AF161-015: Maintenance Data Collection from Non-Networked Automatic Test Equipment

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Air Platform

MODERNIZATION PRIORITIES:

KEYWORDS:

radar, automated test equipment, ATE

ADDITIONAL INFORMATION

OBJECTIVE:

The objective of this effort is to monitor the health of automatic test equipment (ATE) systems by collecting operating time, down time, calibration and self-test results system, maintenance actions - serial number tracking of parts, etc.

DESCRIPTION:

The Air Force desires the determination of a method to provide the capability to perform automated maintenance data collection (MDC) from non-networked ATE. The method used must not involve connection to the DoD Global Information Grid. The ATE’s control and support software could be used or the method could be a standalone application. Data collected should include, but not be limited to: operating time duration; down time duration;

calibration and self-test results and date; system failures and date; system maintenance actions to include date and items removed and replaced, by part number and serial number; system temperature variations and date;

cannibalization actions to include part number and serial number and part/serial number of system out and system in; and ATE utilization, i.e., unit under test (UUT) evaluated/tested with part number, serial number and date. The collection of data should be automated as much as possible with limited manual input only when automation is not possible. To satisfy the requirements of AFI 21-103, Ch. 7, ATE Inventory, Status, and Utilization Reporting: • Each item of ATE is possessed by an Air Force training or maintenance organization (to include organizational, intermediate, or depot level). • The possessing unit reports: o Possession and changes in possession. o Conditions that change the ability of the ATE to do its mission (condition status). o Configuration. o Daily utilization.

PHASE I:

Develop and validate solution that meets above requirements. Demonstrate ability to collect and analyze the above requested data. Conduct preliminary business case analysis (BCA) to determine implementation costs, return-on-investment (ROI) calculation that compares anticipated savings to expected costs. Proof-of-concept prototype(s) shall be developed to demonstrate conformance to requirements.

PHASE II:

Proof-of-concept prototype(s) shall be refined to a collection method capable of supporting various ATE used by the Air Force depot at Hill AFB, Utah, and shall undergo testing to validate all requirements. This process may require multiple iterations before a final design is selected. Refine BCA/ROI based on the final design.

PHASE III DUAL USE APPLICATIONS:

Implement selected and validated solution in support of depot operations.

REFERENCES:

DoD Directive NUMBER 8100.02, section 4.3 states, "Wireless technologies/devices used for storing, processing, and/or transmitting information shall not be operated in areas where classified information is electronically stored, processed, or transmitted unless approved by the DAA …" - The Designated Approving Authority (DAA) does not approve wireless technology/devices in the areas where this ATE resides, therefore wireless technology is not an option.

1.

MIL-PRF-49503C - Section 3.6.2, states: "Data elements. The four data element inputs … required for the operator to obtain reports shall be displayed via the UUT LOG RECORD screen … The programmer shall ensure that these four data elements, together with the other data for which the TP is responsible, are stored in the UUT log file at the conclusion of testing each UUT." This defines the need for a Test Program (TP) to provide a Unit Under Test (UUT) LOG RECORD for each test performed. These log records need to be extracted from the ATE and collected into one area.

2.