AFB Final.pdf

PDF 156 KB Posted

Attached to
Edgar Mine Sewer Line - General Contractors - Colorado School of Mines
Solicitation number
ITB-MINES ODC26-007
Issued by
Clear Creek County, Colorado

About this file

This is an Advertisement for Bids (AFB) issued by the State of Colorado and Colorado School of Mines for the Edgar Mine Dry Building (Sewer Line) project. The project involves installing approximately 1,250 linear feet of HDPE sewer line down an existing road at the Idaho Springs Edgar Mine site, with an estimated project cost of $300,000. The mandatory pre-bid conference and site tour is scheduled for September 24, 2025, at 3 pm, with bid submittals due on October 8, 2025, by 2:00 PM. The anticipated construction start is November 1, 2025, with completion expected by January 15, 2026. Blasting may be required, with potential cost savings if mining staff can perform the work.

Bidders must meet specific minimum requirements, including being in business under the same name for two years, demonstrating contracting experience in similar projects, showing bonding capability up to $500,000, and having attended the mandatory pre-bid conference. The project is subject to Colorado labor preferences, requiring at least 80% Colorado labor, and contractors must provide payment and performance bonds of not less than 50% of the contract value if the contract exceeds $150,000. Bid documents are available on BidNetDirect.com, and a bid bond of 5% is required for construction values of $50,000 or more. The virtual public bid opening will be conducted via Zoom, with the award intent notification anticipated for October 10, 2025.

View the file

Other files

File Type Posted
Geotechnical Report 5-22-2015.pdf PDF
Project Manual 09.16.25 r1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSA-AFB-1 pg. 1

REV 7/2025

ADVERTISEMENT FOR BIDS

Design / Bid / Build State of Colorado

Colorado School of Mines

Notice Number: ITB-MINES ODC26-007 Project Number: IH23-089 Project Title: Edgar Mine Dry Building (Sewer Line) Estimated Project Cost: $300,000

NOTICES

1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.

2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

3. All respondents accept the conditions of this AFB, including but not limited to, the following:

a. All submittals shall become the property of the State of Colorado and will not be returned.

b. Late submittals shall not be evaluated.

c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.

d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.

4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.

5. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.

6. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

OSA-AFB-1 pg. 2

PROJECT OVERVIEW

Construction of new sewer service for the Edgar Mine site.

The State of Colorado, Colorado School of Mines (CSM) is soliciting bids from qualified contractors for the Edgar Mine Dry Building (Sewer Line) project.

Scope of Services

The Colorado School of Mines, Edgar Experimental and Teaching Mine is an extension of the Golden campus where students actively participate in mining operations, underground laboratory use by multiple disciplines and gain experience in real-world hands-on activities. With the Mine site in use by the University since the 1960’s, the site continues to grow and develop with new infrastructure. A new Office/Restroom and locker building is currently in construction with completion scheduled January 2026. With this new building coming online, the new sewer project is critical to occupancy and use of the entire facility.

This project will involve the installation of a new sewer line, approx. 1,250 LFT of HDPE down an existing road at the Idaho Springs Edgar Mine site for CSM.

Blasting may be required. However, mining staff at CSM may be able to perform blasting as a cost savings during negotiations. See Bid Alternate (SBP-6.131). Please provide alternate pricing for contractor to provide blasting services.

The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.

Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.

MINIMUM REQUIREMENTS

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, at a minimum:

1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.

OSA-AFB-1 pg. 3

2. The bidding contractor must have been in the same business, under the same name, for the last two (2) years.

3. Demonstrated specific contracting experience in projects of similar scope and complexity for the last three (3) years for at least three (3) projects each in excess of $ 400,000 (hard costs), utilizing the expertise present in their Colorado Office specifically for commercial construction of sewer line installation; Similar proven project experience with mountain conditions utility installation will be requested if the alternate is accepted and

4. Demonstrated specific General Contracting experience in projects of similar scope and complexity; to include civil sewer service with the ability to provide, install; and

5. Demonstrated bonding capability up to $ 500,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.

6. Attended and signed in at the Mandatory Pre-Bid Conference

Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.

https://www.BidNetDirect.com

MANDATORY PRE-BID CONFERENCE AND SITE TOUR

A mandatory Pre-Bid Meeting will be held at the Edgar Mine, Idaho Springs, CO:

Building Address: 365 8th Avenue, Idaho Springs, CO 80452 Room: School House Building at main gate lower entrance Date/Time Wednesday, September 24, 2025, at 3pm

SCHEDULE

The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.

Advertisement for Bids Issued September 18, 2025, via BidNet Mandatory Pre-Bid Conference and Site Tour September 24, 2025, 3pm Request for Clarifications Due September 26, 2025, 5pm Final Addendum Issued (anticipated) September 30, 2025 Bid Submittals Due (date and Time) October 8, 2025, 2pm, via BidNet Virtual Public Bid Opening October 8, 2025, 3pm, via Zoom Award Intent Notification (anticipated) October 10, 2025 Contracting October 10, 2025 Contract Approval (anticipated) October 20, 2025 Anticipated Construction Start November 1, 2025 Anticipated Construction Finish January 15, 2026 https://www.bidnetdirect.com/

OSA-AFB-1 pg. 4

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on https://www.BidNetDirect.com website.

Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

QUESTIONS, CLARIFICATIONS AND ADDENDA

Owner-initiated changes to this AFB will be issued under numerically sequenced addenda.

Owner-initiated changes to this AFB will be posted in the form of addenda on https://www.BidNetDirect.com

Questions and requests for clarification regarding this project shall be submitted before the deadline listed in the above Schedule through the Points of Contact shown below.

Communication with project Architect, Engineer, Project Manager or other Mines staff regarding the project during the solicitation, outside of this submission process or scheduled procurement milestones is not permitted.

POINT OF CONTACT/CLARIFICATION

Name: Sheri Atencio-Church / Sam Traylor Agency: Colorado School of Mines Email Address: satenciochurch@mines.edu; sam.traylor@mines.edu Phone: 303-273-3615

BIDDING

Bids shall be submitted on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix B1.

A single PDF electronic copy of the sealed bid submittal (with all required Appendices) is due October 8, 2025, and shall be received no later than 2:00 PM (MD/ST) and shall be submitted/accepted via [Insert submission method], as described in the Information for Bidders (SBP-6.12). Do not submit any other information than what has been requested and is required.

Bid Forms and Appendices to be included with bid submittal:

Bid Form (SBP-6.13) Bid Alternates (SBP-6.131) Bid Bond (SBP-6.14)

Late bid submittals will be rejected without consideration. The State of Colorado assumes no responsibility for costs related to the preparation of bid submittals. Do not forward any submittals via email. They will not be accepted.

https://www.bidnetdirect.com/ mailto:satenciochurch@mines.edu mailto:sam.traylor@mines.edu

OSA-AFB-1 pg. 5

BID OPENING

Opening of the bid submittals will be a virtual public bid opening on a Zoom Meeting platform. A Zoom invitation will be forwarded to bidders upon receipt of bid submittals.

Virtual public bid opening will take place at the date and time identified in Schedule

APPENDICES: All appendices can be found in the Project Manual

Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) Appendix B3: Bid Bond (SBP-6.14) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s

Agreement and General Conditions of the Contract

NOTICES
PROJECT OVERVIEW
Scope of Services
MINIMUM REQUIREMENTS
MANDATORY PRE-BID CONFERENCE AND SITE TOUR
SCHEDULE
QUESTIONS, CLARIFICATIONS AND ADDENDA
POINT OF CONTACT/CLARIFICATION
BIDDING
Bid Forms and Appendices to be included with bid submittal:
BID OPENING
APPENDICES: All appendices can be found in the Project Manual