This document is Request for Information (RFI) #6 Questions and Answers for the Department of the Air Force's (DAF) Commercial On-Base Lodging (COBL) Privatization Program. The Q&A addresses key clarifications about the upcoming lodging privatization effort, including construction firm selection, project delivery methods, and development experience requirements. Specifically, the responses indicate that offerors may choose to utilize either a singular construction firm or different firms for various installations, Design-Bid-Build project delivery methods are permitted, and construction management fees will be evaluated based on market rates or proposed team arrangements.
The document also provides insights into the DAF's requirements for the lodging privatization, including that hotel operators must form an exclusive teaming arrangement with developers, hotels must be direct managed by the brand owner, and renovated or new construction hotels must carry a national brand within specified chain scales. The DAF is considering minimum experience requirements for developers (between $500M-$1B of completed projects in the past 10 years) and hoteliers (managing at least 16,000 rooms or 120 hotels across the United States). The anticipated timeline includes issuing a Draft RFP in Spring 2025, with RFP responses due in Fall/Winter 2025 and a potential Group A award in Spring/Summer 2026.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI #6
Questions & Answers
1. Question: Can the Government clarify the intent of the "lead construction firm" as described in the Draft RFP Section 4.4.g? Specifically, is the intent of the Government that the Offeror is to utilize a singular construction firm (the "lead construction firm”) for the entirety of the construction for the development at all installations or could separate construction firms be awarded for some or all of the various installations?
Answer: Offerors may choose to either have a singular construction firm or may elect to utilize different construction firms in different locations or for different types of work depending on what they feel will offer the most value to the project.
2. Question: The draft lease contains a number of provisions which imply that the creation of design drawings and specifications are produced under the obligations provided for by a Construction Contract. For reference review sections 9.13 and 22.1. This language would presume the utilization of a Design-Build project delivery method whereby early in the project timeline the Lessee retains a Contractor who is contractually obligated to both design and construct the work. This would be contrasted against a Design-Bid-Build project delivery method where early in the project timeline, the Lessee would contract directly with the necessary design professionals to complete the design drawings and then later in the project timeline, bid and award the Construction Contract. Would the Government permit the Lessee to utilize a Design-Bid-Build project delivery method?
Answer: A Design-Bid-Build delivery method is allowed. The Government acknowledges that the exact wording of the final COBL Lease may need to be adjusted based upon the project delivery method utilized by the Lessee.
3. Question: The COBL Fee Template excel file contains a section to input “Construction Management Fees”? Is this intended to be a different entity from the development manager? We did not see this role defined elsewhere in the RFP or draft lease documents.
Answer: The Government will approve Construction Contract(s) used for Major Work under the COBL Lease. Once approved, those agreements cannot change without Government approval or as noted in the agreement. The approval of the Construction Contract gives the Government approval of the fees therein. For the purposes of the proposal, if there is not a construction firm that is a part of the offering team and therefore construction fees will be based on market rates when projects are put out for bid, please leave that line blank and indicate that reason in your proposal. If the Offeror has a construction firm that is part of the team and has negotiated construction fees and is including those as part of the proposal, please indicate those fee amounts in the Fee Template.
4. Question: Will the Government accept a strategy where the Hotel Operator is a third-party hotel management company, and the property branding objectives would be achieved through separate franchise agreements between the Offeror and one or more national hotel brands?
Answer: No, a proposal that includes this strategy will not pass the Step One, Minimum Experience Requirements (MERs).
5. Question: For the purposes of meeting the Cumulative Development Experience and Major Development Project Experience MERs, are there any restrictions as to the type of development utilized for this obligation? For example: only commercial real estate or only lodging developments, etc.?
Answer: Any commercial real estate development including, but not limited to, hotels, offices, multi-family residential, single family residential, retail, and industrial development projects will count for the Cumulative Development Experience and Major Development Project Experience.