AF182-010: Selectable Cutting and Fragmentation of Damaged Runway Surfaces

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Materials

MODERNIZATION PRIORITIES:

KEYWORDS:

asphalt, concrete, FOD, heave, runway repair

ADDITIONAL INFORMATION

OBJECTIVE:

An external or embedded technology that can be activated on command to selectively separate and fragment—to dimensions no greater than 100 cubic inches—sections of damaged runway to prepare the crater for repair.

DESCRIPTION:

In a post-event environment, present-generation methods for recovery of a damaged runway employ a series of relatively slow, labor-intensive steps employing vehicle-mounted equipment to cut and break heaved pavement.

Current procedure is cut roughly parallel strips 3 or more inches wide completely through the entire thickness of pavement and any reinforcing steel elements, roughly fragment the pieces, and remove debris to clear a depth of 24 inches for subsequent backfilling and final capping. A nine-person team conducts the repair activities to prepare the crater for application of repair materials; six team members operate rock saws, which process generates an abrasive dust. Cutting corners in a slab with a round blade involves a trade of ease of separation of the cut piece for penetration into the area to be preserved, and additional considerations of generation of foreign object debris (FOD). An alternate approach using cutting charges is also being explored, but conditions for its application remain to be defined. This topic seeks to develop a technology that can be activated quickly in a post-attack environment to selectively separate unsound (or damaged) from sound pavement and effectively prepare a crater for repair, preferably reducing the size of pavement debris so separated chunks can readily be either removed from the crater or redistributed within it as fill and to prepare for pavement capping. In all of five broad aspects—time to separate damaged pavement from adjacent sound pavement, time to salvage as fill or remove the damaged pavement and prepare the crater for capping, FOD generation, respiratory hazards, and hardware and labor investment—this technology must perform as well as or better than current methods. The choice of triggering removal mechanism must be shown to be such that the likelihood of accidental or malicious activation is negligibly small. The overall goal is to decrease or eliminate the need for labor and hardware to break down pavement debris and to decrease the current time to execute the debridement and preparation phases of runway recovery by half. The usual standards for environmental compatibility and regulated Hazardous Materials may have to be relaxed somewhat, but preference will be given to benign technologies. Mechanical cutting and explosive technologies will not be considered.

PHASE I:

A successful Phase I effort will include a demonstration that the concept can selectively respond to one among several stimuli and cleanly remove a 3-foot square corner from a 6-foot square concrete slab 12 inches thick, in pieces no larger than 6 inches in the longest dimension.

PHASE II:

The target for phase II is to demonstrate clean separation of a 4-foot square section centered on the joint at the edge of two 10-foot reinforced concrete slabs 12 inches thick and joined by reinforcing steel bars at 1-foot intervals. Concrete scraps may be no larger than 4 x 4 x 12 inches.

PHASE III DUAL USE APPLICATIONS:

Deliver a marketable product with detailed installation/operators guidance/manual.

REFERENCES:

Bell, H.P., Priddy, L.P., Mason, Q.S. and Rutland, C.A., 2015. Concrete Cutting Refinement for Crater Repair (No. ERDC/GSL-TR-15-29). ENGINEER RESEARCH AND DEVELOPMENT CENTER VICKSBURG MS

GEOTECHNICAL AND STRUCTURES LAB.

1.

Carruth, W.D., Edwards, L., Bell, H.P., Tingle, J.S., Griffin, J.R. and Rutland, C.A., 2015. Large Crater Repair at Silver Flag Exercise Site, Tyndall Air Force Base, Florida (No. ERDC/GSL-TR-15-27). ENGINEER RESEARCH

AND DEVELOPMENT CENTER VICKSBURG MS GEOTECHNICAL AND STRUCTURES LAB.

2.

Edwards, L., Bell, H.P., Rowland, J.F. and Rutland, C.A., 2015. Improved Concrete Cutting and Excavation Capabilities for Crater Repair Phase 2 (No. ERDC/GSL-TR-14-8). ENGINEER RESEARCH AND DEVELOPMENT

CENTER VICKSBURG MS GEOTECHNICAL AND STRUCTURES LA

3.

Bell, H.P., Edwards, L., Rowland, J.F., Andrews, B., Mason, Q.S. and Rutland, C.A., 2014. Improved Concrete Cutting and Excavation Capabilities for Crater Repair, Phase 1 (No. ERDC/GSL-TR-14-8). ENGINEER

RESEARCH AND DEVELOPMENT CENTER VICKSBURG MS GEOTECHNICAL AND STRUCTURES LAB.

4.

TECHNICAL POINT OF CONTACT (TPOC):

None