AFBB1519010.pdf
PDF 86 KB Posted
- Attached to
- AMR Meter Replacement
- Solicitation number
- PE-66357-NONST-2026-000000007
- Issued by
- Terrell County, Georgia
About this file
This is an Advertisement for Bids issued by the City of Boston, Georgia for the AMR Water Meter Replacement project (DWSRF 2026-006, Project #B1519.010). The project involves the replacement of existing water meters with new Automated Meter Reading (AMR) water meters and related infrastructure. Specific deliverables include approximately 575 five-eighths by three-fourths inch AMR water meters, 20 one-inch AMR water meters, 10 two-inch AMR water meters, 100 backflow preventers, 575 water meter boxes with lid removal and replacement, and a laptop meter reading device with associated software. Sealed bids will be received at Boston City Hall (110 N. Main Street, Boston, GA 31626) until 10:00 AM local time on September 1, 2026, at which point bids will be publicly opened and read. Bids are requested on a lump sum and unit price basis with alternate bid items as specified in the Bid Form. The Issuing Office is Still Waters Engineering (130 Veterinary Way Unit 2, Leesburg, GA 31763, 229-496-5700), where prospective bidders may examine bidding documents Monday through Friday from 8:00 AM to 5:00 PM. Bidding documents are also available for examination at Boston City Hall during regular business hours.
Bidding documents are available electronically in portable document format (PDF) for a non-refundable charge of $150.00, with delivery via email or electronic file distribution upon payment. This project is expected to be funded in whole or in part through the Georgia Environmental Finance Authority's (GEFA) Drinking Water State Revolving Loan fund. The construction contract will be subject to GEFA's Supplemental General Conditions for Federally Assisted State Revolving Loan Fund Construction Contracts, including Disadvantaged Business Enterprise requirements and Davis-Bacon & Related Act requirements, as well as GEFA's Build America Buy America Special Conditions and Information for Federally Assisted State Revolving Loan Fund Construction Contracts. All permits required for project construction are expected to be approved prior to bid opening, and acquisition of property for easements or right of way is not anticipated to be required. The project was advertised on July 27, 2026, by Mayor Hon. Danny Groover.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVERTISEMENT FOR BIDS
CITY OF BOSTON, GA JULY 2026
AMR WATER METER REPLACEMENT PROJECT # - B1519.010
C-111 | 1
CITY OF BOSTON, GA
AMR WATER METER REPLACEMENT
DWSRF 2026-006
ADVERTISEMENT FOR BIDS
Sealed Bids for the construction of the AMR Water Meter Replacement, DWSRF 2026-006 will be received, by the City of Boston, at Boston City Hall – 110 N. Main Street, Boston, GA 31626, until 10:00 AM local time on September 1, 2026, at which time the Bids received will be publicly opened and read. The Project consists of replacement of existing water meters with new AMR water meters, more specifically provide and install +/- 575 - 5/8” x 3/4” AMR water meters, +/- 20
– 1” AMR water meters, +/- 10 – 2” AMR water meters, +/- 100 backflow preventers, +/- 575 water meter boxes w/ lid removal & replacement, and furnishing laptop meter reading device and associated software.
Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with alternate bid items as indicated in the Bid Form.
The Issuing Office for the Bidding Documents is: Still Waters Engineering, 130 Veterinary Way Unit - 2, Leesburg, GA 31763, 229-496-5700. Please contact Chad Griffin at cgriffin@stillwaterseng.com or officeadmin@stillwaterseng.com to request contract documents and specifications. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 AM – 5:00 P.M, and may obtain copies of the Bidding Documents from the Issuing Office as described below.
Bidding Documents also may be examined at Boston City Hall; during the City’s regular business hours.
Bidding Documents may be obtained from the Issuing Office during the hours indicated above.
Bidding Documents are available electronically (as portable document format (PDF) files) for a non-refundable charge of $150.00. Upon Issuing Office’s receipt of payment, Bidding Documents will be sent via email or other means of electronic file distribution. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder’s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.
Bid security shall be furnished in accordance with the Instructions to Bidders.
All permits required for the construction of this project are expected to be approved prior to the date of the bid opening.
Acquisition of property for easements, right of way, etc. is not expected to be required for this project.
This project is expected to be funded all or in part by the Georgia Environmental Finance Authority’s (GEFA) Drinking Water State Revolving Loan fund. The construction contract will be subject to GEFA’s Supplemental General Conditions for Federally Assisted State Revolving Loan Fund Construction Contracts including Disadvantaged Business Enterprise requirements and Davis Bacon & Related Act requirements. Additionally, the contract will be subject to GEFA’s Build America Buy America Special Conditions and Information for Federally Assisted State Revolving Loan Fund Construction Contracts.
mailto:cgriffin@stillwaterseng.com mailto:officeadmin@stillwaterseng.com
ADVERTISEMENT FOR BIDS
CITY OF BOSTON, GA JULY 2026
AMR WATER METER REPLACEMENT PROJECT # - B1519.010
C-111 | 2
Owner: City of Boston, GA
By: Hon. Danny Groover
Title: Mayor
Date: July 27, 2026
+ + END OF ADVERTISEMENT FOR BIDS + +
File details come from the government source that posted it. Updated .