Task_Order_1_RFP.pdf

PDF 19 KB Posted

Attached to
Award Notice: Global Awareness and Decision Support (GLADS)
Solicitation number
AFICCFA4452-19-R-A007
Issued by

About this file

Attachment 4: Task Order 1, Request for Proposal (RFP)

View the file

Other files

File Type Posted
GLADS_JA_Redacted_10_Oct.pdf PDF
DD254_GLADS_UDOP_2019_(003).pdf PDF
QASP_GLADS.pdf PDF
Mission_Essential_Letter_Signed.pdf PDF
GLADS_Solicitation_-_FA445219RA007.pdf PDF
CDRLs_FA4452-19-R-A007.pdf PDF
v12_PWS_GLADS_UDOP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 Annual Services 12 Months

Projected delivery date - 1-4 Qtr FY20: Offeror/Customer shall provide program management to proactively control cost, schedule, performance in the system integration of the GLADS VI effort.

Contractor shall work directly with the Government to provide clear updates and insight into the progress, risk and delivery of the enhanced GLADS VI effort. Includes on-site support and development and delivery of all data necessary to support the GLADS VI (including provisioning, installation, online user manuals) consistent with the maintenance concept.

Annual Support & Upgrades 12 Months Projected delivery date as required - 1-4 Qtr FY20: Deliver STK baseline product license and technical upgrades/support for modules utilized in 618 AOC GLADS implementation.

Phase VI 1 Ingest JMPS JRT (JMPS Route Files) as another optional source to get flight plans for sorties. JRTs contain more tactical data than CRDs.

Contractor Proposed Projected delivery date - 2nd Qtr FY20: Provide enhanced tactical capability through the ingestion of Joint Mission Planning System and flight plans into GLADS.

2 Integrate AOC JRE Web Service tracks. Contractor Proposed Projected delivery date 1st Qtr FY20 (Theater visibility): Integrate 618 Air & Space Operations Center (AOC) Joint Range Extension (JRE) web service tracks into the User Defined Operational Picture (UDOP) to allow for display, correlation and searching of tactical data link tracks.

3 Add AOC JRE Web Service tracks to Area Search Contractor Proposed Projected delivery date - 1st Qtr FY20 (Theater visibility): Establish ability to search 618 AOC JRE web services tactical datalink tracks based upon a defined geographic area.

4 Integrate of threat/ROZ proximity DST sourced from ACOs. Contractor Proposed Projected delivery date: 1st Qtr FY20 (Theater visibility): Add ability to display and perform area searches of tactical airspace depicting Threat and Restricted Operational Zones (ROZ) based upon existing airspace control order

5 Integrate FAA data. Contractor Proposed Projected delivery date - 4th Qtr FY20: Integrate Federal Aviation Administration (FAA) track data to UDOP to allow enhanced visibility on commercial and military traffic in the Continental United States Region (CONUS).

Per DO/DDO's, integrate an option to toggle the divert range ring between the existing capability of distance based on fuel, to a second new option of distance based on 3 hour flight time. This is needed to support KC-46 ETOPS operations.

Contractor Proposed Projected Delivery Date - 3rd Qtr FY20: Establish KC-46 Extended Operations’ (ETOPS) divert planning capability using three (3) hour ETOPS flight time toggle within divert planning tool.

7 Add steps in checklists to timeline in manner similar to Gantt chart.

(Requested by FM leadership)

Contractor Proposed Projected delivery date - 2nd Qtr FY20: Integrate Flight management checklists into existing timeline tool to provide time based (Gannt style) awareness of sorties.

Use MEIS AircraftTypeRefService to present users with exact aircraft MDS text and other filterable criteria required by MEIS instead of relying on user knowledge and wildcarding.

Contractor Proposed Projected delivery date - 3rd Qtr FY20: Utilize MEIS aircraft reference type service to allow users to search by aircraft MDS instead of relying on free text criteria entry.

9 Allow users to build sortie filters that only they see, as opposed to adding all filters to the community list. (Requested by FM leadership)

Contractor Proposed Projected delivery date - 2nd Qtr FY20: Enable single user sortie filter creation that is not added to the community list to allow enhanced tailoring by flight manger and 618 AOC Joint Interface Control Cell (JICC) staff.

10 Upload WKT based country borders provided by DAWS and integrate into Area Search DST.

Contractor Proposed Projected delivery date - 4th Qtr FY20: Utilize Well Known Text (WKT) based country borders provided by 618th ACOM’s Data and Web Services (DAWS) to provide an additional area search format for specific political boundaries.

11 In presentation mode, add a parameter that allows dwell for x seconds at current time before beginning each time loop.

Contractor Proposed Projected delivery date - 3rd Qtr FY20: Enhance presentation mode by providing users the ability to specify time loop-time delays in the presentation mode.

"IT Box" requirements for Phase VI. AMC and AGI will coordinate throughout the Phase VI period-of-performance to prioritize this content, focusing first on emerging high priority end user needs, then on high priority small scope backlog requirements.

Contractor Proposed

Projected delivery dates - 1-4 Qtr FY20: Provide AMC and 618 AOC with the ability to make “small scope” high priority changes as required through the period to enhance users’ needs and or adjust to minor changes in the hosting environments. This “IT box” capability allows flexibility to rapidly enhance users experience through mutual agreement of contractor and AMC.

13 Integrate additional, and/or changes to existing ADSs, DSTs, and/or capabilities to address contingency, short notice requirements for 618 AOC.

Contractor Proposed Projected delivery date - 1-4 Qtr FY20: Respond to emerging GLADS DST requirements to meet contingency or short notice requirements for the 618 AOC based upon mutual agreement of contractor and AMC.

CLIN 0003 1 Annual Travel 12 Months

Task Order 1 Request for Proposal - 1 Aug 2019 Task # Item DescriptionNotional Phase Duration Performance Perameter

Sheet1

File details come from the government source that posted it.