ENGLEBRIGHT DAM REACH/NARROWS REACH CHANNEL HABITAT RESTORATION, YUBA RIVER, CA
Opportunity number
AFRP-1104
Issued by

About this file

Yuba River Narrows Habitat Enhancement Project

View the file

Other files

File Type Posted
afrp1104 rpf announcement.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Fish and Wildlife Service

Anadromous Fish Restoration Program Notice of Availability of Federal Assistance

2011 Request for Proposals March 16, 2011 Program Overview Information

Federal Agency Name:

Department of the Interior

U.S. Fish and Wildlife Service (USFWS) Stockton Fish and Wildlife Office 4001 N. Wilson Way

Stockton, CA 95205-2486 Anadromous Fish Restoration Program

Funding Opportunity Title:

ENGLEBRIGHT DAM REACH/NARROWS REACH CHANNEL HABITAT RESTORATION, YUBA RIVER, CA

Funding Opportunity Number:

AFRP-1104

Announcement Type:

Initial Announcement Funding Opportunity Number:

Catalog of Federal Domestic Assistance number (CFDA): 15.648 Dates:

Application Deadline: Electronic copy applications must be received by Grants.gov by the close of business (COB) on April 8, 2011 (4:30 p.m. Pacific Standard Time).

The U.S. Fish and Wildlife Service strongly encourages potential applicants to use

Grants.gov when submitting responses to posted applications. If it is discovered that the proposal cannot be submitted through Grants.gov, it may be submitted to Ike

Luginbill at Dwight_Luginbill@fws.gov. Proposals received after the date and time will not be considered for funding.

I. Funding Opportunity Description A. Legislative Authority and Background

1. The Central Valley Project Improvement Act (CVPIA; Title 34 of Public Law 102-575, Section 3406(b)(1)), authorizes and directs the Secretary of the Department of the Interior (DOI), in consultation with other

State and Federal agencies, Indian tribes, and affected interests, to develop and implement a program which makes all reasonable efforts to at least double natural production of anadromous fish in Central Valley rivers and streams. Further, the CVPIA requires that this program give first priority to measures which protect and restore natural channel and riparian habitat values through habitat restoration actions, modifications to Central

Valley Project operations, and implementation of the supporting measures mandated by the CVPIA. The DOI, is approaching implementation of this directive through development of an Anadromous Fish Restoration

Program (AFRP). The species and races of anadromous fish addressed by the AFRP include fall-run, late-fall-run, winter-run, and spring-run Chinook salmon; steelhead; striped bass; American shad; white sturgeon; and green sturgeon.

2. The Service and Bureau of Reclamation (Bureau) are the DOI agencies responsible for implementing the

CVPIA. They are jointly and cooperatively implementing the CVPIA, with the Service assuming lead responsibility for the AFRP. The CVPIA also establishes a Restoration Fund of up to $50 million annually to assist in implementation of the fish and wildlife restoration provisions. Of this sum, DOI allocates $3 to $12 million annually to the AFRP. The AFRP then leverages these funds with other funds provided by partners in restoration projects totaling $12 to $20 million annually.

B. Purposes and Funding Priorities

SEQ CHAPTER \h \r 1The purpose for the AFRP can be found in the Final Restoration Plan http://www.fws.gov/stockton/afrp/restplan_final.cfm and other program documents for the AFRP (USFWS 2001). The objectives are to:

1. Improve habitat for all life stages of anadromous fish through provision of flows of suitable quality, quantity, and timing, and improved physical habitat;

2. Improve survival rates by reducing or eliminating entrainment of juveniles at diversions;

3. Improve the opportunity for adult fish to reach their spawning habitats in a timely manner;

4. Collect fish population, health, and habitat data to facilitate evaluation of restoration actions;

5. Integrate habitat restoration efforts with harvest and hatchery management; and

6. Involve partners in the implementation and evaluation of restoration actions.

These objectives are addressed through implementation of projects associated with prioritized actions and evaluations in the Final Restoration Plan for the AFRP.

Funding priorities are based on the magnitude of the contribution of the restoration project to doubling natural production, the status of target species and races, and on Section 3406(b)(1)(A) of the CVPIA, which directs the AFRP to give first priority to: 1) measures which protect and restore natural channel and riparian habitat values through habitat restoration actions; 2) modification to Central Valley Project operations; and 3) implementation of the supporting measures mandated by subsection 3406(b) of the CVPIA http://www.fws.gov/stockton/afrp/restplan_final.cfm.

C. Project

Phase 1 funding is available through the U.S. Fish and Wildlife Service Anadromous Fish Restoration Program to restore channel habitat in the Englebright Dam Reach (EDR) and Narrows Reach (NR) of the Yuba River (Yuba County), California.

D. Scope of Work

1. Background

The EDR and NR of the lower Yuba River in California’s Central Valley comprise a bedrock channel in a steep canyon, extending downstream approximately 2 miles from Englebright Dam (RM 23), which is the uppermost limit to anadromous fish migration in the Yuba River. Although spawning habitat is present just downstream of the Narrows and used extensively by fall-run Chinook salmon, spring-run Chinook salmon have been observed attempting to spawn on the bedrock in the EDR, where many may hold in deep pools prior to spawning. Spawning habitat improvement in the EDR and NR may increase the spawning success of spring-run Chinook salmon.

2. General Methods Concepts for salmon spawning habitat improvement in the EDR and NR have most recently been described in Pasternack (2009) and in the Final Habitat Expansion Plan for Central Valley Spring-run Chinook Salmon and Central Valley Steelhead (http://www.sac-basin-hea.com). However, these efforts are largely focused on channel geomorphology and site-specific physical habitat improvements. A comprehensive planning document written from a fisheries habitat and management perspective of the EDR and NR from Englebright Dam downstream is lacking. The purpose of this project is to reduce the scientific and engineering uncertainty of implementing salmonid habitat restoration in the EDR and NR. Future funding would be to complete the project designs and environmental documents leading to implementation of salmonid habitat restoration actions.

Fiscal Year 2011 (Phase 1) funding is to assess restoration alternatives and develop a planning document for the EDR and NR, and develop conceptual designs and initiate permitting for a restoration project. It is anticipated that habitat restoration actions would be incrementally implemented as funding becomes available.

3. Project Objectives The following specific objectives are to be addressed in the proposal:

1. Evaluate multiple alternatives (i.e., in terms of cost-effectiveness, expected longevity, expected benefit to fish, etc.) among various potential habitat restoration activities in the EDR and NR (e.g., increasing spawning habitat through the removal of “shot rock,” coupled with implementing different frequencies or amounts of gravel augmentation).

2. Develop a reach-level, habitat restoration planning document including pre- and post-project monitoring for the EDR and NR of the lower Yuba River.

3. Develop conceptual designs and initiate permits for the preferred alternative.

4. Reference Pasternack, G.B. 2009. SHIRA-based river analysis and field-based manipulative sediment transport experiments to balance habitat and geomorphic goals on the lower Yuba River. Final Report for Cooperative Ecosystems Studies Unit (CESU) 81332 6 J002. Department of Land, Air, and Water Resources (in association with the UCD Center for Watershed Sciences), University of California, Davis. August 2008 (Revised January 29, 2009).

II. Award Information The Stockton Fish and Wildlife Office (STFWO), Anadromous Fish Restoration Program is soliciting proposals for Phase 1 of a project to restore channel habitat that has been degraded by dam construction, historic dredger mining, and other watershed activities in the Narrows reach of the Yuba River (Yuba County), California. The AFRP anticipates approximately $99,000 will be available for funding the alternatives analysis, planning document, conceptual designs, and initial permitting in Fiscal Year 2011 (fiscal year began October 1, 2010).

Anticipated project start date would be in Fiscal Year 2011 with an expected completion date (including implementation) of September 30, 2016.

III. Eligibility Information A. Eligible Applicants Eligible applicants for Phase 1 are limited to those institutions, organizations or individuals with a background in environmental permitting and project management, and experience working on anadromous fish habitat restoration projects in the Central Valley of California. Applications from federal agencies or employees of federal agencies cannot be considered.

B. Cost Sharing or Matching Cost-share is not a requirement for this project, although the applicant is encouraged to seek cost-share opportunities by donating labor and/or materials, or obtaining funding from other sources.

IV. Application and Submission Information

A. This Announcement Contains All the Information Required to Submit an Application

1. Electronic Applications Materials The required Standard Form (SF) 424 form set may be accessed on the Synopsis page by clicking on the Application Button, then at “Download Application Package”; or at http://www.grants.gov; or by contacting Ike Luginbill at Dwight_Luginbill@fws.gov for any of the required forms as listed in 2. Supplemental Requirements as listed below.

Grants.gov now supports the latest version of Adobe Reader (10.0.1), which is available for free download from the Adobe Website: http://get.adobe.com/reader. Grants.gov continues to support Adobe Reader version 7.0.9. Only these two versions should be used when submitting grant applications. Other Adobe Reader versions are not supported.

2, Hard Copy Application Materials If you do not have access to the web page or have trouble downloading material, and you would like a hard copy you may mail the request to Dwight Luginbill at STFWO 4001 N. Wilson Way, Stockton, CA 95205 or call (209) 946-6400 x340. When calling the STFWO, please indicate that you are requesting the RFP and associated application forms for the ENGLEBRIGHT DAM REACH/NARROWS REACH CHANNEL HABITAT RESTORATION, YUBA RIVER, CA, AFRP-1104 Materials may also be requested via Internet by sending an e-mail to Dwight_Luginbill@fws.gov. For all technical questions, call Elizabeth Campbell at (209) 334-2968 x402, or email to Elizabeth_Campbell@fws.gov.

B. Content and Form of Application Submission

1. Application Requirements This announcement contains all the information needed to submit a proposal. The project proposal is a narrative description and the budgetary information of the project. Only information that is pertinent to the project should be included. The project proposal should also indicate whether partial funding of the project is practicable, and, if so, what specific portion(s) of the project could be implemented with what level of funding.

A project proposal that is part of a longer term initiative will be considered, however, the proposed project’s objectives, benefits, and tasks must stand on their own, as there are no assurances that additional funding would be awarded in subsequent years for associated or complementary projects. An incomplete proposal will not be considered for funding.

Applications must be no smaller than 12 point font, preferably in Times New Roman type, with 1-inch margins, double-spaced, no longer than 20 pages and submitted in single-sided, electronic or hard copy.

Complete applications must include:

· Applicant name, mailing address, phone and fax number, and email address

· Budgetary information (including necessary Federal Forms, i.e. SF-424 Application for Assistance)

· Background and need for proposed work

· Justification for proposed work

· Approach including study design, hypotheses, goals, methods, equipment and facilities, data collection, any statistical analysis and quality assurance procedures, tasks

· Feasibility of the described approach, any contingencies or requirements (e.g., dependence on outcome of other projects, environmental compliance or permitting)

· Performance measures related to project goals and objectives

· Data handling and storage

· Expected products and outcomes

· Deliverables for each task

· Work schedule, including estimated start and completion dates of each task

· Applicant qualifications and experience

2. Supplemental Requirements The following table provides a summary of the supplemental forms and requirements that must be included in the application. The Dun & Bradstreet (DUNS number), Central Contractor Registration (CCR), and electronic funds transfer actions are a requirement. Potential applicants must complete these requirements before the award can be made.

What’s required Available at: When to submit Application for Federal

Assistance, Standard Form SF424 Cover sheet, 424 A & B for Non-Construction; C & D for Construction awards http://www.whitehouse.gov/omb/grants_forms http://www.gsa.gov/forms http://www.fedforms.gov

By April 8, 2011

Dun & Bradstreet Number

(DUNS)

www.dnb.com www.dnb.com/US/customer_service/index.html 1-800-234-3867.

Will need before registering with

CCR

Registration in the Central

Contractor’s Registration

(CCR)

http://www.CCR.GOV

By April 8, 2011

Electronic funds transfer

Form - ACH 3881 Form is available at the Stockton office of the U.S. Fish and Wildlife Service 209/946-6400 x340

Note: must be completed for funds transfer to occur. If your organization has a history of having received government funds/payments, you do not need to complete this form again.

By April 8, 2011

Registration Grants.gov

*Before applying for a grant opportunity on Grants.gov, an applicant must complete the registration process http://www.Grants.gov or support@Grants.gov, or you may call the Contact Center at: 1.800.518.4726

Registration is a 3-step process:

1. Register your organization, then;

2. Register yourself as an Authorized Organization

Representative (AOR) then;

3. Become authorized by your organization to submit applications

Please note: It may take up to two (2) weeks to complete the registration process due to unexpected delays. It is highly recommended that you begin the registration process as soon as possible

SEE THE GRANTS.GOV WEBSITE FOR COMPLETE DETAILS

By April 8, 2011

3. Data Universal Numbering System Number (DUNS)

On June 27, 2003, The Office of Management and Budget (OMB) published a Federal Register notice (68 FR 38402) that announced final policy issuance on the use of a universal identifier by grant applicants. The policy requires applicants applying for Federal grants or cooperative agreements on or after October 1, 2003 to acquire a Data Universal Number System (DUNS) number. It is the responsibility of the organization seeking Federal funds to obtain a DUNS, as necessary. Grant and cooperative agreement applicants need to ensure they have a DUNS number. Organizations can receive a DUNS number at no cost by calling the dedicated toll-free DUNS number request line at 1-877-753-1444 or on the web at https://eupdate.dnb.com/requestoptions.asp C. Submission Dates and Times. Electronic applications must be received by Grants.gov by the close of business on April 8, 2011 (4:30 p.m. Pacific Standard Time). If the proposal cannot be submitted via Grants.gov, it may be submitted to Dwight_Luginbill@fws.gov. If the electronic application cannot be submitted, a hard copy must be received by the STFWO Anadromous Fish Restoration Program (address as above in section IV A. 2.), Attention Dwight Luginbill, by April 8, 2011 (4:30 pm Pacific Standard Time). Hard copy applications should be printed on one side only and should not be bound in any manner. Proposals received after the date and time will not be considered for funding.

D. Intergovernmental Review

This program is not covered by Executive Order 12372. Review process is not required.

E. Funding Restrictions:

Awards will not allow reimbursement of pre-award costs. Funding is contingent upon the STFWO Anadromous Fish Restoration Program’s receipt of an adequate implementation project budget for FY 2011.

V. Application Review and Selection Information A. Criteria

Proposals will be reviewed by a team of Federal staff based on the following criteria:

1) applicant’s demonstrated expertise in fish habitat restoration, environmental permitting, and management of projects in California streams and rivers, and experience in the Yuba River watershed,

2) applicant’s and/or sub-recipients record of performance and expertise,

3) applicant’s provision of cost-sharing or matching funds;

4) proposal’s approach utilizing technically sound protocols to accomplish project objectives;

5) proposal’s clearly stated goals, objectives, and methods;

6) proposal’s economic efficiency, budget is reasonable and provides good value for funds requested;

7) proposal’s feasibility of implementation;

8) proposal’s description/approach to the tasks found in this request for proposals.

B. Review and Selection

Additional technical review will be conducted by reviewers external to the Anadromous Fish Restoration Program. Projects selected for funding may require revision based on internal and/or external review comments. The selection recommendations of the Federal staff (and any external reviewers) will be provided to the STFWO Project Leader, who is the Selection Official. The Selection Official will make the final award decision. All applicants will be notified of the results of the selection process by the Grants/Agreements Assistant.

C. Applicant’s and the USFWS responsibilities

1. Applicant’s Responsibilities and Deliverables

a) Successful applicants shall ensure that the project complies with all applicable Federal, State and local laws and regulations. A successful applicant is ultimately responsible for obtaining all applicable Federal, State and local permits for work to be performed under the award.

b) Applicant will provide quarterly status updates in electronic format that track project status. Invoices will include a detailed narrative explaining costs for labor and materials and documenting the activities conducted for the hours invoiced.

c) The successful applicant will submit requests for reimbursement using Standard Form 270, Request for Reimbursement, no more frequently than monthly. A breakdown of funds spent, by task, must accompany each invoice. Requests for reimbursement will be made on the basis of submission by recipient of acceptable documentation and deliverables as defined by the Service. Ten percent of the total amount of the agreement may be withheld until all requirements of the agreement are accomplished. If 10% is withheld, a final invoice may be submitted for the 10% withheld once all the requirements are approved.

2. USFWS Responsibilities

a) USFWS will provide a science-based technical review of selected proposal, may provide technical information, and may be available for assisting with products such as peer-reviewed publications and presentations.

b) USFWS-AFRP will provide funding for the project as proposed in the schedule and budget attached.

VI. Award Administration Information A. Award Notice Successful applicant will be notified after selection and confirmation of available funding by August 31, 2011. An applicant should not initiate a project in expectation of USFWS funding, nor should they purchase materials or begin work until such time as they receive the final award document signed by an authorized Service official.

B. Administrative and National Policy Requirements:

Federal awards are subject to Federal financial administrative requirements. Please see the following for a particular application.

Type of Recipient
Applicable Guidance
Institutions of Higher Education
2 CFR Part 215 Administrative Requirements

2 CFR Part 220 Cost Principles for Higher Education

43 CFR Part 12, Subpart D – Governmentwide

Debarment and Suspension (Nonprocurement)

And Governmentwide Requirements for a Drug

Free Workplace

43 CFR Part 12, Subpart E – Buy American

Requirements for Assistance Programs

43 CFR Part 18 – New Restrictions on Lobbying

48 CFR Part 31.2 – Contracts with Commercial

Organizations (if work will be subcontracted out)

48 CFR Part 52.215.2 – Audit and Records

Non-Profit Organizations

2 CFR Part 215 Administrative Requirements 2 CFR Part 230 Cost Principles for Non-Profits

OMB Circular A-133, Audits of States, Local

Governments, and Non-Profit Organizations 43 CFR Part 12, Subpart D – Governmentwide

Debarment and Suspension (Nonprocurement)

And Governmentwide Requirements for a Drug

Free Workplace

43 CFR Part 12, Subpart E – Buy American

Requirements for Assistance Programs

43 CFR Part 18 – New Restrictions on Lobbying

48 CFR Part 31.2 – Contracts with Commercial

Organizations (if work will be subcontracted out)

Negotiation

For profit, individuals and others excluded from coverage with OMB Circular A-122 Federal Acquisition Regulations, full text of appropriate clause may be found at http://www.dcaa.mil/FAR_Cost_Principles_Guide.pdf 43 CFR Part 18 – New Restrictions on Lobbying

48 CFR Part 31.2 – Contracts with Commercial

Organizations

43 CFR Part 12, Subpart E – Buy American

Requirements for Assistance Programs

Governments – State, Local, and Federally

Recognized Indian tribal governments

OMB Circular A-102

2 CFR Part 225, Cost Principles for State, Local and Indian Tribal Governments

OMB Circular A-133, Audits of States, Local

Governments, and Non-Profit Organizations 43 CFR Part 12, Subpart E – Buy American

Requirements for Assistance Programs

43 CFR Part 18 – New Restrictions on Lobbying

43 CFR Part 12, Subpart D – Governmentwide

Debarment and Suspension (Nonprocurement)

And Governmentwide Requirements for a Drug

Free Workplace

Negotiation

C. Reporting Requirements

1. Progress Reports The recipient shall submit a written progress report to the project contact listed in VII on a quarterly basis in Adobe PDF or Microsoft Word format presenting the activities that occurred and provide a description of the project accomplishments during each quarter of the calendar year beginning with the quarter immediately succeeding the project start date. The reports shall be submitted within 30 days following the end of each quarter.

2. Final reports Draft final reports are due no later than 60 days after completion of the project. Final reports will be due 30 days after receipt of Service comments on the draft report. The successful applicant shall submit, within 90 calendar days of completion of the project, a final invoice. The successful applicant shall account for any real and personal property acquired with Federal funds or received from the Federal Government according to requirements of regulations referenced in the award. The final report will be provided in hardcopy and electronic copy, using Adobe PDF or Microsoft Word format, and sent to: (Anadromous Fish Restoration Program Habitat Restoration Coordinator’s mailing and e-mail address. See Section VII.). The final report will include a project summary.

3. Invoice Reports

The recipient will submit requests for reimbursement using Standard Form 270, Request for Reimbursement, no more frequently than monthly. A breakdown of funds spent, by task, must accompany each invoice. Requests for reimbursement will be made on the basis of submission by recipient of acceptable documentation and deliverables as defined by the Service. Ten percent of the total amount of the agreement may be withheld until all requirements of the agreement are accomplished. If 10% is withheld, a final invoice may be submitted for the 10% withheld once all the requirements are approved.

VII. Agency Contact(s) For technical questions associated with this project contact Anadromous Fish Restoration Program Habitat Restoration Coordinator Elizabeth Campbell, 4001 N. Wilson Way; Stockton, CA 95205; telephone 209-334-2968 x402; fax 209-334-2171; email: Elizabeth_Campbell@fws.gov. For questions of an administrative content such as forms completion and for sending hard copies such as the signature page contact Dwight Luginbill, Grants/Agreements Assistant at telephone 209-946-6400 x340; fax 209-946-6355; email Dwight_Luginbill@fws.gov.

VIII. Other Information Please note that the Federal Government is not obliged to make any awards as a result of this announcement, and only official Service grant officers can bind the Government to the expenditure of funds. If you are selected as a Federal grant recipient, the funds you receive may be subject to Federal and other taxes.

A. Proposal preparation instructions and format:

In addition to the required forms identified in Section IV, a narrative proposal is also required. The following is the format of the proposal, as well as instructions on how to complete the proposal.

1. Project information page This proposal (title of proposal) is for the fiscal year 2011: 1) name; 2) proposal title; 3) project duration; 4) lead organization name; 5) enter the name of the agency or institution to whom funds would be awarded; 6) organization contact (please provide information for the primary person responsible for oversight of the project’s operation, management, and reporting requirements at the lead institution, social title, first name, last name, street address, city, state or province, ZIP Code or mailing code, telephone (include area code and e-mail); 7) lead investigator (is the lead investigator the same as the main contact person? If not please provide information for the primary person responsible for oversight of the award operation, management, and reporting requirements at the lead institution, social title, first name, last name, street address, city, state or province, ZIP Code or mailing code, telephone number and e-mail); and, 8) provide information about additional investigators (last name, first name, organization).

2. Summary or abstract page Provide a summary of your project including the following: a brief description of your proposed project, including location, goals, objectives, the approach and actions to be implemented, and expected outcomes.

3. Proposal description text

a. Problem- describe the problem that the project is designed to address including a brief narrative of the project location. Provide background, including a review of relevant past studies of and solutions (if any) to the problem, here and elsewhere, with appropriate citations of relevant reports. Clearly state the goals, objectives and hypotheses of your proposed study.

b. Approach (scope of work) - Provide study design. Describe (if applicable) all sampling, analytical, planning, and construction procedures for each objective as appropriate. Include details about methods and techniques, equipment and facilities, data collection, statistical analysis and quality assurance procedures, performance measures, and describe the criteria to be used in hypothesis testing. Clearly identify how your approach maximizes the information richness and value to decision-makers.

c. Feasibility- Demonstrate that the described approach is both feasible and appropriate to the proposed work, and that the project can be completed in the time allotted, allowing for weather and other exigencies. Any contingencies or requirements (e.g., dependence on outcome or timing of other projects, dependence on natural or operational conditions, environmental compliance and permitting) must be thoroughly addressed.

d. Permits and agreements- If applicable, explain what permits are necessary to proceed with the tasks described. Explain the current status of each permit. Explain any other constraints that could impact the schedule and the ability to implement the project. Identify the nature and approach to resolving other outstanding implementation issues.

e. Private property access and landowner permission and participation- Projects proposed on private property or that require access of private property owned by someone other than the applicant must provide written permission from the property owner. Projects conducted in the field for which specific locations have not been identified in the proposal will be required to provide access needs and permission for access shortly after notification of approval. Failure to include written permission from the property owner may result in disqualification of the proposal. This is another hard copy item that should be sent, along with other hard copy items (such as the signature page), to the STFWO Anadromous Fish Restoration Program contact person (See Section VII, Agency contacts).

f. Data handling and storage - describe how the data and other information will be handled, stored, and made accessible.

g. Expected products/outcomes - Provide a list of planned deliverables such as; reports, presentations, advances in technology, and information transfers via workshops, seminars, education programs, etc. and timing of each.

h. Qualifications. Provide brief biographical sketches of the principal participants, identifying education and relevant experience as well as contributions (e.g., completed projects, published reports on the same topic) consistent with their roles and responsibilities in the proposed project. Explain how these participants provide the range of expertise in sciences or other disciplines needed to achieve the project’s objectives.

Specify individual roles and responsibilities regarding technical, administrative, and project management. When sub-recipients are identified, explain briefly how they were or will be selected and why. Disclose or discuss any potential problems regarding the principal participants’ availability to complete their work within the projected timeline.

4. Work Schedule page

Identify the start and completion dates of each of the tasks and associated deliverables discussed above as well as other key milestones. Clearly identify which tasks are considered to be inseparable if only a portion of the project were to be funded. Identify the potential to incrementally fund and implement the proposed scope of work. Identify how payments would relate to milestones, as applicable. Please identify project management as an independent task. Provide a time line with expected start and stop dates, and accomplishment of milestones. Tasks identified in the work schedule should match those shown in the budget.

5. Budget

Provide a detailed budget showing how requested funds will be used to carry out the project's scope of work. Costs for each major task described in the "Approach (scope of work)” section of your proposal must be presented. A task for project management should include the specific costs associated with insuring accomplishment of a specific project, such as inspection of work in progress, validation of costs, report preparation, response to project specific questions and necessary costs directly associated with specific project oversight. Applicants should also include costs associated with managing project funds, including preparation of quarterly and final reports to the funding agency. Tasks for environmental compliance, monitoring, project design, data handling, storage, and dissemination, and public outreach should also be included as appropriate for your project. Include information related to cost sharing and in-kind contributions.

Suggested Budget Format:

Months 1 to 12

task
labor
benefits
travel
supplies and expendables
services and consultants
equipment
lands and rights of way
other direct costs
direct total
indirect costs
total
totals
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0

6. Signature page: If the applicant is unable to submit the proposal via Grants.gov they then must provide a signature page with the following instructions. A one page sheet with an original signature, the sheet may have a scanned-in signature, otherwise it must be followed up with a faxed or mailed copy. This declaration must be submitted to Dwight Luginbill, Grants/Agreements Assistant at address 4001 N. Wilson Way, Stockton, CA 95205; telephone 209-946-6400, ext. 340; fax 209-946-6355; email Dwight_Luginbill@fws.gov, as identified in Section IV .B. Section 2 by March 14, 2011.

This signature page should declare that all representations in this proposal are truthful, and the individual signing the form is authorized to submit the application on behalf of the applicant (if applicant is an entity or organization). Include proposal title and submitter. Failure to sign and submit this information will result in the application not being considered for funding.

PAGE