_stnd_glulam_bridge2.dwg 12 14
TYPICAL ABUTMENT SECTION
GLU-LAM DECK PANEL
STIFFENER BEAM - PLAN VIEW
A
NOTES:
1. ALL STEEL ANGLES AND ROLLED SHAPES
SHALL BE ASTM A36 GRADE.
2. ALL STEEL NUTS & BOLTS SHALL BE
ASTM A307 GRADE.
3. HOT DIP GALVANIZE ALL STEEL AFTER FABRICATION.
TYPICAL BRIDGE PROFILE
50'-0"
10'-0"
TYPICAL
TYPICAL
50'-0"
TYPICAL
DITCH FLOWDITCH FLOW
S
TR
EA
M
F
LO
W
PLACE SILT FENCE ALONG WATERWAY,
TERMINATE AT END OF CUT, TYPICAL
STRAW BALES, CENTERED IN DITCH LINE
SILT FENCE, TYPICAL
SILT FENCE, SECURE AROUND INLET
TO KEEP DEBRIS OUT OF STREAM
SILT FENCE, TYPICAL
APPROX. 6 ' APPROX. 6'CENTER ON DITCHTYPICAL
135°
135°
DITC
H FL
OW
STRAW BALES (2)
'-6
'-0
GEOTEXTILE FABRIC FILTER CLOTH,
SECURE TO TOP OF POSTS
WOVEN WIRE FENCE FABRIC
BOTTOM OF SILT FENCE BURIED
IN TRENCH MINIMUM 6" DEPTH
SECURE EACH BALE W/
AT LEAST 2 STAKES BURIED
MINIMUM 12" DEPTH
DITCH FLOW
APPROX. 10' TYPICAL
POST
WOVEN WIRE FABRIC
GEOTEXTILE FABRIC
BRUSH BARRIER
SEE NOTES
GEOTEXTILE FABRIC, BURY
BOTTOM EDGE ±6"
ROAD FILL SLOPE
EXIST.
GROUND
VARIES 3' TO 5' VARIES 5' TO 10'
TYPICAL SEDIMENT CONTROL AT CULVERTS
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. OFR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:01/05
SHRIMP BAY LTF AND BRIDGE EROSION CONTROL DEVICES
KMRD
SJC 01/2005
K. BRAY 01/2005
13 14
NOTES:
SILT FENCE CONSISTS OF WOVEN WIRE FENCE FABRIC WITH A MAXIMUM 6 INCHES MESH, MINIMUM HEIGHT
30 INCHES.
THE CO MAY REQUIRE ADJUSTMENTS TO ACTUAL LENGTHS OR LOCATIONS TO FIT FIELD CONDITIONS.
INSPECT SILT FENCES AFTER EACH RUNOFF EVENT AND IMMEDIATELY REPAIR ALL EROSION ALONG EDGES
AND BOTTOM.
ACCUMULATED DEPTH OF SEDIMENT SHALL NOT EXCEED ONE HALF THE ORIGINAL HEIGHT OF THE SILT FENCE.
IN AREAS DESIGNATED FOR BRUSH BARRIERS, LIMIT CLEARING TO TREES, SHRUBS AND PLANTS LESS THAN 4
INCHES IN DIAMETER. GRUBBING SHALL NOT BE PERFORMED IN THESE AREAS.
BRUSH BARIER SHALL BE CONSTRUCTED APPROX. PARALLEL TO ORIGINAL GROUND CONTOUR. USE WELL-INTERMINGLED MASS OF BRUSH, TREES, TRIMMINGS, ETC. BARRIER SHALL BE POROUS ENOUGH TO ALLOW WATER TO FILTER THROUGH. SECURE BY PLACING HEAVIER MATERIAL (TREES, LOGS, ETC.) ON TOP
OF AND THROUGHOUT THE BRUSH.
ADJOIN BRUSH BARRIER WITH ROADWAY SLOPE ON THE LOW END AS NEEDED TO CONTAIN SEDIMENTS.
3.
4.
2.
1.
TYPICAL SILT FENCE INSTALLATION FOR DITCHES
POST
TYPICAL SEDIMENT CONTROL AT CULVERTS
TYPICAL BRUSH BARRIER
5.
6.
7.
THIS AREA TO BE CLEARED ONLY IF
ROAD
DEVELOPMENT PLAN
TO THE BACKWALL BENCH.
REHABILITATION PLAN
REQUIREMENT IS WAIVED BY THE COR.
OF THE ACCESS ROAD WITH ROAD NO. 6030 AND BY ROUGHING UP THE ACCESS
THE ACCESS ROAD WILL BE OBLITERATED BY CUTTING A DITCH AT THE JUNCTION
PROVISIONS FOR FUTURE QUARRY ACCESS WILL BE PROVIDED UNLESS THIS
ACCESS ROAD SURFACES, WILL BE SEEDED AND FERTILIZED IN ACCORDANCE WITH
ALL DISTURBED AREAS, SUCH AS OVERBURDEN PILES, BENCH SURFACES, AND
A MINIMUM OF 12-IN OF OVERBURDEN WILL BE EVENLY SPREAD OVER THE
ALL OVERSIZE ROCK WILL BE PLACED AGAINST THE SIDES OF THE QUARRY NEXT
QUARRY DEVELOPMENT PLAN
DECKED IN THE MUSKEG LEFT OF 27+20
ALL MERCHANTABLE TIMBER WILL BE REMOVED FROM THE QUARRY SITE AND
OVERBURDEN WILL NOT BE PLACED IN THE SMALL STREAM BORDERING THE QUARRY.
QUARRY IS LOCATED RIGHT OF STA 27+58 ON ROAD NO. 6030
QUARRY DEVELOPMENT TYPICAL SHEET.
TEST SHOT OF APPROX. 2000 CU. YD. IS PLANNED.
DEVELOPMENT WILL COMPLY WITH THE GENERAL NOTES SHOWN ON THE PIT &
ROAD AND ROAD NO. 6030
CONTAINED BETWEEN THE ACCESS
THE OVERBURDEN CANNOT BE
TIMBER FROM QUARRY SITE
DECKED IN MUSKEG
CLEARING LIMIT FLAGGED
2+720
ROAD SURFACE.
CONTRACTOR DATE
2.
3.
4.
5.
SPECIFICATIONS.
QUARRY FLOOR.
1.
2.
3.
4.
1.
ELEV 1160
APPROX.
OBD
DISTRICT RANGERCOR DATE DATE
40-FT
15-FT MIN
CROSS SECTION VIEW
3% SLOPE
68%
OBD
ACCESS
ROADLC
CL
72%
SOIL
APPROX.
ELEV 1260
OBD
RD. NO. 6030
PLAN VIEW
ESTIMATE OF VOLUME = 24,850 CU. YD.
OVERBURDEN
ACCESS ROAD
STREAM
18-IN CMP
15-FT MIN
TOTAL POUNDS OF POWDER IN SHOT
(INCLUDING PRIMERS) = 3385 lbs.
MAX. POUNDS OF POWDER PER 8 ms DELAY = 1090
POWDER FACTOR = 1 lb. PER CUBIC YARD
NAME OF BLASTER IN CHARGE = T.J. BARRY
PLANNED SHOT DATE = JUNE 15, 1996
NUMBER OF CUBIC YARDS IN SHOT = 2670
"HI DRIVE" PRIMER WITH 125 to 250 ms DU PONT ELECTRIC
BLASTING CAP LOCATED AT
BOTTOM OF HOLE WITH ONE
3-IN x 6-IN STICK OF TOVEX
USED FOR CUSHION.
TYPICAL LOADED HOLE
5-FT STEMMING
3.5-IN DIA HOLE
m s
19,620 CU.YD.
TYPE OF EXPLOSIVES = TOVEX 800, 3" X 16"
SECOND
QUARRY BLASTING PLAN
RIGHT OF STA. 27+58 ON ROAD NO. 6030
THIS PLAN IS FOR THE FIRST TEST SHOT IN THE QUARRY
ACTUAL MILLESECOND DELAY USING
FIRING SEQUENCE - SEQUENCE OF DELAYS
IS THE SAME FOR ALL 5 ROWS
PRODUCTION
STA 27+58
LOCATED IN BOTTOM OF HOLE
TOTAL NUMBER OF HOLES IN SHOT = 45
TYPE OF PRIMER & LOCATION IN HOLE =
STEMMING = 5-FT
BURDEN = 8-FT
DENSITY = 20 lbs./cu. yd.
2" DIA STICK OF HI DRIVE
HOLE DEPTH = 10-FT to 30-FT
BOREHOLE SIZE = 3.5-IN
SPACING = 10-FT
SHOT
SEQUENTIAL TIMER
16 3
SEQUENTIAL TIMER
FR
EE FA
C E m s m s m s m s m s m s m s m s
RD. NO. 6030
PRODUCTION
SHOT
TEST SHOT
13,080 CU.YD.
FIRST
FLOOR
QUARRY
RO
CK F
AC
E
EXIST.
M A X.
15'
MIN
MIN
15'
MIN
15'
CLEARING LIMITS
OVERBURDEN
M A X.
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. 0FR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:02/05
SHRIMP BAY LTF AND BRIDGE QUARRY DEVELOPMENT PLAN
KMRD
SJC 2/24/05
K.BRAY 2/24/05
14 14
NOTES
ALL PITS AND QUARRIES SHALL BE APPROVED IN WRITING BY THE C.O. PRIOR TO
EXPLORATION, CLEARING OR DEVELOPMENT.
REMOVE ALL OVERBURDEN TO SOLID ROCK FOR A MINIMUM DISTANCE OF 15'
FROM THE WORKING FACE.
SLOPE THE CUT BANK OF THE OVERBURDEN TO THE NATURAL ANGLE OF REPOSE
BUT IN NO CASE STEEPER THAN 1:1.
WITHIN THE CLEARING LIMITS:
- MAXIMUM STUMP HEIGHT SHALL BE IN ACCORDANCE WITH SPECIFICATIONS.
- STABLE TREES UP TO 6" dbh NEED NOT BE CUT IF THEY WILL NOT INTERFERE WITH
BACK SLOPE STABILITY.
- STUMPS AND BRUSH MAY BE LEFT IN PLACE, EXCEPT THAT ALL STUMPS THAT
PROTRUDE FROM EXCAVATED BANKS OR THAT HAVE THE POTENTIAL TO BECOME
DISLODGED AT ANY LATER DATE SHALL BE REMOVED.
DISPOSE OF OR STOCKPILE FOR LATER USE ALL OVERBURDEN, CLEARING,
MERCHANTABLE TIMBER AND GRUBBING DEBRIS AS SHOWN ON THE QUARRY
DEVELOPMENT PLAN.
FELL ALL DEAD TREES AND SNAGS WHICH ARE SUFFICIENTLY TALL TO REACH THE
WORK AREA.
LEAVE THE PIT/QUARRY IN A NEAT, ORDERLY AND WELL-DRAINED CONDITION.
REMOVE ALL OVERHANGS AND LOOSE ROCK.
AFTER EXCAVATION IS COMPLETE CLEAN THE AREA AND LEAVE AS SHOWN ON
THE QUARRY DEVELOPMENT PLAN. TREAT ANY ACCESS ROAD AS SHOWN ON THE
QUARRY DEVELOPMENT PLAN.
TEST SHOTS OF 1300 to 2600 CUBIC YARDS ARE REQUIRED AT ALL QUARRY SITES
IF DESCRIBED IN THE SPECIFICATIONS.
LEAVE NO MORE THAN 5% BY VOLUME OF OVERSIZE MATERIAL IN THE QUARRY.
BREAK DOWN ANY MATERIAL OVER THIS VOLUME AND USE AS SPECIFIED IN
SECTIONS 651.
PROVISIONS FOR FUTURE QUARRY DEVELOPMENT ACCESS WILL BE PROVIDED,
UNLESS THIS REQUIREMENT IS WAVED BY THE CO.
INSTALL AND MAINTAIN A COMMERCIALLY AVAILABLE RAIN GAUGE MEASURING IN
UNITS OF INCHES AND FRACTIONS OF INCHES IN ACCORDANCE WITH SECTION
205.08.
HAUL WILL NOT BE ALLOWED BEYOND DESIGNATED SOURCES UNLESS OTHERWISE
SHOWN ON THE DRAWINGS OR AGREED TO BY THE CO.
SEED AND FERTILIZE ALL DISTURBED AREAS SUCH AS OVERBURDEN PILES AND
BENCH SURFACES IN ACCORDANCE WITH SECTION 625.
SAMPLE QUARRY DEVELOPMENT PLAN SAMPLE QUARRY BLASTING PLAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
13.
11.
12.
14.
File details come from the government source that posted it. Updated .