AF151-166.pdf

PDF 43 KB Posted

Attached to
Thermal Spray Dashboard/Knowledge Management System
Solicitation number
AF151-166
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF151-166: Thermal Spray Dashboard/Knowledge Management System

PROJECTED CMMC LEVEL REQUIREMENT:

N/A

TECHNOLOGY AREAS:

Materials

MODERNIZATION PRIORITIES:

KEYWORDS:

thermal spray, dashboard, monitoring, process control

ADDITIONAL INFORMATION

OBJECTIVE:

Improve thermal spray application process through reduction in variability and increase in overall improvement in process efficiency.

DESCRIPTION:

The thermal spray dashboard/knowledge management system requirement is to pull collected information from lab reports/evaluations, PlumeOpt, thermal spray system run data and engineering copulated data to monitor the thermal spray process as well as help with troubleshooting, quality measurements, and process improvement procedures. The dashboard will help streamline and assist process engineering and production personnel with ensuring an efficient, consistent process is achieved with the final product being a quality coating applied to various engine components. The dashboard/knowledge will also streamline research and development and qualification projects with providing accurate data/procedures. All of these factors' long-term effects would be cost savings in lab testing, qualification procedures troubleshooting and production running. Once enough data is collected and consistently analyzed preventative procedures can be put in place to ensure minimum amount of production down time and rework of under quality sprayed parts. Long-term factors would be a reduction of one for one lab testing of thermal sprayed coupons and increased production output of various thermal coated engine components. After a given amount of time the collected data will help with preventative maintenance of thermal spray equipment and reduce down time for repair. Streamlining the thermal spray process will make it easier for workload to be moved from booth to booth with minimum amount of qualification time and minimum variance in quality output.

PHASE I:

Research and develop a methodology that demonstrates the results in a data system of the various thermal spray process data and integrate the various information in such a way that it can be interpreted and utilized to streamline and troubleshoot the thermal spray process. This concept approach will also provide information to create preventative measurement procedures for the process.

PHASE II:

Expand on Phase I methodology concept and develop the capability resulting in pilot working environment to validate the design and capability. Operational testing of pilot during Phase II will determine effectiveness and what actions will be needed for a production system.

PHASE III DUAL USE APPLICATIONS:

Resulting capability will be implemented by Air Force's Air Logistics Complexes, as well as being available to commercial depots that utilize thermal spray production or for repair applications.

REFERENCES:

Technical Order 2-1-1-11.1.

Process Order 85-11.2.

TECHNICAL POINT OF CONTACT (TPOC):

None

File details come from the government source that posted it. Updated .